OT Estimation-Nizwa

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

OT Estimation-Nizwa

Sr Unit Price in R Total Price in R


No Item Qty Unit O O
Supply & installation of Fermacell Board Ceiling.
1 12 150 sqm 65.00 9,750.00
mm thickness including GA Substructure
Supply & Installation of Antibacterial & antifungal 
2 painting with Primer Putty 300‐micron thickness on  150 sqm 45.00 6,750.00
existing bricks walls 
Supply and installation of peripheral light Tail Structure
for Operation Theatre with dimmer. SIZE: 60X60X10
3 cm, 12 No 270.00 3,240.00
4 Laminar Flow system. Ultra clean ventilation as per  1 No 4,900.00 4,900.00
recommendation of HTM 03‐01/ DIN for operation 
theatre. Ceiling systems ‐ 2000mm x 2100 mm size 
with air flow rate of 2350 m3/hr. with an Aluminum 
profiles and H14 filters. Filter sensor Note: Ahu 
capacity should meet the air flow requirement.  
5 Surgen Control panel 1 6,200.00 6,200.00
6 OT Door 1 3,500.00 3,500.00
7 OT Pendant, Single arm 1 4,500.00 4,500.00
8 OT Pendant, Rigid 1 2,000.00 2,000.00
9 Pressure Relief damper 1 600.00 600.00
10 Room Pressure Monitor 1 1,800.00 1,800.00

Equipment
1 OT Light 1 6,500.00 6,500.00
2 OT Table 1 5,000.00 5,000.00
3 Anaesthesia Machine 1 18,000.00 18,000.00
4 Crash cart with Defibrillator 1 5,000.00 5,000.00
5 Trolleys 1 4,500.00 4,500.00
6 Instruments 1 2,000.00 2,000.00
7 Other general equipment. 1 15,000.00 15,000.00

Medical Gas System


1 Oxygen manifold with cylinders 1 6,000.00 6,000.00
2 Air Manifold with cylinders 1 6,000.00 6,000.00
3 Vacuum Pump 1 15,000.00 15,000.00
4 N2O manifold with cylinders 1 4,500.00 4,500.00
5 Piping. Line vales and AVSUs 1 14,000.00 14,000.00
6 Purity test 1 3,000.00 3,000.00

TOTAL in R O 147,740.00