FRIDAY OVERTIME WORK SCHEDULE

Company Work locations Manpower Work activities Supervisors name & contact no#

OSBL - Package #2

Welding,drilling,grinding,cutting of the pipe


Welding,drilling,grinding,cutting
support,bolt torquing.loop of the pipe
SINOPEC J 06 27 support,bolt torquing.loop XIA ZHICHAO-055 874 8337
testing,painting,sand blasting,cable
testing,painting,sand blasting,cable
termination,scaffolding,loop
termination,scaffolding,loop
test,structure surface of the pipe
Welding,drilling,grinding,cutting
test,structure surface
SINOPEC J 15 23 preparation,hydrotest and lay-up,cleaning
support,bolt torquing.loop RAHUL-058 379 7568
preparation,hydrotest and lay-up,cleaning
of flange,soft alignment of
testing,painting,sand
of flange,soft blasting,cable
alignment of
pump,manlift,insulation,cladding,post
termination,scaffolding,loop weld
pump,manlift,insulation,cladding,post
heat treatment,vehicle entry,air weld
Welding,drilling,grinding,cutting
test,structure surface
heat treatment,vehicle of the pipe
entry,air
SINOPEC J 64 26 blowing,lifting.
support,bolt torquing.loop GU XIN-053 890 2636
preparation,hydrotest and lay-up,cleaning
blowing,lifting.
testing,painting,sand blasting,cable
of flange,soft alignment of
termination,scaffolding,loop weld
pump,manlift,insulation,cladding,post
Welding,drilling,grinding,cutting
test,structure surface
heat treatment,vehicle of the pipe
entry,air
SINOPEC J 94 16 support,bolt torquing.loop HU LULU-056 150 3447
preparation,hydrotest and lay-up,cleaning
blowing,lifting.
testing,painting,sand blasting,cable
of flange,soft alignment of
termination,scaffolding,loop
pump,manlift,insulation,cladding,post weld
SINOPEC J 37 20 test,structure surface
heat treatment,vehicle entry,air FAN JIANG-053 725 5182
preparation,hydrotest and lay-up,cleaning
blowing,lifting.
of flange,soft alignment of
pump,manlift,insulation,cladding,post weld OSBL - Package #2
heat treatment,vehicle entry,air
blowing,lifting.
TR HSE COVERAGE TR MEDIC TEAM COVERAGE

TR CONSTUCTION SUPERVISOR &ISSUER


RIDAY OVERTIME WORK SCHEDULE
Date: 2nd July 2021
Work Permit Receiver’s name & Work Duration Safety coverage name & contact no# First-Aider & contact no#
contact no# (From……To……)

OSBL - Package #2

SHAHZAD NABI - 0596394746 6AM to 5PM ISAGANI +050 283 5902 DILIP KUMAR - 058 273 5596

SALEEM - 0581622105 6AM to 5PM GHULAM +050 211 0627 MIRKE TAMANG - 050 097 6385

Devaji G. +058 162 0637 6AM to 5PM NAHEED +056 926 5424 RAM - 059 843 5120

ALI. +053 255 3663 6AM to 5PM JESUS VALDEZ +053 109 5923 RAJ KUMAR - 053 532 4650

RGS-059 653 3792 6AM to 5PM ANSIF +054 988 1916 JAMAL UDDIN - 058 313 0270

OSBL - Package #2
TR Medic Team: 053 475 5072
Allwyn (Nurse) & Hazmat (Ambulance Driver) - After 1800 hrs Jashper (Nurse) & Sadil (Ambulance Driver) - Upto
1800 hrs