Lokasi : BP64, BP58, BP20, BP21, BP12, BP98 & BP96

3
LS BENDILI PRIMA 200 mm (trial 1) (7 m X 10 m) Sub-Drill 1 m PPV Target :
Jarak ke Station (m): 5000
Num of holes blast at same time : 1 Isian maksimum/ lubang =
DECKING NON - DECKING Maximum Exp Charge tiap Lubang2824
(Kgs) :
76.47 m

Dalam Isian Bawah Control


Isian Atas Control Stemming Stemming Isian Control PF Decking PF Non-Deck
Kuzram Analysis (% Pass < 30 cm)
Lubang Isian Stemming Stemming Isian Stemming Plan Akhir Stemming Decking
Deck Non-Decking
(m) meter kg Akhir meter kg meter kg Kg/m3 Kg/m3 Isian Bawah Isian Atas Rata-rata
1.5 1.27 1.3 0.2 8 1.3 0.243 32.5%
2 1.53 1.5 0.5 17 1.5 0.248 44.5%
2.5 1.78 1.8 0.7 27 1.8 0.254 50.5%
3 1.84 1.8 1.2 43 2.0 0.000 0.306 60.2%
3.5 2.10 2.1 1.4 52 2.2 0.000 0.295 60.5%
4 2.30 2.3 1.7 63 2.5 0.000 0.299 62.0%
4.5 2.52 2.5 2.0 73 2.7 0.000 0.298 62.6%
5 2.81 2.8 2.2 81 3.0 0.000 0.289 61.8%
5.5 3.08 3.1 2.4 89 3.3 0.000 0.284 61.4%
6 3.20 3.2 2.8 103 3.5 0.000 0.295 63.0%
6.5 3.40 3.4 3.1 114 3.7 0.000 0.297 63.4%
7 3.60 3.6 3.4 126 3.9 0.000 0.299 63.6%
7.5 3.80 3.8 3.7 137 4.2 0.000 0.300 63.8%
8 4.02 4.0 4.0 147 4.4 0.000 0.300 63.7%
8.5 4.24 4.2 4.3 157 4.7 0.000 0.300 63.6%
9 4.45 4.5 4.6 168 4.9 0.000 0.300 63.6%
9.5 4.67 4.7 4.8 178 5.2 0.000 0.300 63.4%
10 4.89 4.9 5.1 189 5.4 0.000 0.300 63.3%
10.5 4.95 5.0 5.6 205 5.5 0.000 0.308 64.3%
11 1.5 2.90 107 8.39 3.7 2.90 107 3.99 5.04 5.04 6.0 220 5.6 0.306 0.315 77.5% 60.2% 63.9% 65.0%
11.5 1.7 3.05 113 8.76 3.8 3.00 111 4.05 5.22 5.22 6.3 232 5.9 0.304 0.316 76.1% 60.5% 63.5% 65.0%
12 2.0 3.10 114 9.21 3.7 3.16 117 4.06 5.21 5.21 6.8 251 5.9 0.300 0.326 73.8% 61.5% 63.0% 66.0%
12.5 2.2 3.20 118 9.62 3.8 3.33 123 4.11 5.20 5.20 7.3 270 5.9 0.300 0.335 72.5% 62.2% 62.8% 66.9%
13 2.3 3.45 127 9.90 3.8 3.37 124 4.18 5.20 5.20 7.8 288 6.0 0.300 0.343 72.3% 62.0% 62.7% 67.7%
13.5 2.5 3.65 135 10.22 3.9 3.45 127 4.28 5.20 5.20 8.3 307 6.0 0.300 0.350 72.0% 61.8% 62.6% 68.4%
14 2.6 3.80 140 10.58 4.0 3.60 133 4.36 5.20 5.20 8.8 325 6.1 0.300 0.357 71.6% 62.1% 62.5% 69.0%
14.5 2.8 3.90 144 10.99 4.0 3.77 139 4.39 5.20 5.20 9.3 343 6.1 0.300 0.363 70.5% 62.9% 62.3% 69.5%
15 3.1 4.00 148 11.40 4.0 3.95 146 4.37 5.30 5.30 9.7 358 6.3 0.300 0.366 69.2% 63.8% 62.2% 69.6%
15.5 3.3 4.10 151 11.81 4.0 4.14 153 4.38 5.30 5.30 10.2 377 6.3 0.300 0.371 68.2% 64.6% 62.1% 70.1%
16 3.5 4.30 159 12.13 3.9 4.22 156 4.37 5.30 5.30 10.7 395 6.4 0.300 0.376 67.5% 65.0% 62.0% 70.5%
16.5 3.6 3.74 138 13.14 4.2 5.00 185 4.66 5.00 5.00 10.8 399 6.1 0.297 0.368 65.1% 66.3% 61.6% 69.5%
17 3.2 3.90 144 13.49 4.8 5.15 190 5.27 5.75 5.75 11.3 415 6.9 0.298 0.371 68.1% 64.0% 61.6% 69.7%
18 3.5 4.35 161 14.09 4.9 5.30 196 5.41 5.75 5.75 12.3 452 7.0 0.299 0.380 67.9% 63.9% 61.5% 70.4%
19 3.9 4.80 177 14.68 4.8 5.45 201 5.36 5.75 5.75 13.3 489 7.1 0.300 0.388 66.8% 64.6% 61.4% 71.0%
20 4.0 4.00 148 16.40 5.2 6.85 253 5.84 5.75 5.75 14.3 526 7.2 0.301 0.396 63.9% 66.3% 61.3% 71.4%
21 4.0 4.00 148 17.40 5.5 7.50 277 6.26 5.75 5.75 15.3 563 7.3 0.303 0.402 63.9% 66.3% 61.4% 71.8%
22 4.0 4.00 148 18.40 5.5 8.50 314 6.36 5.75 5.75 16.3 600 7.4 0.314 0.408 63.9% 67.7% 62.5% 72.2%
23 4.0 4.00 148 19.40 5.5 9.50 351 6.46 5.75 5.75 17.3 637 7.5 0.324 0.414 63.9% 68.8% 63.4% 72.4%
24 4.0 4.00 148 20.40 5.5 10.50 388 6.56 5.75 5.75 18.3 674 7.6 0.333 0.419 63.9% 69.8% 64.2% 72.7%

Note
LUBANG PRODUKSI
1. Loading disesuaikan dengan angka actual pita drill, angka di belakang koma semuanya dibulatkan ke LS 0.5 meter ( Contoh: 10.1 m s/d 10.9 m menggunakan isian LS: 10.5m)
2. Waktu gassing adalah 40 menit sebelum di stemming, minimal adalah 20 menit dan harus approval T5
3. Stemming lubang basah 2 meter sisanya drill cutti ng, kering full drill cutting
4. Mulai kedalaman 11 meter ke atas praktek Decking untuk semua lubang kering
5. Bila lubang basah, kedalaman 11 meter keatas praktek decking dengan stemming batu merah (bila stemming tidak ada lakukan Praktek Non deck)
LUBANG TRIM
1. Plascon mulai digunakan pada kedalaman 6 m
2. Dibawah 9m = 1/2 Col Charge Explosive (Lubang Produksi)
3. 10m - 12m = 80 kg, 13m - 14m = 100kg, 15m - 16m = 120kg, 17m - 18m = 140kg, 19m - 20m = 160kg, 21m - 22m = 180kg, 23m - 24m = 200kg