MEP

TABLE OF CONTENTS

1. DEFINITIONS & ABBREVIATIONS

2. PURPOSE

3. SCOPE

4. ROLES & RESPONSIBILITIES

5. EQUIPMENT, TOOLS, INSTRUMENTS, SIGNAGES, ETC

6. COMMISSIONING WORK SEQUENCE

7. HEALTH, SAFETY AND ENVIRONMENT

8. REFERENCE DOCUMENTS

9. APPENDICES

9.1 Health and Safety Risk Assessment


9.2 Drawings and Sketches
9.3 Organizational Chart
9.4 Forms and Templates
9.5 Approved MAR’s
9.6 Testing and Commissioning TestReports
9.7 Testing and CommissioninFlow Chart
9.8 Certificates
9.9 Compliance Statement
9.10 Clearance to Energize
1. DEFINITIONS & ABBREVIATIONS
1.1 ABBREVIATIONS

S No Abbreviation Description
1 ITP Inspection Test Plan
2 IRE Inspection Request
3 ARC Electrical
4 NCR Non-Conformance Report
5 PPE Personal Protective Equipment
6 PQP Project Quality Plan
7 PM Project Manager
8 QA/QC Quality Assurance/ Quality Control
10 SE Site Engineer
11 Cx Commissioning
12 CxM Commissioning Manager
13 CxA Commissioning Authority
14 CxE Commissioning Engineer
15 CxC Commissioning Contractor - (Subcontractor)
16 Cx Team Commissioning Team
17 CBS Central Battery System
18 RA Risk Assessment

1.2 GENERAL TERMS

a) Owner is Qatar Rail who is referred also as End User.


b) QRIT is - Qatar Rail Integrated Team
c) Commissioning Authority - An entity identified by the Owner who plans,
schedules, and coordinates the commissioning team to implement the
Commissioning Process.
d) Sub-Contractor IMAR Trading & Contracting Co.W.L.L is who is a self-
certification company who hired the supervising engineer to check and approve
subcontractor’s works.
e) Inspection Request (IRE) refers to a request to the SE to inspect an installation
or to witness a test. This request raised by the construction team of the
subcontractor to QRIT through SPH. The works must have prior inspection and
recommending approval by subcontractor’s QA/QC inspector(s) prior to
submission to QRIT, through SPH.
2. PURPOSE

The purpose of these specifications is to assure that all Installed SMOKE CURTAIN are
operational and within design and project specifications.
This procedure details must be conducted during installation, commissioning and start
up.
These inspections and tests are performed on Smoke Curtain in order to confirm that:
1. The system’s equipment is properly working.
2. The system’s equipment is compliance with design intent.
3. The system's equipment doesn't have conflict with other nearby systems or
structures.

3. SCOPE

The document covers the procedure of testing and commissioning of the Smoke Curtain
installed in the project, which is in accordance to technical documents and Project
Specification Section M009-SPH-ARC-SPE-00007, Section - 55 23 3701.

4. ROLES & RESPONSIBILITIES

There shall be different teams within the subcontractor who will be involved in conducting
SMOKE CURTAIN’s testing and commissioning. The inspection will be offered to the
QA/QC Engineer(SPH), Consultant/Engineer and QRIT.

4.1 Project Manager

1. Project manager is responsible for overall project execution.


2. Project manager is responsible timely completion of project in accordance
to all contractual requirements.

4.2 Qatar Rail Integrated Team (QRIT), Consultant / Engineer

1. QRIT, Consultant or Engineer is the approving body during testing and


commissioning. They are responsible for witnessing and commending the
equipment or works being inspected.

4.3 T&C or QA/QC Manager (SPH-JV)

1. Reviewing all relevant documentation and test reports and prepare all
handing over documents.
2. Ensuring that all activities subject to inspection are recorded.
3. Controlling and organizing the inspection works.
4. Ensuring that inspections are carried out in a timely manner.
He is authorized to report to the Project Manager if any deviation from the Safety and
quality Procedures are identified with site installations during the stages of witnessing
the testing and commissioning inspections, and accountable to ensure that QA/QC
team is adequately staffed by suitably trained and experienced personnel with relevant
knowledge about HSE procedures.

4.4 T&C or QA/QC Engineer (SPH-JV)

1. CxE is Responsible for the day to day testing activities on site, design
information approval and for the onsite Testing & Commissioning ensuring
that HSE, quality and standards are maintained throughout the
commissioning process.
2. CxE is Responsible to verify that applicable equipment and systems are
installed according to the manufacturer’s recommendations and to industry
accepted standards.
3. CxE is Responsible to verify that all commissioning works are to be carried
out according to specification and approved drawings.
4. CxE is Responsible to ensure in consultation with the Commissioning
Manager that the manpower involved in the Commissioning process are
moved as agreed and planned.
5. CxE is Responsible to Coordinate with the CxM, Commissioning Team, and
Specialist Sub Contractor and plan the work in advance as per the work
sequence.
6. CxE is Responsible to Coordinate with the Main Contractor and ensure
implementation of any comments raised by the consultant.
7. CxE is responsible for maintaining a proper records of all the test, check list
and their results record.
8. CxE is Responsible to monitor and update Testing and Commissioning
progress and report to the Commissioning Manager.

4.5 Commissioning Contractor (CxC) - Subcontractor (IMAR)

1. CxC is responsible to Verify test and document proper performance of


equipment and system.
2. CxC is responsible to maintain proper coordination with the Commissioning
Engineer on the daily basis regarding the commissioning status of the
particular equipment/system being undertaken.
3. CxC is responsible to provide the Engineer daily progress report indicating
the works achieved and discuss with him the planned activities for the next
day.
4. CxC is responsible to inform the Engineer of the areas/system ready for
inspection.
5. CxC is responsible to ensure full coordination with the Safety Officer to
maintain safe working and proper housekeeping of the site.
6. CxC is responsible for verifying the tests shall carried out as per the
specification of the project, if there is any technical or non-technical issue, it
should be notified and discussed with commissioning Engineer of the
area/system
7. CxC shall Initial system/equipment start up
8. CxC Shall co-operate with the Commissioning Manager & Engineer, as far
as may be necessary,
9. CxC shall provide equipment specific test sheets for the system.
10. CxC shall attend the site as per the commissioning schedule to lead the
equipment testing as per project specification.
11. CxC shall provide calibrated test instruments as required to carry out the
commissioning process
12. CxC shall provide their own specialist equipment which is not generally on
site and this should be agreed before commencement.
13. CxC should carry a calibrated instrument for the testing of system, the
calibration certificate should be available with supplier during testing and
Inspection with Main contractor, consultant, Client.
14. In case of failure in any test, the supplier shall rectify, and the commissioning
engineer to re-offer the test to CxM & the Consultant for re-witnessing and
approval.

4.6 Specialist's Team - (Techtradedoors)


(Project Engineer / T&C Engineer / Site Engineer / Site Supervisor & Foreman)

1. Delivering the overall Testing works in a safe and timely manner, ensuring
conformance with the approved design.
2. Verifying that testing work carried out in accordance with the requirements
of the contract.
3. Ensuring the quality standards set for the Testing work are achieved and
the work team adhere to the QA/ QC and HSE requirements of the contract.
4. Shall inform the T&C Team for finished constructions and available systems
for testing.
5. Shall raise inspection request (IRE) if the system or part of the system is
ready for the testing & commissioning of Lights.
6. Shall ensure that proper work permit is obtained prior to start of testing
activities.
7. Shall ensure that proper safety precautionary measures and proper tool box
briefing were conducted prior to the start of testing activities.
8. Shall ensure that the activities shall be conducted safely and in compliance
with the approved methods, manufacturer’s recommendations, and relevant
standards.
9. Shall ensure the readiness of system /panel / area / tools / devices /
personnel / etc. that are included and required for the testing.
10. Shall provide the necessary manpower, supplies, lifting and shifting
equipment.
11. Shall ensure that the works are being carried out in accordance with contract
requirements and this Procedure.
12. Management of the site activities to ensure that the team carries out the
works in time with the delivery schedule.
13. Shall conduct rectification of works in case of failed testing and raised a
revised IRE.

4.7 HSE Manager

1. Liaise with management team to enforce policy conformance and Project


HSE Plan. Evaluates site process to determine controls to keep the workers
safe.
2. Ensure that all workers received adequate instructions, trainings and
supervisions at site for them to work safely
3. Provide instructions to establish safe working methods outline potential
hazards at each stages and indicate precautions to be adopted.
4. Carry out site survey on daily basis to ensure that the HSE methods of
working are in operation and that all regulation is being observed
5. He is accountable to ensure that adequate inspections and reporting on
places of work and working practices is carried out, ensures that all
necessary records are maintained, Assist Managers in the preparation of
HSE Plans in order to identify hazards and recommends appropriate action,
Promotes HSE awareness and HSE training at all levels, HSE training
needs and liaise with other departments regarding the implementation of
training and maintenance of records.

4.8 HSE Officer

1. On site safety issues, site safety induction. Implement and ensure the safety
procedures and work environment at site.
2. He is authorized to perform all the essential HSE related inspections and
reporting on places of work in order to ensure that proper working practices
are carried out.
3. He is accountable to implement an adequate system to control and identify
hazards and provides advice to all site personnel regarding the safety
matters considering also the health and environment management.
4. HSE officer is authorized to stop any unsafe work.

5. EQUIPMENT, TOOLS, INSTRUMENTS, SIGNAGES, ETC

Listed below is the list of proposed major items needed to undergo the work.
Items Tools / Plants & Equipment
1 Hand tools: tapes, markers, etc.
2 Scaffolds / Ladders ( Supplied by the main contractor)

6. COMMISSIONING WORK SEQUENCE

Work sequence of testing and commissioning for SMOKE CURTAIN will be done as
per the following phases

6.1 Tests Before Completion

a) Stage – 1: Factory Acceptance Test (FAT)


Factory Acceptance Test (FAT) is not applicable for SMOKE CURTAIN as per QRAIL
Memorandum
b) Stage – 2:- Installation Test (IT)
1 Visual Inspection to verify system Installed on site as per approved MES, MAR and shop
drawings
2 Verify that the Inspection request (IRE) for the system being commissioned is approved
for installation.

c) Stage – 3: Partial Standalone (PSAT)

After approval of the Inspection Release Note (IRN), these steps of testing shall takes place
In an energized state to prove functionality of the system by completing these tests,
Pre-Commissioning Certificates (PCC) to be issued and submitted to the Engineer for
comment/review and acceptance.

Pre-commissioning Checks and Visual Checks Smoke Curtain

1. Check and ensure all the DBs, feeding power to Smoke Curtains are commissioned
and ready to energise.
2. Check and ensure, CBS are commissioned and ready to be used.
3. Check all the cable/Wire are tested for continuity and insulation resistance.
4. Check and ensure, there is no any damage on Smoke Curtain fittings
5. Ensure all the Cable/Wires are terminated at Smoke Curtain and panel side with proper
and approved tagging.
6. Ensure proper cable management inside panel.
7. Ensure all Smoke curtains and components are installed.
8. Ensure there is no obstruction on the curtain's path.
d) Stage – 4: Stand Alone Test (SAT)

1. Prior to the Stand Alone Tests (SAT), a Test Readiness Review will be held. The main
purpose of TRR is to check that the objective of the test is stated, the test configuration
(test methods and procedures, scope of test and safety) is defined , the test resources
are available and the results of the previous tests have not affected the test pre-
requisites. By Completing these tests, Partial Acceptance Certificate (PAC) to be issued
and submitted to the Engineer for Comment/review and acceptance. Ensure that all the
pre-commissioning checks are carried out successfully and are approved.

SAT checks for Normal Smoke curtain Performance Tests:

1. Ensure that all the pre commissioning checks are carried out successfully and are
approved.
2. Ensure power supply availability to energize for respective normal Smoke curtain.
3. Turn ON the power supply of the circuit being tested.
4. Check the function of Smoke Curtain by turning the key to TEST.
5. Check the function of Smoke Curtain when key is in TEST and NORMAL position.
6. Record the Performance of Smoke Curtain in commissioning sheet.

• Access the Fire Curtain Power Supply Unit (PSU) and Zone
Control Panel (ZCP).
• In the ZCP, key to “Test” position (default position is “Normal”
or “Auto”) to descend the curtain into fire operational position.
• After finishing the test, key to “Normal” or “Auto” position and
press the “Reset” Button.

6.2 Tests on Completion

Stage – 5: MEP System Integration Test (SIT)


Smoke Curtains are controlled by the Smoke Curtain control system and Integrated
with BACS, System integration of Smoke Curtain system with BACS.
Operation of Smoke Curtain is automatically activated by an alarm or detector signal.
To test the Integration of the Smoke Curtain system and Fire Alarm System, fire alarm
signal should be send to the Smoke Curtain system. Smoke curtains should descend
to its fire operational position upon receiving the signal. To reset the system, the
"Reset" button in the Zone Control Panel (ZCP) should be pressed.

6.3 Tests After Completion

Stage – 6: System performance Test (SIT)


System performance Test is the last stage of Testing and Commissioning procedure
and by completing these test, Certificate of Completion (COC) to be issued and
submitted to the Engineer for comment/review and acceptance.
7. HEALTH, SAFETY, ENVIRONMENT

The Health and Safety Plan shall be adhered.

7.1 Site Induction, Permit and Rules

1. All workers (Labour and Staff) will receive a site induction and be issued with PPE
including a helmet with a PMC Inducted sticker.
2. The workers (Labour and Staff), whom have been inducted are only Permitted to work.
3. Regular Tool Box talks shall be held and attendance shall be logged.
4. The Emergency Response Plan of the main contractor will be in place and will be strictly
adhered to.
5. In the event of any accident the Incident Reporting Procedure will be followed at all
times.
6. Always pay attention to the Emergency Telephone Numbers posted on the notice board
in the site office See the attached Sheet of Incident Reporting Procedure.
7. Specific HSE Hazards are mitigated in the Job Hazard Analysis.
8. Heat Stress Management Plan shall be followed for Site Working.
9. Safety inspection is conducted by Health & Safety officer according to QCS 2010
section-11, as per the whole process of the job to identify any hazards to be stated and
recommend for rectification.
10. The result of the inspection will be communicated to all persons who will be involved for
the execution of the work.
11. Dispose all wastes, and unwanted materials must be disposed of at a designated place.
12. Notify your supervisor of the requirement for the separate disposal of chemical or
inflammable wastes.

7.2 Health & Safety

1. The Supervising personnel shall ensure that each person reporting to them in the field
is aware of all of the information and requirements issued through the tool box talks,
induction or such other notices.
2. The health and safety Officer/Supervisor shall create and approve Tool Box Talks which
the site supervisor shall conduct at various times and before use of equipment, within
the topics, not limited to, are:

➢ Use of ladders;(If specified to use in a particular space)


➢ Use of tools including specialized equipment;
➢ Personal protective equipment;
➢ Smoking;
➢ Handling of waste material;
➢ Use of ablution facilities;
➢ Barricades, signs and warning tape, etc.

7.3 Work Permits


1. Before commencement of work, a PERMIT TO WORK indicating the activities to be
performed shall be obtain from the concern authorities as per HSE policy and
procedure.
2. The Site Supervisor / Site Engineer are the authorized personnel to issue and control
work permits.
3. Make sure that every worker to perform the work has attended the specific safety
Training before commencing work.
4. Working in confined space (Only trained worker shell be allowed), require work permit
form Site Engineer / Site Supervisor.
5. Safety inspection is conducted by Health & Safety officer and shall identify any hazards
to be stated on the permit to work format.
6. The result of the inspection with the permit to work will be communicated to all persons
who will be involved for the execution of the work.

8. REFERENCE DOCUMENTS

1. Technical Specifications References


• Project Specifications M009-SPH-ARC-SPE-00007 Section 55 23 3701

• Main Contractor HSE Plan - M009-SPH-HMC-PLN-0001

• Approved MAR - M009-SPH -ARC-MAR -00291 Rev 1.0

• Approved Shop Drawings -


M009-SPH-ARC-DWG-GWST080-ZZ-25969 Rev 1
M009-SPH-ARC-DWG-GWST080-ZZ-25970 Rev 1
M009-SPH-ARC-DWG-GWST080-ZZ-25971 Rev 1
M009-SPH-ARC-DWG-GWST080-ZZ-25972 Rev 1
M009-SPH-ARC-DWG-GWST080-ZZ-25973 Rev 1
M009-SPH-ARC-DWG-GWST080-ZZ-25974 Rev 1
M009-SPH-ARC-DWG-GWST080-ZZ-25975 Rev 1
M009-SPH-ARC-DWG-GWST080-ZZ-25976 Rev 1
M009-SPH-ARC-DWG-GWST080-ZZ-25977 Rev 1
M009-SPH-ARC-DWG-GWST080-ZZ-25978 Rev 1
M009-SPH-ARC-DWG-GWST080-ZZ-25979 Rev 1
M009-SPH-ARC-DWG-GWST080-ZZ-25980 Rev 1
M009-SPH-ARC-DWG-GWST080-ZZ-25981 Rev 1
M009-SPH-ARC-DWG-GWST080-ZZ-25982 Rev 1
M009-SPH-ARC-DWG-GWST080-ZZ-25983 Rev 1
M009-SPH-ARC-DWG-GWST080-ZZ-25984 Rev 1
M009-SPH-ARC-DWG-GWST080-ZZ-25985 Rev 1
M009-SPH-ARC-DWG-GWST080-ZZ-25986 Rev 1
M009-SPH-ARC-DWG-GWST080-ZZ-25987 Rev 1
M009-SPH-ARC-DWG-GWST080-ZZ-25988 Rev 1
2. Qatar Construction Standards
• QCS 2010/2014

3. International Standards
• BS 8524-1:2013
• BS EN 13501-2:2007+A1:2009
• BS EN 1634-1:2014

4. Project Quality Plans


• M009-IMR-QMS-PLN-00001

9. REFERENCE DOCUMENTS

9.1 Health, Safety & Risk Assessment


9.2 Drawing and Sketches
9.3 Organizational Chart
9.4 Forms and Templates
9.5 Approved MAR's
9.6 Testing & Commissioning Test Reports
9.7 Testing & Commissioning Flow Chart
9.8 Certificates
9.9 Project Specification
Appendix 9.1
Health & Safety & Risk Assessment
RISK ASSESSMENT

Date: 2018-09-04 M009-SPH-MEP-PRO-00044 Rev: 1 Page 1 of 15

HAZARD IDENTIFICATION AND RISK ASSESSMENT SHEET


Hazard Identification & Risk Assessment Sheet for Testing and Commissioning of Smoke Curtain

Project GREEN LINE ELEVATED AND AT GRADE

Risk Assessment Risk Assessment


Item Process Hazard (No Control) Controls (With Controls)
P S R P S R

➢ Competent operators to be engaged


with 3rd party test certificate for fork lift
➢ Train forklift truck operators to follow
site safety requirements. i.e.,
maintaining maximum speed, switching
off engine in basement areas when idle
and wearing seat belt etc.,
Loading / unloading ➢ Separate forklift truck traffic and other
1. Fork lift truck operation
Smoke curtain with, workers where possible.
lead to struck / hit over 4 4 High 1 4 Low
Crane, forklift truck, and ➢ Restrict the use of forklifts truck near
1.1 men and other vehicles
shifting to site. time clocks, break rooms, cafeterias,
and main exits, particularly when the
flow of workers on foot is at a peak
(such as at the end of a shift or during
breaks)
➢ Flagman to be trained by 3rd Party.
Lifting equipment to have load
certificate and checked daily prior to
use.

Page 1 of 15
RISK ASSESSMENT

Date: 2018-09-04 M009-SPH-MEP-PRO-00044 Rev: 1 Page 2 of 15

HAZARD IDENTIFICATION AND RISK ASSESSMENT SHEET


Hazard Identification & Risk Assessment Sheet for Testing and Commissioning of Smoke Curtain

Project GREEN LINE ELEVATED AND AT GRADE

Risk Assessment Risk Assessment


Item Process Hazard (No Control) Controls (With Controls)
P S R P S R

➢ Install physical barriers where practical


to ensure that workstations are isolated
from aisles travelled by forklift truck.
➢ Evaluate intersections and other blind
corners to determine whether overhead
dome mirrors could improve the visibility
of forklift truck operators or workers on
foot
➢ Make every effort to alert workers when
a forklift is nearby. Use horns, audible
backup alarms, and flashing lights to
warn workers and other forklift truck
operators in the area
➢ Install and use Flashing lights which
are important in areas where the
ambient noise level is high Work
Environment
➢ Ensure that workplace safety
inspections are routinely conducted by
a person who can identify hazards and

Page 2 of 15
RISK ASSESSMENT

Date: 2018-09-04 M009-SPH-MEP-PRO-00044 Rev: 1 Page 3 of 15

HAZARD IDENTIFICATION AND RISK ASSESSMENT SHEET


Hazard Identification & Risk Assessment Sheet for Testing and Commissioning of Smoke Curtain

Project GREEN LINE ELEVATED AND AT GRADE

Risk Assessment Risk Assessment


Item Process Hazard (No Control) Controls (With Controls)
P S R P S R
conditions that are dangerous to
workers e.g. obstructions in the aisle,
blind corners and intersections, and
forklift truck that come too close to
workers on foot
➢ Enforce safe driving practices such as
obeying speed limits, stopping at stop
signs, and slowing down and blowing
the horn at intersections
➢ Repair and maintain cracks, crumbling
edges, and other defects on loading
➢ docks, aisles, and other operating
surfaces
• Engage competent drivers.
• Coordination while loading/unloading
Dangers from
reversing / mano- with the vehicle drivers. Med
1.2 4 3 High • Maintenance of side & rear mirrors and 2 3
euvring vehicles while i um
unloading. engage reverse horns and engage
assistant / banks man while reversing of
trailers

Page 3 of 15
RISK ASSESSMENT

Date: 2018-09-04 M009-SPH-MEP-PRO-00044 Rev: 1 Page 4 of 15

HAZARD IDENTIFICATION AND RISK ASSESSMENT SHEET


Hazard Identification & Risk Assessment Sheet for Testing and Commissioning of Smoke Curtain

Project GREEN LINE ELEVATED AND AT GRADE

Risk Assessment Risk Assessment


Item Process Hazard (No Control) Controls (With Controls)
P S R P S R
• Trained flagman to be engaged in
directing the operator. All persons to
stand clear of loads being loaded or
unloaded.
• Flagman to control work area prevent
persons from entering area of moving
vehicles.
• Flagman to control work area, prevent
persons from entering area of moving
vehicles. No persons to stand
underneath or close to suspended
loads
Check weight of load and object size /
Fall of objects from shape.
1.3 fork lift truck while 4 4 High Secure the large volume loads 1 4 Low
handling with the forklifts. Use palletized loads to
the maximum extend.
Engage suitable size of fork lift
having higher capacity having valid 3rd
party certificates & inspecting
periodically.

Page 4 of 15
RISK ASSESSMENT

Date: 2018-09-04 M009-SPH-MEP-PRO-00044 Rev: 1 Page 5 of 15

HAZARD IDENTIFICATION AND RISK ASSESSMENT SHEET


Hazard Identification & Risk Assessment Sheet for Testing and Commissioning of Smoke Curtain

Project GREEN LINE ELEVATED AND AT GRADE

Risk Assessment Risk Assessment


Item Process Hazard (No Control) Controls (With Controls)
P S R P S R
• Periodic inspection and availability of
revolving beacon lamps/reverse horns
etc.
• Competent operators with valid 3rd
party certificate.
• Operators/ drivers shall follow site safety
requirements i.e. maintaining stipulated
speed limit, switch off engine when idle
and wearing seat belts etc.
Loading and • Separate vehicle traffic and other worker
unloading from where possible.
vehicles using mobile • Restrict the unloading works near duty
1.4. 3 4 High 1 4 Low
crane ,lifting start/finish times, breaks rest rooms
equipment and lifting canteen And main exits, particularly
operations when the flow of workers on foot is at a
peak (such as at the end of a shift or
during breaks)
• Install physical barriers and signs to
ensure that the work and
offloading/loading areas are isolated
from other employees

Page 5 of 15
RISK ASSESSMENT

Date: 2018-09-04 M009-SPH-MEP-PRO-00044 Rev: 1 Page 6 of 15

HAZARD IDENTIFICATION AND RISK ASSESSMENT SHEET


Hazard Identification & Risk Assessment Sheet for Testing and Commissioning of Smoke Curtain

Project GREEN LINE ELEVATED AND AT GRADE

Risk Assessment Risk Assessment


Item Process Hazard (No Control) Controls (With Controls)
P S R P S R
• Proper communication between banks
man with the crane operator and vehicle
driven by means of flag/whistle /radios or
hand signals
• Daily pre-start inspections of plant and
lifting equipment-lifting equipment to
have valid 3rd party load test certificates.
All person to stand clear of loads being
loaded or unloaded
• Taglines to be used
• Banks men to be competent and is
possession of 3rd party training
certificate.
• Tool box talk shall be conducted by
supervisor in charge before starting the
works.
Handling, lifting carrying • Tools and Equipment are to be handled
Back injury, Hand by trained and competent workers only.
2. tools and other heavy 4 3 High 1 3 Low
Injury and Legs Injury • Workers shall wear suitable hand gloves
materials.
and other compulsory PPE’s
Using mechanical plant before manual
lifting should be considered before all

Page 6 of 15
RISK ASSESSMENT

Date: 2018-09-04 M009-SPH-MEP-PRO-00044 Rev: 1 Page 7 of 15

HAZARD IDENTIFICATION AND RISK ASSESSMENT SHEET


Hazard Identification & Risk Assessment Sheet for Testing and Commissioning of Smoke Curtain

Project GREEN LINE ELEVATED AND AT GRADE

Risk Assessment Risk Assessment


Item Process Hazard (No Control) Controls (With Controls)
P S R P S R
else

• Tool box talk shall be conducted by


supervisor in charge before starting the
works.
• Working area must be kept clean and
Material tip off whilst free of any obstruction.
Shifting material using
being transported. Hand • Pallet trucks shall be pulled by at least
3. hydraulic trolley and 4 2 High 1 2 Low
Injury and Legs Injury two workers.
Manually
during manual handling. • Do not overload the pallet trucks such
that the materials may fall off or having
difficulty to move the loaded trucks even
by two men.
Wear Compulsory PPE’s
Drilling of CMU, RC • Tool box talk must be conducted before
Walls and metal studs work will start.
using electric drills. Leading to eye Hig • All equipments and connections of
4. 4 4 1 4 Low
Use of portable electrical injuries. h power cables are to be checked prior to
drills Drilling at height use and ensure that all are in good
on/over passenger condition.

Page 7 of 15
RISK ASSESSMENT

Date: 2018-09-04 M009-SPH-MEP-PRO-00044 Rev: 1 Page 8 of 15

HAZARD IDENTIFICATION AND RISK ASSESSMENT SHEET


Hazard Identification & Risk Assessment Sheet for Testing and Commissioning of Smoke Curtain

Project GREEN LINE ELEVATED AND AT GRADE

Risk Assessment Risk Assessment


Item Process Hazard (No Control) Controls (With Controls)
P S R P S R
access area All electrical equipment and
appliancesshall be inspected by
competent person and given a current
color coding quarterly.
• Ensure electrical tools are handled and
operated by trained and competent
workers.
• Do not attempt to repair the electric drill
in case of malfunction. send it to the
workshop
• Trained Operators
• Persons conducting drilling shall wear
gloves and eye protection.
• Passengers access/walk way area must
be cordoned off with proper hoarding
• False ceiling must be protected with
proper platform to prevent fall of
• materials outside the hoarding due
vibrations inside the hoarded area

Page 8 of 15
RISK ASSESSMENT

Date: 2018-09-04 M009-SPH-MEP-PRO-00044 Rev: 1 Page 9 of 15

HAZARD IDENTIFICATION AND RISK ASSESSMENT SHEET


Hazard Identification & Risk Assessment Sheet for Testing and Commissioning of Smoke Curtain

Project GREEN LINE ELEVATED AND AT GRADE

Risk Assessment Risk Assessment


Item Process Hazard (No Control) Controls (With Controls)
P S R P S R
• Manufacturers operating instructions are
on site, known to appropriate staff and
are being followed
• Appropriate servicing is carried out by a
competent contractor at a frequency as
determined by the manufacturer
• Inspection / servicing records for any
repairs / maintenance that has been
Unrestricted Fall of carried out by anyone are held within a
Smoke Curtain, central file which is kept on site
Pre-Post Installation components, tools & Hig • Regular checks on the Smoke Curtain
5. 3 5 1 5 Low
activities equipments in h and operating mechanism is
passenger access undertaken by a suitably trained
area employee
• Area must be barricaded
• Warning signs to be installed.
Passengers access/walk way area must
be cordoned off with proper hoarding
False ceiling must be protected with
proper platform to prevent fall of
materials outside the hoarding due
vibrations inside the hoarded area

Page 9 of 15
RISK ASSESSMENT

Date: 2018-09-04 M009-SPH-MEP-PRO-00044 Rev: 1 Page 10 of 15

HAZARD IDENTIFICATION AND RISK ASSESSMENT SHEET


Hazard Identification & Risk Assessment Sheet for Testing and Commissioning of Smoke Curtain

Project GREEN LINE ELEVATED AND AT GRADE

Risk Assessment Risk Assessment


Item Process Hazard (No Control) Controls (With Controls)
P S R P S R
• Adequate scaffold and work platforms
erected and inspected by competent
persons.
• Scaffold wheels shall be locked before
using it.
• Scaffold bracings and handrails shall not
be tampered or removed.
Working at heights, • Mobile scaffold should not be moved or
using ladders, pushed from one place to another when
platforms or scaffolds person are working in the platform at
6. Installation of Smoke resulting in fall of men. Hig
3 5 top. 1 5 Low
6.1 Curtain h
• Using full body safety harness when
Working in working 2mtr. Above from ground level
passenger access and during working on peripheries of
area bird cage scaffolds.
• Inspection of safety harness on
periodical basis and on spot checking of
the same before start of work.
• Scaffolds to be inspected every 7days or
after increment intervals.
• Passengers access/walk way area must

Page 10 of 15
RISK ASSESSMENT

Date: 2018-09-04 M009-SPH-MEP-PRO-00044 Rev: 1 Page 11 of 15

HAZARD IDENTIFICATION AND RISK ASSESSMENT SHEET


Hazard Identification & Risk Assessment Sheet for Testing and Commissioning of Smoke Curtain

Project GREEN LINE ELEVATED AND AT GRADE

Risk Assessment Risk Assessment


Item Process Hazard (No Control) Controls (With Controls)
P S R P S R
be cordoned off with proper hoarding
• False ceiling must be protected with
proper platform to prevent fall of
materials outside the hoarding due
vibrations inside the hoarded area
Tool box talk must be conducted before
the work starts.
Follow correct and
approved procedures.
Use correct Tools for the job
Tool box talk must be conducted
before the work starts.
PPE’s shall be worn while carrying
Hands / fingers out installation works. (hard hats,
Hig
6.2 caught in moving 4 3 high visibility vest, safety 1 3 Low
h
parts of equipment glasses, safetygloves, coveralls, safety
boots, hearing protection (when
required), face mask (when required)
• Installation of Smoke Curtain shall be
carried out by skilled and competent
workers only.

Page 11 of 15
RISK ASSESSMENT

Date: 2018-09-04 M009-SPH-MEP-PRO-00044 Rev: 1 Page 12 of 15

HAZARD IDENTIFICATION AND RISK ASSESSMENT SHEET


Hazard Identification & Risk Assessment Sheet for Testing and Commissioning of Smoke Curtain

Project GREEN LINE ELEVATED AND AT GRADE

Risk Assessment Risk Assessment


Item Process Hazard (No Control) Controls (With Controls)
P S R P S R
• Use safety glass while drilling
4 2 Med 1 2 Low
• Use dust mask while drilling.
Flying particles from
6.3
drilling • Maintaining proper posture while drilling
3 3 Med 1 3 Low
• Grip and handle to be used during drilling
operation.
• Adequate scaffold and work platforms
erected and inspected by competent
persons.
• Scaffold wheels shall be locked before
Working at heights,
using it.
using ladders,
• Scaffold bracings and handrails shall not
platforms or scaffolds
be tampered or removed.
Motor Operator resulting in fall of men.
7 3 5 High • Mobile scaffold should not be moved or 1 5 Low
Installation
pushed from one place to another when
Working in
person are working in the platform at
passenger
top.
access area
• Using full body safety harness when
working 2mtr. Above from ground level
and during working on peripheries of
bird cage scaffolds.

Page 12 of 15
RISK ASSESSMENT

Date: 2018-09-04 M009-SPH-MEP-PRO-00044 Rev: 1 Page 13 of 15

HAZARD IDENTIFICATION AND RISK ASSESSMENT SHEET


Hazard Identification & Risk Assessment Sheet for Testing and Commissioning of Smoke Curtain

Project GREEN LINE ELEVATED AND AT GRADE

Risk Assessment Risk Assessment


Item Process Hazard (No Control) Controls (With Controls)
P S R P S R
• Inspection of safety harness on
periodical basis and on spot checking of
the same before start of work.
• Scaffolds to be inspected every 7days or
after increment intervals.
. Tool box talk must be conducted before
the work starts.
• Passengers access/walk way area must
be cordoned off with proper hoarding
False ceiling must be protected with
proper platform to prevent fall of
materials outside the hoarding due
vibrations inside the hoarded area

When completing this, you must take due consideration of local conditions, including adjacent operations, weather and premises.

Page 13 of 15
RISK ASSESSMENT

Date: 2018-09-04 M009-SPH-MEP-PRO-00044 Rev: 1 Page 14 of 15

HAZARD IDENTIFICATION AND RISK ASSESSMENT SHEET


Hazard Identification & Risk Assessment Sheet for Testing and Commissioning of Smoke Curtain

Project GREEN LINE ELEVATED AND AT GRADE

Risk Assessment Risk Assessment


Item Process Hazard (No Control) Controls (With Controls)
P S R P S R

Person Responsible for Risk Assessment Implementation at site – Construction Manager (IMAR) Name & Signature -
Prepared by-
Biju Balakrishnan Position Health and Safety Manager
Name
Review
Signature Date 04-09-2018 As required
Date

Probability (P)
Severity (S) = Risk Risk Level (P/S) Conclusions:
X

Page 14 of 15
RISK ASSESSMENT

Date: 2018-09-04 M009-SPH-MEP-PRO-00044 Rev: 1 Page 15 of 15

HAZARD IDENTIFICATION AND RISK ASSESSMENT SHEET


Hazard Identification & Risk Assessment Sheet for Testing and Commissioning of Smoke Curtain

Project GREEN LINE ELEVATED AND AT GRADE

Risk Assessment Risk Assessment


Item Process Hazard (No Control) Controls (With Controls)
P S R P S R
Hazard MUST be avoided (or level of risk reduced significantly
1 = Unlikely 1 = Negligible S1 S2 S3 S4 A =
& reliably by controls)
Hazard SHOULD be avoided ( or level of risk reduced
2 = Low 2 = Minor Injury P1 X X D C B =
significantly & reliably by controls)
3 = Medium 3 = Severe Injury P2 X D C B C = Risk to be controlled as far as reasonably practicable
4 = High 4 = Fatal P3 D C B A D = Risk is controlled as far as reasonably practicable
P4 D B A A X = Normal PPE to be worn as dictated by HSE policy

Page 15 of 15
Appendix 9.2
Drawings & Sketches
Key Plan:

Red Line
FLAT CEILING SUBMITTED SEPARATELY
A06 FCH: +6200 ELEVATOR GLASS LIMIT

ELEVATOR SUBMITTED
OVERALL HEADBOX LEGTH = 101000MM
3

SEPARATELY
Green Line
AG-17101 BARREL LENGTH 5180
17-02-18 CURTAIN WIDTH 5121
400
OVERLAP
150x280 SMOKE CURTAIN
GALVANIZE STEEL FORMED REVERSE
Blue Line

HEADBOX LOWER ROLLER


M M

HIGHER ROLLER LINE OF CURTAIN DROP 400


OVERLAP

EDGE GAP - 20MM MINIMUM CURTAIN WIDTH 5121 Gold Line

20
DROP LESS THAN 2.00MTS
4

LOWER ROLLER
BARREL LENGHT 5180 AG-17101 1 2 3 4

2 3

Y
TEL
FLAT CEILING SUBMITTED SEPARATELY
A

CURTAIN WIDTH 3311

RA
BARREL LENGTH 3368
FCH: +6200 FCH: +6200

PA
20000 C

SE
D

ED
ITT
BM
A NOTES:

SU
ING
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
5350

NOTED OTHERWISE.

DD
LA
2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.

2C
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH

PART OF VAULT CEILING SUBMITTED SEPARATELY

M2
INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY

OVERALL HEADBOX LEGTH = 6488MM


NEEDED CORRECTION.
VAULT CEILING SUBMITTED SEPARATELY 4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
11200

LATEST MATERIAL SUBMITTALS.


5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.
6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.

OVERLAP
LEGENDS:

400
MATERIAL FINISH KEY
C SMOKE STOP SMOKE CURTAIN M009-SPH-ARC-MAR-00291-3
5350

A06 12.5mm THICK ACOUSTIC GYPSUM BOARD M009-SPH-ARC-MAR-00105-1

D 150x280 SMOKE CURTAIN


SPH REFERENCE DETAIL DRAWINGS FOR SMOKE CURTAIN:

GALVANIZE STEEL FORMED REVERSE 1.M009-SPH-ARC-DWG-GWST080-ZZ-25969


2.M009-SPH-ARC-DWG-GWST080-ZZ-25970
HEADBOX

M2
3.M009-SPH-ARC-DWG-GWST080-ZZ-25971

2C
4.M009-SPH-ARC-DWG-GWST080-ZZ-25972
5.M009-SPH-ARC-DWG-GWST080-ZZ-25973
LINE OF CURTAIN DROP

LA
AT GRADE LEVEL (ZONE C) KEYPLAN
BARREL LENGTH 3368

DD
CURTAIN WIDTH 3311

ING
REFERENCE DOCUMENTS:
SCALE 1 : 300 A. IFC DRAWINGS

SU
BM
M009-SPH-ARC-DWG-GWST080-AG-B1700-2

ITT
ED
B. BIM MODEL

SE
M009-SPH-ARC-MD03-GWST080-ZZ-50006
HIGHER ROLLER

PA
PROJECT WISE: 09 JANUARY 2018

RA
TEL
C. MATERIAL SUBMITTAL

Y
M000-SPH-ARC-MAR-00291 Rev.3

6
BARREL LENGHT 5180
17-02-18 AG-17101

EDGE GAP - 20MM MINIMUM 17-02-18 CURTAIN WIDTH 5121


DROP LESS THAN 2.00MTS
20

400
OVERLAP M22 CLADDING SUBMITTED SEPARATELY HIGHER ROLLER
LOWER ROLLER LINE OF CURTAIN DROP

ELEVATOR SUBMITTED
M M

CURTAIN WIDTH 5121

SEPARATELY
400
5 BARREL LENGTH 5180 OVERLAP 150x280 SMOKE CURTAIN
AG-17101 FLAT CEILING SUBMITTED SEPARATELY GALVANIZE STEEL FORMED REVERSE ELEVATOR GLASS LIMIT
HEADBOX
A05 FCH: +6200 Drawing Revision History:
OVERALL HEADBOX LEGTH = 10100MM

REFLECTED CEILING PLAN - AT GRADE LEVEL (ZONE C)


2 SCALE 1 : 25
1 DVE APPROVED J.E. 11-02-18
0.2 SECOND ISSUE J.E. 16-01-18
NOTE: CONTROL PANEL LOCATION SUBMITTED SEPARATELY. 0.1 FIRST ISSUE J.E. 16-12-17
Purpose of Issue:
SHOP DRAWING
Design Validation:
75 75 100
PART OF FLAT CEILING SONO Reference: Date: -
150 45 PART OF M22 CLADDING Date:
DVE Reference: -
SMOKE CURTAIN BARREL
80
ELEVATOR GLASS LIMIT
75

(SUBMITTED SEPARATELY) SMOKE CURTAIN ROLL


40 40
Qatar Railways Company
150

150

SMOKE CURTAIN BARREL OPENING


26 28 26

26 28 26

26 28 26 P.O. Box 29988


40

40

STALL SYSTEM BRACKET


75

Doha - Qatar
80

80

SMOKE CURTAIN DROPPING LINE


40

40
10

10

CEILING EDGE
35 CEILING EDGE Originator Name & Logo: Contractor Name &
SMOKE CURTAIN DROPPING LINE
20
100

Logo:
SMOKE CURTAIN BARREL
SMOKE CURTAIN ROLL SMOKE CURTAIN DROPPING LINE
SMOKE CURTAIN BARREL OPENING SMOKE CURTAIN BARREL OPENING P.O.BOX : 22403 DOHA - QATAR
SMOKE CURTAIN BARREL OPENING SMOKE CURTAIN ROLL TEL: 4131770 , FAX: 4369529
www.groupimar.com
Saudi Binladin Group - PORR - HBK
Green Line Elevated
SMOKE CURTAIN DROPPING LINE
CEILING EDGE SMOKE CURTAIN BARREL OPENING STALL SYSTEM BRACKET Project:
100

SMOKE CURTAIN BARREL CEILING EDGE SMOKE CURTAIN DROPPING LINE 35 Qatar Integrated Railway Project
20

Green Line – Elevated & At-Grade


45

45
STALL SYSTEM BRACKET
130 28 26

26 28 26
SMOKE CURTAIN ROLL RTC/082/2013
40

40
80

80
75

SMOKE CURTAIN BARREL OPENING


40

40
Discipline:
PART OF M22 CLADDING ARCHITECTURAL
750

150
Drawing Title:
SMOKE CURTAIN DROPPING LINE PART OF FLAT CEILING
75

26 28 26
CEILING EDGE
CONSTRUCTION PHASE - ARCHITECTURE (FOH)
40 40 AL RIFFA STATION
75 75 100 AT GRADE LEVEL - ZONE C
80 ELEVATOR GLASS LIMIT
PART OF FLAT CEILING PART OF FLAT CEILING (SUBMITTED SEPARATELY) SMOKE CURTAIN PLAN AND DETAIL
150 10

Originator: Contractor:
Drawn J.M.E. 11-02-2018
Checked S.B.
SMOKE CURTAIN BLOW-UP PLAN SMOKE CURTAIN BLOW-UP PLAN SMOKE CURTAIN BLOW-UP PLAN SMOKE CURTAIN BLOW-UP PLAN Checked R.B.F. 11-02-2018

3 SCALE 1 : 5
4 SCALE 1 : 5
5 SCALE 1 : 5
6 SCALE 1 : 5
Approved

Scale:
S.E.H.

As Indicated
11-02-2018 Approved

Sheet Size
H.E.

A1
Drawing No:
IMR M009-IMR-ARC-DWG-GWST080-AG-17101 1
SPH M009-SPH-ARC-DWG-GWST080-ZZ-25969 1
Key Plan:

Red Line
FLAT CEILING SUBMITTED SEPARATELY
FCH: +6200
HIGHER ROLLER LOWER ROLLER
M M

Green Line
3 M22 CLADDING SUBMITTED SEPARATELY
4 Blue Line
AG-17102
AG-17102

Y
TEL
LOWER ROLLER

RA
FLAT CEILING SUBMITTED SEPARATELY

PA
SE
FCH: +6200

ED
ITT
BM
Gold Line

SU
2

ING
1 2 3 4

DD
AG-17104

LA
2C
M2
A

D
VAULT CEILING SUBMITTED SEPARATELY

PART OF VAULT CEILING


SUBMITTED SEPARATELY 2 NOTES:
AG-17105 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
NOTED OTHERWISE.
2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH
INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY

2 NEEDED CORRECTION.

M2
4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE

2C
AG-17102
LATEST MATERIAL SUBMITTALS.

LA
5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.

DD
2 6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.

ING
SU
AG-17106 LEGENDS:

BM
MATERIAL FINISH KEY

ITT
SMOKE STOP SMOKE CURTAIN M009-SPH-ARC-MAR-00291-3

ED
SE
PA
A06 12.5mm THICK ACOUSTIC GYPSUM BOARD M009-SPH-ARC-MAR-00105-1
HIGHER ROLLER

RA
TEL
SPH REFERENCE DETAIL DRAWINGS FOR SMOKE CURTAIN:

Y
1.M009-SPH-ARC-DWG-GWST080-ZZ-25969
2.M009-SPH-ARC-DWG-GWST080-ZZ-25970
3.M009-SPH-ARC-DWG-GWST080-ZZ-25971
3 4 4.M009-SPH-ARC-DWG-GWST080-ZZ-25972
5.M009-SPH-ARC-DWG-GWST080-ZZ-25973
AG-17102
AG-17102
17-02-18
REFERENCE DOCUMENTS:
LOWER ROLLER HIGHER ROLLER
A. IFC DRAWINGS
M009-SPH-ARC-DWG-GWST080-AG-B1700-2
M M

FLAT CEILING SUBMITTED SEPARATELY B. BIM MODEL


M009-SPH-ARC-MD03-GWST080-ZZ-50006
FCH: +6200 PROJECT WISE: 09 JANUARY 2018

REFLECTED CEILING PLAN - AT GRADE LEVEL (ZONE C) C. MATERIAL SUBMITTAL


1 SCALE 1 : 25
M000-SPH-ARC-MAR-00291 Rev.3

SUBSTRUCTURE CONNECTION DETAIL REFER TO: M009-SPH-ARC-DWG-GWST080-ZZ-25675 SUBSTRUCTURE CONNECTION DETAIL REFER TO: M009-SPH-ARC-DWG-GWST080-ZZ-25675

CONCRETE
CONCRETE
SLABSLAB
( BY OTHERS)
( BY OTHERS) CONCRETE SLAB ( BY OTHERS)

CONCRETE DROP BEAM

50X50X1.5mm GALVANIZED 8mm Ø THREADED ROD WITH


STEEL STUD SUPPORT NUTS AND WASHER 2 - 50x50x1.2mm
GALVANIZED STEEL STUD

570
SPACED @ 600mm
8mm Ø THREADED ROD WITH 50X50X1.5mm GALVANIZED Drawing Revision History:
NUTS AND WASHER 8mm Ø THREADED ROD
STEEL STUD SUPPORT
WITH NUTS AND
2 - 50x50x1.2mm WASHER

50
GALVANIZED STEEL STUD
M8 COACH SCREW
SPACED @ 600mm

492
M10 THREAD ROD
1 DVE APPROVED J.E. 11-02-18
M8 COACH SCREW 0.2 SECOND ISSUE J.E. 16-01-18
M8 COACH SCREW 0.1 FIRST ISSUE J.E. 16-12-17

1000
200 200
Purpose of Issue:
450 2 - 50x50x1.2mm M10 THREAD ROD 450 SHOP DRAWING
M10 THREAD ROD SPRING WASHER
150 GALVANIZED STEEL STUD
Design Validation:
SPACED @ 600mm 10mm Ø THREADED ROD WITH SONO Reference: Date: -
NUTS AND WASHER 2390 DVE Reference: Date: -
2 - 50x50x1.2mm
GALVANIZED STEEL
STUD SPACED @
600mm NUT Qatar Railways Company
1.2mm (18 GAUGE) STEEL
1.2mm (18 GAUGE) STEEL FORMED TO MATCH BRACKETS. P.O. Box 29988
FORMED TO MATCH TOP AND BOTTOM TO BE BENT 1.2mm (18 GAUGE) Doha - Qatar
BRACKETS. TOP AND FOR STIFFNESS STEEL FORMED TO
BOTTOM TO BE BENT FOR MATCH BRACKETS. TOP
280

280

280
130
130

STIFFNESS AND BOTTOM TO BE


Originator Name & Logo: Contractor Name &
Logo:
FABRIC TYPE LS EFP 2/A2, A BENT FOR STIFFNESS
GLASS FABRIC COATED WITH
FABRIC TYPE LS EFP 2/A2, A FABRIC TYPE LS EFP 2/A2, A
A MICRONIZED ALUMINUM 150 P.O.BOX : 22403 DOHA - QATAR
Saudi Binladin Group - PORR - HBK
GLASS FABRIC COATED WITH FILLED FIRE RETARDANT 28 GLASS FABRIC COATED WITH
TEL: 4131770 , FAX: 4369529
www.groupimar.com Green Line Elevated
A MICRONIZED ALUMINUM POLYURETHANE NOMINAL 465 A MICRONIZED ALUMINUM
FILLED FIRE RETARDANT FILLED FIRE RETARDANT Project:
G/M²
50

POLYURETHANE NOMINAL 465 POLYURETHANE NOMINAL M22 CLADDING Qatar Integrated Railway Project
G/M² 465 G/M² SUBMITTED SEPARATELY Green Line – Elevated & At-Grade
RTC/082/2013
FCH: +6200 FCH: +6200 FCH: +6200 FCH: +6200 Discipline:
40 40 40 40 40 40 ARCHITECTURAL
Drawing Title:
80 80 80
PART OF VAULT CEILING SUBMITTED SEPARATELY PART OF FLAT CEILING SUBMITTED SEPARATELY PART OF FLAT CEILING SUBMITTED SEPARATELY PART OF FLAT CEILING SUBMITTED SEPARATELY PART OF FLAT CEILING SUBMITTED SEPARATELY
CONSTRUCTION PHASE - ARCHITECTURE (FOH)
AL RIFFA STATION
AT GRADE LEVEL - ZONE C
BOTTOM BAR BOTTOM BAR BOTTOM BAR SMOKE CURTAIN PLAN AND SECTION
Originator: Contractor:
Drawn J.M.E. 11-02-2018
Checked
SMOKE CURTAIN TYPICAL DETAIL GRADE LEVEL - SMOKE CURTAIN TYPICAL DETAIL SMOKE CURTAIN TYPICAL DETAIL Checked R.B.F. 11-02-2018
S.B.

2 SCALE 1 : 5
3 SCALE 1 : 5
4 SCALE 1 : 5
Approved S.E.H. 11-02-2018 Approved H.E.

Scale: As Indicated Sheet Size A1


Drawing No:
IMR M009-IMR-ARC-DWG-GWST080-AG-17102 1
SPH M009-SPH-ARC-DWG-GWST080-ZZ-25970 1
Key Plan:

Red Line
OVERALL HEADBOX LEGTH = 101000MM

BARREL LENGTH 5180

CURTAIN WIDTH 5121


35
HIGHER CURTAIN ROLL Green Line
M M
Blue Line
75
150
75

LOWER CURTAIN ROLL

20
400
CURTAIN OVERLAP
CURTAIN WIDTH 5121
SMOKE CURTAIN BARREL OPENING Gold Line
BARREL LENGTH 5180
SMOKE CURTAIN DROPPING LINE 1 2 3 4

ELEVATOR GLASS LIMIT


SMOKE CURTAIN BARREL (TO BE SUBMITTED SEPARATELY)
SMOKE CURTAIN TYPICAL BLOW-UP PLAN 2
CONCRETE DROP
OP BEAM
BE
CONCRETE SLAB (BY OTHERS)

1 SCALE 1 : 10
CL-17104
A
8mm Ø THREADED ROD WITH B

NUTS AND WASHER C


OVERALL HEADBOX LEGTH = 101000MM
D

3
BARREL LENGTH 5180
ELEVATOR GLASS LIMIT M10 THREADED ROD
CL-17104 NOTES:
CURTAIN WIDTH 5121 (TO BE SUBMITTED SEPARATELY)
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
NOTED OTHERWISE.
HIGHER CURTAIN ROLL FLAG BRACKET M CURTAIN ROLLER
2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH
SUB-ASSEMBLY INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY
2 - 50x50x1.2mm GALVANIZED STEEL STUD NEEDED CORRECTION.
TAIL BEARING SET SPACED @ 600mm 4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
280

280
130
MOTOR LATEST MATERIAL SUBMITTALS.
5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.

28
150 150x280mm HEADBOX 6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.

LEGENDS:
MATERIAL FINISH KEY

M SMOKE CURTAIN END SMOKE STOP SMOKE CURTAIN M009-SPH-ARC-MAR-00291-3


PLATE
150 LINE OF CEILING FINISH : +6200 LOWER CURTAIN ROLL
40 40
LINE OF CEILING FINISH :
80
A06 12.5mm THICK ACOUSTIC GYPSUM BOARD M009-SPH-ARC-MAR-00105-1
+6200
400
SPH REFERENCE DETAIL DRAWINGS FOR SMOKE CURTAIN:
CURTAIN OVERLAP
1.M009-SPH-ARC-DWG-GWST080-ZZ-25969
CURTAIN WIDTH 5121 12.5mm THK. ACOUSTIC 2.M009-SPH-ARC-DWG-GWST080-ZZ-25970
GYPSUM CEILING (A06) 3.M009-SPH-ARC-DWG-GWST080-ZZ-25971
BARREL LENGTH 5180 4.M009-SPH-ARC-DWG-GWST080-ZZ-25972
4 5.M009-SPH-ARC-DWG-GWST080-ZZ-25973
CL-17102
REFERENCE DOCUMENTS:
A. IFC DRAWINGS
M009-SPH-ARC-DWG-GWST080-AG-B1700-2

ELEVATOR (SUBMITTED SEPARATELY)


B. BIM MODEL
M009-SPH-ARC-MD03-GWST080-ZZ-50006
PROJECT WISE: 09 JANUARY 2018

C. MATERIAL SUBMITTAL
M000-SPH-ARC-MAR-00291 Rev.3

S M O K E C U R T A I N S M O K E C U R T A I N
CURTAIN DROP FROM FCH = 4200MM

CURTAIN DROP FROM FCH = 4200MM


SMOKE CURTAIN FABRIC

17-02-18
Drawing Revision History:

1 DVE APPROVED J.E. 11-02-18


0.3 THIRD ISSUE J.E. 07-02-18
0.2 SECOND ISSUE J.E. 16-01-18

ELEVATOR (SUBMITTED SEPARATELY)


0.1 FIRST ISSUE J.E. 16-12-17
Purpose of Issue:
SHOP DRAWING
Design Validation:
SONO Reference: Date: -
DVE Reference: Date: -

Qatar Railways Company


P.O. Box 29988
Doha - Qatar

Originator Name & Logo: Contractor Name &


Logo:
BOTTOM BAR

P.O.BOX : 22403 DOHA - QATAR


TEL: 4131770 , FAX: 4369529 Saudi Binladin Group - PORR - HBK
www.groupimar.com Green Line Elevated

Project:

Qatar Integrated Railway Project


2000

2000

Green Line – Elevated & At-Grade


RTC/082/2013
Discipline:
ARCHITECTURAL
Drawing Title:

FLOOR FINISH LEVEL FLOOR FINISH LEVEL CONSTRUCTION PHASE - ARCHITECTURE (FOH)
AL RIFFA STATION
AT GRADE LEVEL - ZONE C
SMOKE CURTAIN ELEVATION (1 OF 3)

SMOKE CURTAIN ELEVATION SMOKE CURTAIN SECTION Originator: Contractor:

2 SCALE 1 : 10
3 SCALE 1 : 10
Drawn
Checked
J.M.E.
R.B.F.
11-02-2018
11-02-2018
Checked S.B.

Approved S.E.H. 11-02-2018 Approved H.E.

Scale: As Indicated Sheet Size A1


Drawing No:
IMR M009-IMR-ARC-DWG-GWST080-AG-17104 1
SPH M009-SPH-ARC-DWG-GWST080-ZZ-25971 1
Key Plan:

Red Line
OVERALL HEADBOX LEGTH = 6488MM
BARREL LENGTH 3368
150
CURTAIN WIDTH 3311

Green Line
HIGHER CURTAIN ROLL Blue Line
75

75
150

150
75

75
LOWER CURTAIN ROLL 20
400
20

CURTAIN OVERLAP
CURTAIN WIDTH 3311
150
BARREL LENGTH 3368 Gold Line
2 - 50x50x1.2mm GALVANIZED
1 2 3 4
STEEL STUD SPACED @ 600mm

SMOKE CURTAIN TYPICAL BLOW-UP PLAN 2


1 SCALE 1 : 10
CL-17105
A

B
CONCRETE SLAB (BY OTHERS)
C

OVERALL HEADBOX LEGTH = 6488MM D

M10

570
THREADED ROD
BARREL LENGTH 3368 NOTES:
3 CURTAIN ROLLER

50
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
CURTAIN WIDTH 3311
CL-17105 SUB-ASSEMBLY NOTED OTHERWISE.
2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.

1000
TAIL BEARING SET 200
M10 3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH
450

FLAG BRACKET
150
150 THREADED ROD INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY

HIGHER CURTAIN ROLL M NEEDED CORRECTION.


4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
LATEST MATERIAL SUBMITTALS.
5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.
MOTOR
LOWER CURTAIN ROLL 150x280mm
6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.

280
130
280

HEADBOX LEGENDS:
MATERIAL FINISH KEY

12.5mm THK. SMOKE STOP SMOKE CURTAIN M009-SPH-ARC-MAR-00291-3

ACOUSTIC
A06
M GYPSUM CEILING
(A06)
12.5mm THICK ACOUSTIC GYPSUM BOARD M009-SPH-ARC-MAR-00105-1

SPH REFERENCE DETAIL DRAWINGS FOR SMOKE CURTAIN:


FCH = +6200
LINE OF CEILING FINISH : +6200 400 SMOKE CURTAIN END 1.M009-SPH-ARC-DWG-GWST080-ZZ-25969
CURTAIN OVERLAP
PLATE 2.M009-SPH-ARC-DWG-GWST080-ZZ-25970
3.M009-SPH-ARC-DWG-GWST080-ZZ-25971
CURTAIN WIDTH 3311 4.M009-SPH-ARC-DWG-GWST080-ZZ-25972
5.M009-SPH-ARC-DWG-GWST080-ZZ-25973

BARREL LENGTH 3368 REFERENCE DOCUMENTS:


2 A. IFC DRAWINGS
CL-17102 M009-SPH-ARC-DWG-GWST080-AG-B1700-2

B. BIM MODEL
M009-SPH-ARC-MD03-GWST080-ZZ-50006
PROJECT WISE: 09 JANUARY 2018

C. MATERIAL SUBMITTAL
M000-SPH-ARC-MAR-00291 Rev.3

S M O K E C U R T A I N
S M O K E C U R T A I N
CURTAIN DROP FROM FCH = 4200MM

CURTAIN DROP FROM FCH = 4200MM


SMOKE CURTAIN
FABRIC Drawing Revision History:

1 DVE APPROVED J.E. 11-02-18


0.2 SECOND ISSUE J.E. 16-01-18
0.1 FIRST ISSUE J.E. 16-12-17
Purpose of Issue:
SHOP DRAWING
Design Validation:
SONO Reference: Date: -
DVE Reference: Date: -

Qatar Railways Company


P.O. Box 29988
Doha - Qatar

Originator Name & Logo: Contractor Name &


BOTTOM BAR Logo:

P.O.BOX : 22403 DOHA - QATAR


TEL: 4131770 , FAX: 4369529 Saudi Binladin Group - PORR - HBK
www.groupimar.com Green Line Elevated

Project:
2000

2000
Qatar Integrated Railway Project
Green Line – Elevated & At-Grade
RTC/082/2013
Discipline:
ARCHITECTURAL
Drawing Title:
FLOOR FINISH LEVEL FLOOR FINISH LEVEL
CONSTRUCTION PHASE - ARCHITECTURE (FOH)
AL RIFFA STATION
AT GRADE LEVEL - ZONE C
SMOKE CURTAIN ELEVATION (2 OF 3)
Originator: Contractor:
SMOKE CURTAIN ELEVATION SMOKE CURTAIN SECTION Drawn J.M.E. 11-02-2018
2 3 Checked R.B.F. 11-02-2018
Checked S.B.

17-02-18 SCALE 1 : 10 SCALE 1 : 10 Approved S.E.H. 11-02-2018 Approved H.E.

Scale: As Indicated Sheet Size A1


Drawing No:
IMR M009-IMR-ARC-DWG-GWST080-AG-17105 1
SPH M009-SPH-ARC-DWG-GWST080-ZZ-25972 1
Key Plan:

OVERALL HEADBOX LEGTH = 101000MM


Red Line
BARREL LENGTH 5180
150
CURTAIN WIDTH 5121 75 75

HIGHER CURTAIN ROLL M M Green Line


75

20
Blue Line
150

75

LOWER CURTAIN ROLL


400
CURTAIN OVERLAP

CURTAIN WIDTH 5121


ELEVATOR GLASS LIMIT
(TO BE SUBMITTED SEPARATELY) BARREL LENGTH 5180 Gold Line

SMOKE CURTAIN DROPPING LINE 1 2 3 4

2 1
SMOKE CURTAIN TYPICAL BLOW-UP PLAN
SMOKE CURTAIN BARREL CL-17106
SCALE 1 : 10 8mm Ø THREADED ROD WITH
NUTS AND WASHER A

OVERALL HEADBOX LEGTH = 101000MM 50x50x1.2mm GALVANIZED


B

STEEL STUD
3
C

BARREL LENGTH 5180 150 D


ELEVATOR GLASS LIMIT CL-17106
(TO BE SUBMITTED SEPARATELY) CURTAIN WIDTH 5121

150 NOTES:
CURTAIN ROLLER M10 THREADED ROD
SUB-ASSEMBLY
HIGHER CURTAIN ROLL
FLAG BRACKET
M 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
NOTED OTHERWISE.
2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.
TAIL BEARING SET MOTOR 2 - 50x50x1.2mm GALVANIZED STEEL 3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH
LOWER CURTAIN ROLL STUD SPACED @ 600mm INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY

130
280

280
SMOKE CURTAIN END

280
130
NEEDED CORRECTION.
PLATE 4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
150
150x280mm HEADBOX LATEST MATERIAL SUBMITTALS.
5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.
28
6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.
35
M LEGENDS:
MATERIAL FINISH KEY

LINE OF CEILING FINISH : +6200 LINE OF CEILING 40 40

SMOKE STOP SMOKE CURTAIN M009-SPH-ARC-MAR-00291-3


80
400 FINISH : +6200
CURTAIN OVERLAP
CURTAIN WIDTH 5121
A06 12.5mm THICK ACOUSTIC GYPSUM BOARD M009-SPH-ARC-MAR-00105-1

BARREL LENGTH 5180 12.5mm THK. ACOUSTIC SPH REFERENCE DETAIL DRAWINGS FOR SMOKE CURTAIN:
GYPSUM CEILING (A05) 1.M009-SPH-ARC-DWG-GWST080-ZZ-25969
2.M009-SPH-ARC-DWG-GWST080-ZZ-25970
4 3.M009-SPH-ARC-DWG-GWST080-ZZ-25971
4.M009-SPH-ARC-DWG-GWST080-ZZ-25972
CL-17102 5.M009-SPH-ARC-DWG-GWST080-ZZ-25973
ELEVATOR (SUBMITTED SEPARATELY)

REFERENCE DOCUMENTS:
A. IFC DRAWINGS
M009-SPH-ARC-DWG-GWST080-AG-B1700-2

B. BIM MODEL
M009-SPH-ARC-MD03-GWST080-ZZ-50006
PROJECT WISE: 09 JANUARY 2018

S M O K E C U R T A I N S M O K E C U R T A I N C. MATERIAL SUBMITTAL
M000-SPH-ARC-MAR-00291 Rev.3

CURTAIN DROP FROM FCH = 4200MM

CURTAIN DROP FROM FCH = 4200MM


SMOKE CURTAIN FABRIC

Drawing Revision History:

1 DVE APPROVED J.E. 11-02-18


0.3 THIRD ISSUE J.E. 07-02-18
0.2 SECOND ISSUE J.E. 14-01-18
0.1 FIRST ISSUE J.E. 16-12-17
Purpose of Issue:
SHOP DRAWING
Design Validation:
SONO Reference: Date: -
DVE Reference: Date: -

17-02-18
Qatar Railways Company
P.O. Box 29988
Doha - Qatar

Originator Name & Logo: Contractor Name &


BOTTOM BAR Logo:

P.O.BOX : 22403 DOHA - QATAR


TEL: 4131770 , FAX: 4369529 Saudi Binladin Group - PORR - HBK
www.groupimar.com Green Line Elevated

Project:

Qatar Integrated Railway Project


Green Line – Elevated & At-Grade
2000

2000
RTC/082/2013
Discipline:
ARCHITECTURAL
Drawing Title:

FLOOR FINISH LEVEL FLOOR FINISH LEVEL


CONSTRUCTION PHASE - ARCHITECTURE (FOH)
AL RIFFA STATION
AT GRADE LEVEL - ZONE C
SMOKE CURTAIN ELEVATION (3 OF 3)
Originator: Contractor:
Drawn J.M.E. 11-02-2018
SMOKE CURTAIN ELEVATION SMOKE CURTAIN SECTION Checked R.B.F. 11-02-2018
Checked S.B.

2 SCALE 1 : 10
3 SCALE 1 : 10
Approved S.E.H. 11-02-2018 Approved H.E.

Scale: As Indicated Sheet Size A1


Drawing No:
IMR M009-IMR-ARC-DWG-GWST080-AG-17106 1
SPH M009-SPH-ARC-DWG-GWST080-ZZ-25973 1
Key Plan:

Red Line

Green Line
Blue Line
1 4 2

CONTINUATION DWG. REFER TO: M009-IMR-ARC-DWG-GWST080-CL-17103


CL-17106 CL-17106

16905 4961

BARREL LENGTH 4779 BARREL LENGTH 4779 A06 FCH: +7030


Gold Line
CURTAIN WIDTH 4691 CURTAIN WIDTH 4691
A06 FCH: +4500 ESCALATOR VAULT SUBMITTED SEPARATELY 150x280 SMOKE CURTAIN
GALVANIZE STEEL FORMED
HIGHER ROLLER LINE OF CURTAIN DROP HIGHER ROLLER REVERSE HEADBOX HIGHER ROLLER
80

400 400 400 400


OVERLAP OVERLAP OVERLAP OVERLAP
CURTAIN WIDTH 4678 LOWER ROLLER CURTAIN WIDTH 4691 LOWER ROLLER CURTAIN WIDTH 4678

BARREL LENGTH 4735 BARREL LENGTH 4779 A06 FCH: +4500 BARREL LENGTH 4735
ZONE E
1535

NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
OVERALL HEADBOX LEGTH = 21901MM NOTED OTHERWISE.
2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH

B
INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY
NEEDED CORRECTION.
4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
WALL LIMIT
2 3 LATEST MATERIAL SUBMITTALS.
5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.
CL-17108
CL-17108 6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.

LEGENDS:
MATERIAL FINISH KEY

SMOKE STOP SMOKE CURTAIN M009-SPH-ARC-MAR-00291-3

VAULT CEILING SUBMITTED SEPARATELY VAULT CEILING SUBMITTED SEPARATELY VAULT CEILING SUBMITTED SEPARATELY
A06 12.5mm THICK ACOUSTIC GYPSUM BOARD M009-SPH-ARC-MAR-00105-1

SPH REFERENCE DETAIL DRAWINGS FOR SMOKE CURTAIN:

M009-SPH-ARC-DWG-GWST080-ZZ-25974
M009-SPH-ARC-DWG-GWST080-ZZ-25975
M009-SPH-ARC-DWG-GWST080-ZZ-25976
M009-SPH-ARC-DWG-GWST080-ZZ-25977
M009-SPH-ARC-DWG-GWST080-ZZ-25978
NOTE: CONTROL PANEL LOCATION SUBMITTED SEPARATELY. M009-SPH-ARC-DWG-GWST080-ZZ-25979
M009-SPH-ARC-DWG-GWST080-ZZ-25980
M009-SPH-ARC-DWG-GWST080-ZZ-25981
AL RIFFA STATION M009-SPH-ARC-DWG-GWST080-ZZ-25982

1 CONCOURSE LEVEL SMOKE CURTAIN PLAN @ 4500 FCH M009-SPH-ARC-DWG-GWST080-ZZ-25983


M009-SPH-ARC-DWG-GWST080-ZZ-25984

CL-17102 SCALE : 1:30 REFERENCE DOCUMENTS:


A. IFC DRAWINGS
M009-SPH-ARC-DWG-GWST080-CL-B17102-2
M009-SPH-ARC-DWG-GWST080-CL-B17103-2

B. BIM MODEL
M009-SPH-ARC-MD03-GWST080-ZZ-50006
PROJECT WISE: 09 JANUARY 2018
17-02-18
C. MATERIAL SUBMITTAL
M000-SPH-ARC-MAR-00291 Rev. 3

CONTINUATION DWG. REFER TO: M009-IMR-ARC-DWG-GWST080-CL-17103


VAULT CEILING SUBMITTED SEPARATELY VAULT CEILING SUBMITTED SEPARATELY VAULT CEILING SUBMITTED SEPARATELY

2 3 Drawing Revision History:

CL-17108 CL-17108

WALL LIMIT

C
1 DVE APPROVED J.E. 11-02-18
OVERALL HEADBOX LEGTH = 21901MM 0.2 SECOND ISSUE J.E. 14-01-18
0.1 FIRST ISSUE J.E. 16-12-17
Purpose of Issue:
1535

BARREL LENGTH 4735 BARREL LENGTH 4779 BARREL LENGTH 4735


SHOP DRAWING
CURTAIN WIDTH 4678 CURTAIN WIDTH 4691 CURTAIN WIDTH 4678
A06 FCH: +4500
Design Validation:
A06 FCH: +4500 400 400 400 400
OVERLAP LOWER ROLLER OVERLAP OVERLAP LOWER ROLLER OVERLAP
SONO Reference: Date: -
DVE Reference: Date: -
80

CURTAIN WIDTH 4691 CURTAIN WIDTH 4691


150x280 SMOKE CURTAIN Qatar Railways Company
HIGHER ROLLER HIGHER ROLLER GALVANIZE STEEL FORMED REVERSE HIGHER ROLLER P.O. Box 29988
BARREL LENGTH 4779 BARREL LENGTH 4779 HEADBOX Doha - Qatar
ESCALATOR VAULT SUBMITTED SEPARATELY
16999 4866

Originator Name & Logo: Contractor Name &


A06 FCH: +7030 Logo:

P.O.BOX : 22403 DOHA - QATAR


TEL: 4131770 , FAX: 4369529 Saudi Binladin Group - PORR - HBK
www.groupimar.com Green Line Elevated

Project:

6 7 Qatar Integrated Railway Project


CL-17106 CL-17106
Green Line – Elevated & At-Grade
RTC/082/2013
AL RIFFA STATION
2 CONCOURSE LEVEL SMOKE CURTAIN PLAN @ 4500 FCH
NOTE: CONTROL PANEL LOCATION SUBMITTED SEPARATELY. Discipline:
ARCHITECTURAL
Drawing Title:
CL-17102 SCALE : 1:30
CONSTRUCTION PHASE - ARCHITECTURE (FOH)
AL RIFFA STATION
SMOKE CURTAIN PLAN DETAIL
CONCOURSE LEVEL - ZONE E
(PART 1 OF 2)
Originator: Contractor:
Drawn J.M.E. 11-02-2018
Checked S.B.
Checked R.B.F. 11-02-2018
Approved S.E.H. 11-02-2018 Approved H.E.

Scale: As Indicated Sheet Size A1


Drawing No:
IMR M009-IMR-ARC-DWG-GWST080-CL-17102 1
SPH M009-SPH-ARC-DWG-GWST080-ZZ-25975 1
Key Plan:

Red Line

Green Line
Blue Line
1 4 2

CONTINUATION DWG. REFER TO: M009-IMR-ARC-DWG-GWST080-CL-17103


CL-17106 CL-17106

16905 4961

BARREL LENGTH 4779 BARREL LENGTH 4779 A06 FCH: +7030


Gold Line
CURTAIN WIDTH 4691 CURTAIN WIDTH 4691
A06 FCH: +4500 ESCALATOR VAULT SUBMITTED SEPARATELY 150x280 SMOKE CURTAIN
GALVANIZE STEEL FORMED
HIGHER ROLLER LINE OF CURTAIN DROP HIGHER ROLLER REVERSE HEADBOX HIGHER ROLLER
80

400 400 400 400


OVERLAP OVERLAP OVERLAP OVERLAP
CURTAIN WIDTH 4678 LOWER ROLLER CURTAIN WIDTH 4691 LOWER ROLLER CURTAIN WIDTH 4678

BARREL LENGTH 4735 BARREL LENGTH 4779 A06 FCH: +4500 BARREL LENGTH 4735
ZONE E
1535

NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
OVERALL HEADBOX LEGTH = 21901MM NOTED OTHERWISE.
2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH

B
INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY
NEEDED CORRECTION.
4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
WALL LIMIT
2 3 LATEST MATERIAL SUBMITTALS.
5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.
CL-17108
CL-17108 6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.

LEGENDS:
MATERIAL FINISH KEY

SMOKE STOP SMOKE CURTAIN M009-SPH-ARC-MAR-00291-3

VAULT CEILING SUBMITTED SEPARATELY VAULT CEILING SUBMITTED SEPARATELY VAULT CEILING SUBMITTED SEPARATELY
A06 12.5mm THICK ACOUSTIC GYPSUM BOARD M009-SPH-ARC-MAR-00105-1

SPH REFERENCE DETAIL DRAWINGS FOR SMOKE CURTAIN:

M009-SPH-ARC-DWG-GWST080-ZZ-25974
M009-SPH-ARC-DWG-GWST080-ZZ-25975
M009-SPH-ARC-DWG-GWST080-ZZ-25976
M009-SPH-ARC-DWG-GWST080-ZZ-25977
M009-SPH-ARC-DWG-GWST080-ZZ-25978
NOTE: CONTROL PANEL LOCATION SUBMITTED SEPARATELY. M009-SPH-ARC-DWG-GWST080-ZZ-25979
M009-SPH-ARC-DWG-GWST080-ZZ-25980
M009-SPH-ARC-DWG-GWST080-ZZ-25981
AL RIFFA STATION M009-SPH-ARC-DWG-GWST080-ZZ-25982

1 CONCOURSE LEVEL SMOKE CURTAIN PLAN @ 4500 FCH M009-SPH-ARC-DWG-GWST080-ZZ-25983


M009-SPH-ARC-DWG-GWST080-ZZ-25984

CL-17102 SCALE : 1:30 REFERENCE DOCUMENTS:


A. IFC DRAWINGS
M009-SPH-ARC-DWG-GWST080-CL-B17102-2
M009-SPH-ARC-DWG-GWST080-CL-B17103-2

B. BIM MODEL
M009-SPH-ARC-MD03-GWST080-ZZ-50006
PROJECT WISE: 09 JANUARY 2018
17-02-18
C. MATERIAL SUBMITTAL
M000-SPH-ARC-MAR-00291 Rev. 3

CONTINUATION DWG. REFER TO: M009-IMR-ARC-DWG-GWST080-CL-17103


VAULT CEILING SUBMITTED SEPARATELY VAULT CEILING SUBMITTED SEPARATELY VAULT CEILING SUBMITTED SEPARATELY

2 3 Drawing Revision History:

CL-17108 CL-17108

WALL LIMIT

C
1 DVE APPROVED J.E. 11-02-18
OVERALL HEADBOX LEGTH = 21901MM 0.2 SECOND ISSUE J.E. 14-01-18
0.1 FIRST ISSUE J.E. 16-12-17
Purpose of Issue:
1535

BARREL LENGTH 4735 BARREL LENGTH 4779 BARREL LENGTH 4735


SHOP DRAWING
CURTAIN WIDTH 4678 CURTAIN WIDTH 4691 CURTAIN WIDTH 4678
A06 FCH: +4500
Design Validation:
A06 FCH: +4500 400 400 400 400
OVERLAP LOWER ROLLER OVERLAP OVERLAP LOWER ROLLER OVERLAP
SONO Reference: Date: -
DVE Reference: Date: -
80

CURTAIN WIDTH 4691 CURTAIN WIDTH 4691


150x280 SMOKE CURTAIN Qatar Railways Company
HIGHER ROLLER HIGHER ROLLER GALVANIZE STEEL FORMED REVERSE HIGHER ROLLER P.O. Box 29988
BARREL LENGTH 4779 BARREL LENGTH 4779 HEADBOX Doha - Qatar
ESCALATOR VAULT SUBMITTED SEPARATELY
16999 4866

Originator Name & Logo: Contractor Name &


A06 FCH: +7030 Logo:

P.O.BOX : 22403 DOHA - QATAR


TEL: 4131770 , FAX: 4369529 Saudi Binladin Group - PORR - HBK
www.groupimar.com Green Line Elevated

Project:

6 7 Qatar Integrated Railway Project


CL-17106 CL-17106
Green Line – Elevated & At-Grade
RTC/082/2013
AL RIFFA STATION
2 CONCOURSE LEVEL SMOKE CURTAIN PLAN @ 4500 FCH
NOTE: CONTROL PANEL LOCATION SUBMITTED SEPARATELY. Discipline:
ARCHITECTURAL
Drawing Title:
CL-17102 SCALE : 1:30
CONSTRUCTION PHASE - ARCHITECTURE (FOH)
AL RIFFA STATION
SMOKE CURTAIN PLAN DETAIL
CONCOURSE LEVEL - ZONE E
(PART 1 OF 2)
Originator: Contractor:
Drawn J.M.E. 11-02-2018
Checked S.B.
Checked R.B.F. 11-02-2018
Approved S.E.H. 11-02-2018 Approved H.E.

Scale: As Indicated Sheet Size A1


Drawing No:
IMR M009-IMR-ARC-DWG-GWST080-CL-17102 1
SPH M009-SPH-ARC-DWG-GWST080-ZZ-25975 1
Key Plan:

4 5
Red Line
CL-17106
OVERALL HEADBOX LEGTH = 10093MM 5025

CONTINUATION DWG. REFER TO: M009-IMR-ARC-DWG-GWST080-CL-17102

CONTINUATION DWG. REFER TO: M009-IMR-ARC-DWG-GWST080-CL-17104


BARREL LENGTH 5220
CURTAIN WIDTH 5163 NOTE: CONTROL PANEL LOCATION SUBMITTED SEPARATELY. Green Line
Blue Line
LOWER ROLLER LINE OF CURTAIN DROP HIGHER ROLLER

400

HIGHER ROLLER
OVERLAP
CURTAIN WIDTH 5163

EDGE GAP - 20MM MINIMUM BARREL LENGTH 5220

DROP LESS THAN 2.00MTS

20
CURTAIN WIDTH 2563
BARREL LENGTH 2620

Gold Line
LINE OF CURTAIN DROP 2 3 5 1 2 3 4 5 6 7 8 9
CL-17110 CL-17110 CL-17106

150x280 SMOKE CURTAIN


OVERALL HEADBOX LEGTH = 4894MM

GALVANIZE STEEL FORMED REVERSE ELEVATOR SUBMITTED SEPARATELY


HEADBOX A

PETAL CEILING SUBMITTED SEPARATELY B

OVERLAP 2 C

CL-17109
D
400

ZONE E
NOTES:
3 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
CL-17109 NOTED OTHERWISE.
BARREL LENGTH 2620
CURTAIN WIDTH 2563

2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.


3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH
INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY
NEEDED CORRECTION.
4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
LATEST MATERIAL SUBMITTALS.
LOWER ROLLER

5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.
FLAT CEILING SUBMITTED SEPARATELY
3
6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.
A06 FCH: +7030 LEGENDS:
CL-17106
MATERIAL FINISH KEY

SMOKE STOP SMOKE CURTAIN M009-SPH-ARC-MAR-00291-3

A06 12.5mm THICK ACOUSTIC GYPSUM BOARD M009-SPH-ARC-MAR-00105-1


17-02-18 SPH REFERENCE DETAIL DRAWINGS FOR SMOKE CURTAIN:
A06 FCH: +4500 A06 FCH: +4500
M009-SPH-ARC-DWG-GWST080-ZZ-25974
M009-SPH-ARC-DWG-GWST080-ZZ-25975
1535

M009-SPH-ARC-DWG-GWST080-ZZ-25976
M009-SPH-ARC-DWG-GWST080-ZZ-25977
M009-SPH-ARC-DWG-GWST080-ZZ-25978
M009-SPH-ARC-DWG-GWST080-ZZ-25979
VAULT CEILING SUBMITTED SEPARATELY VAULT CEILING SUBMITTED SEPARATELY M009-SPH-ARC-DWG-GWST080-ZZ-25980
M009-SPH-ARC-DWG-GWST080-ZZ-25981

B
M009-SPH-ARC-DWG-GWST080-ZZ-25982
M009-SPH-ARC-DWG-GWST080-ZZ-25983
M009-SPH-ARC-DWG-GWST080-ZZ-25984

REFERENCE DOCUMENTS:
RE
A. IFC DRAWINGS
A
M009-SPH-ARC-DWG-GWST080-CL-B17102-2
M
AL RIFFA STATION M009-SPH-ARC-DWG-GWST080-CL-B17103-2
M

3 CONCOURSE LEVEL (ZONE E) - SMOKE CURTAIN PLAN @ 7030 FCH B.


B BIM MODEL
M009-SPH-ARC-MD03-GWST080-ZZ-50006
M
CL-17103 SCALE : 1:30
5 PROJECT WISE: 09 JANUARY 2018
P

C
C. MATERIAL SUBMITTAL
M000-SPH-ARC-MAR-00291
M Rev. 3

C
PETAL CEILING SUBMITTED SEPARATELY VAULT CEILING SUBMITTED SEPARATELY
1535

Drawing Revision History:

A06 FCH: +4500 A06 FCH: +4500


LOWER ROLLER

8 LINE OF CURTAIN DROP 1 DVE APPROVED J.E. 11-02-18


CL-17106 0.2 SECOND ISSUE J.E. 16-01-18
0.1 FIRST ISSUE J.E. 16-12-17
150x280 SMOKE CURTAIN FLAT CEILING SUBMITTED SEPARATELY Purpose of Issue:
CURTAIN WIDTH 2563
BARREL LENGTH 2620

GALVANIZE STEEL FORMED REVERSE SHOP DRAWING


A06 FCH: +7030
HEADBOX Design Validation:
SONO Reference: Date: -
DVE Reference: Date: -
OVERALL HEADBOX LEGTH = 4894MM

2 Qatar Railways Company


CL-17112
OVERLAP

P.O. Box 29988


400

Doha - Qatar

3
CL-17112 Originator Name & Logo: Contractor Name &
PETAL CEILING SUBMITTED SEPARATELY Logo:
BARREL LENGTH 2620
CURTAIN WIDTH 2563

ELEVATOR SUBMITTED SEPARATELY

2 3 10
CONTINUATION DWG. REFER TO: M009-IMR-ARC-DWG-GWST080-CL-17102

CONTINUATION DWG. REFER TO: M009-IMR-ARC-DWG-GWST080-CL-17104


P.O.BOX : 22403 DOHA - QATAR
TEL: 4131770 , FAX: 4369529 Saudi Binladin Group - PORR - HBK
CL-17113 CL-17113 CL-17107 www.groupimar.com Green Line Elevated
20 EDGE GAP - 20MM MINIMUM
DROP LESS THAN 2.00MTS Project:
HIGHER ROLLER

BARREL LENGTH 5220


Qatar Integrated Railway Project
CURTAIN WIDTH 5163 Green Line – Elevated & At-Grade
LINE OF CURTAIN DROP 400 RTC/082/2013
OVERLAP
Discipline:
ARCHITECTURAL
LOWER ROLLER HIGHER ROLLER Drawing Title:
CURTAIN WIDTH 5163 CONSTRUCTION PHASE - ARCHITECTURE (FOH)
BARREL LENGTH 5220 NOTE: CONTROL PANEL LOCATION SUBMITTED SEPARATELY. AL RIFFA STATION
OVERALL HEADBOX LEGTH = 10093MM 5025
SMOKE CURTAIN PLAN
CONCOURSE LEVEL - ZONE E
AL RIFFA STATION (PART 2 OF 2)
9 4 CONCOURSE LEVEL (ZONE E) - SMOKE CURTAIN PLAN @ 7030 FCH Originator: Contractor:
CL-17106 Drawn J.M.E. 11-02-2018
Checked S.B.
R.B.F. 11-02-2018
CL-17103 SCALE : 1:30
Checked
S.E.H. 11-02-2018 Approved H.E.
Approved

Scale: As Indicated Sheet Size A1


Drawing No:
IMR M009-IMR-ARC-DWG-GWST080-CL-17103 1
SPH M009-SPH-ARC-DWG-GWST080-ZZ-25976 1
Key Plan:

5 4 Red Line
CL-17106
5025 OVERALL HEADBOX LEGTH = 10093MM

CONTINUATION DWG. REFER TO: M009-IMR-ARC-DWG-GWST080-CL-17103

CONTINUATION DWG. REFER TO: M009-IMR-ARC-DWG-GWST080-CL-17105


BARREL LENGTH 5220
NOTE: CONTROL PANEL LOCATION SUBMITTED SEPARATELY.
CURTAIN WIDTH 5163 Green Line
Blue Line
HIGHER ROLLER LINE OF CURTAIN DROP LOWER ROLLER

400

HIGHER ROLLER
OVERLAP

CURTAIN WIDTH 5163


EDGE GAP - 20MM MINIMUM
BARREL LENGTH 5220 DROP LESS THAN 2.00MTS

CURTAIN WIDTH 2563


BARREL LENGTH 2620
Gold Line

3 2

20
17-02-18 5
1 2 3 4 5 6 7 8 9

CL-17110 CL-17110
CL-17106

OVERALL HEADBOX LEGTH = 4815MM


ELEVATOR SUBMITTED SEPARATELY
PETAL CEILING SUBMITTED SEPARATELY 3 A

B
CL-17109
C
C

OVERLAP
D

400
ZONE F

2
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
CL-17109 NOTED OTHERWISE.

BARREL LENGTH 2620


CURTAIN WIDTH 2563
2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH
INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY
NEEDED CORRECTION.
LINE OF CURTAIN DROP 4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
LATEST MATERIAL SUBMITTALS.

LOWER ROLLER
FLAT CEILING SUBMITTED SEPARATELY 150x280 SMOKE CURTAIN 5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.

3
6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.
GALVANIZE STEEL FORMED REVERSE
FCH: +7030
HEADBOX CL-17106
LEGENDS:
MATERIAL FINISH KEY

SMOKE STOP SMOKE CURTAIN M009-SPH-ARC-MAR-00291-3

A06 12.5mm THICK ACOUSTIC GYPSUM BOARD M009-SPH-ARC-MAR-00105-1

A06 FCH: +4500 A06 FCH: +4500 SPH REFERENCE DETAIL DRAWINGS FOR SMOKE CURTAIN:

M009-SPH-ARC-DWG-GWST080-ZZ-25974
M009-SPH-ARC-DWG-GWST080-ZZ-25975

1535
M009-SPH-ARC-DWG-GWST080-ZZ-25976
M009-SPH-ARC-DWG-GWST080-ZZ-25977
VAULT CEILING SUBMITTED SEPARATELY PETAL CEILING SUBMITTED SEPARATELY M009-SPH-ARC-DWG-GWST080-ZZ-25978
M009-SPH-ARC-DWG-GWST080-ZZ-25979
M009-SPH-ARC-DWG-GWST080-ZZ-25980
M009-SPH-ARC-DWG-GWST080-ZZ-25981

B
M009-SPH-ARC-DWG-GWST080-ZZ-25982
M009-SPH-ARC-DWG-GWST080-ZZ-25983
M009-SPH-ARC-DWG-GWST080-ZZ-25984

REFERENCE DOCUMENTS:
A. IFC DRAWINGS
M009-SPH-ARC-DWG-GWST080-CL-B17102-2
AL RIFFA STATION M009-SPH-ARC-DWG-GWST080-CL-B17103-2

1 CONCOURSE LEVEL (ZONE F) - SMOKE CURTAIN PLAN @ 7030 FCH B. BIM MODEL
M009-SPH-ARC-MD03-GWST080-ZZ-50006

5 CL-17104 SCALE : 1:30 PROJECT WISE: 09 JANUARY 2018

C. MATERIAL SUBMITTAL
M000-SPH-ARC-MAR-00291 Rev. 3

VAULT CEILING SUBMITTED SEPARATELY

1535
Drawing Revision History:
A06 FCH: +4500 A06 FCH: +4500

LOWER ROLLER
8 1
0.2
DVE APPROVED
SECOND ISSUE
J.E.
J.E.
11-02-18
16-01-18
CL-17106
0.1 FIRST ISSUE J.E. 16-12-17
FLAT CEILING SUBMITTED SEPARATELY

CURTAIN WIDTH 2519


Purpose of Issue:

BARREL LENGTH 2576


FCH: +7030 SHOP DRAWING
Design Validation:
SONO Reference: Date: -
DVE Reference: Date: -

OVERALL HEADBOX LEGTH = 4894MM


3
CL-17112 Qatar Railways Company

OVERLAP
P.O. Box 29988

312
Doha - Qatar
2
CL-17112
Originator Name & Logo: Contractor Name &
PETAL CEILING SUBMITTED SEPARATELY Logo:

BARREL LENGTH 2576


CURTAIN WIDTH 2519
ELEVATOR SUBMITTED SEPARATELY
10 3 2 LINE OF CURTAIN DROP
CONTINUATION DWG. REFER TO: M009-IMR-ARC-DWG-GWST080-CL-17103

CONTINUATION DWG. REFER TO: M009-IMR-ARC-DWG-GWST080-CL-17105


CL-17113 CL-17113 P.O.BOX : 22403 DOHA - QATAR
CL-17107 TEL: 4131770 , FAX: 4369529 Saudi Binladin Group - PORR - HBK
www.groupimar.com Green Line Elevated
150x280 SMOKE CURTAIN

HIGHER ROLLER
BARREL LENGTH 5220 Project:
GALVANIZE STEEL FORMED REVERSE
CURTAIN WIDTH 5163 HEADBOX Qatar Integrated Railway Project
400
EDGE GAP - 20MM MINIMUM 20 Green Line – Elevated & At-Grade
OVERLAP
LINE OF CURTAIN DROP DROP LESS THAN 2.00MTS
RTC/082/2013
Discipline:
ARCHITECTURAL
HIGHER ROLLER LOWER ROLLER Drawing Title:

CURTAIN WIDTH 5163 CONSTRUCTION PHASE - ARCHITECTURE (FOH)


NOTE: CONTROL PANEL LOCATION SUBMITTED SEPARATELY. AL RIFFA STATION
BARREL LENGTH 5220

5025 OVERALL HEADBOX LEGTH = 10093MM


SMOKE CURTAIN PLAN
CONCOURSE LEVEL - ZONE F
AL RIFFA STATION 9 (PART 1 OF 2)
2 CONCOURSE LEVEL (ZONE F) - SMOKE CURTAIN PLAN @ 7030 FCH CL-17106 Originator:
Drawn J.M.E. 11-02-2018
Contractor:
Checked S.B.
R.B.F. 11-02-2018
CL-17104 SCALE : 1:30
Checked
S.E.H. 11-02-2018 Approved H.E.
Approved

Scale: As Indicated Sheet Size A1


Drawing No:
IMR M009-IMR-ARC-DWG-GWST080-CL-17104 1
SPH M009-SPH-ARC-DWG-GWST080-ZZ-25977 1
Key Plan:

Red Line

2 1
6
Green Line
CL-17106 CL-17106
Blue Line

4996 12900

FLAT CEILING SUBMITTED SEPARATELY ESCALATOR VAULT SUBMITTED SEPARATELY


Gold Line
BARREL LENGTH 4807
A06 FCH: +7030 BARREL LENGTH 4850
150x280 SMOKE CURTAIN 1 2 3 4 5 6 7 8 9

CURTAIN WIDTH 4675 BARREL LENGTH 4762 GALVANIZE STEEL FORMED REVERSE
HEADBOX

A
80

LOWER ROLLER A06 FCH: +4500 HIGHER ROLLER LOWER ROLLER HIGHER ROLLER C

D
400 400
FLAT CEILING SUBMITTED SEPARATELY OVERLAP OVERLAP ZONE F
1535

NOTES:
CURTAIN WIDTH 4762 CURTAIN LENGTH 4675
CONTINUATION DWG. REFER TO: M009-IMR-ARC-DWG-GWST080-CL-17104

1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS


BARREL LENGTH 4850 BARREL LENGTH 4807 NOTED OTHERWISE.
2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.
OVERALL HEADBOX LEGTH = 17896MM 3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH

B
INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY
NEEDED CORRECTION.
4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE

2 3 LATEST MATERIAL SUBMITTALS.


5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.
CL-17111 CL-17111
6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.
WALL LIMIT LEGENDS:
MATERIAL FINISH KEY

SMOKE STOP SMOKE CURTAIN M009-SPH-ARC-MAR-00291-3

A06 12.5mm THICK ACOUSTIC GYPSUM BOARD M009-SPH-ARC-MAR-00105-1


VAULT CEILING SUBMITTED SEPARATELY VAULT CEILING SUBMITTED SEPARATELY PETAL CEILING
VAULT CEILING SUBMITTED SEPARATELY SUBMITTED SEPARATELY SPH REFERENCE DETAIL DRAWINGS FOR SMOKE CURTAIN:

M009-SPH-ARC-DWG-GWST080-ZZ-25974
M009-SPH-ARC-DWG-GWST080-ZZ-25975
CONTINUAT

M009-SPH-ARC-DWG-GWST080-ZZ-25976
M009-SPH-ARC-DWG-GWST080-ZZ-25977
M009-SPH-ARC-DWG-GWST080-ZZ-25978
NOTE: CONTROL PANEL LOCATION SUBMITTED SEPARATELY. M009-SPH-ARC-DWG-GWST080-ZZ-25979
M009-SPH-ARC-DWG-GWST080-ZZ-25980
M009-SPH-ARC-DWG-GWST080-ZZ-25981
AL RIFFA STATION M009-SPH-ARC-DWG-GWST080-ZZ-25982

3 CONCOURSE LEVEL (ZONE F) - SMOKE CURTAIN PLAN @ 4500 FCH M009-SPH-ARC-DWG-GWST080-ZZ-25983


M009-SPH-ARC-DWG-GWST080-ZZ-25984

CL-17105 SCALE : 1:30 REFERENCE DOCUMENTS:


A. IFC DRAWINGS
M009-SPH-ARC-DWG-GWST080-CL-B17102-2
M009-SPH-ARC-DWG-GWST080-CL-B17103-2

B. BIM MODEL
17-02-18 M009-SPH-ARC-MD03-GWST080-ZZ-50006
PROJECT WISE: 09 JANUARY 2018

6 C. MATERIAL SUBMITTAL
M000-SPH-ARC-MAR-00291 Rev. 3

4996 12900

VAULT CEILING SUBMITTED SEPARATELY VAULT CEILING SUBMITTED SEPARATELY PETAL CEILING
VAULT CEILING SUBMITTED SEPARATELY SUBMITTED SEPARATELY
Drawing Revision History:

WALL LIMIT

C
BARREL LENGTH 4850
2 3 BARREL LENGTH 4807
1
0.2
DVE APPROVED
SECOND ISSUE
J.E.
J.E.
11-02-18
16-01-18
CL-17111 CL-17111 0.1 FIRST ISSUE J.E. 16-12-17
CONTINUATION DWG. REFER TO: M009-IMR-ARC-DWG-GWST080-CL-17104

CURTAIN WIDTH 4762 CURTAIN WIDTH 4675 Purpose of Issue:


1535

SHOP DRAWING
400 A06 FCH: +4500 400 LINE OF CURTAIN DROP 400
FLAT CEILING SUBMITTED SEPARATELY
OVERLAP OVERLAP OVERLAP Design Validation:
A06 FCH: +4500
LOWER ROLLER A06 FCH: +4500 HIGHER ROLLER LOWER ROLLER HIGHER ROLLER SONO Reference: Date: -
DVE Reference: Date: -
80

150x280 SMOKE CURTAIN Qatar Railways Company


CURTAIN WIDTH 4675 CURTAIN WIDTH 4763 GALVANIZE STEEL FORMED REVERSE P.O. Box 29988
BARREL LENGTH 4807 BARREL LENGTH 4851
HEADBOX Doha - Qatar

OVERALL HEADBOX LENGTH = 17896MM


Originator Name & Logo: Contractor Name &
Logo:
FLAT CEILING SUBMITTED SEPARATELY ESCALATOR VAULT SUBMITTED SEPARATELY
A06 FCH: +7030
P.O.BOX : 22403 DOHA - QATAR
TEL: 4131770 , FAX: 4369529 Saudi Binladin Group - PORR - HBK
www.groupimar.com Green Line Elevated

NOTE: CONTROL PANEL LOCATION SUBMITTED SEPARATELY. Project:

7 6 Qatar Integrated Railway Project


CL-17106 CL-17106
AL RIFFA STATION
Green Line – Elevated & At-Grade
RTC/082/2013
4 CONCOURSE LEVEL (ZONE F) - SMOKE CURTAIN PLAN @ 4500 FCH Discipline:
CL-17105 SCALE : 1:30
ARCHITECTURAL
Drawing Title:

CONSTRUCTION PHASE - ARCHITECTURE (FOH)


AL RIFFA STATION
SMOKE CURTAIN PLAN
CONCOURSE LEVEL - ZONE F
(PART 2 OF 2)
Originator: Contractor:
Drawn J.M.E. 11-02-2018
Checked S.B.
Checked R.B.F. 11-02-2018
Approved S.E.H. 11-02-2018 Approved H.E.

Scale: As Indicated Sheet Size A1


Drawing No:
IMR M009-IMR-ARC-DWG-GWST080-CL-17105 1
SPH M009-SPH-ARC-DWG-GWST080-ZZ-25978 1
Key Plan:

Red Line

ELEVATOR SUBMITTED SEPARATELY


PART OF FLAT CEILING
Green Line
Blue Line

STALL SYSTEM BRACKET

SMOKE CURTAIN BARREL


SMOKE CURTAIN BARREL OPENING 17-02-18
SMOKE CURTAIN ROLL
Gold Line
SMOKE CURTAIN DROPPING LINE
26 28 26
40
80

40

CEILING EDGE

HIGHER ROLLER
NOTES:

PART OF FLAT CEILING 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
NOTED OTHERWISE.
2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.

NOTE: SIMILAR TO SMOKE CURTAIN AT ZONE F


3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH
INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY
NEEDED CORRECTION.
4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
AL RIFFA STATION LATEST MATERIAL SUBMITTALS.

10 SMOKE CURTAIN END PLAN DETAIL @ 7030 FCH 5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.
6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.

CL-17107 SCALE : 1:5 LEGENDS:


MATERIAL FINISH KEY

SMOKE STOP SMOKE CURTAIN M009-SPH-ARC-MAR-00291-3

A06 12.5mm THICK ACOUSTIC GYPSUM BOARD M009-SPH-ARC-MAR-00105-1

10mm Ø SPH REFERENCE DETAIL DRAWINGS FOR SMOKE CURTAIN:


THREADED M009-SPH-ARC-DWG-GWST080-ZZ-25974
ROD WITH M009-SPH-ARC-DWG-GWST080-ZZ-25975
M009-SPH-ARC-DWG-GWST080-ZZ-25976
NUTS AND M009-SPH-ARC-DWG-GWST080-ZZ-25977
WASHER M009-SPH-ARC-DWG-GWST080-ZZ-25978
M009-SPH-ARC-DWG-GWST080-ZZ-25979
M009-SPH-ARC-DWG-GWST080-ZZ-25980
M009-SPH-ARC-DWG-GWST080-ZZ-25981
M8 COACH SCREW M009-SPH-ARC-DWG-GWST080-ZZ-25982
50x50x5mm M009-SPH-ARC-DWG-GWST080-ZZ-25983

50

50
THICK M009-SPH-ARC-DWG-GWST080-ZZ-25984
GALVANIZED
STEEL L-ANGLE 50x50x1.2mm
REFERENCE DOCUMENTS:
A. IFC DRAWINGS
GALVANIZED STEEL STUD M10 M009-SPH-ARC-DWG-GWST080-CL-B17102-2
2 - 50x50x1.2mm 100x100x3MM @ 1000MM THREADED M009-SPH-ARC-DWG-GWST080-CL-B17103-2

50x50x4mm GALVANIZED STEEL L-ANGLE SUPPORT ROD


STUD SPACED @ B. BIM MODEL

737
737
THICK

10
600mm M8 COACH M009-SPH-ARC-MD03-GWST080-ZZ-50006
GALVANIZED M10 THREADED ROD 250 SCREW PROJECT WISE: 09 JANUARY 2018
STEEL TUBE 450
150
VERTICAL 1.2mm (18 GAUGE) C. MATERIAL SUBMITTAL
SUPPORT STEEL FORMED TO M000-SPH-ARC-MAR-00291 Rev. 3
AT 1200mm C/C MATCH BRACKETS. 150
2 - 50x50x1.2mm
TOP AND BOTTOM
GALVANIZED STEEL STUD
TO BE BENT FOR
SPACED @ 600mm
50

STIFFNESS

2 - 50x50x1.2mm
GALVANIZED STEEL
M8 COACH SCREW STUD SPACED @
0.9mm THK.

280
130

130
280
600mm Drawing Revision History:
FURRING
CHANNEL @

1160
400mm C/C 1.2mm (18 GAUGE)
1.2mm (18 GAUGE) CONCRETE BEAM BY OTHERS 150 STEEL FORMED TO
STEEL FORMED TO MATCH BRACKETS. TOP
MATCH BRACKETS. TOP AND BOTTOM TO BE
AND BOTTOM TO BE BENT BENT FOR STIFFNESS 1 DVE APPROVED J.E. 11-02-18
FOR STIFFNESS ALIGNED WITH DETAIL 13 26 28 26 0.2 SECOND ISSUE J.E. 16-01-18
0.1 FIRST ISSUE J.E. 16-12-17
12.5mm THK. Purpose of Issue:
ACOUSTIC SHOP DRAWING
GYPSUM CEILING
(A06) 10mm Ø THREADED ROD 50x50x4mm THK. GALVANIZED STEEL Design Validation:

WITH NUT & WASHER TUBE BRIDGING SONO Reference: Date: -


DVE Reference: Date: -

EDGE COVER STRIP


Qatar Railways Company
FCH=+4500MM P.O. Box 29988
VAULT CEILING SUBMITTED SEPARATELY Doha - Qatar

PETAL CEILING SUBMITTED SEPARATELY CH = REFER TO RCP PETAL CEILING SUBMITTED SEPARATELY
26 28 26 FCH=+7030MM
LINEAR DIFFUSER TO BE SUBMITTED
Originator Name & Logo: Contractor Name &
SEPARATELY 12.5mm THK. ACOUSTIC GYPSUM CEILING 40 40
40 40 Logo:
CURTAIN DROP FROM FCH = 2500MM

(A06) PETAL INFILL PANEL BY HUNTER


0.9mm THK. FURRING 80 DOUGLAS

CURTAIN DROP FROM FCH = 5030MM


CHANNEL @600mm C/C 80
FABRIC TYPE LS EFP 2/A2, A GLASS GALVANIZED STEEL P.O.BOX : 22403 DOHA - QATAR
Saudi Binladin Group - PORR - HBK
FABRIC COATED WITH A MICRONIZED
TEL: 4131770 , FAX: 4369529
STUDS & TRACKS www.groupimar.com Green Line Elevated
ALUMINUM FILLED FIRE RETARDANT
FABRIC TYPE LS EFP 2/A2, A GLASS FABRIC TYPE LS EFP 2/A2, A GLASS
POLYURETHANE NOMINAL 465 G/M² Project:
FABRIC COATED WITH A MICRONIZED FABRIC COATED WITH A MICRONIZED
ALUMINUM FILLED FIRE RETARDANT ALUMINUM FILLED FIRE RETARDANT Qatar Integrated Railway Project
12.5mm THK. ACOUSTIC GYPSUM CEILING POLYURETHANE NOMINAL 465 G/M² POLYURETHANE NOMINAL 465 G/M² Green Line – Elevated & At-Grade
(A06) RTC/082/2013
Discipline:
BOTTOM BAR MADE OF TWO BOTTOM BAR MADE OF TWO ARCHITECTURAL
BOTTOM BAR MADE OF TWO SECTIONS OF FOLDED 2.0MM (4 SECTIONS OF FOLDED 2.0MM (4 Drawing Title:
SECTIONS OF FOLDED 2.0MM (4 GAUGE) GALVANIZE ANGLES GAUGE) GALVANIZE ANGLES
GAUGE) GALVANIZE ANGLES FORMED INTO TRAINGULAR SHAPE FORMED INTO TRAINGULAR SHAPE CONSTRUCTION PHASE - ARCHITECTURE (FOH)
FORMED INTO TRAINGULAR SHAPE
AL RIFFA STATION
SMOKE CURTAIN PLAN DETAIL & SECTION
CONCOURSE LEVEL
AL RIFFA STATION AL RIFFA STATION AL RIFFA STATION
11 SMOKE CURTAIN SECTION DETAIL @ 4500 FCH 12 SMOKE CURTAIN SECTION DETAIL @ 7030 FCH 13 SMOKE CURTAIN SECTION DETAIL @ 7030 FCH Originator:
Drawn J.M.E. 11-02-2018
Contractor:
Checked S.B.
CL-17107 SCALE : 1:5 CL-17107 SCALE : 1:5 CL-17107 SCALE : 1:5 Checked R.B.F. 11-02-2018
Approved
Approved S.E.H. 11-02-2018 H.E.

Scale: As Indicated Sheet Size A1


Drawing No:
IMR M009-IMR-ARC-DWG-GWST080-CL-17107 1
SPH M009-SPH-ARC-DWG-GWST080-ZZ-25980 1
Key Plan:

OVERALL HEADBOX LEGTH = 21901MM


Red Line
BARREL LENGTH 4735 BARREL LENGTH 4779 BARREL LENGTH 4735

CURTAIN WIDTH 4678 CURTAIN WIDTH 4691 CURTAIN WIDTH 4678

HIGHER ROLLER HIGHER ROLLER HIGHER ROLLER SMOKE CURTAIN


@ FCH 7030
17-02-18
Green Line

CLNG OPENING
400 400 400 400
CURTAIN OVERLAP CURTAIN OVERLAP CURTAIN OVERLAP CURTAIN OVERLAP
Blue Line

80
CURTAIN WIDTH 4691 CURTAIN WIDTH 4691
SMOKE CURTAIN BARREL OPENING BARREL LENGTH 4779 BARREL LENGTH 4779
NOTE: SIMILAR TO SMOKE CURTAIN AT ZONE F
ELEVATOR LIMIT
(TO BE SUBMITTED LOWER ROLLER AL RIFFA STATION LOWER ROLLER
SMOKE CURTAIN DROPPING LINE
SMOKE CURTAIN BLOW-UP PLAN
SEPARATELY)
1 2
SMOKE CURTAIN BARREL CL-17108

CL-17108 SCALE : 1:10


Gold Line

OVERALL HEADBOX LEGTH = 21901MM 3


CL-17108
BARREL LENGTH 4735 BARREL LENGTH 4779 BARREL LENGTH 4735

CURTAIN WIDTH 4678 CURTAIN WIDTH 4691 CURTAIN WIDTH 4678


150
MOTOR M M MOTOR M M MOTOR FLAG BRACKET
NOTES:

HIGHER ROLLER HIGHER ROLLER HIGHER ROLLER 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
NOTED OTHERWISE.

280
2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH
LOWER ROLLER LOWER ROLLER
INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY
NEEDED CORRECTION.
4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
TAIL BEARING SET 28

BOTTOM COVER PLATE


M M M M 40 LATEST MATERIAL SUBMITTALS.
5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.
CURTAIN WIDTH 4691 CURTAIN WIDTH 4691 6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.

FLAG BRACKET BARREL LENGTH 4779 BARREL LENGTH 4779 LEGENDS:


MATERIAL FINISH KEY

SMOKE STOP SMOKE CURTAIN M009-SPH-ARC-MAR-00291-3


+4.500MTS 400 400 400 400
LINE OF CEILING FINISH CURTAIN OVERLAP CURTAIN OVERLAP CURTAIN OVERLAP CURTAIN OVERLAP A06 12.5mm THICK ACOUSTIC GYPSUM BOARD M009-SPH-ARC-MAR-00105-1

SPH REFERENCE DETAIL DRAWINGS FOR SMOKE CURTAIN:

M009-SPH-ARC-DWG-GWST080-ZZ-25974
M009-SPH-ARC-DWG-GWST080-ZZ-25975
M009-SPH-ARC-DWG-GWST080-ZZ-25976
FCH=+4.500MTS M009-SPH-ARC-DWG-GWST080-ZZ-25977
M009-SPH-ARC-DWG-GWST080-ZZ-25978
40 40 M009-SPH-ARC-DWG-GWST080-ZZ-25979
M009-SPH-ARC-DWG-GWST080-ZZ-25980
80 M009-SPH-ARC-DWG-GWST080-ZZ-25981
M009-SPH-ARC-DWG-GWST080-ZZ-25982

CEILING CURTAIN DROP FROM FCH (7030) = 5030MM


M009-SPH-ARC-DWG-GWST080-ZZ-25983
12.5mm THK. ACOUSTIC M009-SPH-ARC-DWG-GWST080-ZZ-25984

GYPSUM CEILING (A05)


ELEVATOR (SUBMITTED SEPARATELY)

11
REFERENCE DOCUMENTS:
A. IFC DRAWINGS
CL-17107
M009-SPH-ARC-DWG-GWST080-CL-B17102-2
M009-SPH-ARC-DWG-GWST080-CL-B17103-2

B. BIM MODEL
M009-SPH-ARC-MD03-GWST080-ZZ-50006
PROJECT WISE: 09 JANUARY 2018

C. MATERIAL SUBMITTAL
M000-SPH-ARC-MAR-00291 Rev. 3
S M O K E C U R T A I N S M O K E C U R T A I N
CURTAIN DROP FROM FCH = 2500MM

CURTAIN DROP FROM FCH = 2500MM


SMOKE CURTAIN FABRIC

Drawing Revision History:

1 DVE APPROVED J.E. 11-02-18


0.2 SECOND ISSUE J.E. 14-01-18
0.1 FIRST ISSUE J.E. 16-12-17
Purpose of Issue:
SHOP DRAWING
Design Validation:
SONO Reference: Date: -
DVE Reference: Date: -

Qatar Railways Company


P.O. Box 29988
Doha - Qatar
BOTTOM BAR
Originator Name & Logo: Contractor Name &
Logo:

P.O.BOX : 22403 DOHA - QATAR


TEL: 4131770 , FAX: 4369529 Saudi Binladin Group - PORR - HBK
www.groupimar.com Green Line Elevated

Project:
2000

2000

2000
Qatar Integrated Railway Project
Green Line – Elevated & At-Grade
RTC/082/2013
Discipline:
ARCHITECTURAL
FLOOR FINISH LEVEL FLOOR FINISH LEVEL Drawing Title:

CONSTRUCTION PHASE - ARCHITECTURE (FOH)


AL RIFFA STATION
SMOKE CURTAIN ELEVATION & SECTION
CONCOURSE LEVEL
AL RIFFA STATION AL RIFFA STATION (1 OF 6)
2 SMOKE CURTAIN ELEVATION 3 SMOKE CURTAIN SECTION Originator:
Drawn J.M.E. 11-02-2018
Contractor:

CL-17108 SCALE : 1:10 CL-17108 SCALE : 1:10 Checked R.B.F. 11-02-2018


Checked S.B.

Approved S.E.H. 11-02-2018 Approved H.E.

Scale: As Indicated Sheet Size A1


Drawing No:
IMR M009-IMR-ARC-DWG-GWST080-CL-17108 1
SPH M009-SPH-ARC-DWG-GWST080-ZZ-25981 1
Key Plan:

Red Line
OVERALL HEADBOX LEGTH = 4894MM

35

BARREL LENGTH 2620


SMOKE CURTAIN
@ FCH 4500 CURTAIN WIDTH 2563 Green Line
HIGHER ROLLER
17-02-18 Blue Line
75
150

75

80
LOWER ROLLER 400

20
2
CURTAIN OVERLAP
(A06) BULKHEAD CURTAIN WIDTH 2563
LIMIT BARREL LENGTH 2620 CL-17109
(TO BE SUBMITTED
Gold Line
SEPARATELY)
NOTE: SIMILAR TO SMOKE CURTAIN AT ZONE F 1 2 3 4 5 6 7 8 9

AL RIFFA STATION SMOKE CURTAIN BARREL OPENING 75 75

1 SMOKE CURTAIN BLOW-UP PLAN SMOKE CURTAIN DROPPING LINE 150


A
CL-17109 SCALE : 1:10 SMOKE CURTAIN BARREL B

OVERALL HEADBOX LEGTH = 4894MM


NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS

50
BARREL LENGTH 2620 NOTED OTHERWISE.
2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.
3 CURTAIN WIDTH 2563 3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH
CL-17109 450 INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY

737
150 NEEDED CORRECTION.
4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
LATEST MATERIAL SUBMITTALS.
M 5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.

50
6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.

LEGENDS:
MATERIAL FINISH KEY
150x280mm

280
SMOKE STOP SMOKE CURTAIN M009-SPH-ARC-MAR-00291-3
HEADBOX
A06 12.5mm THICK ACOUSTIC GYPSUM BOARD M009-SPH-ARC-MAR-00105-1

SPH REFERENCE DETAIL DRAWINGS FOR SMOKE CURTAIN:

M TAIL BEARING SET 28 M009-SPH-ARC-DWG-GWST080-ZZ-25974


M009-SPH-ARC-DWG-GWST080-ZZ-25975
CURTAIN WIDTH 2563 BOTTOM COVER PLATE M009-SPH-ARC-DWG-GWST080-ZZ-25976
FLAG BRACKET M009-SPH-ARC-DWG-GWST080-ZZ-25977
M009-SPH-ARC-DWG-GWST080-ZZ-25978
BARREL LENGTH 2620 40 40 M009-SPH-ARC-DWG-GWST080-ZZ-25979
M009-SPH-ARC-DWG-GWST080-ZZ-25980
80 M009-SPH-ARC-DWG-GWST080-ZZ-25981
M009-SPH-ARC-DWG-GWST080-ZZ-25982
+7.030MTS +7.030MTS M009-SPH-ARC-DWG-GWST080-ZZ-25983
35 LINE OF CEILING FINISH 400 LINE OF CEILING FINISH M009-SPH-ARC-DWG-GWST080-ZZ-25984
CURTAIN OVERLAP
A06 BULKHEAD LIMIT (SUBMITTED SEPARATELY)

REFERENCE DOCUMENTS:
A. IFC DRAWINGS
M009-SPH-ARC-DWG-GWST080-CL-B17102-2
PETAL INFILL PANEL M009-SPH-ARC-DWG-GWST080-CL-B17103-2
BY HUNTER DOUGLAS

13
B. BIM MODEL
M009-SPH-ARC-MD03-GWST080-ZZ-50006
CL-17107 PROJECT WISE: 09 JANUARY 2018

C. MATERIAL SUBMITTAL
CEILING CURTAIN DROP FROM FCH (7030) = 5030MM

CEILING CURTAIN DROP FROM FCH (7030) = 5030MM


M000-SPH-ARC-MAR-00291 Rev. 3
S M O K E C U R T A I N S M O K E C U R T A I N
SMOKE CURTAIN
FABRIC

Drawing Revision History:

+4.500MTS 1 DVE APPROVED J.E. 11-02-18


LINE OF CEILING FINISH
CEILING CURTAIN DROP FROM FCH (4500) = 2500MM

0.2 SECOND ISSUE J.E. 14-01-18


0.1 FIRST ISSUE J.E. 16-12-17
Purpose of Issue:
SHOP DRAWING
Design Validation:
SONO Reference: Date: -
DVE Reference: Date: -

Qatar Railways Company


P.O. Box 29988
Doha - Qatar

BOTTOM BAR
Originator Name & Logo: Contractor Name &
Logo:

P.O.BOX : 22403 DOHA - QATAR


TEL: 4131770 , FAX: 4369529 Saudi Binladin Group - PORR - HBK
www.groupimar.com Green Line Elevated

Project:

Qatar Integrated Railway Project


2000

2000
Green Line – Elevated & At-Grade
RTC/082/2013
Discipline:
ARCHITECTURAL
FLOOR FINISH LEVEL FLOOR FINISH LEVEL Drawing Title:

CONSTRUCTION PHASE - ARCHITECTURE (FOH)


AL RIFFA STATION
SMOKE CURTAIN ELEVATION & SECTION
CONCOURSE LEVEL
AL RIFFA STATION AL RIFFA STATION (2 OF 6)
2 SMOKE CURTAIN ELEVATION 3 SMOKE CURTAIN SECTION Originator:
Drawn J.M.E. 11-02-2018
Contractor:
Checked S.B.
CL-17109 SCALE : 1:10 CL-17109 SCALE : 1:10 Checked R.B.F. 11-02-2018
Approved S.E.H. 11-02-2018 Approved H.E.

Scale: As Indicated Sheet Size A1


Drawing No:
IMR M009-IMR-ARC-DWG-GWST080-CL-17109 1
SPH M009-SPH-ARC-DWG-GWST080-ZZ-25982 1
Key Plan:

Red Line
OVERALL HEADBOX LEGTH = 10093MM
BARREL LENGTH 5520

CURTAIN WIDTH 5163

HIGHER ROLLER Green Line


Blue Line
75

75
150

150
75

75
80

LOWER ROLLER 400


20

35
CURTAIN OVERLAP SMOKE CURTAIN BARREL OPENING
CURTAIN WIDTH 5163 2 SMOKE CURTAIN DROPPING LINE
ELEVATOR LIMIT
(TO BE SUBMITTED
CL-17110
BARREL LENGTH 5520 SEPARATELY) Gold Line
80 SMOKE CURTAIN BARREL

NOTE: SIMILAR TO SMOKE CURTAIN AT ZONE F

AL RIFFA STATION
1 SMOKE CURTAIN BLOW-UP PLAN
CL-17110 SCALE : 1:10
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
NOTED OTHERWISE.
2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH
INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY
OVERALL HEADBOX LEGTH = 10093MM NEEDED CORRECTION.
4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
M10 LATEST MATERIAL SUBMITTALS.
BARREL LENGTH 5520
3 THREADED 5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.

10
CL-17110 CURTAIN WIDTH 5163 ROD 6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.

FLAG LEGENDS:

MOTOR M BRACKET HIGHER ROLLER


MATERIAL FINISH KEY

SMOKE STOP SMOKE CURTAIN M009-SPH-ARC-MAR-00291-3

2 - 50x50x1.2mm CONCRETE BEAM A06 12.5mm THICK ACOUSTIC GYPSUM BOARD M009-SPH-ARC-MAR-00105-1
LOWER ROLLER GALVANIZED STEEL BY OTHERS
SPH REFERENCE DETAIL DRAWINGS FOR SMOKE CURTAIN:
STUD SPACED @

1160
600mm M009-SPH-ARC-DWG-GWST080-ZZ-25974
M009-SPH-ARC-DWG-GWST080-ZZ-25975
150x280mm M009-SPH-ARC-DWG-GWST080-ZZ-25976

TAIL BEARING SET HEADBOX M009-SPH-ARC-DWG-GWST080-ZZ-25977


CURTAIN ROLLER SUB-ASSEMBLY 35 M009-SPH-ARC-DWG-GWST080-ZZ-25978

BOTTOM COVER PLATE


M M009-SPH-ARC-DWG-GWST080-ZZ-25979
M009-SPH-ARC-DWG-GWST080-ZZ-25980
CURTAIN WIDTH 5163 TAIL BEARING SET M009-SPH-ARC-DWG-GWST080-ZZ-25981
M009-SPH-ARC-DWG-GWST080-ZZ-25982
BARREL LENGTH 5520 SMOKE CURTAIN END PLATE M009-SPH-ARC-DWG-GWST080-ZZ-25983
M009-SPH-ARC-DWG-GWST080-ZZ-25984

ELEVATOR LIMIT (SUBMITTED SEPARATELY)


REFERENCE DOCUMENTS:
+7.030MTS 40 40
FCL = +7.030MTS
A. IFC DRAWINGS
LINE OF CEILING FINISH 400 80 M009-SPH-ARC-DWG-GWST080-CL-B17102-2
CURTAIN OVERLAP M009-SPH-ARC-DWG-GWST080-CL-B17103-2

B. BIM MODEL
M009-SPH-ARC-MD03-GWST080-ZZ-50006
12.5mm THK. ACOUSTIC
PROJECT WISE: 09 JANUARY 2018
GYPSUM CEILING (A06)
C. MATERIAL SUBMITTAL
M000-SPH-ARC-MAR-00291 Rev. 3
S M O K E C U R T A I N S M O K E C U R T A I N
12
CL-17107

SMOKE CURTAIN FABRIC


CURTAIN DROP FROM FCH = 5030MM

CURTAIN DROP FROM FCH = 5030MM


Drawing Revision History:

1 DVE APPROVED J.E. 11-02-18


0.2 SECOND ISSUE J.E. 16-01-18
0.1 FIRST ISSUE J.E. 16-12-17
Purpose of Issue:
SHOP DRAWING
Design Validation:
SONO Reference: Date: -
DVE Reference: Date: -

17-02-18
Qatar Railways Company
P.O. Box 29988
Doha - Qatar

Originator Name & Logo: Contractor Name &


Logo:
BOTTOM BAR

P.O.BOX : 22403 DOHA - QATAR


TEL: 4131770 , FAX: 4369529 Saudi Binladin Group - PORR - HBK
www.groupimar.com Green Line Elevated

Project:

Qatar Integrated Railway Project


2000

2000
Green Line – Elevated & At-Grade
RTC/082/2013
Discipline:
ARCHITECTURAL
FLOOR FINISH LEVEL Drawing Title:

CONSTRUCTION PHASE - ARCHITECTURE (FOH)


AL RIFFA STATION
SMOKE CURTAIN ELEVATION & SECTION
AL RIFFA STATION AL RIFFA STATION CONCOURSE LEVEL
(3 OF 6)
2 SMOKE CURTAIN ELEVATION 3 SMOKE CURTAIN SECTION Originator: Contractor:
Drawn J.M.E. 11-02-2018
CL-17110 SCALE : 1:10 CL-17110 SCALE : 1:10
Checked R.B.F. 11-02-2018
Checked S.B.

Approved S.E.H. 11-02-2018 Approved H.E.

Scale: As Indicated Sheet Size A1


Drawing No:
IMR M009-IMR-ARC-DWG-GWST080-CL-17110 1
SPH M009-SPH-ARC-DWG-GWST080-ZZ-25983 1
Key Plan:

OVERALL HEADBOX LEGTH = 17896MM Red Line


BARREL LENGTH 4807 BARREL LENGTH 4850

CURTAIN WIDTH 4675 CURTAIN WIDTH 4762


HIGHER ROLLER HIGHER ROLLER

Green Line
75
150

Blue Line
75

LOWER ROLLER 80 CURTAIN WIDTH 4762 LOWER ROLLER CURTAIN WIDTH 4675

SMOKE CURTAIN BARREL OPENING


2 BARREL LENGTH 4850 BARREL LENGTH 4807 ELEVATOR LIMIT
(TO BE SUBMITTED
CL-17111
EPAR
EPARATELY)
SEPARATELY)
SMOKE CURTAIN DROPPING LINE AL RIFFA STATION

SMOKE CURTAIN BARREL 1 SMOKE CURTAIN BLOW-UP PLAN Gold Line

CL-17111 SCALE : 1:10

OVERALL HEADBOX LEGTH = 17896MM

BARREL LENGTH 4807 BARREL LENGTH 4850 35

CURTAIN WIDTH 4675 CURTAIN WIDTH 4762 3 NOTES:


CL-17111 150
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
M M M NOTED OTHERWISE.
2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH
TAIL BEARING SET
HIGHER ROLLER HIGHER ROLLER INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY
BOTTOM COVER PLATE NEEDED CORRECTION.

280
130
CURTAIN ROLLER 4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
LATEST MATERIAL SUBMITTALS.
SUB-ASSEMBLY
5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.
TAIL BEARING SET 6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.

LOWER ROLLER LOWER ROLLER SMOKE CURTAIN END LEGENDS:


M CURTAIN WIDTH 4762
M M CURTAIN WIDTH 4675
PLATE MATERIAL FINISH KEY

SMOKE STOP SMOKE CURTAIN M009-SPH-ARC-MAR-00291-3

BARREL LENGTH 4850 BARREL LENGTH 4807


A06 12.5mm THICK ACOUSTIC GYPSUM BOARD M009-SPH-ARC-MAR-00105-1

SPH REFERENCE DETAIL DRAWINGS FOR SMOKE CURTAIN:


400 400 400
CURTAIN OVERLAP CURTAIN OVERLAP CURTAIN OVERLAP M009-SPH-ARC-DWG-GWST080-ZZ-25974
M009-SPH-ARC-DWG-GWST080-ZZ-25975
M009-SPH-ARC-DWG-GWST080-ZZ-25976
M009-SPH-ARC-DWG-GWST080-ZZ-25977
M009-SPH-ARC-DWG-GWST080-ZZ-25978
M009-SPH-ARC-DWG-GWST080-ZZ-25979
M009-SPH-ARC-DWG-GWST080-ZZ-25980
M009-SPH-ARC-DWG-GWST080-ZZ-25981
FCH=+4.500MTS M009-SPH-ARC-DWG-GWST080-ZZ-25982
40 40
M009-SPH-ARC-DWG-GWST080-ZZ-25983
80 M009-SPH-ARC-DWG-GWST080-ZZ-25984

11
REFERENCE DOCUMENTS:
A. IFC DRAWINGS
CL-17107 12.5mm THK.
M009-SPH-ARC-DWG-GWST080-CL-B17102-2
ACOUSTIC

ELEVATOR (SUBMITTED SEPARATELY)


M009-SPH-ARC-DWG-GWST080-CL-B17103-2
GYPSUM CEILING
(A06) B. BIM MODEL
M009-SPH-ARC-MD03-GWST080-ZZ-50006
PROJECT WISE: 09 JANUARY 2018

C. MATERIAL SUBMITTAL
M000-SPH-ARC-MAR-00291 Rev. 3
S M O K E C U R T A I N S M O K E C U R T A I N

CURTAIN DROP FROM FCH = 2500MM


SMOKE CURTAIN
FABRIC 17-02-18
CURTAIN DROP FROM FCH = 2500MM

Drawing Revision History:

1 DVE APPROVED J.E. 11-02-18


0.2 SECOND ISSUE J.E. 14-01-18
0.1 FIRST ISSUE J.E. 16-12-17
Purpose of Issue:
SHOP DRAWING
Design Validation:
SONO Reference: Date: -
DVE Reference: Date: -

Qatar Railways Company


P.O. Box 29988
Doha - Qatar

Originator Name & Logo: Contractor Name &


Logo:

BOTTOM BAR P.O.BOX : 22403 DOHA - QATAR


Saudi Binladin Group - PORR - HBK
TEL: 4131770 , FAX: 4369529
www.groupimar.com Green Line Elevated

Project:

Qatar Integrated Railway Project


Green Line – Elevated & At-Grade
2000

2000
RTC/082/2013
Discipline:
ARCHITECTURAL
FLOOR FINISH LEVEL FLOOR FINISH LEVEL Drawing Title:

CONSTRUCTION PHASE - ARCHITECTURE (FOH)


AL RIFFA STATION
SMOKE CURTAIN ELEVATION & SECTION
CONCOURSE LEVEL
AL RIFFA STATION AL RIFFA STATION (4 OF 6)
2 SMOKE CURTAIN ELEVATION 3 SMOKE CURTAIN SECTION Originator:
Drawn J.M.E. 11-02-2018
Contractor:

CL-17111 SCALE : 1:10 CL-17111 SCALE : 1:10 Checked R.B.F. 11-02-2018


Checked S.B.

Approved S.E.H. 11-02-2018 Approved H.E.

Scale: As Indicated Sheet Size A1


Drawing No:
IMR M009-IMR-ARC-DWG-GWST080-CL-17111 1
SPH M009-SPH-ARC-DWG-GWST080-ZZ-25984 1
Key Plan:

Red Line

N
1 2 3 4 5 6 7 8 9
2
PL-17101 Green Line
Blue Line

LA
IB
Q
$O5LIID6WDWLRQ
A

REFL
B
Gold Line

1 2 3 4 5 6 7 8 9

A
C

REFL

REFL
B

REFL

REFL
D

REFL
D
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
5 NOTED OTHERWISE.
2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.
PL-17101
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH
INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY
NOTE: NEEDED CORRECTION.
PLATFORM LEVEL- SMOKE BARRIER KEYPLAN TED
REFLECTED CEILING LAYOUT SUBMITTED 4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
1 SCALE 1:300
SEPARATELY. LATEST MATERIAL SUBMITTALS.
5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.
6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.

LEGENDS:
MATERIAL FINISH KEY

5 5 SMOKE STOP SMOKE CURTAIN M009-SPH-ARC-MAR-00291-3

A06 12.5mm THICK ACOUSTIC GYPSUM BOARD M009-SPH-ARC-MAR-00105-1

SPH REFERENCE DETAIL DRAWINGS FOR SMOKE CURTAIN:


PSD SYSTEM ELEVATOR SUBMITTED SEPARATELY
M009-SPH-ARC-DWG-GWST080-ZZ-25985
M009-SPH-ARC-DWG-GWST080-ZZ-25986
ELEVATOR SUBMITTED SEPARATELY 4
PL-17101
REFERENCE DOCUMENTS:
35

A. IFC DRAWINGS
150x150x3MM @
CEILING BULK HEAD CEILING BULK HEAD M009-SPH-ARC-DWG-GWST080-PL-B1710_2
350

200 850 1000MM L-ANGLE

35
M009-SPH-ARC-DWG-GWST080-PL-B1711_2
SUPPORT

315
SMOKE CURTAIN DROPPING LINE
35

B. BIM MODEL

150

350
M009-SPH-ARC-MD03-GWST080-ZZ-50006
8MM Ø

115
3 M SMOKE CURTAIN BARREL OPENING 300
THREADED ROD
PROJECT WISE: 09 JANUARY 2018

PL-17101 WITH NUTS AND C. MATERIAL SUBMITTAL


200 WASHER
STALL SYSTEM BRACKET OPENING
M000-SPH-ARC-MAR-00291 Rev.3
1750

C-CLAMP
SMOKE CURTAIN BARREL

SMOKE CURTAIN ROLL


50x50x3MM STEEL
86 28 86
TUBE
LINE OF CURTAIN LINE OF CURTAIN
DROP DROP
100 100 17-02-18
PART OF FLAT 12.5MM THK.
200
CEILING ACOUSTIC
FCH=+6.400MTS GYPSUM CEILING
C (A05)
2950

150 70
OVERALL HEADBOX LEGTH = 4700MM

0.9MM THK.
FURRING
BARREL LENGTH 4655
CURTAIN WIDTH 4630

Drawing Revision History:


FLAT CEILING FLAT CEILING CHANNEL @
OVERALL HEADBOX LEGTH = 4700MM

SUBMITTED SUBMITTED 600mm C/C


SEPARATELY SEPARATELY
SMOKE CURTAIN - DETAIL

BUKHEAD HEIGHT 760


150x150x3MM @
BARREL LENGTH 4655
CURTAIN WIDTH 4630

A05 FCH: +6400 A05 FCH: +6400 3 SCALE 1:5


1000MM L-ANGLE
SUPPORT 1 DVE APPROVED J.E. 11-02-18

2 2
0.3 THIRD ISSUE J.E. 07-02-18
M8 COACH SCREW 0.2 SECOND ISSUE J.E. 16-01-18
PL-17103 PL-17102 0.1 FIRST ISSUE J.E. 06-12-17
75 150 Purpose of Issue:

50x50x3MM STEEL SHOP DRAWING


SMOKE CURTAIN ROLL
150 70 TUBE
Design Validation:
2950

SMOKE CURTAIN BARREL PART OF FLAT SONO Reference: Date: -


B 200 CEILING DVE Reference: Date: -

STALL SYSTEM BRACKET FCH=+6.400MTS


100 100
1750

SMOKE CURTAIN BARREL OPENING Qatar Railways Company

150
86 28 86 P.O. Box 29988
SMOKE CURTAIN DROPPING LINE Doha - Qatar

Originator Name & Logo: Contractor Name &


Logo:
FCH=+6.400MTS
M 3 86 28 86
0.9MM THK. C-CHANNEL @
PL-17101 900MM C/C
4 100 100
P.O.BOX : 22403 DOHA - QATAR
TEL: 4131770 , FAX: 4369529 Saudi Binladin Group - PORR - HBK
PL-17101 12.5MM THK. ACOUSTIC www.groupimar.com Green Line Elevated
GYPSUM CEILING (A05)
35

350

200 Project:
CEILING BULK HEAD
1.2MM (18 GAUGE) STEEL FORMED Qatar Integrated Railway Project
350

CEILING BULK HEAD CEILING BULK HEAD


TO MATCH BRACKETS. TOP AND Green Line – Elevated & At-Grade
BOTTOM TO BE BENT FOR
115

RTC/082/2013
35

M
150

STIFFNESS
ELEVATOR
E
ELL
LEE
EVA
EV
VA
VAT
ATO
ATO
TOR
OR SUBMITTED
S
SU
UB
UB
BMM
MIT
IIT
ITT
TT
TED
TEED SE
S
SEPARATELY
EP
EPA
EPPA
AR
ARRA
A
ATT
TE
EL
ELY
EL
LY
Y Discipline:
FABRIC TYPE LS EFP 2/A2, A GLASS ARCHITECTURAL
FABRIC COATED WITH A MICRONIZED
35

Drawing Title:
ALUMINUM FILLED FIRE RETARDANT
PSD SYSTEM PSD SYSTEM POLYURETHANE NOMINAL 465 G/M² CONSTRUCTION PHASE - ARCHITECTURE (FOH)
AL RIFFA STATION
NOTE: CONTROL PANEL LOCATION SUBMITTED SEPARATELY. PLATFORM LEVEL
SMOKE CURTAIN PLAN, SECTION & DETAILS
PLATFORM LEVEL PLATFORM LEVEL PLATFORM LEVEL Originator: Contractor:

SMOKE CURTAIN PLAN SMOKE CURTAIN PLAN SMOKE CURTAIN - DETAIL SMOKE CURTAIN TYPICAL SECTION Drawn J.M.E. 11-02-2018
Checked S.B.
2 SCALE 1:20
5 SCALE 1:20
4 SCALE 1:5
6 SCALE 1:5
Checked
Approved
R.B.F.
S.E.H.
11-02-2018
11-02-2018 Approved H.E.

Scale: As Indicated Sheet Size A1


Drawing No:
IMR M009-IMR-ARC-DWG-GWST080-PL-17101 1
SPH M009-SPH-ARC-DWG-GWST080-ZZ-25985 1
Key Plan:

OVERALL HEADBOX LEGTH = 4700MM Red Line


BARREL LENGTH 4655

CURTAIN WIDTH 4630

M ELEVATOR GLASS LIMIT


Green Line
PSD SYSTEM (BY OTHERS)

(TO BE SUBMITTED SEPARATELY) Blue Line


100

$O5LIID6WDWLRQ
200

100

115 35
35 115
150 10mm Ø
150
THREADED ROD Gold Line

315
350
WITH NUTS AND
WASHER
STALL SYSTEM 2 PLATFORM LEVEL - SMOKE CURTAIN ENLARGE PLAN SMOKE CURTAIN DROPPING LINE
BRACKET PL-17102 1 SCALE 1:10
SMOKE CURTAIN BARREL
50x50x3MM
1 2 3 4 5 6 7 8 9

CEILING EDGE SMOKE CURTAIN BARREL STEEL TUBE


200
OPENING A

REFL

REFL
B

3 0.9mm THK.
C

REFL

REFL
D
PL-17102 OVERALL HEADBOX LEGTH = 4700MM
FURRING
BARREL LENGTH 4655 CHANNEL @
CURTAIN WIDTH 4630 600mm C/C
NOTES:

760
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
TAIL BEARING SET
150 50x50x3MM NOTED OTHERWISE.
STALL SYSTEM BRACKET 2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.
STEEL TUBE
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH
INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY
150x150mm HEADBOX NEEDED CORRECTION.

150
4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
LATEST MATERIAL SUBMITTALS.
5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.
+6.400MTS 6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.
LINE OF CEILING FINISH 86 28 86 FCH=+6.400MTS LEGENDS:
35 35
MOTOR CURTAIN ROLLER SUB-ASSEMBLY CURTAIN ROLLER SUB-ASSEMBLY 100 100
MATERIAL FINISH KEY

ELEVATOR (SUBMITTED SEPARATELY)


SMOKE STOP SMOKE CURTAIN M009-SPH-ARC-MAR-00291-3
12.5mm THK. ACOUSTIC
PSD SYSTEM (BY OTHERS)

MOTOR END BRACKET 200


150x150mm HEADBOX GYPSUM CEILING (A06)
SUB-ASSEMBLY A06 12.5mm THICK ACOUSTIC GYPSUM BOARD M009-SPH-ARC-MAR-00105-1

SPH REFERENCE DETAIL DRAWINGS FOR SMOKE CURTAIN:

SMOKE CURTAIN FABRIC M009-SPH-ARC-DWG-GWST080-ZZ-25985


M009-SPH-ARC-DWG-GWST080-ZZ-25986

6
REFERENCE DOCUMENTS:
A. IFC DRAWINGS
PL-17101
M009-SPH-ARC-DWG-GWST080-PL-B1710_2
M009-SPH-ARC-DWG-GWST080-PL-B1711_2

B. BIM MODEL
M009-SPH-ARC-MD03-GWST080-ZZ-50006
PROJECT WISE: 09 JANUARY 2018

S M O K E C U R T A I N C. MATERIAL SUBMITTAL
M000-SPH-ARC-MAR-00291 Rev.3
CURTAIN DROP FROM FCH = 4400MM

17-02-18

CURTAIN DROP FROM FCH = 4400MM


Drawing Revision History:
PSD SYSTEM (BY OTHERS)

ELEVATOR (SUBMITTED SEPARATELY)


1 DVE APPROVED J.E. 11-02-18
0.3 THIRD ISSUE J.E. 07-02-18
0.2 SECOND ISSUE J.E. 14-01-18
0.1 FIRST ISSUE J.E. 16-12-17
SMOKE CURTAIN FABRIC Purpose of Issue:
SHOP DRAWING
Design Validation:
SONO Reference: Date: -
DVE Reference: Date: -

Qatar Railways Company


P.O. Box 29988
Doha - Qatar
BOTTOM BAR
Originator Name & Logo: Contractor Name &
Logo:

P.O.BOX : 22403 DOHA - QATAR


TEL: 4131770 , FAX: 4369529 Saudi Binladin Group - PORR - HBK
www.groupimar.com Green Line Elevated

Project:
2000

2000
Qatar Integrated Railway Project
Green Line – Elevated & At-Grade
RTC/082/2013
FLOOR FINISH LEVEL FLOOR FINISH LEVEL Discipline:
ARCHITECTURAL
Drawing Title:

CONSTRUCTION PHASE - ARCHITECTURE (FOH)


AL RIFFA STATION
PLATFORM LEVEL
SMOKE CURTAIN BLOW-UP PLAN,
PLATFORM LEVEL - SMOKE CURTAIN TYPICAL ELEVATION SECTION ELEVATION & SECTION
2 SCALE 1:10
3 SCALE 1:10
Originator:
Drawn J.M.E. 11-02-2018
Contractor:
Checked S.B.
Checked R.B.F. 11-02-2018
Approved S.E.H. 11-02-2018 Approved H.E.

Scale: As Indicated Sheet Size A1


Drawing No:
IMR M009-IMR-ARC-DWG-GWST080-PL-17102 1
SPH M009-SPH-ARC-DWG-GWST080-ZZ-25986 1
Key Plan:

Red Line
OVERALL HEADBOX LEGTH = 4894MM

BARREL LENGTH 2620


SMOKE CURTAIN
TAIN
CURTAIN WIDTH 2563 @ FCH 4500 Green Line
HIGHER ROLLER Blue Line

75

150
75
400 LOWER ROLLER
2
CURTAIN OVERLAP
CURTAIN WIDTH 2563 (A06)
A06) BULKHE
BULKHEAD
EAD D LIMIT
LIM
MIT
BARREL LENGTH 2620 CL-17112 TO BE SUBMITTED
(TO SUBMIT
UBMITTTED
T
EPARA
EPARATELY)
SEPARATELY)
Gold Line

NOTE: SIMILAR TO SMOKE CURTAIN AT ZONE F


75 75 AL RIFFA STATION SMOKE CURTAIN BARREL OPENING

150 1 SMOKE CURTAIN BLOW-UP PLAN SMOKE CURTAIN DROPPING LINE

CL-17112 SCALE : 1:10 SMOKE CURTAIN BARREL

OVERALL HEADBOX LEGTH = 4894MM


NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS

50
NOTED OTHERWISE.
2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.
3 BARREL LENGTH 2620
450 3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH
CL-17112 150 INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY

737
NEEDED CORRECTION.
CURTAIN WIDTH 2563 4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
LATEST MATERIAL SUBMITTALS.
M 5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.

50
6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.

LEGENDS:
MATERIAL FINISH KEY
150x280mm

280
SMOKE STOP SMOKE CURTAIN M009-SPH-ARC-MAR-00291-3
HEADBOX
A06 12.5mm THICK ACOUSTIC GYPSUM BOARD M009-SPH-ARC-MAR-00105-1

SPH REFERENCE DETAIL DRAWINGS FOR SMOKE CURTAIN:


TAIL BEARING SET FLAG BRACKET
BOTTOM COVER M M009-SPH-ARC-DWG-GWST080-ZZ-25974
M009-SPH-ARC-DWG-GWST080-ZZ-25975
PLATE M009-SPH-ARC-DWG-GWST080-ZZ-25976
CURTAIN WIDTH 2563 M009-SPH-ARC-DWG-GWST080-ZZ-25977
M009-SPH-ARC-DWG-GWST080-ZZ-25978
M009-SPH-ARC-DWG-GWST080-ZZ-25979
BARREL LENGTH 2620
M009-SPH-ARC-DWG-GWST080-ZZ-25980
M009-SPH-ARC-DWG-GWST080-ZZ-25981
M009-SPH-ARC-DWG-GWST080-ZZ-25982
+7.030MTS +7.030MTS M009-SPH-ARC-DWG-GWST080-ZZ-25983
400 LINE OF CEILING FINISH LINE OF CEILING FINISH M009-SPH-ARC-DWG-GWST080-ZZ-25984
CURTAIN OVERLAP

REFERENCE DOCUMENTS:
A. IFC DRAWINGS

ELEVATOR (SUBMITTED SEPARATELY)


M009-SPH-ARC-DWG-GWST080-CL-B17102-2
PETAL INFILL PANEL M009-SPH-ARC-DWG-GWST080-CL-B17103-2
BY HUNTER DOUGLAS

13
B. BIM MODEL
M009-SPH-ARC-MD03-GWST080-ZZ-50006
CL-17107 PROJECT WISE: 09 JANUARY 2018

C. MATERIAL SUBMITTAL

CEILING CURTAIN DROP FROM FCH (7030) = 5030MM


M000-SPH-ARC-MAR-00291 Rev. 3
S M O K E C U R T A I N S M O K E C U R T A I N
SMOKE CURTAIN
FABRIC

CEILING CURTAIN DROP FROM FCH (7030) = 5030MM


17-02-18

Drawing Revision History:

+4.500MTS
LINE OF CEILING FINISH

CEILING CURTAIN DROP FROM FCH (4500) = 2500MM


1 DVE APPROVED J.E. 11-02-18
0.1 FIRST ISSUE J.E. 16-01-18
Purpose of Issue:
SHOP DRAWING
Design Validation:
SONO Reference: Date: -
DVE Reference: Date: -

Qatar Railways Company


P.O. Box 29988
Doha - Qatar

BOTTOM BAR
Originator Name & Logo: Contractor Name &
Logo:

P.O.BOX : 22403 DOHA - QATAR


TEL: 4131770 , FAX: 4369529 Saudi Binladin Group - PORR - HBK
www.groupimar.com Green Line Elevated

Project:

Qatar Integrated Railway Project

2000

2000
Green Line – Elevated & At-Grade
RTC/082/2013
Discipline:
ARCHITECTURAL
FLOOR FINISH LEVEL Drawing Title:

CONSTRUCTION PHASE - ARCHITECTURE (FOH)


AL RIFFA STATION
SMOKE CURTAIN ELEVATION & SECTION
CONCOURSE LEVEL
AL RIFFA STATION AL RIFFA STATION (5 OF 6)
2 SMOKE CURTAIN ELEVATION 3 SMOKE CURTAIN SECTION Originator:
Drawn J.M.E. 11-02-2018
Contractor:
Checked S.B.
CL-17112 SCALE : 1:10 CL-17112 SCALE : 1:10 Checked R.B.F. 11-02-2018
Approved S.E.H. 11-02-2018 Approved H.E.

Scale: As Indicated Sheet Size A1


Drawing No:
IMR M009-IMR-ARC-DWG-GWST080-CL-17112 1
SPH M009-SPH-ARC-DWG-GWST080-ZZ-26087 1
Key Plan:

OVERALL HEADBOX LEGTH = 10093MM Red Line

35 BARREL LENGTH 5520


NOTE: SIMILAR TO SMOKE CURTAIN AT ZONE F
CURTAIN WIDTH 5163

HIGHER ROLLER Green Line


Blue Line
75

75
150

150
75

75
400 LOWER ROLLER 20
ELEVATOR SMOKE CURTAIN BARREL OPENING
CURTAIN OVERLAP
LIMIT
SMOKE CURTAIN DROPPING LINE
(TO BE
SUBMITTED CURTAIN WIDTH 5163 SMOKE CURTAIN BARREL 150
SEPARATELY) Gold Line
BARREL LENGTH 5520 2
CL-17113

AL RIFFA STATION
1 SMOKE CURTAIN BLOW-UP PLAN
CL-17113 SCALE : 1:10

NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
NOTED OTHERWISE.

50
OVERALL HEADBOX LEGTH = 10093MM 2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH
BARREL LENGTH 5520 M10 INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY
NEEDED CORRECTION.
THREADED
3

737
4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
ROD

10
CURTAIN WIDTH 5163 150
CL-17113 LATEST MATERIAL SUBMITTALS.
5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.
FLAG BRACKET MOTOR 6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.
HIGHER ROLLER M

50
LEGENDS:
MATERIAL FINISH KEY

SMOKE STOP SMOKE CURTAIN M009-SPH-ARC-MAR-00291-3


LOWER ROLLER 2 - 50x50x1.2mm

280
CONCRETE BEAM GALVANIZED STEEL A06 12.5mm THICK ACOUSTIC GYPSUM BOARD M009-SPH-ARC-MAR-00105-1
BY OTHERS STUD SPACED @

1160
SPH REFERENCE DETAIL DRAWINGS FOR SMOKE CURTAIN:
600mm
M009-SPH-ARC-DWG-GWST080-ZZ-25974
M009-SPH-ARC-DWG-GWST080-ZZ-25975
TAIL BEARING SET 150x280mm
BOTTOM COVER PLATE
M BARREL LENGTH 5520
HEADBOX
M009-SPH-ARC-DWG-GWST080-ZZ-25976
M009-SPH-ARC-DWG-GWST080-ZZ-25977
M009-SPH-ARC-DWG-GWST080-ZZ-25978
M009-SPH-ARC-DWG-GWST080-ZZ-25979
M009-SPH-ARC-DWG-GWST080-ZZ-25980
CURTAIN WIDTH 5163 M009-SPH-ARC-DWG-GWST080-ZZ-25981
M009-SPH-ARC-DWG-GWST080-ZZ-25982
M009-SPH-ARC-DWG-GWST080-ZZ-25983
M009-SPH-ARC-DWG-GWST080-ZZ-25984
+7.030MTS FCL = +7.030MTS 40 40
LINE OF CEILING FINISH REFERENCE DOCUMENTS:
80
400 12.5mm THK. ACOUSTIC A. IFC DRAWINGS
ELEVATOR LIMIT (SUBMITTED SEPARATELY)

CURTAIN OVERLAP GYPSUM CEILING (A06) M009-SPH-ARC-DWG-GWST080-CL-B17102-2


M009-SPH-ARC-DWG-GWST080-CL-B17103-2

B. BIM MODEL
M009-SPH-ARC-MD03-GWST080-ZZ-50006

12
PROJECT WISE: 09 JANUARY 2018

CL-17107 C. MATERIAL SUBMITTAL


M000-SPH-ARC-MAR-00291 Rev. 3
S M O K E C U R T A I N S M O K E C U R T A I N

SMOKE CURTAIN FABRIC


17-02-18
CURTAIN DROP FROM FCH = 5030MM

CURTAIN DROP FROM FCH = 5030MM


Drawing Revision History:

1 DVE APPROVED J.E. 11-02-18


0.1 FIRST ISSUE J.E. 16-01-18
Purpose of Issue:
SHOP DRAWING
Design Validation:
SONO Reference: Date: -
DVE Reference: Date: -

Qatar Railways Company


P.O. Box 29988
Doha - Qatar

BOTTOM BAR Originator Name & Logo: Contractor Name &


Logo:

P.O.BOX : 22403 DOHA - QATAR


TEL: 4131770 , FAX: 4369529 Saudi Binladin Group - PORR - HBK
www.groupimar.com Green Line Elevated

Project:
2000

2000
Qatar Integrated Railway Project
Green Line – Elevated & At-Grade
RTC/082/2013
FLOOR FINISH LEVEL Discipline:
ARCHITECTURAL
Drawing Title:

CONSTRUCTION PHASE - ARCHITECTURE (FOH)


AL RIFFA STATION
SMOKE CURTAIN ELEVATION & SECTION
AL RIFFA STATION AL RIFFA STATION CONCOURSE LEVEL

SMOKE CURTAIN ELEVATION


(6 OF 6)
2 3 SMOKE CURTAIN SECTION Originator: Contractor:
CL-17113 SCALE : 1:10 CL-17113 SCALE : 1:10
Drawn J.M.E. 11-02-2018
Checked S.B.
Checked R.B.F. 11-02-2018
Approved S.E.H. 11-02-2018 Approved H.E.

Scale: As Indicated Sheet Size A1


Drawing No:
IMR M009-IMR-ARC-DWG-GWST080-CL-17113 1
SPH M009-SPH-ARC-DWG-GWST080-ZZ-25088 1
Appendix 9.3
Organization Chart
IMAR

IMAR Project Manager Techtrade T&C Engineer


(Mohamad Khalil) (Bala)

IMAR T&C or QA/QC Manager Techtrade T&C Engineer


(Jayaprakash Narayanan) (Vineeth)

IMAR T&C or QA/QC Engineer


(Salvador Reyes)
Appendix 9.4
Forms and Templates
INSPECTION REQUEST FORM ( IRE )

Green Line Elevated & at Grade - Al Riffa Station

Inspection Request No.: Revision No. DATE INSPECTED & Time :

Requested by ( IMAR
Mobile No.: Designation:
Construction Dept.)

Sub Contrator Name :

Drawing No: Rev. No.

Method Statement No: Rev. No.

MIR REF. No. Rev. No.

ITP No. Rev. No.

Detailed Location : Grid: Level: Panel:

Items to be inspected
Type of Inspection H V
( Detailed description )

Inspection Pertaining To: NCR Activity Others Document No.:

Section Name Date & Time Designation Signature

Construction Dept.

Construction Department Comments Remarks

*If Not Ready ( Re-inspection Target Date & Time :_______________________ Inspected Date & Time : _________________________________

Re-inspected Date & Time : _______________________________

QC Comments Closed Signature

Inspected by IMAR QC : ______________________________________________ Signature : ______________________________

A- Accepted B - Accepted with Comments E -Rejected

SE Comments Closed Signature

Supervision Engineer : ______________________________________________ Signature : ______________________________

A- Accepted B - Accepted with Comments E -Rejected

Form No. M009-IMR-QMS-IRE-Q-02 Rev No. 2 Issued Date: 3-Jul-17


Appendix 9.5
Approved MAR
n u
~.:J q c"' L:.J .:J L..:.H
SAUDI BINLADIN GROUP
qo? n ac.
BK
Co11tract1rg Cor"lpar)

SPH-JV
GREEN LINE- ELEVATED & AT-GRADE

QATAR INTEGRATED RAIL PROJECT


Doha Metro: Green Line Elevated & At Grade
Material Approval Request
M009-SPH-ARC-MAR-00291
SmokeStop Smoke Curtain

Name Role Company Date

Project Engineer SPH-JV 04-01-2018

Architectural Manager SPH -JV 04-01-2018


Checker
lmre Martin Environmental Manager SPH- JV 04-01 -2018

Reviewer Hassan Easa Construction Manager SPH- JV 04-01-2018

Approval Hussein Elsaeid oject Director SPH -JV 04-01-2018

APPROVAL:
Action Name Signature Role Date
Recommendation
for Approval

Approval
Mohamed Ahme Senior Director 2018
Timbely ,_ Architecture
Approval Daniel Leckel Engineer 07 FEB 2018

Document Number : M009-SPH-ARC-MAR-00291 Rev 1 & M009-ARC-ERS-00382 Rev 1 Page 1 of 1 04- Jan-2018

Uncontrolled if printed, refer to EDMS for current version


Qatar Rail
_Jtaterial Approval Request Review Sheet (Engineer)
Com..,any Manageu1ent System

Green line Elevated & At Grade PROJECT NO.: M009 (RTC/082/2013)

DATE: 7-Dec-17

TRANSMITTAL NO./ DATE:

DOCUMENT NO.: DISCIPLINE: ARC

DOCUMENT TITLE: DOCUMENT TYPE: MAR · Material Approval Request

MATERIAL MANUFACTURER: PREFERRED MATERIAL SUPPLIER: Techtrade

LOCATION OF MANUFACTURER: United K ingdom LOCATION OF USE: FOH YES BOH YES

Required N/A Provi ded N/A MATERIAL SAMPL E PROVIDED: NA

YES/NO N/A Reference N/A

Reply Code legend

C. SONO
Document Review Status Code:
E. Fail/Not approved
- - --
Reviewer Engineer's Assistant Technical Department
-

Reviewer's Name Position RECOMMENDED ACCEPTED

Reviewer 1 Name Position Name: Name: Mohamed Ahmed Timbely Name: Name:
OJ'
.
Sr. Director Architectural &
Position: Position: {f{ Design
Position: Position:

0~
Reviewer 2 !'lame

Signature: Signat ur e: Signature: Signature:

Reviewer 3 Name

Date:
Ak
Date~
\
Date:
\

Date:

t •\OH-.It,I IHillHJI! I I ,... l


Appendix 9.6
Testing & Commissioning test report
PSAT/PRE-COMMISSIONING CHECKLIST
FOR SMOKE CURTAIN

GREEN LINE ELEVATED & AT-GRADE

DESCRIPTION OF WORK DATE

IRE REF.
STATION
NO.

DWG REF.
LOCATION
MES/ITP

MANUFACTURER SYSTEM
COUNTRY
MODEL NO.
OF ORIGIN
SERIAL TYPE
CHECKLIST
Checked by
S/N DESCRIPTION T&C Engineer QA/QC Engineer Supervision
SPH T&C Remarks
(Techtrade) (IMAR) Engineer (SE)

1 Pre-Requisite for PSAT

1.1 Ensure valid permit to work is issued

Ensure that IRN is submitted by Construction and approved by


1.2
all parties

1.6 Ensure Lock out Tag out is in place

1.7 Ensure HSE is in place

1.9 Ensure approved Procedure is available at site.

2 Pre- Commissioning Check


Check and ensure all the DBs, feeding power to Smoke
2.1
Curtains are commissioned.
Check and ensure, CBS are commissioned and ready to be
2.2
used.
Check all the cable/Wire are tested for continuity and insulation
2.3
resistance.
Check and ensure, there is no any damage on Smoke Curtain
2.4
fittings

Ensure all the Cable/Wires are terminated at Smoke Curtain and


2.5
panel side with proper and approved tagging.

2.6 Ensure proper cable management inside panel.

2.7 Ensure all Smoke curtains and components are installed.

2.8 Ensure there is no obstruction on the curtain's path.

Comments:

Description T & C Engineer T & C (IMAR QA/QC Engineer) SPH T& C Supervision Engineer (SE) PMC (Witness)

Name

Position

Signature

Date

Form No. M009-IMR-QMS-QCI-Q-06 Rev No. 0.1 Issued Date: 15-Jun-17


SAT / COMMISSIONING CHECKLIST
FOR SMOKE CURTAIN

GREEN LINE ELEVATED & AT-GRADE

UNIT TAG DATE

STATION IRE REF. NO.

DWG REF.
LOCATION
MES/ITP

MANUFACTURER SYSTEM
COUNTRY
MODEL NO.
OF ORIGIN
SERIAL TYPE
CHECKLIST
Checked by
S/N DESCRIPTION T&C Engineer QA/QC Engineer Supervision
SPH T&C Remarks
(Techtrade) (IMAR) Engineer (SE)

Ensure that all the pre-commissioning checks are carried out


1
successfully and are approved.

Ensure power supply availability to energize for respective


2
normal Smoke curtain.

3 Turn ON the power supply of the circuit being tested.

Check the function of Smoke Curtain by turning the key to


4
TEST.
Check the function of Smoke Curtain when key is in TEST and
5
NORMAL position.
Record the Performance of Smoke Curtain in commissioning
6
sheet.

Overall Result Passed Failed Retest

Type of Instrument
Instrument Make

Calibration Date

Model

Serial No.

Comments:

Description T & C Engineer (Techtrade) T & C (IMAR -QA/QC Engineer) SPH T&C Supervision Engineer (SE) PMC (Witness)

Name

Position

Signature

Date

Form No. M009-IMR-QMS-QCI-Q-06 Rev No. 0.1 Issued Date: 15-Jun-17


II
I I
I I
• 11
SACS Cables loop Check

IRE No: Dat e:

l ocation/Area: Room No:

SR. NO. ACTIVITIES/ITEM CHECK YES No N/A Signature/Initial

Material Inspection

1 Check all materials used as per approved material submittal and MAR .

2 Check availability of loop checking procedure.

Check and ensure the Man ufacturer's test certificate is present and
3 complies with QCDD requi rements.

Loop Checking

Check for physical panel identificat ion label with respect to the
1 locatio n of installation
Check for the area / location of the installation acti vity free from any
2 hindrances such as other sub-contractor works

Check for availability of site installat ion team includ ing the quality,
3 safety and technical staff to perform the intend ed installation works

Availability of records of sa fet y induct ion provided to th e technical


4 intends to perform this loop checking .

5 Availability of requ ired tools and tackles to perform this activit y

6 Good housekeeping of the area after completion of work

7 Loo p check test passed

Rema rks:

LTEA
SPH JV/PMC
Subcontractor (Optional)
Subcont ractor SE Subcontractor QC
Construction

Name

Signature

Date

Document Number: M009-SPH-QMS-TMP-00007 Rev 2 Page 1 of 1 12-Feb-2018


Uncontrolled if prmted, refer to EDMS for current version
lll•lilil ~
~~:::~.:....·"~ -:; ~
Coi>H l. f 4 t..~
ePH
'- ...,..,.,.tJ.o
- - IIIBK
'" a o~r~ T c~r..-~ ~d c o lnr<!marion al

FIRE ALARM CABLE TEST


IRE No.: OWG. No. Dille:

SULATION RE SISTANCE (MO)


CAB E SIZE
LOOP REF FROM TO LOOP CONTI-NUITY
(mm2 1
PH-N PH-E ~

Test Equipment Description MakB/Type Serial No. Calibration Date .

NAME SIGNATURE OATE

Tested by:

Inspected by.

W~nessed by.

Witnessed by:

fUM No.: M~RE I-QMHRM.00142 flew. No.: 1


l .... liMe: 1 28-Au~-20 1 6
Appendix 9.77
Testing & Commissioning flow Chart
Testing and Commissioning Process Flow Chart: Rectify

Stage 1: FAT (Only for Applicable Systems) if fails

Procedure Review Plan Review Notification Result Review Result Sign-off


FAT FAT Report

Rectify
Stage 2: Inspection Test (IT)
if fails

Procedure Review Plan Review Notification IT Result Review Result Sign-off IRN

Stage 3: Partial Stand Alone Test (PSAT) Rectify

if fails

Procedure Review Plan Review Notification PSAT Result Review Result Sign-off PCC

Stage 4: Stand Alone Test (SAT) Rectify

if fails

Procedure Review Plan Review Notification TRR SAT Result Review Result Sign-off PCC
Stage 5: System Integration Test (SIT) Rectify

if fails

Procedure Review Plan Review Notification SIT Result Review Result Sign-off AC

Rectify
Stage 6: System Performance Test (SPT)
if fails

Procedure Review Plan Review Notification SPT Result Review Result Sign-off CofC
Appendix 9.8
Certificates
GLE - Al Riffa
Acceptance Certificate (AC)
Stations

No. Rev.
Document
Station
No. / Rev.
Subcontractor IMAR Redco LTA TKE MSI* Inspection /
(*MSI relevant Subcontractor
as applicable) Test Date
Mechanical Electrical Plumbing FLS (Fire Life Safety)
System Type

System /Sub System /


Equipment /
Commissioning Lot

Location

Inspection Request(s)

Drawings Ref.(s)

Test Sheet(s) /
Checklist(s)

Applicable
3rd Party Report
Not Applicable

Previous Certificates FAT IRN PCC PAC AC C of C

QRC Consultant
Approval Not Applicable Applicable

Snag List / Punchlist


Ref. No.

Observations

Contractor to Proceed to Next Stage on T & C Workflow Yes No

IT PSAT SAT SIT SPT

Subcontractor T & C
Name Title Signature Date
Engineer
Subcontractor T & C Name Title Signature Date
Manager
The Subcontractor certifies the Works have been inspected and/or tested in accordance with the Contract & comply with the Contract.

Contractor T & C Name Title Signature Date


Engineer
Contractor T & C
Name Title Signature Date
Manager
The Contractor certifies the Works have been inspected and/or tested in accordance with the Contract & comply with the Contract.

QRC
(Applicable for QCDD related Name Title Signature Date
system only)

The Qatar Registered Consultant (QRC) certifies the Works are compliant with all applicable QCDD requirements.

QRIT/PMC (Witness) Name Title Signature Date

Page 1 of 1
GLE - Al Riffa Certificate of Completion (C of C)
Stations

No. Rev.
Document
Station
No. / Rev.
Subcontractor IMAR Redco LTA TKE MSI* Inspection /
(*MSI relevant Subcontractor
as applicable) Test Date
Mechanical Electrical Plumbing FLS (Fire Life Safety)
System Type

System /Sub System /


Equipment /
Commissioning Lot

Location

Inspection Request(s)

Drawings Ref.(s)

Test Sheet(s) /
Checklist(s)

3rd Party Report Not Applicable Applicable

Previous Certificates FAT IRN PCC PAC AC C of C

QRC Consultant
Approval Not Applicable Applicable

Snag List / Punchlist


Ref. No.

Observations

Contractor to Proceed to Next Stage on T & C Workflow Yes No

IT PSAT SAT SIT SPT

Subcontractor T & C
Name Title Signature Date
Engineer
Subcontractor T & C Name Title Signature Date
Manager
The Subcontractor certifies the Works have been inspected and/or tested in accordance with the Contract & comply with the Contract.

Contractor T & C Name Title Signature Date


Engineer
Contractor T & C
Name Title Signature Date
Manager
The Contractor certifies the Works have been inspected and/or tested in accordance with the Contract & comply with the Contract.

QRC
(Applicable for QCDD related Name Title Signature Date
system only)

The Qatar Registered Consultant (QRC) certifies the Works are compliant with all applicable QCDD requirements.

QRIT/PMC (Witness) Name Title Signature Date

Page 1 of 1
GLE - Al Riffa Installation Release Note (IRN)
Stations

No. Rev.
Document
Station
No. / Rev.
Subcontractor IMAR Redco LTA TKE MSI* Inspection /
(*MSI relevant Subcontractor
as applicable) Test Date
Mechanical Electrical Plumbing FLS (Fire Life Safety)
System Type

System /Sub System /


Equipment /
Commissioning Lot

Location

Inspection Request(s)

Drawings Ref.(s)

Test Sheet(s) /
Checklist(s)

3rd Party Report Not Applicable Applicable

Previous Certificates FAT IRN PCC PAC AC C of C

QRC Consultant
Not Applicable Applicable
Approval
Snag List / Punchlist
Ref. No.

Observations

Contractor to Proceed to Next Stage on T & C Workflow Yes No

IT PSAT SAT SIT SPT

Subcontractor T & C
Name Title Signature Date
Engineer
Subcontractor T & C Name Title Signature Date
Manager
The Subcontractor certifies the Works have been inspected and/or tested in accordance with the Contract & comply with the Contract.

Contractor T & C Name Title Signature Date


Engineer
Contractor T & C
Name Title Signature Date
Manager
The Contractor certifies the Works have been inspected and/or tested in accordance with the Contract & comply with the Contract.

QRC
(Applicable for QCDD related Name Title Signature Date
system only)

The Qatar Registered Consultant (QRC) certifies the Works are compliant with all applicable QCDD requirements.

QRIT/PMC (Witness) Name Title Signature Date

Page 1 of 1
GLE - Al Riffa Partial Acceptance Certificate (PAC)
Stations

No. Rev.
Document
Station
No. / Rev.
Subcontractor IMAR Redco LTA TKE MSI* Inspection /
(*MSI relevant Subcontractor
as applicable) Test Date
Mechanical Electrical Plumbing FLS (Fire Life Safety)
System Type

System /Sub System /


Equipment /
Commissioning Lot

Location

Inspection Request(s)

Drawings Ref.(s)

Test Sheet(s) /
Checklist(s)

3rd Party Report Not Applicable Applicable

Previous Certificates FAT IRN PCC PAC AC C of C

QRC Consultant Not Applicable Applicable


Approval
Snag List / Punchlist
Ref. No.

Observations

Contractor to Proceed to Next Stage on T & C Workflow Yes No

IT PSAT SAT SIT SPT

Subcontractor T & C
Name Title Signature Date
Engineer
Subcontractor T & C Name Title Signature Date
Manager
The Subcontractor certifies the Works have been inspected and/or tested in accordance with the Contract & comply with the Contract.

Contractor T & C Name Title Signature Date


Engineer
Contractor T & C
Name Title Signature Date
Manager
The Contractor certifies the Works have been inspected and/or tested in accordance with the Contract & comply with the Contract.

QRC
(Applicable for QCDD related Name Title Signature Date
system only)

The Qatar Registered Consultant (QRC) certifies the Works are compliant with all applicable QCDD requirements.

QRIT/PMC (Witness) Name Title Signature Date

Page 1 of 1
GLE - Al Riffa
Pre Commissioning Certificate (PCC)
Stations

No. Rev.
Document
Station
No. / Rev.
Subcontractor IMAR Redco LTA TKE MSI* Inspection /
(*MSI relevant Subcontractor
as applicable) Test Date
Mechanical Electrical Plumbing FLS (Fire Life Safety)
System Type

System /Sub System /


Equipment /
Commissioning Lot

Location

Inspection Request(s)

Drawings Ref.(s)

Test Sheet(s) /
Checklist(s)

3rd Party Report Not Applicable Applicable

Previous Certificates FAT IRN PCC PAC AC C of C

QRC Consultant
Approval Not Applicable Applicable
Snag List / Punchlist
Ref. No.

Observations

Contractor to Proceed to Next Stage on T & C Workflow Yes No

IT PSAT SAT SIT SPT

Subcontractor T & C
Name Title Signature Date
Engineer
Subcontractor T & C Name Title Signature Date
Manager
The Subcontractor certifies the Works have been inspected and/or tested in accordance with the Contract & comply with the Contract.

Contractor T & C Name Title Signature Date


Engineer
Contractor T & C
Name Title Signature Date
Manager
The Contractor certifies the Works have been inspected and/or tested in accordance with the Contract & comply with the Contract.

QRC
(Applicable for QCDD related Name Title Signature Date
system only)

The Qatar Registered Consultant (QRC) certifies the Works are compliant with all applicable QCDD requirements.

QRIT/PMC (Witness) Name Title Signature Date

Page 1 of 1
Appendix 9.9
Compliance Statement
COMPLIANCE STATEMENT

Date: Nov. 29, 2018


To: IMAR Trading & Contracting co. W.L..L.
P.o. Box: 22403
Doha - Qatar
Tel.: +974 4413 1770
Fax: +974 4436 9529

Project Name: Qatar Railway – Green Line Elevated

Letter Ref: TTD-LTR-QAT-020

To whom this may concern,

This is to confirm that we comply to the Testing & Commissioning requirements provided for the Smoke curtains for
Green Line Elevated which are installed on the following levels:
 Al Riffa – Platform
 Al Riffa – Concourse
 Al Riffa - Entrance

For any further clarification or information, please do not hesitate to contact the undersigned.

Regards,

Elias Najjar
Managing Director
TechTrade Doors
EN ISO 9001 : 2008 Certified.
Mob +961 70 686
Tel: + 961(6) 955 501
Fax :+961 (6)955502
Website: www.techtradedoors.com

Techtrade S.a.l (offshore): Tel: + 961 6 955501 Fax: + 961 6 955502


P.O.BOX: 19 El Koura, Lebanon Mob: + 961 3 040394 Email: info@techtradedoors.com
Below is the result of reviewed data sheets received from the vendor

Architectural Materials Compliance Check Sheet


ABM Material Code option #
Company Position Name Signature
Material Code
Dynamic Smoke Curtain Prepared by Techtrade Doors Project Coordinator Jennifer Zakhem

Submission Date 5/10/2017 Checked by PMC JV

Revision Verified by DVE

DVE/JV
note

1. Material
1.1 Location Green Line Elevated
1.2 Type Smoke Curtain

1.3 Color Silver Grey

1.4 Finish Fabric

2. Suppliers Data
2.1 Company TechTrade Doos
2.2 Website www.techtradedoors.com
2.3 Contact Shady Najjar
2.4 Telephone 972 559 846088
2.5 Email jennifer.techtradedoors@gmail.com
2.6 Location Main Office- Lebanon
2.7 Gulf Branch Office 1001 , 51 Tower at Buisness Bay, Dubai UAE
2.8 Product Name Dynamic Smoke Curtain

3. ABM Compliances (Look and Feel)


3.1 Color possibility / reflection / coating Silver/Grey
3.2 Geometry & Shape Straight
3.3 Fit with the design Comply
3.4 Appropriate for use Comply

medium weight weave fibre


3.5 Finish Texture
glass fabric. The coating is a specially formulated micronized aluminium filled polymer

4. Employer Requirements (CODE) - to be filled by Manufacturer / Supplier and provide test certificates
Remarks Compliance Check Compliance Check
Employer Requirements
by Manufacturer / Supplier by DVE
NFPA 130 - Interior floor finish materials shall be non-combustible or shall exhibit a critical radiant
4.1 flux not less than 0.8 W / cm² when tested in accordance with ASTM E 648. N/A
Materials and
Finishes 4.2 4.13.1.4 Durability: Wear, strength and weathering qualities N/A
4.3 4.13.1.6 Maintainability: Materials shall be easily cleaned N/A
4.13.4.1 Slip-Resistence: Anti-Slip Properties according to techinical specification:
4.4 for all public(General) areas N/A
- Slip resistance: minimum Class R10 According to German regulation (BGR 181)
4.13.4.1 Slip-Resistence: Water spillage possible area(Wet Area) (eg. Station entrances)
4.5 - Slip resistance: minimum Class R12 According to German regulation (BGR 181) N/A

4.6 Water Resistence/absorption N/A


Floors

4.7 Abrasion resistance N/A

4.13.4.2 Coefficient of reflection (within Underground Stations) shall at least 0.25 according to
4.8 Specification, Avoid highly reflective material N/A

4.13.4.3 The structural capacity of platform (eg. Paving)


4.9 N/A
General live load : minimum 5kN/m²
NFPA 130 - Interior finish materials for walls and ceilings shall comply with NFPA 130: 5.2.5 and
be non-combustible. Interior wall and ceiling finish materials shall exhibit a flame
4.10 spread index not exceeding 25 and smoke developing index not exceeding 450, when tested by N/A
ASTM E 84.

4.11 4.13.6.1 Fixing shall be vibration resistant and insensitive to train generated pressure fluctions N/A

Walls 4.13.6.1 Impact Resistance, Materials within reach of public: Highly resistant to wear and
Columns 4.12 Vandalism N/A
- Withstand 1.5 KN point load
4.13 Water Resistence N/A
4.14 Acoustical Performance (limited to non reachable areas e.g 2m above FFL) N/A
4.13.6.4 Provision for replacement in case of damage; individulally demountable without removal of
4.15 adjacent panels N/A

4.13.6.3 Wall finishes at exposed levels according to technical specifications


4.16 N/A
- Withstand: 1.5 kN applied point load

NFPA 130 - Interior finish materials for walls and ceilings shall comply with NFPA 130: 5.2.5 and
be non-combustible. Interior wall and ceiling finish materials shall exhibit a flame
4.17 N/A
spread index not exceeding 25 and smoke developing index not exceeding 450, when tested by
ASTM E 84.

4.18 4.13.8.1 (Ceiling access for maintenance) N/A

Ceilings 4.19 4.13.8.2 Mechanical Fastenings - (Suspended ceiling system) N/A

4.20 4.13.8.3 Ceiling systems, especially perforated ceiling panels, shall be easy to clean (public areas) N/A

4.21 Acoustical Performance, Minimum NRC of 0.65 N/A


Ceilings

4.22 Water Resistence N/A

4.13.9.2 Low-emissivity coating of the glass


G-Value (SHGC value): minimal of between 0.20 to 0.30
External 4.23 N/A
U-Value : 1.1 W/m²K,
Glazing / Acoustic isolation ca. 40 dB
Façade
4.13.9.3 Wind Load
4.24 N/A
- Withstand 160 km/h, 180 km/h wind speed for 3 seconds.
Furniture 4.14.1.3 Furniture shall be designed and places so that ut does not impede passenger flow and
Fixtures & 4.25 shall be easy to clean and hard wearing for heavy duty (public and staff areas) N/A
Equipment
NFPA 130 Clause 5.2.6.3 Seating furniture in stations shall be noncombustible,
or it shall have limited rates of heat release when tested in
accordance with ASTM E 1537, as follows:
(1) The peak rate of heat release for a single seating furniture
4.26 N/A
item shall not exceed 80 kW (270 kBtu/hr).
Seating (2) The total energy released by a single seating furniture
item during the first 10 minutes of the test shall not exceed
25 MJ (23,700 Btu).
4.14.2.1 Seating furniture Durability, high quality and comfort is necessary.
4.27 Seat heights - 440mm for low and deep single seats N/A
Lightly curved - up to 460mm
Office
4.28 Local Fabrication/Manufacture N/A
Furniture
GDCD 4.29 General Directorate of Civil Defense certified in Qatar Yes

* Use (yes, No) to mention if the product comply with the Certification Body approved scheme for Responsible Sourcing of Materials guided by regional or international recognized standards. Such as BS8902:2009, Social Responsibility Policies
ISO 26000, Quality Assurance & Supply Chain Management Systems ISO 9001, Environmental Management Systems ISO 14001. (for Yes answer mention the certification name)

** Use (Yes, No or N/A ) to mention if the product comply with the following major standards in term of VOC limit: (for Yes/No answers provide the measurement value)
South Coast Air Quality Management District Rule #1113. (for Clear wood finishes, floor coatings, stains, sealers, and shellacs)

<Legend>

Blank to be filled in with corresponding information of the material by the supplier.


Blank to be filled in with DVE's confirmation
(Fill in 'N/A' if not applicable)

GB/T3810.2, GB/T3810.3, GB/T3810.4, GB/T3810.7,


GB/T3810.9, GB/T3810.11, GB/T3810.14, GB/T4100-
Test Standard
200G Average M, etc…Supplier can suggest other
Standards such as ASTM

Jennifer
5.10.2017
Zakhem
Company representative
Signature, date and stamp
Rev 7.2 | Jan 15
SPECIFICATION
COOPERS SMOKESTOP® D600A
ACTIVE SMOKE BARRIERS

In accordance with:

BS EN 12101-1+A1
BS EN 1363-1
BS EN 1634-3
BS EN 13501-4
BS EN ISO 1716
BS EN 13823
BS EN 13501-1
BS 476-6
BS 476-7

Period of Fire Resistance:


150 minutes (2 ½ hours) integrity at 600 °C (1112 °F)

Classification:
D600A, A2-s1, d0, Class “0”

Maximum Dimensions:
Approved for spans unlimited in width, heights up to 10.5 m (413.385 in), minimum panel
overlap 400 mm (15.748 in)

Certification:

The Coopers SmokeStop® active smoke barrier shall have certification and listing with an
independent accredited certification body operating a Level 5 certification scheme as defined
in ISO Guide 65, and in accordance with BS EN 45011. The system shall be CE Marked in
accordance with EU Construction Products Directive (89/106/EEC), as amended by the CE
Marking Directive (93/68/EEC), with attestation being conducted by an accredited notified
certification body that conducts regular FPC surveillance visits to the manufacturer. The
manufacturer shall operate and be certified to BS EN ISO 9001 for quality management
systems, and BS EN ISO 14001 for environmental management systems. The manufacturer
shall operate and shall have certification and listing with an independent accredited
certification body operating an accredited UKAS installer, commissioning and servicing
scheme.

Product Name and Model:

Coopers SmokeStop® D600A active smoke barrier

General description:

An electrically operated Coopers SmokeStop® active smoke barrier is used to form a


virtually continuous barrier against fire effluent (smoke).

NOTE For ease of reference the Coopers SmokeStop® active smoke barrier has been referred to the “barrier assembly -
ies” throughout the remainder of this specification.

Barrier assemblies shall be tested for fire resistance to BS EN 1363-1, tested for
permeability BS EN 1634-3 as required by BS EN 12101-1+A1, and be classified to
BS EN 13501-4.

©2013 Coopers Fire Ltd. All rights reserved.


Coopers Fire Ltd has a policy of continuous product improvement. As such we reserve the right to change design and specifications without prior notice. Please check our
website for the latest information. Multiple patents granted and pending.
Rev 7.2 | Jan 15
SPECIFICATION
COOPERS SMOKESTOP® D600A
ACTIVE SMOKE BARRIERS

Description:

Active smoke barrier assemblies shall comprise of a fire resistant fabric which is wound on to
a steel roller, with 1:600 deflection performance to BS 6323-5, which is powered by an
internal 24Vdc electric motor. They are enclosed within a 1.2 mm (0.047 in) galvanized mild
steel box. A bottom bar to suit the deflection performance requirements of the project and
the desired ceiling configuration in fitted to the bottom edge of the fabric curtain.

Motors shall meet all applicable safety standards. Motors shall contain the necessary drive
mechanisms, a mechanical epicyclic gearbox retarder, automatic overload protection and
both automatic and manual distance travel positioning, linked to an internal 24Vdc
electromagnetic brake with regenerative braking system. When Motors are retracted their
internal drive motor shall be isolated from all power and the barrier shall be held in position
by an internal electromagnetic brake. This ensures the barriers not drift upward or
downward.

The barrier assemblies shall operate with fail-safe by gravity, using patented true TOTAL
(TGFS), in accordance with BS EN 12101-1+A1, and be able to move to their fire
operational position even in the event of open or closed circuit wiring, or total system
corruption, with controlled braking system and drive mechanisms. All working parts shall be
totally enclosed and protected within the steel roller and shall be tested as part of the
complete assembly for fire resistance.

The barrier assemblies must show the tested ability to use a range of heavy bottom bar
weights in order to meet critical anti-deflection performance requirements, as required in
design guides such as BS 7346-4, BR 368 etc. The bottom edge of the smoke barrier shall
incorporate a heavy bottom bar with a minimum standard weight of 3 kg/m (2.015 lbs/ft) with
the facility to increase this weight to 10 kg/m (6.719 lbs/ft) to ensure positive operation when
subjected to pressure. The Engineer shall declare to the manufacturer such pressures, or
wind loads in advance to ensure operational conformity.

Operation:

The barrier assemblies type ASB1 & ASB3 for “Life Safety” shall move to their fire
operational position in a controlled manner when all consumable primary and auxiliary power
sources are removed, in the event the wiring, open or short circuit, or system corruption, or
any combination thereof.

The barrier assemblies shall fail-safe by gravity, using patented true TOTAL (TGFS), and
‘drive up’ with mains power available. In the event of mains power failure, they shall remain
retracted using their own dedicated battery back-up power supply for a pre-determined
period (nominally 30 minutes). If signalled to descend during this period they shall fail-safe
by gravity in a controlled manner to their fire operational position. At the end of the pre-
determined time delay they shall fail-safe by gravity in a controlled manner. This safety
feature is essential to avoid dangerous guillotine/free-fall deployment.

The barrier assemblies must commence movement upon initiation or any initiation, power or
system failure and move to the fire operational position, in all operating modes, at site
specific adjustable and synchronised velocities within the range of 0,06 m/s to 0,30 m/s
(2.362 in/s to 11.811 in/s) using the unique VarioSpeed™ function. Barrier assemblies which

©2013 Coopers Fire Ltd. All rights reserved.


Coopers Fire Ltd has a policy of continuous product improvement. As such we reserve the right to change design and specifications without prior notice. Please check our
website for the latest information. Multiple patents granted and pending.
Rev 7.2 | Jan 15
SPECIFICATION
COOPERS SMOKESTOP® D600A
ACTIVE SMOKE BARRIERS

are located in critical areas of the project, e.g. escape routes, entrances/exits to escalators,
stairways, etc., shall have site specific adjustable and synchronised velocities within the
range of 0,06 m/s to 0,15 m/s (2.362 in/s to 5.905 in/s) using the unique VarioSpeed™
function. Operating speeds shall be site adjustable without altering bottom bar mass. Speeds
may be dictated by those authorities having jurisdiction for ‘safety in use’ according to the
location, nature or function of each unit.

The barrier assemblies shall have the facility to deploy to a partial drop position prior to
moving to their fire operational position under both mains, and emergency power. Barrier
assemblies in their retracted or ‘stalled’ position shall have all power removed from the
motor(s) to prolong motor life. Barriers assemblies that require multiple overlapping barriers
shall have a continuous bottom bar system conjoining the run with mutual operation, i.e. one
down–all down (handshaking).

The barrier assemblies shall have a “soft ascent facility” to ensure no damage to the
surrounding ceiling interface when retracting. The barrier assemblies shall have a built-in
protection in the event that they are prevented from ascending to their retracted position, or
descending to their fire operational position. This ensures they are always in their required
position and avoids damage to the barrier assemblies’ mechanism and surrounding ceiling
finishes. In sensitive ceiling aesthetic areas a unique patented SLAT® ceiling interface can
be provided. Any combination of the alarm/control signal provided by the Electrical
Subcontractor, and/or the specified fail-safe functions shall activate the system.

The barrier assemblies must prove the ability to operate with edge gaps between 20, 40 and
60 mm (0.787, 1.574, 2.362 in), height dependent, in all other situations unless the fabric
edge interfaces with a retention system, i.e. side to resist pressure (as standard 25 Pa
(0.1 in water).

If side guides are provided they shall have formed part of the complete system test in
accordance with BS EN 12101-1+A1.

Fabric:

The fabric material shall be tested as part of the complete assembly complete with
overlapping barrier panels in the orientation and standard use of the application and
installation in accordance with the fire resistance test in BS EN 1363-1, as required by
BS EN 12101-1+A1.

The fabric material (part of the original test specimen) shall be tested for permeability to
BS EN 1634-3 with a rate <25m3/h/m2 (882.866ft3/h/ft2) at ambient temperature at 25 Pa
(0.1 in water).

The fabric material shall be tested independently to reaction to fire tests in accordance with
BS EN ISO 1716 and BS EN 13823 to achieve an “A2-s1, d0” classification in accordance
with BS EN 13501-1+A1 in accordance with A11 of Approved Document B (Volumes 1 & 2)
2006 Edition ‘Fire Safety’ to England & Wales Building Regulations 2000.

The fabric material shall be tested independently for fire propagation to BS 476-6+A1, and
for surface spread of flame to BS 476-7 to achieve National Class ‘0’ in accordance with
A13(b) of Approved Document B (Volumes 1 & 2) 2006 Edition ‘Fire Safety’ to England &
Wales Building Regulations 2000.

©2013 Coopers Fire Ltd. All rights reserved.


Coopers Fire Ltd has a policy of continuous product improvement. As such we reserve the right to change design and specifications without prior notice. Please check our
website for the latest information. Multiple patents granted and pending.
Rev 7.2 | Jan 15
SPECIFICATION
COOPERS SMOKESTOP® D600A
ACTIVE SMOKE BARRIERS

Fabric type is EFP™ 2/A2 a glass fibre fabric coated with a micronised aluminium filled fire
retardant polyurethane 455 g/m2 (0.093 lbs/ft2) –5% +10%.

Optional extras:

x Voice warning:
Audio or spoken multi message facility when mains or emergency power is available.
x Beam protection and obstruction warning:
A beam detector, with delay timer which will sound in the event of any obstruction
being placed in the barrier drop line when mains or emergency power is available.
x Visual alert system:
Light warning system when mains or emergency power is available.
x Split drop delay:
To partially deploy to pre-determined level to permit escape, and initial smoke
containment. After delay fully deploys to its fire operational position when mains, or
emergency power is available.
x Emergency retract:
Touch button retract facility for multi-escape and emergency service ingress/egress
when mains or emergency power is available.

Manufacturers:

Subject to compliance with all requirements set out in this specification, manufacturers
offering products may be incorporated into the work are limited to the following:

x Coopers Fire Limited, Edward House, Penner Road, Havant Hampshire, PO9 1QZ,
United Kingdom. Tel +44 (0)23 9245 4405, Fax: +44 (0)23 9249 2732, Email:
sales@coopersfire.com, Web: http://www.coopersfire.com

Warranty:

The manufacturer shall submit a written warranty for a period of one (1) year. If any part of
the works of this section, including design, fabrication or installation are sublet to any party,
such party shall provide a collateral warranty equivalent to the warranty.

Product certification, performance and/ or testing:

x Complete barrier assemblies are CE Marked in accordance with EU Construction


Products Directive (89/106/EEC)
x Complete barrier assemblies are certified with an independent accredited certification
body operating a Level 5 scheme as defined in ISO Guide 65, and in accordance with
BS EN 45011
x Complete barrier assemblies are certified with an independent accredited certification
body operating an accredited UKAS scheme for installation, commissioning and
servicing
x Complete barrier assemblies have full testing to BS EN 12101-1+A1
x The fabric used within the barrier assemblies shall be tested to BS EN 1634-3
x The fabric used within the barrier assemblies shall be tested to BS EN ISO 1716
x The fabric used within the barrier assemblies shall be tested to BS EN 13823

©2013 Coopers Fire Ltd. All rights reserved.


Coopers Fire Ltd has a policy of continuous product improvement. As such we reserve the right to change design and specifications without prior notice. Please check our
website for the latest information. Multiple patents granted and pending.
Rev 7.2 | Jan 15
SPECIFICATION
COOPERS SMOKESTOP® D600A
ACTIVE SMOKE BARRIERS

x The fabric used within the barrier assemblies shall be tested to BS 476-6+A1
x The fabric used within the barrier assemblies shall be tested to BS 476-7

Approving standards:

The following standards apply to this product:

x BS EN 12101-1:2005+A1:2006, Smoke and heat control systems – Part 1: Specification


for smoke barriers
x BS EN 1363-1:1999, Fire resistance tests – Part 1: General requirements
x BS EN 1634-3, Fire resistance tests for door and shutter assemblies – Part 3: Smoke
control doors and shutters
x BS EN 13501-4:2007+A1:2009, Fire classification of construction products and building
elements. Classification using data from fire resistance tests on components of smoke
control systems
x BS EN ISO 1716:2010, Reaction to fire tests for products. Determination of the gross
heat of combustion. (Calorific value)
x BS EN 13823:2010, Reaction to fire tests for building products. Building products
excluding floorings exposed to the thermal attack by a single burning item
x BS EN 13501-1:2007+A1:2009, Fire classification of construction products and building
elements. Classification using test data from reaction to fire tests
x BS 476-6:1989+A1:2009, Fire tests on building materials and structures. Method of test
for fire propagation for products
x BS 476-7:1997, Fire tests on building materials and structures. Method of test to
determine the classification of the surface spread of flame of products
x BS 6323-5:1982, Specification for seamless and welded steel tubes for automobile,
mechanical and general engineering purposes. Specific requirements for electric
resistance welded (including induction welded) steel tubes
x BS EN ISO 9001:2008, Quality management system
x BS EN ISO 14001:2004, Environmental management system

©2013 Coopers Fire Ltd. All rights reserved.


Coopers Fire Ltd has a policy of continuous product improvement. As such we reserve the right to change design and specifications without prior notice. Please check our
website for the latest information. Multiple patents granted and pending.
Appendix 9.10
Clearance
CLEARANCE TO ENERGIZE

Date: Nov. 26, 2018


To: IMAR Trading & Contracting co. W.L..L.
P.o. Box: 22403
Doha - Qatar
Tel.: +974 4413 1770
Fax: +974 4436 9529

Project Name: Qatar Railway – Green Line Elevated

Letter Ref: TTD-LTR-QAT-007

To whom this may concern,

This is to provide clearance to energize the Smoke curtains for Green Line Elevated which are installed on the following
levels:
 Al Riffa – Platform
 Al Riffa – Concourse
 Al Riffa - Entrance

This clearance is only for the purpose of Testing and Commissioning. The curtains may not be used for any
other purposes, and may not be energized in the absence of Techtrade’s personnel.

For any further clarification or information, please do not hesitate to contact the undersigned.

Regards,

Elias Najjar
Managing Director
TechTrade Doors
EN ISO 9001 : 2008 Certified.
Mob +961 70 686
Tel: + 961(6) 955 501
Fax :+961 (6)955502
Website: www.techtradedoors.com

Techtrade S.a.l (offshore): Tel: + 961 6 955501 Fax: + 961 6 955502


P.O.BOX: 19 El Koura, Lebanon Mob: + 961 3 040394 Email: info@techtradedoors.com

You might also like