Calculate ST Sheet:10 Model: ANT A51-Efficiency (90%)
Calculate ST Sheet:10 Model: ANT A51-Efficiency (90%)
Assy1: ANS+PET
1 2.00 0.90 1620 12150 16200 13 1.7 3 0 1.3 1
Assy3: Assy1+Assy2
4 2.89 0.90 1122 8412 11215 19 2.5 3 0 1.9 2
Assy4:Remove film
5 2.83 0.90 1144 8576 11435 18 2.4 - 1.8 2
Assy7:Assy 7+ Grapheshite
8 3.20 0.90 1013 7594 10125 21 2.8 3 0 2.1 2
Assy9:Assy9+Adhesive tape
10 3.10 0.90 1045 7839 10452 20 2.7 3 2.0 2
Function MST+NFC
12 2.65 0.90 1223 9170 12226 17 2.3 3 0 1.7 2
Visual
13 3.99 0.90 812 6090 8120 26 3.4 - 2.6 3
Packing
14 - - 1.0 1
Total 23 22
Calculate ST sheet:10 Model ANT A426N MST- Efficiency (90%)
Plan/ Day 40000 7.5 HOURS
Process
No S/T (s)
Efficiency UPH UPH UPH Plan Current(현재 ) Request (요청) Jig Spare Total Request (요청)
Man power
(90%) (1 H) (7.5H) (10H) Jig -Machine Q'ty Jig Machine Q'ty Jig Machine Q'ty Jig Machine Q'ty (Predictions)
Assy 1
1 (FPCB + ANS Front) 3.38 0.90 959 7189 9586 5.6 6 6 0 6 5.6
Assy 2
2 (Assy 1 +ANS Rear) 3.45 0.90 939 7043 9391 5.7 6 6 0 6 5.7
10 Packing - - 1.0
Total 32
ANT A426N MST- Efficiency (90%)
7.5 HOURS
Man power
Final Man power
actual
15
ANT A426B-NFC-
Calculate ST sheet:10 Model
Efficiency (90%)
Plan/ Day 42000 10 HOURS
Process Jig Jig
No S/T (s)
Efficiency
UPH (1 H) 7.5
UPH Plan Current(현재 ) Man power
Final Man power
Man power
Supplier Supplier
(90%) (10H) Jig -Machine Q'ty Jig Machine Q'ty (Predictions) actual
Korea Việt Nam
Total 19 12
ANT A516V-
Calculate ST sheet:10
Efficiency (90%)
Plan/ Day 10000 7.5 HOURS
Process
Efficiency UPH UPH UPH Plan Man power Man power
No S/T (s) Final Man power
(90%) (1 H) (7.5H) (10H) Jig -Machine Q'ty (Predictions) actual
Assy 1
1 (Bot ANS+Black PET) 4.30 0.90 753 5651 7535 1.8 1.8 3
Assy 2
2 (TOP ANS+ Ferite+ Graphite) 7.50 0.90 432 3240 4320 3.1 3.1 3
Assy3
3 (FPCB + Assy2) 8.70 0.90 372 2793 3724 3.6 3.6 4
Assy 4
4 (Assy 3+ Assy1) 6.90 0.90 470 3522 4696 2.8 2.8 3
Assy 5
5 Remove Film 4.30 0.90 753 5651 7535 1.8 2
Assy6
6 (Assy5 + Adhesive) 6.00 0.90 540 4050 5400 2.5 2.5 2
Assy 7:
7 Remove film 3.00 0.90 1080 8100 10800 1.2 1
10 Packing - 1.0 1
Total 22 23
Calculate ST sheet:10 Model ANT CANVAS 2- Efficiency (90%)
Process
No S/T (s)
Efficiency UPH UPH UPH Plan Current(현재 ) Request (요청) Jig Spare Total Request (요청)
Man power
(90%) (1 H) (7.5H) (10H) Jig -Machine Q'ty Jig Machine Q'ty Jig Machine Q'ty Jig Machine Q'ty (Predictions)
1 Assy 1 ( ANS +Graphite sheet) 4.10 0.90 790 5927 7902 8.4 7 3 3 8.4
Assy 2
2 4.80 0.90 675 5063 6750 9.9 7 3 3 9.9
(Cushion +FPCB)
Assy3
3 4.75 0.90 682 5116 6821 9.8 7 3 3 9.8
( Assy1 + Assy2)
Assy 4
4 5.40 0.90 600 4500 6000 11.1 7 3 3 11.1
(Assy 3+ Top Adhesive)
Assy 5
5 4.80 0.90 675 5063 6750 9.9 7 3 3 9.9
(Assy 4+ Bottom Adhesive)
Assy6
6 5.00 0.90 648 4860 6480 10.3 7 3 3 10.3
(Assy5 + Carrier)
Assy 7
7 4.00 0.90 810 6075 8100 0 8.2
Remove film
Total 117
ANT CANVAS 2- Efficiency (90%)
7.5 HOURS
Man power
Final Man power
actual
10
10
11
11
12
11
10
19
127
ANT TXR 15inch- Efficiency
Calculate ST sheet:10 Model
(90%)
Plan/ Day 10000 10 HOURS
Process
Efficiency UPH Plan Current(현재 ) Man power Man power
No S/T (s) UPH (1 H) 7.5 Jig Spare Final Man power
(90%) (10H) Jig -Machine Q'ty Jig Machine Q'ty (Predictions) actual
2 Assy2: Assy 1 + FPCB 5.31 0.90 610 4576 6102 2.2 2 1.6 2 2
Assy3: Adheshive tape
4 +Assy2 4.80 0.90 675 5063 6750 2.0 0 0 1.5 2 2
6 Assy5: Remove film 3.51 0.90 923 6923 9231 1.4 - 0 1.1 2 2
Total 12 15 15
4.5
Calculate ST sheet:10 Model ANT Bloom 5G- Efficiency (90%)
Plan/ Day 10000 7.5 HOURS
Process
Man power
No S/T (s)
Efficiency UPH UPH UPH Plan Current(현재 ) Request (요청) Total Request (요청) (Predictions)
(90%) (1 H) (7.5H) (10H) Jig -Machine Q'ty Jig Machine Q'ty Jig Machine Q'ty Jig Machine Q'ty 7.5h
2 Assy 2 (TOP ANS 2N +Assy 1) 4.00 0.90 810 6075 8100 1.6 1 1 1 1.6
3 Assy 3(BOT ANS 1N+BOT ANS 2N) 3.90 0.90 831 6231 8308 1.6 1 1 1 1.6
4 Assy 4 (FPCB+ Assy 2) 5.38 0.90 603 4521 6028 2.2 2 0 2.2
5 Assy 5(Assy 4+Assy 3) 5.70 0.90 568 4263 5684 2.3 1 1 1 2.3
6 Assy 6 (Assy 5 +Black Pet) 5.00 0.90 648 4860 6480 2.1 1 1 1 2.1
8 Assy 7 (Assy 6+ Poron) 4.38 0.90 741 5554 7406 1.8 1 1 1 1.8
9 Assy 8 (Assy 7 +Adhesive tape) 5.95 0.90 545 4084 5445 2.4 1 1 1 2.4
Total 33
ANT Bloom 5G- Efficiency (90%)
7.5 HOURS
Man power
Final Man power
actual
31
Calculate ST sheet:10 Model ANT P3- Efficiency (90%)
Plan/ Day 70000 7.5 HOURS
Process
Current( Request Total
Plan
Efficiency UPH Jig 현재 ) (요청) Request (
Man power Final Man
No S/T (s)
(90%) (1 H)
UPH (7.5H) UPH (10H)
-Machine Jig Jig Jig Spare 요청) (Predictions) power( 7,5h)
Q'ty Machine Machine Jig Machine
Q'ty Q'ty Q'ty
1
Assy 1 4.04 0.90 802 6015 8020 11.6 1 10.6 10.6 11.6 10
(Graphite sheet + ANS sheet) Đối với Jig máy tự động : 1 bộ
bao gồm 2 Jig.
2
Assy 2 4.52 0.90 717 5376 7168 13.0 14 -1.0 4 3.0 13.0 13
(Cushion Tape +FPCB)
3
Assy 3 4.60 0.90 704 5283 7043 13.3 12 1.3 4 5.3 13.3 13
(Assy 1 +Assy 2)
4
Assy 4 3.25 0.90 997 7477 9969 9.4 9.4 9.4 9.4 9
(Remove film tape+ép lami)
5
Assy 5 4.55 0.90 712 5341 7121 13.1 12 1.1 4 5.1 13.1 13
(Assy 3 +Adhesive Tape)
6
Assy 6 2.72 0.90 1191 8934 11912 7.8 0 7.8 8
(Remove film tape+ ép lami)
7
Assy 7 3.50 0.90 926 6943 9257 10.1 0 10.1 10
(Nhặt xếp sản phẩm )
Maarking Machine 1 1.24 0.90 2616 19623 26164 3.6 3.6
Avg Marking Machine 1.32 0.90 2460 18454 24605 3.8 3 3 3.8 8
9 Function 3.45 0.90 939 7043 9391 9.9 10 -0.1 -0.1 9.9 10
11 Check Tape in backside 4.05 0.90 800 6000 8000 11.7 0 11.7 12
Man power
(10h)
10
10
10
10
10
10
13
99
Calculate ST sheet:10 Model
Plan/ Day 40000
Process Plan Current(현재
Efficiency UPH )
No S/T (s) UPH (7.5H) UPH (10H) Jig -Machine
(90%) (1 H) Jig Machine
Q'ty
Q'ty
Assy 1
1 3.80 0.90 853 6395 8526 4.7 8
(ANS + Gray Pet)
Assy 2
2 4.25 0.85 720 5400 7200 5.6 4
(Graphite +FPCB)
Assy 3
3 4.15 0.85 737 5530 7373 5.4 4
(Cushion Tape+ Assy 2)
Assy 4
4 4.50 0.85 680 5100 6800 5.9 4
(Assy 3+Assy 1
Assy 5
5 4.78 0.85 640 4801 6402 6.2 4
(Assy4 + Black Pet)
Assy6
6 4.16 0.85 736 5517 7356 5.4 4
(Assy5 + Adhesive)
Assy 7
7 3.95 0.90 820 6152 8203 4.9
Remove film
-3 -3.3 6.3 6
2 1.6 7.4 7
0 6.5 7
0 7.1 7
3.8 4
3.8 4
0 9.4 9
TỰ ĐỘNG 80 80
Calculate ST sheet:10 Model
Plan/ Day 40000
Plan Current(현재
Process Efficiency UPH )
No S/T (s) UPH (7.5H) UPH (10H) Jig -Machine
(90%) (1 H) Jig Machine
Q'ty
Assy 1 Q'ty
1 3.80 0.90 853 6395 8526 4.7 8
(ANS + Gray Pet)
Assy 2
2 4.63 0.85 661 4956 6608 6.1 8
(Graphite +FPCB)
Assy 3
3 4.60 0.85 665 4986 6648 6.0 8
(Cushion Tape+ Assy 2)
Assy 4
4 4.80 0.85 638 4781 6375 6.3 8
(Assy 3+Assy 1
Assy 5
5 4.95 0.85 618 4636 6182 6.5 8
(Assy4 + Black Pet)
Assy6
6 4.00 0.85 765 5738 7650 5.2 8
(Assy5 + Adhesive)
Assy 7
7 3.95 0.90 820 6152 8203 4.9
Remove film
10 Function 3.00 0.90 1080 8100 10800 4.9 5
11 CCD Visual 4.30 0.90 753 5651 7535 7.1
12 Remove Tape 2.28 0.90 1421 10658 14211
13 Check Tape in backside 2.30 0.90 1409 10565 14087
14 Visual 5.70 0.90 568 4263 5684 9.4
Total LINE JIG THỦ CÔNG
ANT R8- Efficiency (90%)
7.5 HOURS
Request (요청) Jig Man power
Total Request (요청)
Jig Machine Spare Final Man power
Jig Machine Q'ty (Predictions)
Q'ty
-3 -3.3 6.3 6
-2 -1.9 8.1 8
0 6.5 7