Objectives
A total number of 424,000 (according to 1981 census) people in India are suffering from
amputation of limbs. The objective of my project is to develop a prosthetic/robot hand
controlled using movement in the remaining muscles of the limb.
For the Minor Project, I will work on detecting, predicting and moving just a servo motor
using muscle movement in my hand. Further, in the Major Project, I will use a 3-D printed
hand and several servo motors to predict and replicate a human hand.
Project Planning
Pert Chart
Weekly progress Report
To be filled by Students
Project Title finalized, if Yes, give the YES
name, if NO, give the reason
EMG controlled prosthetic/robotic hand
Synopsis submitted YES
Literature review YES
Technical & Economical Feasibility YES
Bill of Material NA
Project Progress Schedule (PERT AS MENTIONED ABOVE
Chart)
Design of critical components IN PROGRESS
Fabrication work (give %) 0%
Experimental work (give %) 0%
Result and Analysis Result and Analysis of this week is that I have
finalized the topic of my minor project.
Correction made in the synopsis according to
the comments/suggestions received by
mentors/guide in synopsis presentation on
13/08/20. Analysis the requirement of hardware
and software need for my project.
Report writing NO
Signature of students
Work done in this week: During my first week as discussed in the PERT chart I have been
doing project planning of our project such as what are the objective of our project,
roles/responsibilities, methodology to be followed during the project. Literature review was