Safety Meeting With SPC 27 Feb 2019
Safety Meeting With SPC 27 Feb 2019
SUPRACO LINES
Kantor Pusat :
Radiant Building, 2nd Floor, Jl. Kapten Tendean No.24 Mampang Prapatan Jakarta 12720
Telp. 62-21-7191070 Fax.62-21-7191077
RISALAH RAPAT No. Form/ Form No. : F-ISM-QHSE-1501-02
Minutes of Meeting Hal./ Page : Page 1 of 2
No.Rev/ Rev.No. : 00
3. Signal for Call voucher provide by Still search for suitable vendor Pak Joseph
Communication owner for on board call
quota. Send every month for
existing Andromeda &
equinox crew POB.
Still need internet &
communication signal for all
crew needed.
4. VHSEMS WIP 12 of 14 findings closed.
audit progress Hygiene inspection finding: No longer available for Pak Roberto &
2018 & Hygiene 6 wash basin, 1 water closet existing type of water closet Ibu Andrea
inspection and 1 show case fridge need and wash basin. Already send
finding to be closed due to past the to master federal 2 on 25 Feb
due date. 2019 regarding new type of
water closet, wait for
confirmation from Federal II
Master regarding installation.
Diterbitkan : Setiap 1bulan sekali / disesuaikan disimpan selama : 5 tahun
to be issued : Every 1 months / Occasionally to be kept for : 5 years
PT. SUPRACO LINES
Kantor Pusat :
Radiant Building, 2nd Floor, Jl. Kapten Tendean No.24 Mampang Prapatan Jakarta 12720
Telp. 62-21-7191070 Fax.62-21-7191077
RISALAH RAPAT No. Form/ Form No. : F-ISM-QHSE-1501-02
Minutes of Meeting Hal./ Page : Page 2 of 2
No.Rev/ Rev.No. : 00
5. Facility issue a. COPT#2 failure, gear Purchasing progress on Pak Roberto &
coupling damage Andromeda Ibu Andrea
b. Boiler#1 failure, VFD VFD handle by Andromeda &
damage equinox
c. WBT 5P bad corroded
6. Miscellaneous Poor coordination between Should improve on the Pak Joseph &
vessel operator – owner agreement. Pak Andi
representative – client.
Less information on existing
daily report. Need to add
outstanding issue regarding
operation & maintenance
(O&M) update on board.