Terminator
Start, Stop or Halt the process
Decision
select one of several paths
based om a conditional statement
Delay
Waiting period, during which
there is no activity
Preparation
Any preparation process
Process
Any operation or activity
Predefined Process
Named process(es) defined
where
Alternate Process
Alternative to 2 standard process
(rectangle), Usualy connected by 3
dashed arcow ine
sort
Order items sequentially
Collate
Merge & Earact create muttple sets
of tems from multiple other sets
Merge| Storage _
Combine multiple sets into one
BPMzravi material storage
Extract | Measurement
Remove specific set(s) of tems from
3 larger set
BPM: finished goods storage
or
Logical OR
Summing Function
Logical AND
Link/Connector | Inspection
like-labeled pair to link process sections on
the same page
BPM: Inspection point
Off Page Link/ Connector
Indicates flow continues on anther
page
Manual Operation
offline operation or process
adjustment done manually
Manual Input
Dats or eommand entry dane
manually
Display
Information to be displayed in any
manner, sueh a8. screen or printer
‘Transfer
Physical movement of item(s)
=
Flow Lines
bata / 1/0
InpuvOutput_ generate or
receive some type of data.
‘Spectiomeda:
Document Multi- Sequential Access
cociment Storage! Magnenc
pe
Online Storage/Stored Data
VO using any type of online
magnetic storage
‘Spe ctic media for 1/0.
Direct Access Database or _ Core, Internal
Storage, Hard Disk Data File Storage, Random
Drive (HDD) aeciiaron
Cand bySorce Sa