Perhitungan Persen Lereng

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Jody Bintara Pradiksa M

21100119120012
IK = 1 / 2000 * Skala Peta
= 1 / 2000 * 27.829
= 13.9

Beda Tinggi = Δh = n kontur x IK


 = 5 * 12.5
 = 62.5

Bl Struktural Renggang:

62.5
• %lereng 1= ×100 %=57,3 %
1 09 m
62,5
• %lereng 2= ×100 %=84,4 %
74 m
62,5
• %lereng 3= × 100 %=100,8 %
62m
62,5
• %lereng 4= ×100 %=61,2 %
1 02 m
625
• %lereng 5= ×100 %=54,3 %
115 m

Rata- rata % Lereng = (57,3+84,4+100.8+61,2+54,31) / 5

= 71,44 % (

Bl Struktural Rapat:

62.5
• %lereng 1= ×100 %=36,9 %
1 69 m
62,5
• %lereng 2= × 100 %=50,4 %
329 m
62,5
• %lereng 3= ×100 %=43,4 %
472 m
62,5
• %lereng 4= × 100 %=19,7 %
317 m
62,5
• %lereng 5= × 100 %=77,1%
81m

Rata- rata % Lereng = (72,6 + 72,6 + 66,8 + 92 + 77,1) / 5

= 76,24 % (Pegunungan sangat terjal)