Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

Annexure A

Annexure to the addendum to Jio Prime Partner Devices and Services Terms & Conditions dated
_______ executed between M/s NEIGHBOURHOOD GROCERY & Reliance Retail Ltd.

List of Equipment & Other Elements

Sr Quantity required Nos- Sign off by


Item Description Remarks
No Site Specific Kirana
  Equipment      
1 Wall Unit 9    
2 Mid Floor Unit 3    
3 End Cap 2    
4 Corner Unit 2    
5 Staple Bins 3    
6 Billing Counter 0    
7 Billing Counter 2(Express counter) 1    
8 Note Separator 1    
9 Weighing Scale table 1    
10 Slotted Angle Rack 0    
11 Staple Shelf 4    
12 Broom Display Unit 0    
13 Coconut Display Unit 0    
14 Glass Display Unit 1    
15 Glass Box on top of Cash Counter 0    
16 Peg Hook panel 1    
17 Holder Oil Pouch 0    
  Branding Elements      
Fascia Signage - 2440mm x 915mm -
18    
8' x 3'
19 Cash Counter side sun board    
20 Wall Headers    
21 Gondola Headers As per site conditions    
22 Cash Counter front logo    
23 Print (Desh ki nayi Dukan) -    
24 A/7 Shelf talker with hinge    
25 Hanging POSM Element    
Store Area ( sq.ft.):
JME_NEIGHBORHOOD GROCERY-SZ
Name: 208
Zone/
SOUTH Zone City: Banglore
State:
Sr No. Cost Component Amount
  FIXED ELEMENTS  
A External Signage and paint
1 Signages box Yes
2 External Painting
3 External Plastering
4 Logo paintig on rolling shutter
B Internal Branding
5 Internal Branding cost Yes
C FIM Items
6 Ceiling fan ( 2 Nos.)
7 Exhaust fan ( 1 No.)
8 Fire Extinguisher ( 1 No.) Yes
     
  OPTIONAL ELEMENTS  
D Flooring  
1 Vitrified floor Tiles
2 Dismantling of existing Flooring/ Skirting/ Dado
E Painting work  
3 Internal Painting
4 Plastering
H FOH/ BOH area  
BOH Wall / External Hung partition (100mm Thl Plywood
7
partition)
8 BOH Door (900 mm x 2100 mm)
9 Plywood paneling (12mm thk ply)
I Façade  
10 Glass storefront façade ( 12mm thk toughened glass)
11 Glass Door (900 mm x 2100 mm)
J Misc. work  
12 Miscellaneous Civil Works
13 Cut out for exhaust fan
K Dismantling work
L External Infrastructure
14 Installation of new Rolling shutter
15 Otla flooring ( Verandah)
16 Staircase
17 Awning
M Electrical
18 Miscellaneous Electrical Works
19 SITC of Light Fixtures, LED Tubes, ELCB, MCBs
20 Power outlet point wiring and circuit wiring
21 Outside area illumination

Following is the overall Estimated costing and EMI structure


Estimation of cost of transformation  
Estimated Total cost of store transformation 1,99,473
Cost to be borne by Reliance (Branding +FIM) 25,747
Cost to be borne by kirana (excluding taxes) 1,73,726
GST @ 18% 31,271
Estimated Total cost to be borne by kirana (including taxes) 2,04,997
   
Security deposit @10% 20,500
   
Estimated EMI 2,848

Note
1) The above is based on estimate and will be actualised on completion of Project
2) Reliance will endeavour to generate further visibility income to minimise your pay-out.

Kirana Name & Signature For Reliance Retail Ltd.

Date: __________________

You might also like