PLUMBING Perspektif Indoor

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

The foundation of air-condition please see

-0.750 -0.030 -0.030 -0.750


ENTRANCE STEP ENTRANCE STEP
F2092S-T0103 F2092S-T0103
NK1204
MQ-7 MQ-8 MQ-9 MQ-8 MQ-8 MQ-9 MQ-8 MQ-7
R=4 00
00 Clinic R=4
baffle wall
bafflewall
MCC Room
±0.000
NK0505
±0.000
0.5%
Toilet PL-3
PL-2 ZK0608 Pipe
0.5% R
=40
0

Stair Case
up 2.340
Room
2.340 up
JL-4
ZK0608
DM3
JL-3 R=4
MQ-6

SK0712 ZK0607 Movablesemi - partitionwall 00


Stair Case
-0.850
Smoke-proof Atria DK0905
Smoke-proof Atria
DM3 ±0.000 ±0.000

Lady Toilet -0.050 GL1200


H=2100 00
Handrail of stairs R=6
F2092S-T0103 Fire Control Room
DM3
-0.850 ±0.000
Cleansing Room Hall
-0.030
ENTRANCE STEP
F2092S-T0103 Men Toilet -0.050
BASIN DM2 ±0.000 Reading Room
JL-1 & JL-2 Coffee Room ±0.000
JL-5
-0.050 SK0712
DM2 Screen
PL-1 PL-4

MQ-5'
MQ-5

PL-5 Passenger Lift


Exhibition Area

Elevator Hall
Reception Area
MQ-3 MQ-4 MQ-3 Stainlesssteelrail 0 DES 19, 2019 ISSUED FOR APPROVAL
Corridor R=6 00 Theotherssameas REV DATE DESCRIPTION SIGN

=40
0 00 R=6 F2092S-T0103 R=4
00 PROYEK / PROJECT
R
CILACAP EXPANSION (1x660 MW) CFSPP PROJECT
MQ-1 MQ-2 MQ-2' MQ-1'
VIP Elevator CILACAP, JAWA TENGAH

APRON OWNER
Rainwater pipe connect to the F2092S-T0103 PT. SUMBER SEGARA PRIMADAYA
-0.030 baffle wall
ENTRANCE STEP PORCH S2P
NOTE : F2092S-T0103 1/12 SLOPE SLOPE 1/12
1. THE DETAILED DESIGN FOR FIREPROOFING BOARD SHALL BE SUPPLIED BY THE MANUFACTURER OR SUPPLIER. -0.980 -0.030 -0.980
Handrailof stairs EPC CONTRACTOR
2. LEGEND : F2092S-T0103 中國化學工程股份有限公司
CNCEC
CONCRETE HOLLOW BLOCK SLOPE bafflewall CHINA NATIONAL CHEMICAL ENGINEERING CO., LTD.
SLOPE
FIREPROOFING BOARD -0.960
The fire-resistance rate shall not be less than 2.5 hours CONSTRUCTION CONTRACTOR
3. DECISION OF ALL COLOR WILL BE DECIDED LATER ( BY OWNER) ENTRANCESTEP 踏步
D&C ENGINEERING COMPANY
F2092S-T0103 D&C
SUB CONTRACTOR

PT. Wijaya Karya


Power Plant & Energy Departement

NAMA GAMBAR /
DRAWN : DRAWING TITLE :

ADMINISTRATION BUILDING FLOOR-1 PLAN VIEW ADMINISTRATION BUILDING


INDOOR PLUMBING
CHECKED :

APPROVED :

SKALA JUMLAH GAMBAR


1 : 200 1 of 06
SCALE TOTAL OF DWG

NO. GAMBAR WIKA-SD-CLP- GAMBAR REFERENSI F2092S-S0717-13


REFERENCE DRAWING R-1
DRAWING NO. COB-PL-01/06-00
0 DES 19, 2019 ISSUED FOR APPROVAL
REV DATE DESCRIPTION SIGN
PROYEK / PROJECT

CILACAP EXPANSION (1x660 MW) CFSPP PROJECT


CILACAP, JAWA TENGAH

OWNER
PT. SUMBER SEGARA PRIMADAYA
S2P
EPC CONTRACTOR
中國化學工程股份有限公司
CNCEC
CHINA NATIONAL CHEMICAL ENGINEERING CO., LTD.

CONSTRUCTION CONTRACTOR
D&C ENGINEERING COMPANY
D&C
SUB CONTRACTOR

PT. Wijaya Karya


Power Plant & Energy Departement

NAMA GAMBAR /
DRAWN : DRAWING TITLE :

ADMINISTRATION BUILDING
FLOOR 10 PLAN VIEW
CHECKED :

APPROVED :

SKALA JUMLAH GAMBAR


1 : 200 02 of 06
SCALE TOTAL OF DWG

NO. GAMBAR WIKA-SD-CLP- GAMBAR REFERENSI F2092S-S0717-13


REFERENCE DRAWING R-1
DRAWING NO. COB-PL-02/06-00
0 DES 19, 2019 ISSUED FOR APPROVAL
REV DATE DESCRIPTION SIGN
PROYEK / PROJECT

CILACAP EXPANSION (1x660 MW) CFSPP PROJECT


CILACAP, JAWA TENGAH

OWNER
PT. SUMBER SEGARA PRIMADAYA
S2P
EPC CONTRACTOR
中國化學工程股份有限公司
CNCEC
CHINA NATIONAL CHEMICAL ENGINEERING CO., LTD.

CONSTRUCTION CONTRACTOR
D&C ENGINEERING COMPANY
D&C
SUB CONTRACTOR

PT. Wijaya Karya


Power Plant & Energy Departement

NAMA GAMBAR /
DRAWN : DRAWING TITLE :

ADMINISTRATION BUILDING
FLOOR 11 PLAN VIEW
CHECKED :

APPROVED :

SKALA JUMLAH GAMBAR


1 : 200 3 of 06
SCALE TOTAL OF DWG

NO. GAMBAR WIKA-SD-CLP- GAMBAR REFERENSI F2092S-S0717-13


REFERENCE DRAWING R-1
DRAWING NO. COB-PL-03/06-00
0 DES 19, 2019 ISSUED FOR APPROVAL
REV DATE DESCRIPTION SIGN
PROYEK / PROJECT

CILACAP EXPANSION (1x660 MW) CFSPP PROJECT


CILACAP, JAWA TENGAH

OWNER
PT. SUMBER SEGARA PRIMADAYA
S2P
EPC CONTRACTOR
中國化學工程股份有限公司
CNCEC
CHINA NATIONAL CHEMICAL ENGINEERING CO., LTD.

CONSTRUCTION CONTRACTOR
D&C ENGINEERING COMPANY
D&C
SUB CONTRACTOR

PT. Wijaya Karya


Power Plant & Energy Departement

NAMA GAMBAR /
DRAWN : DRAWING TITLE :

ADMINISTRATION BUILDING
ROOF PLAN VIEW
CHECKED :

APPROVED :

SKALA JUMLAH GAMBAR


1 : 200 4 of 06
SCALE TOTAL OF DWG

NO. GAMBAR WIKA-SD-CLP- GAMBAR REFERENSI F2092S-S0717-13


REFERENCE DRAWING R-1
DRAWING NO. COB-PL-00-00-01
0 DES 19, 2019 ISSUED FOR APPROVAL
REV DATE DESCRIPTION SIGN
PROYEK / PROJECT

CILACAP EXPANSION (1x660 MW) CFSPP PROJECT


CILACAP, JAWA TENGAH

OWNER
PT. SUMBER SEGARA PRIMADAYA
S2P
EPC CONTRACTOR
中國化學工程股份有限公司
CNCEC
CHINA NATIONAL CHEMICAL ENGINEERING CO., LTD.

CONSTRUCTION CONTRACTOR
D&C ENGINEERING COMPANY
D&C
SUB CONTRACTOR

PT. Wijaya Karya


Power Plant & Energy Departement

NAMA GAMBAR /
DRAWN : DRAWING TITLE :

ADMINISTRATION BUILDING
PERSPECTIVE OF PIPE LINE
CHECKED : INDOOR PLUMBING

APPROVED :

SKALA JUMLAH GAMBAR


1 : 50 05 of 06
SCALE TOTAL OF DWG

NO. GAMBAR WIKA-SD-CLP- GAMBAR REFERENSI F2092S-S0717-13


REFERENCE DRAWING R-1
DRAWING NO. COB-PL-05/06-00
PARAMETE UNIT 19 Flange DN 50 pcs 2
No NOMINATION SPECIFICATION MATERIAL TOTAL REMARK
R S pcs
20 Float valve DN 50 1
Potable Water Pipe 0 DES 19, 2019 ISSUED FOR APPROVAL
21 Manual butterfly valve DN 50 pcs 2 REV DATE DESCRIPTION SIGN
1 Electric tank on roof V = 2 m3 stainless steel set 1 PROYEK / PROJECT
22 Cut off valve DN 80 pcs 1
V = 40L U=220V CILACAP EXPANSION (1x660 MW) CFSPP PROJECT
2 Electric water heater set 24 23 Cut off valve DN 50 pcs 2 CILACAP, JAWA TENGAH
P=1.5kW
OWNER
V = 8L U=220V 24 Cut off valve DN 32 pcs 1
3 Electric water heater set 1 PT. SUMBER SEGARA PRIMADAYA
P=1.2kW 25 Cut off valve DN 25 pcs 1 S2P
4 Potable water pipe DN80 m 7 Sewage Waste Water Pipe
EPC CONTRACTOR
5 Potable water pipe DN50 m 68,3 1 UPVC pipe Ø160 m 49,591 中國化學工程股份有限公司
6 Potable water pipe DN80 m 7,6 2 UPVC pipe Ø110 m 179,1
CNCEC
CHINA NATIONAL CHEMICAL ENGINEERING CO., LTD.

7 Potable water pipe DN63 m 53,02 3 90° outdoor big elbow Ø160 pcs 1 CONSTRUCTION CONTRACTOR
8 Potable water pipe DN50 m 9,68 4 90° elbow Ø110 pcs 4 D&C ENGINEERING COMPANY

9 Potable water pipe DN40 m 31,74 D&C


5 45° elbow Ø110 pcs 4
10 Potable water pipe DN32 m 69,9 6 Tee Ø110 pcs 7 SUB CONTRACTOR

11 Potable water pipe DN25 m 5,8 7 Reducer tee Ø160x110 pcs 9


PT. Wijaya Karya
12 90° elbow DN50 pcs 3 8 Manhole Ø160 set 9 Power Plant & Energy Departement

13 90° elbow DN32 pcs 6 9 Manhole Ø110 set 17 NAMA GAMBAR /


DRAWN : DRAWING TITLE :
14 90° elbow DN25 pcs 2 10 Roof drain set 22
ADMINISTRATION BUILDING
15 Reducing tee De 80x50 pcs 1 11 Vent Ø160 set 1 PERSPECTIVE OF ROOF WATER TANK
CHECKED : AND PIPE LINE
16 Reducing tee De 40x32 pcs 1 12 Vent Ø110 set 4 PLUMBING FIXTURE SCHEDULE
17 Reducer De 63x50 pcs 2 13 Expansion joint Ø160 set 9
18 Reducer De 50x40 pcs 6 14 Expansion joint Ø110 set 36
APPROVED :

SKALA JUMLAH GAMBAR


1 : 25 06 of 06
SCALE TOTAL OF DWG

NO. GAMBAR WIKA-SD-CLP- GAMBAR REFERENSI F2092S-S0717-13


REFERENCE DRAWING R-1
DRAWING NO. COB-PL-06/06-00
The foundation of air-condition please see

Rainwater pipe connect to Rainwater pipe connect to


the apron at -0.500 m level, typic the apron at -0.500 m level, typic
N

-0.750 -0.750

MQ-7 MQ-9 MQ-8 MQ-8 MQ-9 MQ-8 MQ-7

Clinic

MCC Room
±0.000
NK0505
±0.000
0.5%
Toilet
0.5% R
ZK0608 Pipe =40
0
Room
2.340 2.340
Stair Case up up
ZK0608
R=4
MQ-6

SK0712 ZK0607 Movablesemi - partitionwall 00


Stair Case
-0.850
Smoke-proof Atria DK0905
Smoke-proof Atria
DM3 ±0.000 ±0.000

Lady Toilet -0.050 GL1200


H=2100 00
R=6
Fire Control Room

-0.850 ±0.000
Cleansing Room Hall

Men Toilet -0.050


BASIN DM2 ±0.000 Reading Room

Coffee Room ±0.000


-0.050 SK0712
DM2 Screen

MQ-5'
MQ-5

0 DES 19, 2019 ISSUED FOR APPROVAL


REV DATE DESCRIPTION SIGN
Exhibition Area PROYEK / PROJECT

CILACAP EXPANSION (1x660 MW) CFSPP PROJECT


Elevator Hall Passenger Lift CILACAP, JAWA TENGAH
Reception Area
OWNER
MQ-3 MQ-4 MQ-3 PT. SUMBER SEGARA PRIMADAYA
Corridor R=6 00
00 00 R=6 S2P
R=4
EPC CONTRACTOR
MQ-1 MQ-2 MQ-2' MQ-1'
VIP Elevator 中國化學工程股份有限公司
CNCEC
APRON CHINA NATIONAL CHEMICAL ENGINEERING CO., LTD.

Rainwater pipe connect to -0.030


ENTRANCE STEP
baffle wall
PORCH
F2092S-T0103
Rainwater pipe connect to CONSTRUCTION CONTRACTOR

the apron at -0.500 m level, typic F2092S-T0103


-0.980
1/12 SLOPE
-0.030
SLOPE 1/12
-0.980
the apron at -0.500 m level, typic D&C ENGINEERING COMPANY
D&C
Handrailof stairs
F2092S-T0103 SUB CONTRACTOR

SLOPE SLOPE bafflewall


-0.960 PT. Wijaya Karya
Power Plant & Energy Departement

ENTRANCESTEP DRAWN :
NAMA GAMBAR /
F2092S-T0103 DRAWING TITLE :

ADMINISTRATION BUILDING
PERSPECTIVE OF ROOF WATER TANK
CHECKED : AND PIPE LINE
PLUMBING FIXTURE SCHEDULE

APPROVED :

ADMINISTRATION BUILDING FLOOR-1 PLAN VIEW SKALA


SCALE
1 : 25
JUMLAH GAMBAR
TOTAL OF DWG
06 of 06
NO. GAMBAR WIKA-SD-CLP- GAMBAR REFERENSI F2092S-S0717-13
REFERENCE DRAWING R-1
DRAWING NO. COB-PL-06/06-00
Rainwater pipe connect to Rainwater pipe connect to
the apron at -0.500 m level, typic the apron at -0.500 m level, typic

1% 1% 1% 1%

1% 1% 1% 1% 1% 1%

39.110

2% 2% 2% 2% 39.610 2% 2% 2%

MQ-13

up上
4.680

down下 36.985 SK0712 39.110 SK0712 down


36.985

2%

GD-14
2%

MQ-12

1% 1% 1%

39.610

1%

39.110
39.610
SK0712

1% 1% 1% 1%

LM 1021
2% 2%
39.110
2% 2% 0 DES 19, 2019 ISSUED FOR APPROVAL
40.140 REV DATE DESCRIPTION SIGN
40.170
39.110 PROYEK / PROJECT

CILACAP EXPANSION (1x660 MW) CFSPP PROJECT


SK0712 CILACAP, JAWA TENGAH

OWNER
2%
39.110 39.110 PT. SUMBER SEGARA PRIMADAYA
S2P
R=6 00 EPC CONTRACTOR
1%
00 R=6 1% 中國化學工程股份有限公司
CNCEC
CHINA NATIONAL CHEMICAL ENGINEERING CO., LTD.

CONSTRUCTION CONTRACTOR

Rainwater pipe connect to Rainwater pipe connect to D&C ENGINEERING COMPANY


D&C
the apron at -0.500 m level, typic the apron at -0.500 m level, typic SUB CONTRACTOR

PT. Wijaya Karya


Power Plant & Energy Departement

NAMA GAMBAR /
DRAWN : DRAWING TITLE :

ADMINISTRATION BUILDING
PERSPECTIVE OF ROOF WATER TANK
CHECKED : AND PIPE LINE
PLUMBING FIXTURE SCHEDULE

ADMINISTRATION BUILDING FLOOR ROOF-1 PLAN VIEW APPROVED :

REV. 1
SKALA JUMLAH GAMBAR
1 : 25 06 of 06
SCALE TOTAL OF DWG

NO. GAMBAR WIKA-SD-CLP- GAMBAR REFERENSI F2092S-S0717-13


REFERENCE DRAWING R-1
DRAWING NO. COB-PL-06/06-00
Rainwater pipe connect to
45.710 Same as section 1-1
同1-1剖面 45.710
the apron at -0.500 m level, typic
45.110 45.110

Same as section 1-1 43.590


42.990

Ceiling 41.810
41.210 Ceiling
吊顶

40.010
39.110 39.110 39.110

37.860
Fireproofing board Ceiling
36.960 Ceiling 36.960

34.860 34.860

Fireproofing board 33.180 Ceiling


32.710 Ceiling 32.280

30.180 30.180

28.930
28.460 28.460 Ceiling 28.030 Fireproofing board Ceiling

25.930 25.930

24.680
23.780 23.780 23.780 Fireproofing board Ceiling
Ceiling

21.680 21.680

20.430
19.530 19.530 Ceiling 19.530 Fireproofingboard Ceiling

17.430 17.430

16.180
15.280 15.280 Ceiling 15.280 Fireproofingboard Ceiling

13.180 13.180
0 DES 19, 2019 ISSUED FOR APPROVAL
REV DATE DESCRIPTION SIGN
PROYEK / PROJECT
11.030 11.030 Ceiling 11.030 Fireproofingboard Ceiling CILACAP EXPANSION (1x660 MW) CFSPP PROJECT
CILACAP, JAWA TENGAH

OWNER
8.930 8.930 PT. SUMBER SEGARA PRIMADAYA
S2P
7.680
6.780 Fireproofing board Ceiling EPC CONTRACTOR
6.780 Ceiling
中國化學工程股份有限公司
CNCEC
CHINA NATIONAL CHEMICAL ENGINEERING CO., LTD.

4.680 4.680 CONSTRUCTION CONTRACTOR


D&C ENGINEERING COMPANY
D&C
Ceiling
2.100 2.100 SUB CONTRACTOR

PT. Wijaya Karya


±0.000 ±0.000 Power Plant & Energy Departement

NAMA GAMBAR /
-1.500 -0.600 DRAWN : DRAWING TITLE :

ADMINISTRATION BUILDING
PERSPECTIVE OF ROOF WATER TANK
CHECKED : AND PIPE LINE
PLUMBING FIXTURE SCHEDULE

APPROVED :

SKALA JUMLAH GAMBAR


1 : 25 06 of 06
SCALE TOTAL OF DWG

NO. GAMBAR WIKA-SD-CLP- GAMBAR REFERENSI F2092S-S0717-13


REFERENCE DRAWING R-1
DRAWING NO. COB-PL-06/06-00
K
ROOF 2 J
-
PACKING WITH WATERPROOF GLUE
WATER-PROOFING FELT

Ø110 UPVC DOWN PIPE (WHITE)


WELDING

1:2.5 LEVELING MORTOR H ADDITIONAL LAYER OF WATER-PROOFING FELT MATERIAL MUST BE ANTI-CORROSIVE
EXTERIOR WALL
Check-up hole,Above the floor 0.150m F G
-
WALL SLAB
2 WATER-DRAIN SPOUT-B G
DRAINAGE TRENCH 1:10 30 114+10 30
-30X4
Damp proof layer Ø10 HOLE
Ø150x4.5 GALVANIZED
STEEL PIPE

30
APRON
30 114+10 30

F 1:5

INDOOR
H
OUTDOOR

8 PARAPET WALL (WATER-DRAIN SPOUT-B)


DES 19, 2019
0 ISSUED FOR APPROVAL

1:20 J 1:10 REV DATE


PROYEK / PROJECT
DESCRIPTION SIGN

CILACAP EXPANSION (1x660 MW) CFSPP PROJECT

K 1:10 CILACAP, JAWA TENGAH

OWNER
PT. SUMBER SEGARA PRIMADAYA
S2P
EPC CONTRACTOR
中國化學工程股份有限公司
CNCEC
CHINA NATIONAL CHEMICAL ENGINEERING CO., LTD.

CONSTRUCTION CONTRACTOR
D&C ENGINEERING COMPANY
D&C
SUB CONTRACTOR

PT. Wijaya Karya


Power Plant & Energy Departement

NAMA GAMBAR /
DRAWN : DRAWING TITLE :

ADMINISTRATION BUILDING
PERSPECTIVE OF ROOF WATER TANK
CHECKED : AND PIPE LINE
PLUMBING FIXTURE SCHEDULE

APPROVED :

SKALA JUMLAH GAMBAR


1 : 25 06 of 06
SCALE TOTAL OF DWG

NO. GAMBAR WIKA-SD-CLP- GAMBAR REFERENSI F2092S-S0717-13


REFERENCE DRAWING R-1
DRAWING NO. COB-PL-06/06-00

You might also like