PREPARED BY:
FA Independent Consultant
(Support Your Business)-Especially For IUP/PKP2B Evaluation
Including“Site Visit, Geological Modelling, Pit Optimization, Pit Scheduling, Cost ModellinG, Operational Excellent (Mining
Technical Assessment For reduce cost and Increase Profit)”
Offering Letter
www.portaltambang.com
Email : info@portaltambang.com
Location
Access to Location:
-Jakarta – Balikpapan by domestic
flight approximately 2 Hours
- Balikpapan – Berau by domestic
flight approximately 30 Minutes
-Berau – Concession by land
transportation 4WD car
approximately 2 Hours.
www.portaltambang.com
Email : info@portaltambang.com
Legality
www.portaltambang.com
Email : info@portaltambang.com
Forestry Area & Adjacent Concession
www.portaltambang.com
Email : info@portaltambang.com
Land Use
www.portaltambang.com
Email : info@portaltambang.com
Topography & Morphology Condition
www.portaltambang.com
Email : info@portaltambang.com
Geological Evaluation
www.portaltambang.com
Email : info@portaltambang.com
Exploration
www.portaltambang.com
Email : info@portaltambang.com
Exploration – Geological Modeling & Interpretation
www.portaltambang.com
Email : info@portaltambang.com
Exploration – Confidence Level Data
www.portaltambang.com
Email : info@portaltambang.com
Exploration – Quality Data
BJP has sharing their quality data analyses from Geoservices Laboratory. The quality report as bellow:
www.portaltambang.com
Email : info@portaltambang.com
Future Exploration Plan
Detail exploration data required for BJP concession. Stratigraphy boreholes & detail topography needed with JORC
standard required for high exploration accurate data.
Plan stratigraphy borehole separated into 2
stage:
www.portaltambang.com
Email : info@portaltambang.com
Estimation Exploration Cost
Stage Total Borehole Total Depth (Meter) Method Drilling Coring Target Open Hole
1 27 2250 Touch Coring with Geophysical Logging 405 1845
2 25 2200 Touch Coring with Geophysical Logging 375 1825
TOTAL 52 STUDY & FEASIBILITY DATA ANALYSIS
4450
PT BERAU JAYA PERKASA
Estimation Cost Total Est. Cost Est. Total Cost
Open Hole 3670 Rp 350.000 Rp 1.284.500.000
Coring 780 Rp 225.000 Rp 175.500.000
Geophysical Logging 3 Month Rp 120.000.000 Rp 360.000.000
Sampling 100 Rp You’re Reading
2.500.000 Rp a Preview 250.000.000
Topography 700 Rp For Full
1.800.000 Rp Access Clik: 1.260.000.000
Geotechnical Study 1 Rp 500.000.000 Rp 500.000.000
TOTAL GetRpFull Access 3.830.000.000
OVERHEAD 10% Rp 383.000.000
GRAND TOTAL www.portaltambang.comRp | Email : info@portaltambang.com
4.213.000.000
www.portaltambang.com
Email : info@portaltambang.com
Coal Logistic Mine - Jetty
www.portaltambang.com
Email : info@portaltambang.com
Coal Logistic Jetty - Anchorage
www.portaltambang.com
Email : info@portaltambang.com
Pit Optimization SR Plot
No Coal Only
OB
www.portaltambang.com
Email : info@portaltambang.com
Pit Optimization
R eserve C OA L B U R D EN SR
RL +70 100 m
RL -60
RL -40
RL -35
www.portaltambang.com
Email : info@portaltambang.com
Pit Scheduling
www.portaltambang.com
Email : info@portaltambang.com
Pit Scheduling
www.portaltambang.com
Email : info@portaltambang.com
Pit Scheduling
www.portaltambang.com
Email : info@portaltambang.com
Pit Scheduling
www.portaltambang.com
Email : info@portaltambang.com
Pit Scheduling
www.portaltambang.com
Email : info@portaltambang.com
Pit Scheduling
www.portaltambang.com
Email : info@portaltambang.com
Pit Scheduling
www.portaltambang.com
Email : info@portaltambang.com
Pit Scheduling
www.portaltambang.com
Email : info@portaltambang.com
Pit Scheduling
www.portaltambang.com
Email : info@portaltambang.com
Pit Scheduling
www.portaltambang.com
Email : info@portaltambang.com
CostAnalysis
Cost Analysis
Www.COALspot.com
www.portaltambang.com
Email : info@portaltambang.com
Sensitivity Analysis
Basic Fuel Price NPV ($) SR NPV
10,975 38,796,214 2.15 38,796,214
11,524 34,799,167 2.04 39,893,597 Coal Price Excange Rate Basic Fuel Price SR DCF
12,100 28,708,692 1.84 42,916,889
12,705 19,207,297 1.65 47,026,010
50.000.000
13,340 3,930,118 1.49 51,243,570
14,007 (34,164,719) 1.79 52,848,552
14,708 (106,877,616) 2.14 52,870,091
16.000.000.000
15,443 (236,936,624) 2.57 51,321,108
40.000.000
16,215 (479,062,982) 3.09 47,212,104
17,026 (948,862,405) 3.70 37,424,759
17,877 (1,899,974,457) 4.45 12,521,261
18,771 (3,910,870,091) 5.34 (96,705,055)
30.000.000
19,710 (8,354,162,947) 6.40 (491,171,603)
20,695 (18,621,094,216) 7.68 (2,019,542,650)
21,730 (43,441,835,132) 9.22 (8,997,786,934)
20.000.000
Coal Price NPV ($) DCF NPV ($) Excange Rate NPV ($)
24 38,796,214 15% 38,796,214 14,000 10.000.000
38,796,214
25 45,380,722 16% 37,618,573 14,700 39,546,191
26 59,553,876 17% 35,237,275 15,435 40,940,705 6.000.000.000
28 83,583,465 17% 31,629,323 16,207 42,793,197
29 121,615,450 18% 26,839,690 15,396 43,859,119 -
30 180,880,442 19% 21,083,251 14,627 44,316,925
32 273,989,920 20% 14,846,333 13,895 44,239,824
33 423,348,498 21% 8,875,432 13,200 43,615,637
35 669,831,264 22% 3,925,426 12,540 (10.000.000)
42,343,537
37 1,090,343,195 23% 370,921 11,913 40,206,417
39 1,834,474,678 24% (1,917,477) 11,318 36,808,117
41 3,203,560,472 26% (3,305,558) 10,752 31,449,643
43 5,827,064,576 27% (4,121,351) 10,214 (20.000.000)
22,889,585
45 11,070,070,767 28% (4,586,672) 9,704 8,873,307
47 22,009,012,635 30% (4,842,300) 9,218 (23,196,655)
(30.000.000) (4.000.000.000)
www.portaltambang.com
Email : info@portaltambang.com
Trend Of ICI Index
Indonesian Coal INdex
ICI 1 GAR ICI 2 GAR ICI 3 GAR ICI 4 GAR ICI 5 GAR
$140,00 Economic Circular
If Coal Supply Increase-Demand Low-Coal Price Go Down- Phase of Coal Price Increase and Coal
Coal Company Slow Down. Company Growth Up
$120,00
If Coal Company Slow Down-Supply Low-Demand High-Coal
Price Go Up- Coal Company Growth Up
$100,00
Phase of Coal Price
Decrease and Coal
$80,00 Company slowdown
$60,00
$40,00
$20,00
$0,00
Feb-12
Feb-13
Feb-14
Feb-15
Feb-16
Feb-17
Feb-18
Feb-19
Oct-13
Oct-17
Oct-12
Oct-14
Oct-15
Oct-16
Oct-18
Aug-14
Aug-18
Jun-12
Aug-12
Jun-13
Aug-13
Jun-14
Jun-15
Aug-15
Jun-16
Aug-16
Jun-17
Aug-17
Jun-18
Jun-19
Aug-19
Dec-11
Apr-12
Dec-12
Apr-13
Apr-14
Apr-15
Apr-16
Dec-16
Apr-17
Apr-18
Apr-19
Dec-13
Dec-14
Dec-15
Dec-17
Dec-18
www.portaltambang.com
Email : info@portaltambang.com
SWOT Analysis
• No legality issue
• Low cost • Low calorie
• APL Area • Low Price
• High potential reserve • Need to detail exploration for
• Low Sulphur confident level of reserve
• Low ash • Highest Price For Take OVER
• Free digging • We have to Site Visit For
• Open Pit Mining Confident Level acquisition
• No villagers around in Mining Strengths Weakness
Opportunity Threath
Owner clarification
12 Sept 2019 the
owner providing
information related
to this issue has been
declared completed
www.portaltambang.com
Email : info@portaltambang.com
Summary
1. PT BJP Has license for IUP OP With Register Number 503/242/IUP-OP/DPMPTSP/II/2017 and Valid until
2027
STUDY & FEASIBILITY DATA ANALYSIS
2. Total Reserve by borehole data estimation 21 Million Ton with stripping ratio 2.2 but need clearly with
detail exploration for all IUP PT BERAU JAYA PERKASA
3. Total mining cost per Metric ton Est 16.38 USD with FOB MV (Our team provide for detail calculation)
4. For take over price will be negotiable (Owner give information to US)
5. Internal problem PT BJP has been clear with document from PTTUN JAKARTA Register No
60_B_2018_PT_TUN_JKT (Download in PTTUN Website)
You’re Reading a Preview
6.FA Independent Consultant recommendation to Take Over for this
For Full Access Clik:
IUP
Get all
(Our Team will be ready to Explain about Full Access
data in presentation)
www.portaltambang.com
Email : info@portaltambang.com
Closing
THANKS
• FA Independent Consultant
• (Support Your Business)-Especially For IUP/PKP2B Evaluation
• Including“Site Visit, Geological Modelling, Pit Optimization, Pit Scheduling, Cost ModellinG, Operational Excellent (Mining
Technical Assessment For reduce cost and Increase Profit)”