RESEARCH CENTER
1. DESIGN BASIS
Design Codes:
Reinforced concrete design code IS 456 - 2000
Design Loads:
Unit weight of reinforced concrete 25 kN/m3
Load Combinations:
1) 1.5 Dead loads + 1.5 Imposed loads
2) 1.2 Dead loads + 1.2 Imposed loads ± 1.2 (ELx ±0.3ELy ±0.3ELz)
2) 1.2 Dead loads + 1.2 Imposed loads ± 1.2 (Ely± 0.3ELx ±0.3ELz)
Design method
Limit state method of design (As per IS 456 - 2000)
Grade:
Grade of concrete M 25
Grade of reinforcement Fe 500
2. CALCULATION OF BASE SHEAR
Self weight of the structure (columns, beams) is automated by the software for the corresponding member sizes.
Live load (access not provided except for maintenance) 0.75 kN/m²
A
B
x
Wind
D
Height of the building to ridge h = 12.45 m
Pd = 1.261 kN/m²
0.60 1.30
0.60 1.30
0.60 0.10
0.60 0.10
0.70 0.00
0.25 0.95
0.70 1.40
0.25 0.45
= 512.155 kN
Wind angle 90o
Maximum pressure on the surface/Net wind pressure
(Cpe - Cpi).Pd = 1.766 kN/m²
= 346.419 kN
Analysis
(i). The building is a RCC framed structure with columns and beams of appropriate
section properties.
(ii). As the effect of wind load was found to be less than that of earthquake base shear,
wind load was not considered in the analysis.
(iii). A combination with load cases of self weight, live load and seismic load is used for
the design of members.
5.DESIGN OF PILE FOUNDATION
The analysis was carrried out for all pile groups. The typical design calculations are
furnished below from the analysis:
TYPICAL PILE CAP DESIGN CALCULATION:
The size of the pile cap for 4 pile group 2250 x 2250 mm
The size of the pile cap for 2 pile group 2250 x 1000 mm
Diameter of pile 500 mm
Depth of pile below existing ground level 10 m
The thickness of pile cap (9-pile group) 1000 mm
Concrete Grade M 25
Bottom 100 mm
The pile is bored cast in-situ pile.
P.C.C of 100mm thick was provided under the pile cap as shown in the drawing.
Node L/C Force-X kN Force-Y kN Force-Z kN Moment-X kNm Moment-Y kNm Moment-Z kNm
pt 0.12 %(min)
Ast required Pt*b*d/100 900 mm²
pt 0.170 %
Ast required Pt*b*d/100 1064.2 mm²
The size of the pile cap for four pile group 2250 x 2250 mm
ks = 0.5 +ß
ß = 1.00
ks = 1.50
if ks >1, then ks =1
= 0.25fck
2
1.250 N/mm
2
' = 1.25 N/mm
= 94.921875 kN
Vus = ( 0.834-0.36)*626*1026*10 -3
= 304.44 kN
Loads:
Node L/C Force-X kN Force-Y kN Force-Z kN Moment-X kNm Moment-Y kNm Moment-Z kNm
pt 0.12 %
(min)
Ast required Pt*b*d/100 900 mm²
pt 0.154 %
ks = 0.5 +ß
ß = 1.00
ks = 1.50
if ks >1, then ks =1
= 0.25fck
2
1.250 N/mm
2
' = 1.25 N/mm
Vus = ( 0.543-0.36)*626*1026*10 -3
= 117.53 kN
Loads:
Node L/C Force-X kN Force-Y kN Force-Z kN Moment-X kNm Moment-Y kNm Moment-Z kNm
pt 0.12 %(min)
pt 0.179 %
= 42.1875 kN
Vus = ( 0.652-0.36)*626*1000*10 -3
= 182.792 kN
Loads:
Node L/C Force-X kN Force-Y kN Force-Z kN Moment-X kNm Moment-Y kNm Moment-Z kNm
From Analysis V,
The design bending moments for the pile cap
Top 250 kN.m
2
Mu/bd^2 0.64 N/mm
pt 0.154 %(min)
Ast required Pt*b*d/100 964.04 mm²
From Analysis V,
The design bending moments for the pile cap
Bottom 470 kN.m
2
Mu/bd^2 1.20 N/mm
pt 0.293 %
Ast required Pt*b*d/100 1834.18 mm²
Loads:
Node L/C Force-X kN Force-Y kN Force-Z kN Moment-X kNm Moment-Y kNm Moment-Z kNm
pt 0.280 %
Ast required Pt*b*d/100 1752.8 mm²
Mx
Clear cover = 40 mm
Dia of reinforcement = 20 mm
Effective cover (40+10+(20/2)) d' = 60 mm
Moment capacity
an = 1.0000 0.7490
1
Interaction ratio, = 39.17x1.5
540
1
44.99x1.5 = 0.47
189
< 1
Hence safe
Design parameters
Cover 50 mm
Stirrups dia S 8 mm
d' /d 0.113
2
Concrete grade M25 25 N/mm
2
Steel grade Fe 500 N/mm
d' /d 0.128
pt 0.777 ( sp : 16 table 3)
d' /d 0.128
Vu/b*d= 0.92
2
Nominal Shear Stress, = 0.92 N / mm
2
Maximum Shear Stress cmax = 3.1 N / mm
max >
Calculation of
2
Area of steel 1570 mm
2
Sp16 Table 61, 0.636 N/mm
Dia of stirrups 8 mm
spacing of stirrups 300 mm
Slab cover 30 mm
2
Steel grade Fe 500 N/mm
Design results,
Lx 3.295 m
Ly 5.25 m
Ly / Lx ratio 1.59