Mega Power Projects & Associated projects in Tamil Nadu.

==Merchant Thermal Power Plants==


கடலூர் | IL&FS Tamil Nadu Power
Company Ltd. | Cuddalore | 3600 MW
Power Plant
(Phase-I 1200 MW & Phase-II 2400 MW)
Project Website: http://www.ilfsindia.com/projects1.a...=7&subLink=117

IL&FS is developing a 3600 MW (2x600MW in Phase I) imported coal based Thermal


Power Project in Tamil Nadu. The Phase I of the project (1200MW) would be utilizing
sub-critical technology while Phase II (2400MW) would utilize supercritical boiler
technology and would source coal from Indonesia/Australia/SA etc. The project would
consist of a dedicated port/jetty with enabling infrastructure for import of 15-25 million
tones of coal per annum along with other plants and machinery

IL&FS has acquired a mine in Indonesia, which will cater to the coal requirement for
this project. All major clearances including environment clearance from MoEF has been
obtained for this project. The debt financial closure for Phase I has been achieved in
December 2009 with a consortium of 19 banks. The power generated would be sold
under both long term Power Purchase Agreement and as merchant power. IEDCL has
been appointed Project Development Advisor for the project

நாகப்பட்டிணம் | UDI Infrastructure Multi


Product SEZ | Nagapattinam | 2500 acres |
1980 MW Power Plant | 6 MTPA Sea Port
Project Website: http://udiigroup.com/projects.html
1980 MW Power Plant

UDI Infrastructure Pvt. Ltd. Is currently setting up a 3 X 660 MW coal based


vttthThermal Powe thermal merchant power plant in coastal region of Nagapattinam,
Tamil Nadu. The plant will be set up by 2012.

6 MTPA Sea Port

UDI Infrastructure is also setting up a captive sea port to facilitate the transportation
of coal from both foreign and domestic sources. The Port will be able to handle six
million Tons of coal per annum.
1000 cu. m Water Desalination Plant

UDI Infrastructure is setting up a RO Sea water Desalination Plant with a production


capacity of approximately 1000 cubic meters of fresh water per hour.The
Desalination plant shall meet the consumptive needs of both the UDI Power Plant as
well as the Proposed SEZ including the township.

2500 acre Multi product SEZ

UDII GROUP proposes to setup a Multi – product SEZ spread over 2500 acres of land
with unlimited and undinterrupted supply of power and fresh water along the coastal
region of Tamil Nadu. The proposed SEZ will provide a Township, Schools and
Colleges, Hospitals, Multiplex and Malls and other facilities of international standards.

திருக்குவளை | Tridem Power & Port |


Tirukkuvalai | 2000 acre FTZ | 2000 MW
Power Plant | 40 MTPA Sea Port
Project Website:
http://www.elginindustries.com/en/sitecore/content/Engineering%20and
%20Construction/Soros/Projects/Tridem%20Power%20and%20Port%20-
%20Thirukkuvalai%20Port%20Development.aspx?industry={136AEC48-
8C9B-4315-A4AA-B7ADDE5F39E1}

Quote:

Soros’ design included development for a port facility at Thirukkuvalai coast, south of
Nagapattinam in Tamil Nadu India. The development of the port involved construction
of breakwaters, construction of wharves / berths, and dredging the berthing areas,
harbour basin, turning circle and the approach channel.

The modality and details of our design breakdown for the Port and Backup Areas for
the Port included:

· Port limits up to 15 km from the shoreline. 

· Approximately 278-acre waterfront area with some 3.2 km coastline.

· Reclaimed area from dredged materials extending outwards from the 3.

· 2 km coastline. Size of area is to be determined by Consultant.

· A contiguous 2,000 acre Free Trade Zone area with a suitable area so me 3 km away
for storage of thermal coal directly from the berths and evacuated subsequently to the
power plant and to other port users by rail or road. The size and modality of storage
area are to be determined by the Consultant.

· Areas in the same Free Trade Zone for (a) a Tank Farm for the handling and storage
of Bulk Liquid through the Port and (b) storage of RoRo vehicles. The size and modality
of storage area are to be determined by the Consultant.

தூத்துக்குடி | Coastal Energen Pvt Ltd|


Tuticorin | 1200 MW Power Plant
Project Website: http://www.coastalenergen.com/

Quote:

Coastal Energen Pvt Ltd (ENERGEN), the Power Generating Flagship Company of the
Coal and Oil Group, is setting up a 1200 MW coal fired thermal power plant in the
district of Tuticorin in the State of Tamil Nadu , India.

Our maiden power project in Tuticorin, Tamil Nadu, South India is a logical extension
of our multi disciplinary capabilities building on our diverse strengths and leveraging
our varied experiences in “Fuel Management” which gives Coastal Energen a distinct
advantage as a low cost Power Producer.
Tuticorin has been identified by both the Central Government of India and State
Government of Tamilnadu as a power generating centre for southern Tamilnadu lying
as it does in the middle of the power corridor.

Situated only 13 kms from Tuticorin town, our project enjoys the following
advantages:


Close proximity to a major town (13 kms)


Within 21 kms of a major port


Excellent road, Rail & Air connectivity


Excellent grid connectivity

The project has achieved fast progress since its inception.


Land fully acquired


PPA Agreement Signed

MOEF Clearance issued


Funding fully tied up and secured


BTG order finalized


Discussion with PGCIL for power evacuation


Engineering Consultants appointed


Manpower in place


Site preparation completed


Geo-technical investigations completed


Construction water and power in place


Water allocated by TWAD Board for process requirements

நாகப்பட்டிணம் | PEL Power Pvt Ltd |


Nagapattinam | 1000 MW Power Plant
Project Website: http://www.pelpower.com/project.html

Quote:

Located in the east coast, near Marudam Pallam, Sirkali town, in Tharangambadi taluk
of Nagapattinam District, Tamil Nadu in the Southern part of India.

Land required for setting up of the Plant has been acquired.


Environmental clearances from the Ministry of Environment and Forest in progress.
Coal required for running the Plant is to be received by Sea. Coal linkage application
process Fuel Supply Agreement with M/s. PT Equity Commodities, Indonesia
Evacuation of Power through 400 KV Transmission line to be laid by TNEB/PGCIL

ICB for BTG and BOP in packages is in process

First Unit of 500 MW to be commissioned by March 2012 and the second Unit in 3
months there from
DPR prepared by the Consultants viz. Fichtner India Pvt.Ltd is in place
Project estimated to cost about Rs.5000 crore.
Financing through 70% Debt from Banks/DFIs and 30% Equity from Promoters
MOA with PTC India Ltd. for marketing 70% of net power generated through a Long
Term PPA is in process 
TNEB to take 25% of power through Bidding process with first right to reject at Tariff
to be determined by TNERC
Balance power available will be sold through Power Exchange India Ltd.(PXIL)

Key Management Personnel with rich and wide experience power sector are in place

நாகப்பட்டிணம் | NSL Power Pvt Ltd. |


Nagapattinam | 1500 MW Power Plant 
Project Website: http://www.nslpower.com/convene.htm

Quote:

Tamilnadu Govt. has issued Letter of Facilitation to NSL Power Limited for setting up
Coastal Power Generation Plant (Merchant Power Plant) of 1500 MW capacity at
Sirkazhi and Tarangambadi Taluks in Nagapattinam Dist. This project is under
implementation with targeted commissioning First Phase by Oct - Nov 2011. Second
Phase by Feb - March 2012.

» MOU signed with Neyveli Lignite Corporation (NLC) for Coal/Lignite Exploration, Mine
Planning, Mine Survey, Contract Management, Industrial Engineering, Mining, HSE,
etc.

» MOU signed with IDFC Projects for development of Pit-head Thermal Power Project.

Salient Features Capacity of Power Plant 1500 MW Configuration 2 x 660 MW


Commissioning Planning to commission the station capacity by March 2012 Type of
Power Plant Coal based Merchant Power Plant Location Kaveripattinam –
Tarangambadi Coastal region in Sirkazhi and Tarangambadi taluks of Nagapattinam
District. Coal Source a) Coal Blocks identified in Indonesia.

b) Application submitted to Ministry of Coal for Long Term Coal linkage to be alloted
shortly. Water Source 1) Sea-water cooling envisaged for Condenser Cooling.

2) Soft Water requirement shall be met through De-salination Plant / RO Plant.

Status
‡ Letter of Facilitation for setting up of Merchant Power Plant received from the Govt.
of Tamilnadu on 10th December 2007
‡ Land Requirement is about 1280 Acres, the land identification completed and
acquisition in progress.
‡ In the Process of obtaining necessary statutory clearences from Tamilnadu Maritime
Board (TNMB) has given in-principle approval for development of port.

‡ Tamilnadu Maritime Board had approved for establishing offshore coal handling
terminal.
‡ Feasibility Report, for development of Open Jetty, closer to the identified Project Site
and also Coal Handling Terminal to unload imported coal from the ship & transfer to
Coal stock yard, has been received from the Consultants appointed by us. TFR is being
filed with TNMB for final approval of Port.
‡ Discussions are being held with South Indian Mills’ Association and others for tie-up
to supply the power from our proposed Merchant Power Plant,on long term basis.

கடலூர் | SRM Energy Ltd. | Cuddalore |


2000 MW Power Plant| 8000 Crores
Project Website: http://www.spicenergy.com/Businesses/Power.aspx

Quote:

SRM Energy’s first project will be an imported coal fired plant located at Cuddalore in
Tamil Nadu. Out of a total requirement of about 1,200 acres of land for the project,
about 500 acres have already been acquired. The company has already received a
letter of facilitation from the Tamil Nadu Government for setting up a 2,000 MW power
plant.SRM Energy has also signed a long-term Coal Purchase agreement for the supply
of 5 million tonnes of coal per annum for 20 years from mines in Indonesia, and is also
looking at opportunities to acquire captive mines. The detailed EIA study is underway
after obtaining approval of the Terms of Reference (TOR) from the Ministry of
Environment & Forests. The company has invited tenders from prospective EPC
contractors, and the final EPC contract is scheduled to be awarded by May 2009.
Finally, SRM Energy has entered into a PPA for sale of entire power generated by the
Cuddalore plant with the Tata Power Trading Company Ltd.
Apart from these, following projects are under proposal without much info.

கடலூர் | Cuddalore | Cuddalore Powergen


Corporation Limited (CPC) | 1320 MW |
6000 Crores
http://www.bgrcorp.com/cpcl.php

Quote:
Cuddalore Powergen Corporation Limited was incorporated on November 22, 1993, is
an Independent Power Producer (IPP) developing of 2 × 660 MW coal based thermal
power project at Cuddalore, Tamil Nadu, India.

The project is under development and currently undergoing the certification process,
and upon completion of this effort, as well as commissioning on the power plant, will
sell all of its power to TNEB on a take-or-pay basis 

The company has signed a power purchase agreement (PPA) with TNEB during
September 2006.

மனப்பட் (தூத்துக்குடி) | Manapad


(Tuticorin) | Ind-Barat Power Pvt. Ltd |
1320 MW Power Plant 

மரக்காணம் | Marakkanam | Apollo


Infrastructure Project Finance Com. Pvt Ltd
| 2000 MW Power Plant

தூத்துக்குடி | Tuticorin | Sri City


Infrastructure Dev. Ltd | 1000 MW Power
Plants 

குருவிமேடு | Kuruvimedu | Kuruvimedu


Thermal Power Project | 1000 MW 
ராமநாதபுரம் | Ramanathapuram |
Ramanathapuram Power Project | 1000 MW

நாகப்பட்டிணம் | Nagapattinam | McNamara


International Pvt Ltd | 2000 MW 
ETA Star Energy Pvt Ltd | 1200 MW
http://74.125.153.132/search?q=cache...ient=firefox-a

Quote:

ETA STAR has acquired a 100 million tonne (mt) coal mine in Indonesia, worth $300
million, to fuel its proposed 1,200 MW power plant coming up in
coastalTamil Nadu. ETA STAR resources, Indonesia, a wholly owned subsidary of the
Group, will own the mine and sell coal in the recently floated Indian
subsidary,ETA STAR Enery which will own the power project, ETA STAR director
Hameed Syed Salahuddin told Economic Times. 

 
Mr.Hameed Salahuddin, Director, ETA-STAR said, "we will finalise our plans for the
Port venture after the bathmetry study is drafted, which is underway. We will convey
our intensions to the TN government shortly
The group plans to start coal production from the Indonesian mine by 2010. the entire
production will be for the indian Power Projects. Initially, we plan to export 2-3MT
coal annually and later, it will be increased. At present, we are setting up road
infrastructure for evacuating coal from the mine", said the Director, adding
that ETA would invest $3.5 billion in the India's infrastructure and realty sectors

Kumbakonam | GEMAC Energy Limited


(GEL) | 1320 MW| INR 6000 Crores  
== State /Central Power Plants ==
contrib by Arul Murugan

சென்னை | North Chennai Thermal Power


Station I | 600MW Power Plant
Capacity : 1x600MW
Total cost of the project without IDC : 2475 crores
Name of the contractor : M/s.BHEL
Zero date : 18.02.08 Schedule date of commissioning : 17.02.11

Present stage of the project :


The Civil foundation works for Boiler, Chimney ESP have been completed. Boiler and ESP
Column erection commenced on 01.06.09. Drum lifting is scheduled during November
2009.

சென்னை | North Chennai Thermal Power


Station II | 600MW Power Plant
Capacity : 1x600MW
Total cost of the project without IDC : 2175 crores+125 crores
Name of the contractor : M/s.BHEL
Zero date : 16.08.08 Schedule date of commissioning : 15.08.11

Present stage of the project


Civil foundation for boiler ESP,Mill and Bunker bay completed and in progress in power
house and TG Buil;ding.
The erection work for boiler and ESP commenced during August are under progress.

சென்னை | North Chennai Thermal Power


Station III | Tri-Sakthi Energy Pvt. Ltd |
525 MW power plant

மேட்டூர்/சேலம் | Mettur/Salem Thermal


Power Station- Stage-III | 600MW
Capacity : 1x600MW
Total cost of the project without IDC : 3100.06 crores
Name of the contractor : M/s.BGRESL
Zero date : 25.06.08 Schedule date of commissioning : 23.06.11

Present stage of the project :

Weigh bridge No.1 installation completed and weigh bridge No.2 work is in progress. 709
meters length of compound wall completed out of 2.412 Km. 50% roof work completed
in 400 KV GIS and Cable trench RTS binding work is in progress in 230 KV GIS.
Assembly & erection of slip form is in progress in Chimney. Foundation and pedestal
completed in Cooling Tower. Foundation work completed in D.M. System and Equipment
foundations to be provided. HFO & HSD tank foundation works completed. The first
milestone activity of Boiler column erection was carried out on 29.09.2009

சென்னை | NTPC/TNEB JV | Chennai Vallur


power Plant | 1500MW
Location : Vallur village in North Chennai
Capacity : 3 x 500MW
Total cost of the project without IDC : 8000 Crores
Name of the contractor : Main plant contractor M/s.BHEL
Zero date : 13.08.2007 Schedule date of commissioning : Unit I - Oct.2010
Unit II - Mar.2011
Unit III - Sep 2012

Present stage of the project :


Main Plant work consists of turbine, boiler, generator etc., was awarded to M/s. BHEL on
13.08.2007. M/s. BHEL has mobilized for boiler erection work. The boiler drum has
already been received at site. BHEL has been awarded the main plant works for stage II
(1X500 MW). The civil / structural works are carried out simultaneously along with stage
I works in full swing.

காட்டுப்பள்ளி | Kattupalli Thermal power


plant |1600 MW 
Locaion: Kattupalli village in Tiruvallur District
Capacity: 2 x 800 MW
Status: Pre-feasibility study completed. EIA is under process

தூத்துக்குடி | Tuticorin NTPL JV power plant


| 1000MW
Location : Tuticorin
Capacity : 2 x 500MW
Total cost of the project without IDC : 4909 Crores
Name of the contractor : Main plant contractor M/s. BHEL Zero date : 12.05.2008
Schedule date of commissioning : Unit I - Mar.2012
Unit II - Aug.2012

Present stage of the project :


Site preparation works are under progress. LOA issued to M/s L&T for coal handling
system of the project.

உடன்குடி/தூத்துக்குடி | Udangudi Power


plant | 1600MW
Location : Udangudi near Trichendur
Capacity : 2 x 800MW
Total cost of the project without IDC : 9083 Crores
Name of the contractor : Yet to be finalised
Zero date : Yet to be fixed Schedule date of commissioning : Unit I - Mar.2013
Unit II- Sep.2013

Present stage of the project :


Preliminary works are completed. Site specific studies such as EIA study has been
completed. Public hearing are over. On receipt of approval from state level
CZMA(Coastal Zone Management Authority), application will be filed to the MOEF for
Environmental clearance of the project.

http://www.tneb.in/template_3.php?te...d=0&subcid=167

செய்யூர் | Cheyyur | Ultra Mega Power Plant


| 4000 MW | Captive Port
Location : Cheyyur
Capacity :4000 MW
Investment : 16000 crore INR

Features

 The Ultra Mega Power Projects would use Super Critical Technology with
a view to achieve higher levels of fuel efficiency, which results in saving of
fuel and lower green-house gas emissions.
 Flexibility in unit size subject to adoption of specified minimum
Supercritical parameters.
 Integrated power project with dedicated captive coal blocks for pithead
projects.
 Coastal projects to use imported coal.

நாகப்பட்டிணம் | Nagapattinam | Ultra


Mega Power Plant | 4000 MW | Captive Port
| Proposed

ஜெயம்கொண்டம்| Jayamkondam power


plant |Neyveli Lignite Corporation |1600
MW | 9 MTPA | 5700 Crores
website: http://www.nlcindia.co.in/pro_form.pdf

நெய்வேலி |Neyveli TPS III power plant |


1000 MW

என்னூர் | Ennore Power Plant | 1885 MW


மணலி | Manali Power Project | 842 MW

செங்கற்பட்டு | Chengalpet Power Project |


630 MW 

செய்யூர் | Cheyyur Ultra Mega Power Plant


(UMPP) | Neyveli Lignite Corporation (NLC)
| 4000 MW

தூத்துக்குடி | Tuticorin | Spic Electric Power


Corporation (Private) Ltd (SEPC)

மரக்காணம் | Marakkanam | NTPC Thermal


Power Plant | 2000 MW| INR 5500 Crores  

== Nuclear Power Plants ==

கூடன்குளம்/திருநெல்வேலி |
Koodankulam/Tirunelveli Nuclear power
plant | 2000MW
Location, Koodankulam, Tirunelveli
Capacity : 2000MW
Investment: 3.5billion US $ estimation in 2001
Status: 93.9 % as on Oct-2009 Unit I, 83.7 % as on Oct-2009 Unit II
Operation: Sep 2010 Unit I, Mar 2011 Unit II

http://www.npcil.nic.in/
கல்ப்பாக்கம் | Kalpakkam | PFBR | 500 MW

கூடன்குளம் | Koodankulam | VVER |


2x1000 | 2000 MW

கூடன்குளம் | Koodankulam | VVER |


4x1200 | 4800 MW

கல்ப்பாக்கம் | Kalpakkam | PFBR | 1000


MW

==============
Total = 63,722 MW
==============

You might also like