Professional Documents
Culture Documents
Contract
Contract
Contract
(ARCHITECTURE):
- Initial Proposals
- 3-D Views
- Submission Drawing
- Working Plan (Basement)
- Working Plan (Ground Floor)
- Working Plan (First Floor)
- Furniture Layout (Basement)
- Furniture Layout (Ground Floor)
- Furniture Layout (First Floor)
- Working Elevations (All)
- Sections
- Roof Plan
- General Notes
(STRUCTURE):
- General Notes
- Layout Plan
- Foundation Plan
- Foundation Plan of Ground Floor
- Typical Detail of Retaining Wall (Basement)
- Foundation Details of Boundary Wall
- RCC Slab of Basement
- RCC Slab of Ground Floor
- RCC Slab of First Floor
- X-Section of Beams
(ELECTRICAL):
(PUBLIC HEALTH):
2: WOOD WORK
- Doors Detail
- Glass door /Partition Detail
- Windows Detail
- Wardrobe Details
- Floors Details
- Kitchen (Internal & External), Laundry
- First Floor Kitchen (Selection + Layout)
- Utility Cabinets
All working drawings to execute the proposed design
3: FLOORING
- Flooring layout Plan.(Layout plan defining the floor material and design if required)
- Selection of all floor material
All working drawings to execute the proposed design
4: BATHROOM DESIGN
5: WALL TREATMENTS
6: MAIN KITCHEN
- Railing Design
- Main door Design
- Main gate
NOTE: Contract Agreement is valid for the time duration mentioned below. However, if
the construction period exceeds the mentioned timeline, Consultancy fee for the extended
period shall be mutually agreed upon and paid in addition to the already agreed
Consultancy Fee.
CONSULTANCY FEE
PAYMENTS SCHEDULE
_____________________ _____________