Testing and Commissioning Procedure For SCAR and SRCU
Testing and Commissioning Procedure For SCAR and SRCU
TABLE OF CONTENTS
2. PURPOSE
3. SCOPE
8. REFERENCE DOCUMENTS
9. APPENDICES
S No Abbreviation Description
1 ITP Inspection Test Plan
2 IRE Inspection Request
3 ARC Electrical
4 NCR Non-Conformance Report
5 PPE Personal Protective Equipment
6 PQP Project Quality Plan
7 PM Project Manager
8 QA/QC Quality Assurance/ Quality Control
10 SE Site Engineer
11 Cx Commissioning
12 CxM Commissioning Manager
13 CxA Commissioning Authority
14 CxE Commissioning Engineer
15 CxC Commissioning Contractor - (Subcontractor)
16 Cx Team Commissioning Team
17 CBS Central Battery System
18 RA Risk Assessment
The purpose of these specifications is to assure that all Installed SMOKE CURTAIN are
operational and within design and project specifications.
This procedure details must be conducted during installation, commissioning and start
up.
These inspections and tests are performed on Smoke Curtain in order to confirm that:
1. The system’s equipment is properly working.
2. The system’s equipment is compliance with design intent.
3. The system's equipment doesn't have conflict with other nearby systems or
structures.
3. SCOPE
The document covers the procedure of testing and commissioning of the Smoke Curtain
installed in the project, which is in accordance to technical documents and Project
Specification Section M009-SPH-ARC-SPE-00007, Section - 55 23 3701.
There shall be different teams within the subcontractor who will be involved in conducting
SMOKE CURTAIN’s testing and commissioning. The inspection will be offered to the
QA/QC Engineer(SPH), Consultant/Engineer and QRIT.
1. Reviewing all relevant documentation and test reports and prepare all
handing over documents.
2. Ensuring that all activities subject to inspection are recorded.
3. Controlling and organizing the inspection works.
4. Ensuring that inspections are carried out in a timely manner.
He is authorized to report to the Project Manager if any deviation from the Safety and
quality Procedures are identified with site installations during the stages of witnessing
the testing and commissioning inspections, and accountable to ensure that QA/QC
team is adequately staffed by suitably trained and experienced personnel with relevant
knowledge about HSE procedures.
1. CxE is Responsible for the day to day testing activities on site, design
information approval and for the onsite Testing & Commissioning ensuring
that HSE, quality and standards are maintained throughout the
commissioning process.
2. CxE is Responsible to verify that applicable equipment and systems are
installed according to the manufacturer’s recommendations and to industry
accepted standards.
3. CxE is Responsible to verify that all commissioning works are to be carried
out according to specification and approved drawings.
4. CxE is Responsible to ensure in consultation with the Commissioning
Manager that the manpower involved in the Commissioning process are
moved as agreed and planned.
5. CxE is Responsible to Coordinate with the CxM, Commissioning Team, and
Specialist Sub Contractor and plan the work in advance as per the work
sequence.
6. CxE is Responsible to Coordinate with the Main Contractor and ensure
implementation of any comments raised by the consultant.
7. CxE is responsible for maintaining a proper records of all the test, check list
and their results record.
8. CxE is Responsible to monitor and update Testing and Commissioning
progress and report to the Commissioning Manager.
1. Delivering the overall Testing works in a safe and timely manner, ensuring
conformance with the approved design.
2. Verifying that testing work carried out in accordance with the requirements
of the contract.
3. Ensuring the quality standards set for the Testing work are achieved and
the work team adhere to the QA/ QC and HSE requirements of the contract.
4. Shall inform the T&C Team for finished constructions and available systems
for testing.
5. Shall raise inspection request (IRE) if the system or part of the system is
ready for the testing & commissioning of Lights.
6. Shall ensure that proper work permit is obtained prior to start of testing
activities.
7. Shall ensure that proper safety precautionary measures and proper tool box
briefing were conducted prior to the start of testing activities.
8. Shall ensure that the activities shall be conducted safely and in compliance
with the approved methods, manufacturer’s recommendations, and relevant
standards.
9. Shall ensure the readiness of system /panel / area / tools / devices /
personnel / etc. that are included and required for the testing.
10. Shall provide the necessary manpower, supplies, lifting and shifting
equipment.
11. Shall ensure that the works are being carried out in accordance with contract
requirements and this Procedure.
12. Management of the site activities to ensure that the team carries out the
works in time with the delivery schedule.
13. Shall conduct rectification of works in case of failed testing and raised a
revised IRE.
1. On site safety issues, site safety induction. Implement and ensure the safety
procedures and work environment at site.
2. He is authorized to perform all the essential HSE related inspections and
reporting on places of work in order to ensure that proper working practices
are carried out.
3. He is accountable to implement an adequate system to control and identify
hazards and provides advice to all site personnel regarding the safety
matters considering also the health and environment management.
4. HSE officer is authorized to stop any unsafe work.
Listed below is the list of proposed major items needed to undergo the work.
Items Tools / Plants & Equipment
1 Hand tools: tapes, markers, etc.
2 Scaffolds / Ladders ( Supplied by the main contractor)
Work sequence of testing and commissioning for SMOKE CURTAIN will be done as
per the following phases
After approval of the Inspection Release Note (IRN), these steps of testing shall takes place
In an energized state to prove functionality of the system by completing these tests,
Pre-Commissioning Certificates (PCC) to be issued and submitted to the Engineer for
comment/review and acceptance.
1. Check and ensure all the DBs, feeding power to Smoke Curtains are commissioned
and ready to energise.
2. Check and ensure, CBS are commissioned and ready to be used.
3. Check all the cable/Wire are tested for continuity and insulation resistance.
4. Check and ensure, there is no any damage on Smoke Curtain fittings
5. Ensure all the Cable/Wires are terminated at Smoke Curtain and panel side with proper
and approved tagging.
6. Ensure proper cable management inside panel.
7. Ensure all Smoke curtains and components are installed.
8. Ensure there is no obstruction on the curtain's path.
d) Stage – 4: Stand Alone Test (SAT)
1. Prior to the Stand Alone Tests (SAT), a Test Readiness Review will be held. The main
purpose of TRR is to check that the objective of the test is stated, the test configuration
(test methods and procedures, scope of test and safety) is defined , the test resources
are available and the results of the previous tests have not affected the test pre-
requisites. By Completing these tests, Partial Acceptance Certificate (PAC) to be issued
and submitted to the Engineer for Comment/review and acceptance. Ensure that all the
pre-commissioning checks are carried out successfully and are approved.
1. Ensure that all the pre commissioning checks are carried out successfully and are
approved.
2. Ensure power supply availability to energize for respective normal Smoke curtain.
3. Turn ON the power supply of the circuit being tested.
4. Check the function of Smoke Curtain by turning the key to TEST.
5. Check the function of Smoke Curtain when key is in TEST and NORMAL position.
6. Record the Performance of Smoke Curtain in commissioning sheet.
• Access the Fire Curtain Power Supply Unit (PSU) and Zone
Control Panel (ZCP).
• In the ZCP, key to “Test” position (default position is “Normal”
or “Auto”) to descend the curtain into fire operational position.
• After finishing the test, key to “Normal” or “Auto” position and
press the “Reset” Button.
1. All workers (Labour and Staff) will receive a site induction and be issued with PPE
including a helmet with a PMC Inducted sticker.
2. The workers (Labour and Staff), whom have been inducted are only Permitted to work.
3. Regular Tool Box talks shall be held and attendance shall be logged.
4. The Emergency Response Plan of the main contractor will be in place and will be strictly
adhered to.
5. In the event of any accident the Incident Reporting Procedure will be followed at all
times.
6. Always pay attention to the Emergency Telephone Numbers posted on the notice board
in the site office See the attached Sheet of Incident Reporting Procedure.
7. Specific HSE Hazards are mitigated in the Job Hazard Analysis.
8. Heat Stress Management Plan shall be followed for Site Working.
9. Safety inspection is conducted by Health & Safety officer according to QCS 2010
section-11, as per the whole process of the job to identify any hazards to be stated and
recommend for rectification.
10. The result of the inspection will be communicated to all persons who will be involved for
the execution of the work.
11. Dispose all wastes, and unwanted materials must be disposed of at a designated place.
12. Notify your supervisor of the requirement for the separate disposal of chemical or
inflammable wastes.
1. The Supervising personnel shall ensure that each person reporting to them in the field
is aware of all of the information and requirements issued through the tool box talks,
induction or such other notices.
2. The health and safety Officer/Supervisor shall create and approve Tool Box Talks which
the site supervisor shall conduct at various times and before use of equipment, within
the topics, not limited to, are:
8. REFERENCE DOCUMENTS
3. International Standards
• BS 8524-1:2013
• BS EN 13501-2:2007+A1:2009
• BS EN 1634-1:2014
9. REFERENCE DOCUMENTS
Page 1 of 15
RISK ASSESSMENT
Page 2 of 15
RISK ASSESSMENT
Page 3 of 15
RISK ASSESSMENT
Page 4 of 15
RISK ASSESSMENT
Page 5 of 15
RISK ASSESSMENT
Page 6 of 15
RISK ASSESSMENT
Page 7 of 15
RISK ASSESSMENT
Page 8 of 15
RISK ASSESSMENT
Page 9 of 15
RISK ASSESSMENT
Page 10 of 15
RISK ASSESSMENT
Page 11 of 15
RISK ASSESSMENT
Page 12 of 15
RISK ASSESSMENT
When completing this, you must take due consideration of local conditions, including adjacent operations, weather and premises.
Page 13 of 15
RISK ASSESSMENT
Person Responsible for Risk Assessment Implementation at site – Construction Manager (IMAR) Name & Signature -
Prepared by-
Biju Balakrishnan Position Health and Safety Manager
Name
Review
Signature Date 04-09-2018 As required
Date
Probability (P)
Severity (S) = Risk Risk Level (P/S) Conclusions:
X
Page 14 of 15
RISK ASSESSMENT
Page 15 of 15
Appendix 9.2
Drawings & Sketches
Key Plan:
Red Line
FLAT CEILING SUBMITTED SEPARATELY
A06 FCH: +6200 ELEVATOR GLASS LIMIT
ELEVATOR SUBMITTED
OVERALL HEADBOX LEGTH = 101000MM
3
SEPARATELY
Green Line
AG-17101 BARREL LENGTH 5180
17-02-18 CURTAIN WIDTH 5121
400
OVERLAP
150x280 SMOKE CURTAIN
GALVANIZE STEEL FORMED REVERSE
Blue Line
20
DROP LESS THAN 2.00MTS
4
LOWER ROLLER
BARREL LENGHT 5180 AG-17101 1 2 3 4
2 3
Y
TEL
FLAT CEILING SUBMITTED SEPARATELY
A
RA
BARREL LENGTH 3368
FCH: +6200 FCH: +6200
PA
20000 C
SE
D
ED
ITT
BM
A NOTES:
SU
ING
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
5350
NOTED OTHERWISE.
DD
LA
2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.
2C
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH
M2
INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY
OVERLAP
LEGENDS:
400
MATERIAL FINISH KEY
C SMOKE STOP SMOKE CURTAIN M009-SPH-ARC-MAR-00291-3
5350
M2
3.M009-SPH-ARC-DWG-GWST080-ZZ-25971
2C
4.M009-SPH-ARC-DWG-GWST080-ZZ-25972
5.M009-SPH-ARC-DWG-GWST080-ZZ-25973
LINE OF CURTAIN DROP
LA
AT GRADE LEVEL (ZONE C) KEYPLAN
BARREL LENGTH 3368
DD
CURTAIN WIDTH 3311
ING
REFERENCE DOCUMENTS:
SCALE 1 : 300 A. IFC DRAWINGS
SU
BM
M009-SPH-ARC-DWG-GWST080-AG-B1700-2
ITT
ED
B. BIM MODEL
SE
M009-SPH-ARC-MD03-GWST080-ZZ-50006
HIGHER ROLLER
PA
PROJECT WISE: 09 JANUARY 2018
RA
TEL
C. MATERIAL SUBMITTAL
Y
M000-SPH-ARC-MAR-00291 Rev.3
6
BARREL LENGHT 5180
17-02-18 AG-17101
400
OVERLAP M22 CLADDING SUBMITTED SEPARATELY HIGHER ROLLER
LOWER ROLLER LINE OF CURTAIN DROP
ELEVATOR SUBMITTED
M M
SEPARATELY
400
5 BARREL LENGTH 5180 OVERLAP 150x280 SMOKE CURTAIN
AG-17101 FLAT CEILING SUBMITTED SEPARATELY GALVANIZE STEEL FORMED REVERSE ELEVATOR GLASS LIMIT
HEADBOX
A05 FCH: +6200 Drawing Revision History:
OVERALL HEADBOX LEGTH = 10100MM
150
26 28 26
40
Doha - Qatar
80
80
40
10
10
CEILING EDGE
35 CEILING EDGE Originator Name & Logo: Contractor Name &
SMOKE CURTAIN DROPPING LINE
20
100
Logo:
SMOKE CURTAIN BARREL
SMOKE CURTAIN ROLL SMOKE CURTAIN DROPPING LINE
SMOKE CURTAIN BARREL OPENING SMOKE CURTAIN BARREL OPENING P.O.BOX : 22403 DOHA - QATAR
SMOKE CURTAIN BARREL OPENING SMOKE CURTAIN ROLL TEL: 4131770 , FAX: 4369529
www.groupimar.com
Saudi Binladin Group - PORR - HBK
Green Line Elevated
SMOKE CURTAIN DROPPING LINE
CEILING EDGE SMOKE CURTAIN BARREL OPENING STALL SYSTEM BRACKET Project:
100
SMOKE CURTAIN BARREL CEILING EDGE SMOKE CURTAIN DROPPING LINE 35 Qatar Integrated Railway Project
20
45
STALL SYSTEM BRACKET
130 28 26
26 28 26
SMOKE CURTAIN ROLL RTC/082/2013
40
40
80
80
75
40
Discipline:
PART OF M22 CLADDING ARCHITECTURAL
750
150
Drawing Title:
SMOKE CURTAIN DROPPING LINE PART OF FLAT CEILING
75
26 28 26
CEILING EDGE
CONSTRUCTION PHASE - ARCHITECTURE (FOH)
40 40 AL RIFFA STATION
75 75 100 AT GRADE LEVEL - ZONE C
80 ELEVATOR GLASS LIMIT
PART OF FLAT CEILING PART OF FLAT CEILING (SUBMITTED SEPARATELY) SMOKE CURTAIN PLAN AND DETAIL
150 10
Originator: Contractor:
Drawn J.M.E. 11-02-2018
Checked S.B.
SMOKE CURTAIN BLOW-UP PLAN SMOKE CURTAIN BLOW-UP PLAN SMOKE CURTAIN BLOW-UP PLAN SMOKE CURTAIN BLOW-UP PLAN Checked R.B.F. 11-02-2018
3 SCALE 1 : 5
4 SCALE 1 : 5
5 SCALE 1 : 5
6 SCALE 1 : 5
Approved
Scale:
S.E.H.
As Indicated
11-02-2018 Approved
Sheet Size
H.E.
A1
Drawing No:
IMR M009-IMR-ARC-DWG-GWST080-AG-17101 1
SPH M009-SPH-ARC-DWG-GWST080-ZZ-25969 1
Key Plan:
Red Line
FLAT CEILING SUBMITTED SEPARATELY
FCH: +6200
HIGHER ROLLER LOWER ROLLER
M M
Green Line
3 M22 CLADDING SUBMITTED SEPARATELY
4 Blue Line
AG-17102
AG-17102
Y
TEL
LOWER ROLLER
RA
FLAT CEILING SUBMITTED SEPARATELY
PA
SE
FCH: +6200
ED
ITT
BM
Gold Line
SU
2
ING
1 2 3 4
DD
AG-17104
LA
2C
M2
A
D
VAULT CEILING SUBMITTED SEPARATELY
2 NEEDED CORRECTION.
M2
4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
2C
AG-17102
LATEST MATERIAL SUBMITTALS.
LA
5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.
DD
2 6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.
ING
SU
AG-17106 LEGENDS:
BM
MATERIAL FINISH KEY
ITT
SMOKE STOP SMOKE CURTAIN M009-SPH-ARC-MAR-00291-3
ED
SE
PA
A06 12.5mm THICK ACOUSTIC GYPSUM BOARD M009-SPH-ARC-MAR-00105-1
HIGHER ROLLER
RA
TEL
SPH REFERENCE DETAIL DRAWINGS FOR SMOKE CURTAIN:
Y
1.M009-SPH-ARC-DWG-GWST080-ZZ-25969
2.M009-SPH-ARC-DWG-GWST080-ZZ-25970
3.M009-SPH-ARC-DWG-GWST080-ZZ-25971
3 4 4.M009-SPH-ARC-DWG-GWST080-ZZ-25972
5.M009-SPH-ARC-DWG-GWST080-ZZ-25973
AG-17102
AG-17102
17-02-18
REFERENCE DOCUMENTS:
LOWER ROLLER HIGHER ROLLER
A. IFC DRAWINGS
M009-SPH-ARC-DWG-GWST080-AG-B1700-2
M M
SUBSTRUCTURE CONNECTION DETAIL REFER TO: M009-SPH-ARC-DWG-GWST080-ZZ-25675 SUBSTRUCTURE CONNECTION DETAIL REFER TO: M009-SPH-ARC-DWG-GWST080-ZZ-25675
CONCRETE
CONCRETE
SLABSLAB
( BY OTHERS)
( BY OTHERS) CONCRETE SLAB ( BY OTHERS)
570
SPACED @ 600mm
8mm Ø THREADED ROD WITH 50X50X1.5mm GALVANIZED Drawing Revision History:
NUTS AND WASHER 8mm Ø THREADED ROD
STEEL STUD SUPPORT
WITH NUTS AND
2 - 50x50x1.2mm WASHER
50
GALVANIZED STEEL STUD
M8 COACH SCREW
SPACED @ 600mm
492
M10 THREAD ROD
1 DVE APPROVED J.E. 11-02-18
M8 COACH SCREW 0.2 SECOND ISSUE J.E. 16-01-18
M8 COACH SCREW 0.1 FIRST ISSUE J.E. 16-12-17
1000
200 200
Purpose of Issue:
450 2 - 50x50x1.2mm M10 THREAD ROD 450 SHOP DRAWING
M10 THREAD ROD SPRING WASHER
150 GALVANIZED STEEL STUD
Design Validation:
SPACED @ 600mm 10mm Ø THREADED ROD WITH SONO Reference: Date: -
NUTS AND WASHER 2390 DVE Reference: Date: -
2 - 50x50x1.2mm
GALVANIZED STEEL
STUD SPACED @
600mm NUT Qatar Railways Company
1.2mm (18 GAUGE) STEEL
1.2mm (18 GAUGE) STEEL FORMED TO MATCH BRACKETS. P.O. Box 29988
FORMED TO MATCH TOP AND BOTTOM TO BE BENT 1.2mm (18 GAUGE) Doha - Qatar
BRACKETS. TOP AND FOR STIFFNESS STEEL FORMED TO
BOTTOM TO BE BENT FOR MATCH BRACKETS. TOP
280
280
280
130
130
POLYURETHANE NOMINAL 465 POLYURETHANE NOMINAL M22 CLADDING Qatar Integrated Railway Project
G/M² 465 G/M² SUBMITTED SEPARATELY Green Line – Elevated & At-Grade
RTC/082/2013
FCH: +6200 FCH: +6200 FCH: +6200 FCH: +6200 Discipline:
40 40 40 40 40 40 ARCHITECTURAL
Drawing Title:
80 80 80
PART OF VAULT CEILING SUBMITTED SEPARATELY PART OF FLAT CEILING SUBMITTED SEPARATELY PART OF FLAT CEILING SUBMITTED SEPARATELY PART OF FLAT CEILING SUBMITTED SEPARATELY PART OF FLAT CEILING SUBMITTED SEPARATELY
CONSTRUCTION PHASE - ARCHITECTURE (FOH)
AL RIFFA STATION
AT GRADE LEVEL - ZONE C
BOTTOM BAR BOTTOM BAR BOTTOM BAR SMOKE CURTAIN PLAN AND SECTION
Originator: Contractor:
Drawn J.M.E. 11-02-2018
Checked
SMOKE CURTAIN TYPICAL DETAIL GRADE LEVEL - SMOKE CURTAIN TYPICAL DETAIL SMOKE CURTAIN TYPICAL DETAIL Checked R.B.F. 11-02-2018
S.B.
2 SCALE 1 : 5
3 SCALE 1 : 5
4 SCALE 1 : 5
Approved S.E.H. 11-02-2018 Approved H.E.
Red Line
OVERALL HEADBOX LEGTH = 101000MM
20
400
CURTAIN OVERLAP
CURTAIN WIDTH 5121
SMOKE CURTAIN BARREL OPENING Gold Line
BARREL LENGTH 5180
SMOKE CURTAIN DROPPING LINE 1 2 3 4
1 SCALE 1 : 10
CL-17104
A
8mm Ø THREADED ROD WITH B
3
BARREL LENGTH 5180
ELEVATOR GLASS LIMIT M10 THREADED ROD
CL-17104 NOTES:
CURTAIN WIDTH 5121 (TO BE SUBMITTED SEPARATELY)
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
NOTED OTHERWISE.
HIGHER CURTAIN ROLL FLAG BRACKET M CURTAIN ROLLER
2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH
SUB-ASSEMBLY INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY
2 - 50x50x1.2mm GALVANIZED STEEL STUD NEEDED CORRECTION.
TAIL BEARING SET SPACED @ 600mm 4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
280
280
130
MOTOR LATEST MATERIAL SUBMITTALS.
5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.
28
150 150x280mm HEADBOX 6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.
LEGENDS:
MATERIAL FINISH KEY
C. MATERIAL SUBMITTAL
M000-SPH-ARC-MAR-00291 Rev.3
S M O K E C U R T A I N S M O K E C U R T A I N
CURTAIN DROP FROM FCH = 4200MM
17-02-18
Drawing Revision History:
Project:
2000
FLOOR FINISH LEVEL FLOOR FINISH LEVEL CONSTRUCTION PHASE - ARCHITECTURE (FOH)
AL RIFFA STATION
AT GRADE LEVEL - ZONE C
SMOKE CURTAIN ELEVATION (1 OF 3)
2 SCALE 1 : 10
3 SCALE 1 : 10
Drawn
Checked
J.M.E.
R.B.F.
11-02-2018
11-02-2018
Checked S.B.
Red Line
OVERALL HEADBOX LEGTH = 6488MM
BARREL LENGTH 3368
150
CURTAIN WIDTH 3311
Green Line
HIGHER CURTAIN ROLL Blue Line
75
75
150
150
75
75
LOWER CURTAIN ROLL 20
400
20
CURTAIN OVERLAP
CURTAIN WIDTH 3311
150
BARREL LENGTH 3368 Gold Line
2 - 50x50x1.2mm GALVANIZED
1 2 3 4
STEEL STUD SPACED @ 600mm
B
CONCRETE SLAB (BY OTHERS)
C
M10
570
THREADED ROD
BARREL LENGTH 3368 NOTES:
3 CURTAIN ROLLER
50
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
CURTAIN WIDTH 3311
CL-17105 SUB-ASSEMBLY NOTED OTHERWISE.
2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.
1000
TAIL BEARING SET 200
M10 3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH
450
FLAG BRACKET
150
150 THREADED ROD INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY
280
130
280
HEADBOX LEGENDS:
MATERIAL FINISH KEY
ACOUSTIC
A06
M GYPSUM CEILING
(A06)
12.5mm THICK ACOUSTIC GYPSUM BOARD M009-SPH-ARC-MAR-00105-1
B. BIM MODEL
M009-SPH-ARC-MD03-GWST080-ZZ-50006
PROJECT WISE: 09 JANUARY 2018
C. MATERIAL SUBMITTAL
M000-SPH-ARC-MAR-00291 Rev.3
S M O K E C U R T A I N
S M O K E C U R T A I N
CURTAIN DROP FROM FCH = 4200MM
Project:
2000
2000
Qatar Integrated Railway Project
Green Line – Elevated & At-Grade
RTC/082/2013
Discipline:
ARCHITECTURAL
Drawing Title:
FLOOR FINISH LEVEL FLOOR FINISH LEVEL
CONSTRUCTION PHASE - ARCHITECTURE (FOH)
AL RIFFA STATION
AT GRADE LEVEL - ZONE C
SMOKE CURTAIN ELEVATION (2 OF 3)
Originator: Contractor:
SMOKE CURTAIN ELEVATION SMOKE CURTAIN SECTION Drawn J.M.E. 11-02-2018
2 3 Checked R.B.F. 11-02-2018
Checked S.B.
20
Blue Line
150
75
2 1
SMOKE CURTAIN TYPICAL BLOW-UP PLAN
SMOKE CURTAIN BARREL CL-17106
SCALE 1 : 10 8mm Ø THREADED ROD WITH
NUTS AND WASHER A
STEEL STUD
3
C
150 NOTES:
CURTAIN ROLLER M10 THREADED ROD
SUB-ASSEMBLY
HIGHER CURTAIN ROLL
FLAG BRACKET
M 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
NOTED OTHERWISE.
2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.
TAIL BEARING SET MOTOR 2 - 50x50x1.2mm GALVANIZED STEEL 3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH
LOWER CURTAIN ROLL STUD SPACED @ 600mm INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY
130
280
280
SMOKE CURTAIN END
280
130
NEEDED CORRECTION.
PLATE 4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
150
150x280mm HEADBOX LATEST MATERIAL SUBMITTALS.
5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.
28
6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.
35
M LEGENDS:
MATERIAL FINISH KEY
BARREL LENGTH 5180 12.5mm THK. ACOUSTIC SPH REFERENCE DETAIL DRAWINGS FOR SMOKE CURTAIN:
GYPSUM CEILING (A05) 1.M009-SPH-ARC-DWG-GWST080-ZZ-25969
2.M009-SPH-ARC-DWG-GWST080-ZZ-25970
4 3.M009-SPH-ARC-DWG-GWST080-ZZ-25971
4.M009-SPH-ARC-DWG-GWST080-ZZ-25972
CL-17102 5.M009-SPH-ARC-DWG-GWST080-ZZ-25973
ELEVATOR (SUBMITTED SEPARATELY)
REFERENCE DOCUMENTS:
A. IFC DRAWINGS
M009-SPH-ARC-DWG-GWST080-AG-B1700-2
B. BIM MODEL
M009-SPH-ARC-MD03-GWST080-ZZ-50006
PROJECT WISE: 09 JANUARY 2018
S M O K E C U R T A I N S M O K E C U R T A I N C. MATERIAL SUBMITTAL
M000-SPH-ARC-MAR-00291 Rev.3
17-02-18
Qatar Railways Company
P.O. Box 29988
Doha - Qatar
Project:
2000
RTC/082/2013
Discipline:
ARCHITECTURAL
Drawing Title:
2 SCALE 1 : 10
3 SCALE 1 : 10
Approved S.E.H. 11-02-2018 Approved H.E.
Red Line
Green Line
Blue Line
1 4 2
16905 4961
BARREL LENGTH 4735 BARREL LENGTH 4779 A06 FCH: +4500 BARREL LENGTH 4735
ZONE E
1535
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
OVERALL HEADBOX LEGTH = 21901MM NOTED OTHERWISE.
2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH
B
INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY
NEEDED CORRECTION.
4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
WALL LIMIT
2 3 LATEST MATERIAL SUBMITTALS.
5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.
CL-17108
CL-17108 6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.
LEGENDS:
MATERIAL FINISH KEY
VAULT CEILING SUBMITTED SEPARATELY VAULT CEILING SUBMITTED SEPARATELY VAULT CEILING SUBMITTED SEPARATELY
A06 12.5mm THICK ACOUSTIC GYPSUM BOARD M009-SPH-ARC-MAR-00105-1
M009-SPH-ARC-DWG-GWST080-ZZ-25974
M009-SPH-ARC-DWG-GWST080-ZZ-25975
M009-SPH-ARC-DWG-GWST080-ZZ-25976
M009-SPH-ARC-DWG-GWST080-ZZ-25977
M009-SPH-ARC-DWG-GWST080-ZZ-25978
NOTE: CONTROL PANEL LOCATION SUBMITTED SEPARATELY. M009-SPH-ARC-DWG-GWST080-ZZ-25979
M009-SPH-ARC-DWG-GWST080-ZZ-25980
M009-SPH-ARC-DWG-GWST080-ZZ-25981
AL RIFFA STATION M009-SPH-ARC-DWG-GWST080-ZZ-25982
B. BIM MODEL
M009-SPH-ARC-MD03-GWST080-ZZ-50006
PROJECT WISE: 09 JANUARY 2018
17-02-18
C. MATERIAL SUBMITTAL
M000-SPH-ARC-MAR-00291 Rev. 3
CL-17108 CL-17108
WALL LIMIT
C
1 DVE APPROVED J.E. 11-02-18
OVERALL HEADBOX LEGTH = 21901MM 0.2 SECOND ISSUE J.E. 14-01-18
0.1 FIRST ISSUE J.E. 16-12-17
Purpose of Issue:
1535
Project:
Red Line
Green Line
Blue Line
1 4 2
16905 4961
BARREL LENGTH 4735 BARREL LENGTH 4779 A06 FCH: +4500 BARREL LENGTH 4735
ZONE E
1535
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
OVERALL HEADBOX LEGTH = 21901MM NOTED OTHERWISE.
2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH
B
INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY
NEEDED CORRECTION.
4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
WALL LIMIT
2 3 LATEST MATERIAL SUBMITTALS.
5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.
CL-17108
CL-17108 6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.
LEGENDS:
MATERIAL FINISH KEY
VAULT CEILING SUBMITTED SEPARATELY VAULT CEILING SUBMITTED SEPARATELY VAULT CEILING SUBMITTED SEPARATELY
A06 12.5mm THICK ACOUSTIC GYPSUM BOARD M009-SPH-ARC-MAR-00105-1
M009-SPH-ARC-DWG-GWST080-ZZ-25974
M009-SPH-ARC-DWG-GWST080-ZZ-25975
M009-SPH-ARC-DWG-GWST080-ZZ-25976
M009-SPH-ARC-DWG-GWST080-ZZ-25977
M009-SPH-ARC-DWG-GWST080-ZZ-25978
NOTE: CONTROL PANEL LOCATION SUBMITTED SEPARATELY. M009-SPH-ARC-DWG-GWST080-ZZ-25979
M009-SPH-ARC-DWG-GWST080-ZZ-25980
M009-SPH-ARC-DWG-GWST080-ZZ-25981
AL RIFFA STATION M009-SPH-ARC-DWG-GWST080-ZZ-25982
B. BIM MODEL
M009-SPH-ARC-MD03-GWST080-ZZ-50006
PROJECT WISE: 09 JANUARY 2018
17-02-18
C. MATERIAL SUBMITTAL
M000-SPH-ARC-MAR-00291 Rev. 3
CL-17108 CL-17108
WALL LIMIT
C
1 DVE APPROVED J.E. 11-02-18
OVERALL HEADBOX LEGTH = 21901MM 0.2 SECOND ISSUE J.E. 14-01-18
0.1 FIRST ISSUE J.E. 16-12-17
Purpose of Issue:
1535
Project:
4 5
Red Line
CL-17106
OVERALL HEADBOX LEGTH = 10093MM 5025
400
HIGHER ROLLER
OVERLAP
CURTAIN WIDTH 5163
20
CURTAIN WIDTH 2563
BARREL LENGTH 2620
Gold Line
LINE OF CURTAIN DROP 2 3 5 1 2 3 4 5 6 7 8 9
CL-17110 CL-17110 CL-17106
OVERLAP 2 C
CL-17109
D
400
ZONE E
NOTES:
3 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
CL-17109 NOTED OTHERWISE.
BARREL LENGTH 2620
CURTAIN WIDTH 2563
5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.
FLAT CEILING SUBMITTED SEPARATELY
3
6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.
A06 FCH: +7030 LEGENDS:
CL-17106
MATERIAL FINISH KEY
M009-SPH-ARC-DWG-GWST080-ZZ-25976
M009-SPH-ARC-DWG-GWST080-ZZ-25977
M009-SPH-ARC-DWG-GWST080-ZZ-25978
M009-SPH-ARC-DWG-GWST080-ZZ-25979
VAULT CEILING SUBMITTED SEPARATELY VAULT CEILING SUBMITTED SEPARATELY M009-SPH-ARC-DWG-GWST080-ZZ-25980
M009-SPH-ARC-DWG-GWST080-ZZ-25981
B
M009-SPH-ARC-DWG-GWST080-ZZ-25982
M009-SPH-ARC-DWG-GWST080-ZZ-25983
M009-SPH-ARC-DWG-GWST080-ZZ-25984
REFERENCE DOCUMENTS:
RE
A. IFC DRAWINGS
A
M009-SPH-ARC-DWG-GWST080-CL-B17102-2
M
AL RIFFA STATION M009-SPH-ARC-DWG-GWST080-CL-B17103-2
M
C
C. MATERIAL SUBMITTAL
M000-SPH-ARC-MAR-00291
M Rev. 3
C
PETAL CEILING SUBMITTED SEPARATELY VAULT CEILING SUBMITTED SEPARATELY
1535
Doha - Qatar
3
CL-17112 Originator Name & Logo: Contractor Name &
PETAL CEILING SUBMITTED SEPARATELY Logo:
BARREL LENGTH 2620
CURTAIN WIDTH 2563
2 3 10
CONTINUATION DWG. REFER TO: M009-IMR-ARC-DWG-GWST080-CL-17102
5 4 Red Line
CL-17106
5025 OVERALL HEADBOX LEGTH = 10093MM
400
HIGHER ROLLER
OVERLAP
3 2
20
17-02-18 5
1 2 3 4 5 6 7 8 9
CL-17110 CL-17110
CL-17106
B
CL-17109
C
C
OVERLAP
D
400
ZONE F
2
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
CL-17109 NOTED OTHERWISE.
LOWER ROLLER
FLAT CEILING SUBMITTED SEPARATELY 150x280 SMOKE CURTAIN 5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.
3
6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.
GALVANIZE STEEL FORMED REVERSE
FCH: +7030
HEADBOX CL-17106
LEGENDS:
MATERIAL FINISH KEY
A06 FCH: +4500 A06 FCH: +4500 SPH REFERENCE DETAIL DRAWINGS FOR SMOKE CURTAIN:
M009-SPH-ARC-DWG-GWST080-ZZ-25974
M009-SPH-ARC-DWG-GWST080-ZZ-25975
1535
M009-SPH-ARC-DWG-GWST080-ZZ-25976
M009-SPH-ARC-DWG-GWST080-ZZ-25977
VAULT CEILING SUBMITTED SEPARATELY PETAL CEILING SUBMITTED SEPARATELY M009-SPH-ARC-DWG-GWST080-ZZ-25978
M009-SPH-ARC-DWG-GWST080-ZZ-25979
M009-SPH-ARC-DWG-GWST080-ZZ-25980
M009-SPH-ARC-DWG-GWST080-ZZ-25981
B
M009-SPH-ARC-DWG-GWST080-ZZ-25982
M009-SPH-ARC-DWG-GWST080-ZZ-25983
M009-SPH-ARC-DWG-GWST080-ZZ-25984
REFERENCE DOCUMENTS:
A. IFC DRAWINGS
M009-SPH-ARC-DWG-GWST080-CL-B17102-2
AL RIFFA STATION M009-SPH-ARC-DWG-GWST080-CL-B17103-2
1 CONCOURSE LEVEL (ZONE F) - SMOKE CURTAIN PLAN @ 7030 FCH B. BIM MODEL
M009-SPH-ARC-MD03-GWST080-ZZ-50006
C. MATERIAL SUBMITTAL
M000-SPH-ARC-MAR-00291 Rev. 3
1535
Drawing Revision History:
A06 FCH: +4500 A06 FCH: +4500
LOWER ROLLER
8 1
0.2
DVE APPROVED
SECOND ISSUE
J.E.
J.E.
11-02-18
16-01-18
CL-17106
0.1 FIRST ISSUE J.E. 16-12-17
FLAT CEILING SUBMITTED SEPARATELY
OVERLAP
P.O. Box 29988
312
Doha - Qatar
2
CL-17112
Originator Name & Logo: Contractor Name &
PETAL CEILING SUBMITTED SEPARATELY Logo:
HIGHER ROLLER
BARREL LENGTH 5220 Project:
GALVANIZE STEEL FORMED REVERSE
CURTAIN WIDTH 5163 HEADBOX Qatar Integrated Railway Project
400
EDGE GAP - 20MM MINIMUM 20 Green Line – Elevated & At-Grade
OVERLAP
LINE OF CURTAIN DROP DROP LESS THAN 2.00MTS
RTC/082/2013
Discipline:
ARCHITECTURAL
HIGHER ROLLER LOWER ROLLER Drawing Title:
Red Line
2 1
6
Green Line
CL-17106 CL-17106
Blue Line
4996 12900
CURTAIN WIDTH 4675 BARREL LENGTH 4762 GALVANIZE STEEL FORMED REVERSE
HEADBOX
A
80
LOWER ROLLER A06 FCH: +4500 HIGHER ROLLER LOWER ROLLER HIGHER ROLLER C
D
400 400
FLAT CEILING SUBMITTED SEPARATELY OVERLAP OVERLAP ZONE F
1535
NOTES:
CURTAIN WIDTH 4762 CURTAIN LENGTH 4675
CONTINUATION DWG. REFER TO: M009-IMR-ARC-DWG-GWST080-CL-17104
B
INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY
NEEDED CORRECTION.
4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
M009-SPH-ARC-DWG-GWST080-ZZ-25974
M009-SPH-ARC-DWG-GWST080-ZZ-25975
CONTINUAT
M009-SPH-ARC-DWG-GWST080-ZZ-25976
M009-SPH-ARC-DWG-GWST080-ZZ-25977
M009-SPH-ARC-DWG-GWST080-ZZ-25978
NOTE: CONTROL PANEL LOCATION SUBMITTED SEPARATELY. M009-SPH-ARC-DWG-GWST080-ZZ-25979
M009-SPH-ARC-DWG-GWST080-ZZ-25980
M009-SPH-ARC-DWG-GWST080-ZZ-25981
AL RIFFA STATION M009-SPH-ARC-DWG-GWST080-ZZ-25982
B. BIM MODEL
17-02-18 M009-SPH-ARC-MD03-GWST080-ZZ-50006
PROJECT WISE: 09 JANUARY 2018
6 C. MATERIAL SUBMITTAL
M000-SPH-ARC-MAR-00291 Rev. 3
4996 12900
VAULT CEILING SUBMITTED SEPARATELY VAULT CEILING SUBMITTED SEPARATELY PETAL CEILING
VAULT CEILING SUBMITTED SEPARATELY SUBMITTED SEPARATELY
Drawing Revision History:
WALL LIMIT
C
BARREL LENGTH 4850
2 3 BARREL LENGTH 4807
1
0.2
DVE APPROVED
SECOND ISSUE
J.E.
J.E.
11-02-18
16-01-18
CL-17111 CL-17111 0.1 FIRST ISSUE J.E. 16-12-17
CONTINUATION DWG. REFER TO: M009-IMR-ARC-DWG-GWST080-CL-17104
SHOP DRAWING
400 A06 FCH: +4500 400 LINE OF CURTAIN DROP 400
FLAT CEILING SUBMITTED SEPARATELY
OVERLAP OVERLAP OVERLAP Design Validation:
A06 FCH: +4500
LOWER ROLLER A06 FCH: +4500 HIGHER ROLLER LOWER ROLLER HIGHER ROLLER SONO Reference: Date: -
DVE Reference: Date: -
80
Red Line
40
CEILING EDGE
HIGHER ROLLER
NOTES:
PART OF FLAT CEILING 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
NOTED OTHERWISE.
2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.
10 SMOKE CURTAIN END PLAN DETAIL @ 7030 FCH 5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.
6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.
50
50
THICK M009-SPH-ARC-DWG-GWST080-ZZ-25984
GALVANIZED
STEEL L-ANGLE 50x50x1.2mm
REFERENCE DOCUMENTS:
A. IFC DRAWINGS
GALVANIZED STEEL STUD M10 M009-SPH-ARC-DWG-GWST080-CL-B17102-2
2 - 50x50x1.2mm 100x100x3MM @ 1000MM THREADED M009-SPH-ARC-DWG-GWST080-CL-B17103-2
737
737
THICK
10
600mm M8 COACH M009-SPH-ARC-MD03-GWST080-ZZ-50006
GALVANIZED M10 THREADED ROD 250 SCREW PROJECT WISE: 09 JANUARY 2018
STEEL TUBE 450
150
VERTICAL 1.2mm (18 GAUGE) C. MATERIAL SUBMITTAL
SUPPORT STEEL FORMED TO M000-SPH-ARC-MAR-00291 Rev. 3
AT 1200mm C/C MATCH BRACKETS. 150
2 - 50x50x1.2mm
TOP AND BOTTOM
GALVANIZED STEEL STUD
TO BE BENT FOR
SPACED @ 600mm
50
STIFFNESS
2 - 50x50x1.2mm
GALVANIZED STEEL
M8 COACH SCREW STUD SPACED @
0.9mm THK.
280
130
130
280
600mm Drawing Revision History:
FURRING
CHANNEL @
1160
400mm C/C 1.2mm (18 GAUGE)
1.2mm (18 GAUGE) CONCRETE BEAM BY OTHERS 150 STEEL FORMED TO
STEEL FORMED TO MATCH BRACKETS. TOP
MATCH BRACKETS. TOP AND BOTTOM TO BE
AND BOTTOM TO BE BENT BENT FOR STIFFNESS 1 DVE APPROVED J.E. 11-02-18
FOR STIFFNESS ALIGNED WITH DETAIL 13 26 28 26 0.2 SECOND ISSUE J.E. 16-01-18
0.1 FIRST ISSUE J.E. 16-12-17
12.5mm THK. Purpose of Issue:
ACOUSTIC SHOP DRAWING
GYPSUM CEILING
(A06) 10mm Ø THREADED ROD 50x50x4mm THK. GALVANIZED STEEL Design Validation:
PETAL CEILING SUBMITTED SEPARATELY CH = REFER TO RCP PETAL CEILING SUBMITTED SEPARATELY
26 28 26 FCH=+7030MM
LINEAR DIFFUSER TO BE SUBMITTED
Originator Name & Logo: Contractor Name &
SEPARATELY 12.5mm THK. ACOUSTIC GYPSUM CEILING 40 40
40 40 Logo:
CURTAIN DROP FROM FCH = 2500MM
CLNG OPENING
400 400 400 400
CURTAIN OVERLAP CURTAIN OVERLAP CURTAIN OVERLAP CURTAIN OVERLAP
Blue Line
80
CURTAIN WIDTH 4691 CURTAIN WIDTH 4691
SMOKE CURTAIN BARREL OPENING BARREL LENGTH 4779 BARREL LENGTH 4779
NOTE: SIMILAR TO SMOKE CURTAIN AT ZONE F
ELEVATOR LIMIT
(TO BE SUBMITTED LOWER ROLLER AL RIFFA STATION LOWER ROLLER
SMOKE CURTAIN DROPPING LINE
SMOKE CURTAIN BLOW-UP PLAN
SEPARATELY)
1 2
SMOKE CURTAIN BARREL CL-17108
HIGHER ROLLER HIGHER ROLLER HIGHER ROLLER 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
NOTED OTHERWISE.
280
2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH
LOWER ROLLER LOWER ROLLER
INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY
NEEDED CORRECTION.
4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
TAIL BEARING SET 28
M009-SPH-ARC-DWG-GWST080-ZZ-25974
M009-SPH-ARC-DWG-GWST080-ZZ-25975
M009-SPH-ARC-DWG-GWST080-ZZ-25976
FCH=+4.500MTS M009-SPH-ARC-DWG-GWST080-ZZ-25977
M009-SPH-ARC-DWG-GWST080-ZZ-25978
40 40 M009-SPH-ARC-DWG-GWST080-ZZ-25979
M009-SPH-ARC-DWG-GWST080-ZZ-25980
80 M009-SPH-ARC-DWG-GWST080-ZZ-25981
M009-SPH-ARC-DWG-GWST080-ZZ-25982
11
REFERENCE DOCUMENTS:
A. IFC DRAWINGS
CL-17107
M009-SPH-ARC-DWG-GWST080-CL-B17102-2
M009-SPH-ARC-DWG-GWST080-CL-B17103-2
B. BIM MODEL
M009-SPH-ARC-MD03-GWST080-ZZ-50006
PROJECT WISE: 09 JANUARY 2018
C. MATERIAL SUBMITTAL
M000-SPH-ARC-MAR-00291 Rev. 3
S M O K E C U R T A I N S M O K E C U R T A I N
CURTAIN DROP FROM FCH = 2500MM
Project:
2000
2000
2000
Qatar Integrated Railway Project
Green Line – Elevated & At-Grade
RTC/082/2013
Discipline:
ARCHITECTURAL
FLOOR FINISH LEVEL FLOOR FINISH LEVEL Drawing Title:
Red Line
OVERALL HEADBOX LEGTH = 4894MM
35
75
80
LOWER ROLLER 400
20
2
CURTAIN OVERLAP
(A06) BULKHEAD CURTAIN WIDTH 2563
LIMIT BARREL LENGTH 2620 CL-17109
(TO BE SUBMITTED
Gold Line
SEPARATELY)
NOTE: SIMILAR TO SMOKE CURTAIN AT ZONE F 1 2 3 4 5 6 7 8 9
50
BARREL LENGTH 2620 NOTED OTHERWISE.
2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.
3 CURTAIN WIDTH 2563 3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH
CL-17109 450 INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY
737
150 NEEDED CORRECTION.
4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
LATEST MATERIAL SUBMITTALS.
M 5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.
50
6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.
LEGENDS:
MATERIAL FINISH KEY
150x280mm
280
SMOKE STOP SMOKE CURTAIN M009-SPH-ARC-MAR-00291-3
HEADBOX
A06 12.5mm THICK ACOUSTIC GYPSUM BOARD M009-SPH-ARC-MAR-00105-1
REFERENCE DOCUMENTS:
A. IFC DRAWINGS
M009-SPH-ARC-DWG-GWST080-CL-B17102-2
PETAL INFILL PANEL M009-SPH-ARC-DWG-GWST080-CL-B17103-2
BY HUNTER DOUGLAS
13
B. BIM MODEL
M009-SPH-ARC-MD03-GWST080-ZZ-50006
CL-17107 PROJECT WISE: 09 JANUARY 2018
C. MATERIAL SUBMITTAL
CEILING CURTAIN DROP FROM FCH (7030) = 5030MM
BOTTOM BAR
Originator Name & Logo: Contractor Name &
Logo:
Project:
2000
Green Line – Elevated & At-Grade
RTC/082/2013
Discipline:
ARCHITECTURAL
FLOOR FINISH LEVEL FLOOR FINISH LEVEL Drawing Title:
Red Line
OVERALL HEADBOX LEGTH = 10093MM
BARREL LENGTH 5520
75
150
150
75
75
80
35
CURTAIN OVERLAP SMOKE CURTAIN BARREL OPENING
CURTAIN WIDTH 5163 2 SMOKE CURTAIN DROPPING LINE
ELEVATOR LIMIT
(TO BE SUBMITTED
CL-17110
BARREL LENGTH 5520 SEPARATELY) Gold Line
80 SMOKE CURTAIN BARREL
AL RIFFA STATION
1 SMOKE CURTAIN BLOW-UP PLAN
CL-17110 SCALE : 1:10
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
NOTED OTHERWISE.
2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH
INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY
OVERALL HEADBOX LEGTH = 10093MM NEEDED CORRECTION.
4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
M10 LATEST MATERIAL SUBMITTALS.
BARREL LENGTH 5520
3 THREADED 5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.
10
CL-17110 CURTAIN WIDTH 5163 ROD 6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.
FLAG LEGENDS:
2 - 50x50x1.2mm CONCRETE BEAM A06 12.5mm THICK ACOUSTIC GYPSUM BOARD M009-SPH-ARC-MAR-00105-1
LOWER ROLLER GALVANIZED STEEL BY OTHERS
SPH REFERENCE DETAIL DRAWINGS FOR SMOKE CURTAIN:
STUD SPACED @
1160
600mm M009-SPH-ARC-DWG-GWST080-ZZ-25974
M009-SPH-ARC-DWG-GWST080-ZZ-25975
150x280mm M009-SPH-ARC-DWG-GWST080-ZZ-25976
B. BIM MODEL
M009-SPH-ARC-MD03-GWST080-ZZ-50006
12.5mm THK. ACOUSTIC
PROJECT WISE: 09 JANUARY 2018
GYPSUM CEILING (A06)
C. MATERIAL SUBMITTAL
M000-SPH-ARC-MAR-00291 Rev. 3
S M O K E C U R T A I N S M O K E C U R T A I N
12
CL-17107
17-02-18
Qatar Railways Company
P.O. Box 29988
Doha - Qatar
Project:
2000
Green Line – Elevated & At-Grade
RTC/082/2013
Discipline:
ARCHITECTURAL
FLOOR FINISH LEVEL Drawing Title:
Green Line
75
150
Blue Line
75
LOWER ROLLER 80 CURTAIN WIDTH 4762 LOWER ROLLER CURTAIN WIDTH 4675
280
130
CURTAIN ROLLER 4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
LATEST MATERIAL SUBMITTALS.
SUB-ASSEMBLY
5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.
TAIL BEARING SET 6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.
11
REFERENCE DOCUMENTS:
A. IFC DRAWINGS
CL-17107 12.5mm THK.
M009-SPH-ARC-DWG-GWST080-CL-B17102-2
ACOUSTIC
C. MATERIAL SUBMITTAL
M000-SPH-ARC-MAR-00291 Rev. 3
S M O K E C U R T A I N S M O K E C U R T A I N
Project:
2000
RTC/082/2013
Discipline:
ARCHITECTURAL
FLOOR FINISH LEVEL FLOOR FINISH LEVEL Drawing Title:
Red Line
N
1 2 3 4 5 6 7 8 9
2
PL-17101 Green Line
Blue Line
LA
IB
Q
$O5LIID6WDWLRQ
A
REFL
B
Gold Line
1 2 3 4 5 6 7 8 9
A
C
REFL
REFL
B
REFL
REFL
D
REFL
D
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
5 NOTED OTHERWISE.
2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.
PL-17101
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH
INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY
NOTE: NEEDED CORRECTION.
PLATFORM LEVEL- SMOKE BARRIER KEYPLAN TED
REFLECTED CEILING LAYOUT SUBMITTED 4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
1 SCALE 1:300
SEPARATELY. LATEST MATERIAL SUBMITTALS.
5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.
6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.
LEGENDS:
MATERIAL FINISH KEY
A. IFC DRAWINGS
150x150x3MM @
CEILING BULK HEAD CEILING BULK HEAD M009-SPH-ARC-DWG-GWST080-PL-B1710_2
350
35
M009-SPH-ARC-DWG-GWST080-PL-B1711_2
SUPPORT
315
SMOKE CURTAIN DROPPING LINE
35
B. BIM MODEL
150
350
M009-SPH-ARC-MD03-GWST080-ZZ-50006
8MM Ø
115
3 M SMOKE CURTAIN BARREL OPENING 300
THREADED ROD
PROJECT WISE: 09 JANUARY 2018
C-CLAMP
SMOKE CURTAIN BARREL
150 70
OVERALL HEADBOX LEGTH = 4700MM
0.9MM THK.
FURRING
BARREL LENGTH 4655
CURTAIN WIDTH 4630
2 2
0.3 THIRD ISSUE J.E. 07-02-18
M8 COACH SCREW 0.2 SECOND ISSUE J.E. 16-01-18
PL-17103 PL-17102 0.1 FIRST ISSUE J.E. 06-12-17
75 150 Purpose of Issue:
150
86 28 86 P.O. Box 29988
SMOKE CURTAIN DROPPING LINE Doha - Qatar
350
200 Project:
CEILING BULK HEAD
1.2MM (18 GAUGE) STEEL FORMED Qatar Integrated Railway Project
350
RTC/082/2013
35
M
150
STIFFNESS
ELEVATOR
E
ELL
LEE
EVA
EV
VA
VAT
ATO
ATO
TOR
OR SUBMITTED
S
SU
UB
UB
BMM
MIT
IIT
ITT
TT
TED
TEED SE
S
SEPARATELY
EP
EPA
EPPA
AR
ARRA
A
ATT
TE
EL
ELY
EL
LY
Y Discipline:
FABRIC TYPE LS EFP 2/A2, A GLASS ARCHITECTURAL
FABRIC COATED WITH A MICRONIZED
35
Drawing Title:
ALUMINUM FILLED FIRE RETARDANT
PSD SYSTEM PSD SYSTEM POLYURETHANE NOMINAL 465 G/M² CONSTRUCTION PHASE - ARCHITECTURE (FOH)
AL RIFFA STATION
NOTE: CONTROL PANEL LOCATION SUBMITTED SEPARATELY. PLATFORM LEVEL
SMOKE CURTAIN PLAN, SECTION & DETAILS
PLATFORM LEVEL PLATFORM LEVEL PLATFORM LEVEL Originator: Contractor:
SMOKE CURTAIN PLAN SMOKE CURTAIN PLAN SMOKE CURTAIN - DETAIL SMOKE CURTAIN TYPICAL SECTION Drawn J.M.E. 11-02-2018
Checked S.B.
2 SCALE 1:20
5 SCALE 1:20
4 SCALE 1:5
6 SCALE 1:5
Checked
Approved
R.B.F.
S.E.H.
11-02-2018
11-02-2018 Approved H.E.
$O5LIID6WDWLRQ
200
100
115 35
35 115
150 10mm Ø
150
THREADED ROD Gold Line
315
350
WITH NUTS AND
WASHER
STALL SYSTEM 2 PLATFORM LEVEL - SMOKE CURTAIN ENLARGE PLAN SMOKE CURTAIN DROPPING LINE
BRACKET PL-17102 1 SCALE 1:10
SMOKE CURTAIN BARREL
50x50x3MM
1 2 3 4 5 6 7 8 9
REFL
REFL
B
3 0.9mm THK.
C
REFL
REFL
D
PL-17102 OVERALL HEADBOX LEGTH = 4700MM
FURRING
BARREL LENGTH 4655 CHANNEL @
CURTAIN WIDTH 4630 600mm C/C
NOTES:
760
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
TAIL BEARING SET
150 50x50x3MM NOTED OTHERWISE.
STALL SYSTEM BRACKET 2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.
STEEL TUBE
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH
INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY
150x150mm HEADBOX NEEDED CORRECTION.
150
4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
LATEST MATERIAL SUBMITTALS.
5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.
+6.400MTS 6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.
LINE OF CEILING FINISH 86 28 86 FCH=+6.400MTS LEGENDS:
35 35
MOTOR CURTAIN ROLLER SUB-ASSEMBLY CURTAIN ROLLER SUB-ASSEMBLY 100 100
MATERIAL FINISH KEY
6
REFERENCE DOCUMENTS:
A. IFC DRAWINGS
PL-17101
M009-SPH-ARC-DWG-GWST080-PL-B1710_2
M009-SPH-ARC-DWG-GWST080-PL-B1711_2
B. BIM MODEL
M009-SPH-ARC-MD03-GWST080-ZZ-50006
PROJECT WISE: 09 JANUARY 2018
S M O K E C U R T A I N C. MATERIAL SUBMITTAL
M000-SPH-ARC-MAR-00291 Rev.3
CURTAIN DROP FROM FCH = 4400MM
17-02-18
Project:
2000
2000
Qatar Integrated Railway Project
Green Line – Elevated & At-Grade
RTC/082/2013
FLOOR FINISH LEVEL FLOOR FINISH LEVEL Discipline:
ARCHITECTURAL
Drawing Title:
Red Line
OVERALL HEADBOX LEGTH = 4894MM
75
150
75
400 LOWER ROLLER
2
CURTAIN OVERLAP
CURTAIN WIDTH 2563 (A06)
A06) BULKHE
BULKHEAD
EAD D LIMIT
LIM
MIT
BARREL LENGTH 2620 CL-17112 TO BE SUBMITTED
(TO SUBMIT
UBMITTTED
T
EPARA
EPARATELY)
SEPARATELY)
Gold Line
50
NOTED OTHERWISE.
2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.
3 BARREL LENGTH 2620
450 3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH
CL-17112 150 INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY
737
NEEDED CORRECTION.
CURTAIN WIDTH 2563 4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
LATEST MATERIAL SUBMITTALS.
M 5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.
50
6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.
LEGENDS:
MATERIAL FINISH KEY
150x280mm
280
SMOKE STOP SMOKE CURTAIN M009-SPH-ARC-MAR-00291-3
HEADBOX
A06 12.5mm THICK ACOUSTIC GYPSUM BOARD M009-SPH-ARC-MAR-00105-1
REFERENCE DOCUMENTS:
A. IFC DRAWINGS
13
B. BIM MODEL
M009-SPH-ARC-MD03-GWST080-ZZ-50006
CL-17107 PROJECT WISE: 09 JANUARY 2018
C. MATERIAL SUBMITTAL
+4.500MTS
LINE OF CEILING FINISH
BOTTOM BAR
Originator Name & Logo: Contractor Name &
Logo:
Project:
2000
2000
Green Line – Elevated & At-Grade
RTC/082/2013
Discipline:
ARCHITECTURAL
FLOOR FINISH LEVEL Drawing Title:
75
150
150
75
75
400 LOWER ROLLER 20
ELEVATOR SMOKE CURTAIN BARREL OPENING
CURTAIN OVERLAP
LIMIT
SMOKE CURTAIN DROPPING LINE
(TO BE
SUBMITTED CURTAIN WIDTH 5163 SMOKE CURTAIN BARREL 150
SEPARATELY) Gold Line
BARREL LENGTH 5520 2
CL-17113
AL RIFFA STATION
1 SMOKE CURTAIN BLOW-UP PLAN
CL-17113 SCALE : 1:10
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS
NOTED OTHERWISE.
50
OVERALL HEADBOX LEGTH = 10093MM 2. ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED.
3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH
BARREL LENGTH 5520 M10 INSTALLATION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY
NEEDED CORRECTION.
THREADED
3
737
4. INDICATED MATERIALS AND ACCESSORIES MAY CHANGE ACCORDING TO THE
ROD
10
CURTAIN WIDTH 5163 150
CL-17113 LATEST MATERIAL SUBMITTALS.
5. ALL TEXTS FOLLOWED BY ASTERISK (*) IS NOT UNDER IMAR SCOPE OF WORK.
FLAG BRACKET MOTOR 6. THIS DRAWING IS FOR SMOKE CURTAIN REFERENCE ONLY.
HIGHER ROLLER M
50
LEGENDS:
MATERIAL FINISH KEY
280
CONCRETE BEAM GALVANIZED STEEL A06 12.5mm THICK ACOUSTIC GYPSUM BOARD M009-SPH-ARC-MAR-00105-1
BY OTHERS STUD SPACED @
1160
SPH REFERENCE DETAIL DRAWINGS FOR SMOKE CURTAIN:
600mm
M009-SPH-ARC-DWG-GWST080-ZZ-25974
M009-SPH-ARC-DWG-GWST080-ZZ-25975
TAIL BEARING SET 150x280mm
BOTTOM COVER PLATE
M BARREL LENGTH 5520
HEADBOX
M009-SPH-ARC-DWG-GWST080-ZZ-25976
M009-SPH-ARC-DWG-GWST080-ZZ-25977
M009-SPH-ARC-DWG-GWST080-ZZ-25978
M009-SPH-ARC-DWG-GWST080-ZZ-25979
M009-SPH-ARC-DWG-GWST080-ZZ-25980
CURTAIN WIDTH 5163 M009-SPH-ARC-DWG-GWST080-ZZ-25981
M009-SPH-ARC-DWG-GWST080-ZZ-25982
M009-SPH-ARC-DWG-GWST080-ZZ-25983
M009-SPH-ARC-DWG-GWST080-ZZ-25984
+7.030MTS FCL = +7.030MTS 40 40
LINE OF CEILING FINISH REFERENCE DOCUMENTS:
80
400 12.5mm THK. ACOUSTIC A. IFC DRAWINGS
ELEVATOR LIMIT (SUBMITTED SEPARATELY)
B. BIM MODEL
M009-SPH-ARC-MD03-GWST080-ZZ-50006
12
PROJECT WISE: 09 JANUARY 2018
Project:
2000
2000
Qatar Integrated Railway Project
Green Line – Elevated & At-Grade
RTC/082/2013
FLOOR FINISH LEVEL Discipline:
ARCHITECTURAL
Drawing Title:
Requested by ( IMAR
Mobile No.: Designation:
Construction Dept.)
Items to be inspected
Type of Inspection H V
( Detailed description )
Construction Dept.
*If Not Ready ( Re-inspection Target Date & Time :_______________________ Inspected Date & Time : _________________________________
SPH-JV
GREEN LINE- ELEVATED & AT-GRADE
APPROVAL:
Action Name Signature Role Date
Recommendation
for Approval
Approval
Mohamed Ahme Senior Director 2018
Timbely ,_ Architecture
Approval Daniel Leckel Engineer 07 FEB 2018
Document Number : M009-SPH-ARC-MAR-00291 Rev 1 & M009-ARC-ERS-00382 Rev 1 Page 1 of 1 04- Jan-2018
DATE: 7-Dec-17
LOCATION OF MANUFACTURER: United K ingdom LOCATION OF USE: FOH YES BOH YES
C. SONO
Document Review Status Code:
E. Fail/Not approved
- - --
Reviewer Engineer's Assistant Technical Department
-
Reviewer 1 Name Position Name: Name: Mohamed Ahmed Timbely Name: Name:
OJ'
.
Sr. Director Architectural &
Position: Position: {f{ Design
Position: Position:
0~
Reviewer 2 !'lame
Reviewer 3 Name
Date:
Ak
Date~
\
Date:
\
Date:
IRE REF.
STATION
NO.
DWG REF.
LOCATION
MES/ITP
MANUFACTURER SYSTEM
COUNTRY
MODEL NO.
OF ORIGIN
SERIAL TYPE
CHECKLIST
Checked by
S/N DESCRIPTION T&C Engineer QA/QC Engineer Supervision
SPH T&C Remarks
(Techtrade) (IMAR) Engineer (SE)
Comments:
Description T & C Engineer T & C (IMAR QA/QC Engineer) SPH T& C Supervision Engineer (SE) PMC (Witness)
Name
Position
Signature
Date
DWG REF.
LOCATION
MES/ITP
MANUFACTURER SYSTEM
COUNTRY
MODEL NO.
OF ORIGIN
SERIAL TYPE
CHECKLIST
Checked by
S/N DESCRIPTION T&C Engineer QA/QC Engineer Supervision
SPH T&C Remarks
(Techtrade) (IMAR) Engineer (SE)
Type of Instrument
Instrument Make
Calibration Date
Model
Serial No.
Comments:
Description T & C Engineer (Techtrade) T & C (IMAR -QA/QC Engineer) SPH T&C Supervision Engineer (SE) PMC (Witness)
Name
Position
Signature
Date
Material Inspection
1 Check all materials used as per approved material submittal and MAR .
Check and ensure the Man ufacturer's test certificate is present and
3 complies with QCDD requi rements.
Loop Checking
Check for physical panel identificat ion label with respect to the
1 locatio n of installation
Check for the area / location of the installation acti vity free from any
2 hindrances such as other sub-contractor works
Check for availability of site installat ion team includ ing the quality,
3 safety and technical staff to perform the intend ed installation works
Rema rks:
LTEA
SPH JV/PMC
Subcontractor (Optional)
Subcont ractor SE Subcontractor QC
Construction
Name
Signature
Date
Tested by:
Inspected by.
W~nessed by.
Witnessed by:
Rectify
Stage 2: Inspection Test (IT)
if fails
Procedure Review Plan Review Notification IT Result Review Result Sign-off IRN
if fails
Procedure Review Plan Review Notification PSAT Result Review Result Sign-off PCC
if fails
Procedure Review Plan Review Notification TRR SAT Result Review Result Sign-off PCC
Stage 5: System Integration Test (SIT) Rectify
if fails
Procedure Review Plan Review Notification SIT Result Review Result Sign-off AC
Rectify
Stage 6: System Performance Test (SPT)
if fails
Procedure Review Plan Review Notification SPT Result Review Result Sign-off CofC
Appendix 9.8
Certificates
GLE - Al Riffa
Acceptance Certificate (AC)
Stations
No. Rev.
Document
Station
No. / Rev.
Subcontractor IMAR Redco LTA TKE MSI* Inspection /
(*MSI relevant Subcontractor
as applicable) Test Date
Mechanical Electrical Plumbing FLS (Fire Life Safety)
System Type
Location
Inspection Request(s)
Drawings Ref.(s)
Test Sheet(s) /
Checklist(s)
Applicable
3rd Party Report
Not Applicable
QRC Consultant
Approval Not Applicable Applicable
Observations
Subcontractor T & C
Name Title Signature Date
Engineer
Subcontractor T & C Name Title Signature Date
Manager
The Subcontractor certifies the Works have been inspected and/or tested in accordance with the Contract & comply with the Contract.
QRC
(Applicable for QCDD related Name Title Signature Date
system only)
The Qatar Registered Consultant (QRC) certifies the Works are compliant with all applicable QCDD requirements.
Page 1 of 1
GLE - Al Riffa Certificate of Completion (C of C)
Stations
No. Rev.
Document
Station
No. / Rev.
Subcontractor IMAR Redco LTA TKE MSI* Inspection /
(*MSI relevant Subcontractor
as applicable) Test Date
Mechanical Electrical Plumbing FLS (Fire Life Safety)
System Type
Location
Inspection Request(s)
Drawings Ref.(s)
Test Sheet(s) /
Checklist(s)
QRC Consultant
Approval Not Applicable Applicable
Observations
Subcontractor T & C
Name Title Signature Date
Engineer
Subcontractor T & C Name Title Signature Date
Manager
The Subcontractor certifies the Works have been inspected and/or tested in accordance with the Contract & comply with the Contract.
QRC
(Applicable for QCDD related Name Title Signature Date
system only)
The Qatar Registered Consultant (QRC) certifies the Works are compliant with all applicable QCDD requirements.
Page 1 of 1
GLE - Al Riffa Installation Release Note (IRN)
Stations
No. Rev.
Document
Station
No. / Rev.
Subcontractor IMAR Redco LTA TKE MSI* Inspection /
(*MSI relevant Subcontractor
as applicable) Test Date
Mechanical Electrical Plumbing FLS (Fire Life Safety)
System Type
Location
Inspection Request(s)
Drawings Ref.(s)
Test Sheet(s) /
Checklist(s)
QRC Consultant
Not Applicable Applicable
Approval
Snag List / Punchlist
Ref. No.
Observations
Subcontractor T & C
Name Title Signature Date
Engineer
Subcontractor T & C Name Title Signature Date
Manager
The Subcontractor certifies the Works have been inspected and/or tested in accordance with the Contract & comply with the Contract.
QRC
(Applicable for QCDD related Name Title Signature Date
system only)
The Qatar Registered Consultant (QRC) certifies the Works are compliant with all applicable QCDD requirements.
Page 1 of 1
GLE - Al Riffa Partial Acceptance Certificate (PAC)
Stations
No. Rev.
Document
Station
No. / Rev.
Subcontractor IMAR Redco LTA TKE MSI* Inspection /
(*MSI relevant Subcontractor
as applicable) Test Date
Mechanical Electrical Plumbing FLS (Fire Life Safety)
System Type
Location
Inspection Request(s)
Drawings Ref.(s)
Test Sheet(s) /
Checklist(s)
Observations
Subcontractor T & C
Name Title Signature Date
Engineer
Subcontractor T & C Name Title Signature Date
Manager
The Subcontractor certifies the Works have been inspected and/or tested in accordance with the Contract & comply with the Contract.
QRC
(Applicable for QCDD related Name Title Signature Date
system only)
The Qatar Registered Consultant (QRC) certifies the Works are compliant with all applicable QCDD requirements.
Page 1 of 1
GLE - Al Riffa
Pre Commissioning Certificate (PCC)
Stations
No. Rev.
Document
Station
No. / Rev.
Subcontractor IMAR Redco LTA TKE MSI* Inspection /
(*MSI relevant Subcontractor
as applicable) Test Date
Mechanical Electrical Plumbing FLS (Fire Life Safety)
System Type
Location
Inspection Request(s)
Drawings Ref.(s)
Test Sheet(s) /
Checklist(s)
QRC Consultant
Approval Not Applicable Applicable
Snag List / Punchlist
Ref. No.
Observations
Subcontractor T & C
Name Title Signature Date
Engineer
Subcontractor T & C Name Title Signature Date
Manager
The Subcontractor certifies the Works have been inspected and/or tested in accordance with the Contract & comply with the Contract.
QRC
(Applicable for QCDD related Name Title Signature Date
system only)
The Qatar Registered Consultant (QRC) certifies the Works are compliant with all applicable QCDD requirements.
Page 1 of 1
Appendix 9.9
Compliance Statement
COMPLIANCE STATEMENT
This is to confirm that we comply to the Testing & Commissioning requirements provided for the Smoke curtains for
Green Line Elevated which are installed on the following levels:
Al Riffa – Platform
Al Riffa – Concourse
Al Riffa - Entrance
For any further clarification or information, please do not hesitate to contact the undersigned.
Regards,
Elias Najjar
Managing Director
TechTrade Doors
EN ISO 9001 : 2008 Certified.
Mob +961 70 686
Tel: + 961(6) 955 501
Fax :+961 (6)955502
Website: www.techtradedoors.com
DVE/JV
note
1. Material
1.1 Location Green Line Elevated
1.2 Type Smoke Curtain
2. Suppliers Data
2.1 Company TechTrade Doos
2.2 Website www.techtradedoors.com
2.3 Contact Shady Najjar
2.4 Telephone 972 559 846088
2.5 Email jennifer.techtradedoors@gmail.com
2.6 Location Main Office- Lebanon
2.7 Gulf Branch Office 1001 , 51 Tower at Buisness Bay, Dubai UAE
2.8 Product Name Dynamic Smoke Curtain
4. Employer Requirements (CODE) - to be filled by Manufacturer / Supplier and provide test certificates
Remarks Compliance Check Compliance Check
Employer Requirements
by Manufacturer / Supplier by DVE
NFPA 130 - Interior floor finish materials shall be non-combustible or shall exhibit a critical radiant
4.1 flux not less than 0.8 W / cm² when tested in accordance with ASTM E 648. N/A
Materials and
Finishes 4.2 4.13.1.4 Durability: Wear, strength and weathering qualities N/A
4.3 4.13.1.6 Maintainability: Materials shall be easily cleaned N/A
4.13.4.1 Slip-Resistence: Anti-Slip Properties according to techinical specification:
4.4 for all public(General) areas N/A
- Slip resistance: minimum Class R10 According to German regulation (BGR 181)
4.13.4.1 Slip-Resistence: Water spillage possible area(Wet Area) (eg. Station entrances)
4.5 - Slip resistance: minimum Class R12 According to German regulation (BGR 181) N/A
4.13.4.2 Coefficient of reflection (within Underground Stations) shall at least 0.25 according to
4.8 Specification, Avoid highly reflective material N/A
4.11 4.13.6.1 Fixing shall be vibration resistant and insensitive to train generated pressure fluctions N/A
Walls 4.13.6.1 Impact Resistance, Materials within reach of public: Highly resistant to wear and
Columns 4.12 Vandalism N/A
- Withstand 1.5 KN point load
4.13 Water Resistence N/A
4.14 Acoustical Performance (limited to non reachable areas e.g 2m above FFL) N/A
4.13.6.4 Provision for replacement in case of damage; individulally demountable without removal of
4.15 adjacent panels N/A
NFPA 130 - Interior finish materials for walls and ceilings shall comply with NFPA 130: 5.2.5 and
be non-combustible. Interior wall and ceiling finish materials shall exhibit a flame
4.17 N/A
spread index not exceeding 25 and smoke developing index not exceeding 450, when tested by
ASTM E 84.
4.20 4.13.8.3 Ceiling systems, especially perforated ceiling panels, shall be easy to clean (public areas) N/A
* Use (yes, No) to mention if the product comply with the Certification Body approved scheme for Responsible Sourcing of Materials guided by regional or international recognized standards. Such as BS8902:2009, Social Responsibility Policies
ISO 26000, Quality Assurance & Supply Chain Management Systems ISO 9001, Environmental Management Systems ISO 14001. (for Yes answer mention the certification name)
** Use (Yes, No or N/A ) to mention if the product comply with the following major standards in term of VOC limit: (for Yes/No answers provide the measurement value)
South Coast Air Quality Management District Rule #1113. (for Clear wood finishes, floor coatings, stains, sealers, and shellacs)
<Legend>
Jennifer
5.10.2017
Zakhem
Company representative
Signature, date and stamp
Rev 7.2 | Jan 15
SPECIFICATION
COOPERS SMOKESTOP® D600A
ACTIVE SMOKE BARRIERS
In accordance with:
BS EN 12101-1+A1
BS EN 1363-1
BS EN 1634-3
BS EN 13501-4
BS EN ISO 1716
BS EN 13823
BS EN 13501-1
BS 476-6
BS 476-7
Classification:
D600A, A2-s1, d0, Class “0”
Maximum Dimensions:
Approved for spans unlimited in width, heights up to 10.5 m (413.385 in), minimum panel
overlap 400 mm (15.748 in)
Certification:
The Coopers SmokeStop® active smoke barrier shall have certification and listing with an
independent accredited certification body operating a Level 5 certification scheme as defined
in ISO Guide 65, and in accordance with BS EN 45011. The system shall be CE Marked in
accordance with EU Construction Products Directive (89/106/EEC), as amended by the CE
Marking Directive (93/68/EEC), with attestation being conducted by an accredited notified
certification body that conducts regular FPC surveillance visits to the manufacturer. The
manufacturer shall operate and be certified to BS EN ISO 9001 for quality management
systems, and BS EN ISO 14001 for environmental management systems. The manufacturer
shall operate and shall have certification and listing with an independent accredited
certification body operating an accredited UKAS installer, commissioning and servicing
scheme.
General description:
NOTE For ease of reference the Coopers SmokeStop® active smoke barrier has been referred to the “barrier assembly -
ies” throughout the remainder of this specification.
Barrier assemblies shall be tested for fire resistance to BS EN 1363-1, tested for
permeability BS EN 1634-3 as required by BS EN 12101-1+A1, and be classified to
BS EN 13501-4.
Description:
Active smoke barrier assemblies shall comprise of a fire resistant fabric which is wound on to
a steel roller, with 1:600 deflection performance to BS 6323-5, which is powered by an
internal 24Vdc electric motor. They are enclosed within a 1.2 mm (0.047 in) galvanized mild
steel box. A bottom bar to suit the deflection performance requirements of the project and
the desired ceiling configuration in fitted to the bottom edge of the fabric curtain.
Motors shall meet all applicable safety standards. Motors shall contain the necessary drive
mechanisms, a mechanical epicyclic gearbox retarder, automatic overload protection and
both automatic and manual distance travel positioning, linked to an internal 24Vdc
electromagnetic brake with regenerative braking system. When Motors are retracted their
internal drive motor shall be isolated from all power and the barrier shall be held in position
by an internal electromagnetic brake. This ensures the barriers not drift upward or
downward.
The barrier assemblies shall operate with fail-safe by gravity, using patented true TOTAL
(TGFS), in accordance with BS EN 12101-1+A1, and be able to move to their fire
operational position even in the event of open or closed circuit wiring, or total system
corruption, with controlled braking system and drive mechanisms. All working parts shall be
totally enclosed and protected within the steel roller and shall be tested as part of the
complete assembly for fire resistance.
The barrier assemblies must show the tested ability to use a range of heavy bottom bar
weights in order to meet critical anti-deflection performance requirements, as required in
design guides such as BS 7346-4, BR 368 etc. The bottom edge of the smoke barrier shall
incorporate a heavy bottom bar with a minimum standard weight of 3 kg/m (2.015 lbs/ft) with
the facility to increase this weight to 10 kg/m (6.719 lbs/ft) to ensure positive operation when
subjected to pressure. The Engineer shall declare to the manufacturer such pressures, or
wind loads in advance to ensure operational conformity.
Operation:
The barrier assemblies type ASB1 & ASB3 for “Life Safety” shall move to their fire
operational position in a controlled manner when all consumable primary and auxiliary power
sources are removed, in the event the wiring, open or short circuit, or system corruption, or
any combination thereof.
The barrier assemblies shall fail-safe by gravity, using patented true TOTAL (TGFS), and
‘drive up’ with mains power available. In the event of mains power failure, they shall remain
retracted using their own dedicated battery back-up power supply for a pre-determined
period (nominally 30 minutes). If signalled to descend during this period they shall fail-safe
by gravity in a controlled manner to their fire operational position. At the end of the pre-
determined time delay they shall fail-safe by gravity in a controlled manner. This safety
feature is essential to avoid dangerous guillotine/free-fall deployment.
The barrier assemblies must commence movement upon initiation or any initiation, power or
system failure and move to the fire operational position, in all operating modes, at site
specific adjustable and synchronised velocities within the range of 0,06 m/s to 0,30 m/s
(2.362 in/s to 11.811 in/s) using the unique VarioSpeed™ function. Barrier assemblies which
are located in critical areas of the project, e.g. escape routes, entrances/exits to escalators,
stairways, etc., shall have site specific adjustable and synchronised velocities within the
range of 0,06 m/s to 0,15 m/s (2.362 in/s to 5.905 in/s) using the unique VarioSpeed™
function. Operating speeds shall be site adjustable without altering bottom bar mass. Speeds
may be dictated by those authorities having jurisdiction for ‘safety in use’ according to the
location, nature or function of each unit.
The barrier assemblies shall have the facility to deploy to a partial drop position prior to
moving to their fire operational position under both mains, and emergency power. Barrier
assemblies in their retracted or ‘stalled’ position shall have all power removed from the
motor(s) to prolong motor life. Barriers assemblies that require multiple overlapping barriers
shall have a continuous bottom bar system conjoining the run with mutual operation, i.e. one
down–all down (handshaking).
The barrier assemblies shall have a “soft ascent facility” to ensure no damage to the
surrounding ceiling interface when retracting. The barrier assemblies shall have a built-in
protection in the event that they are prevented from ascending to their retracted position, or
descending to their fire operational position. This ensures they are always in their required
position and avoids damage to the barrier assemblies’ mechanism and surrounding ceiling
finishes. In sensitive ceiling aesthetic areas a unique patented SLAT® ceiling interface can
be provided. Any combination of the alarm/control signal provided by the Electrical
Subcontractor, and/or the specified fail-safe functions shall activate the system.
The barrier assemblies must prove the ability to operate with edge gaps between 20, 40 and
60 mm (0.787, 1.574, 2.362 in), height dependent, in all other situations unless the fabric
edge interfaces with a retention system, i.e. side to resist pressure (as standard 25 Pa
(0.1 in water).
If side guides are provided they shall have formed part of the complete system test in
accordance with BS EN 12101-1+A1.
Fabric:
The fabric material shall be tested as part of the complete assembly complete with
overlapping barrier panels in the orientation and standard use of the application and
installation in accordance with the fire resistance test in BS EN 1363-1, as required by
BS EN 12101-1+A1.
The fabric material (part of the original test specimen) shall be tested for permeability to
BS EN 1634-3 with a rate <25m3/h/m2 (882.866ft3/h/ft2) at ambient temperature at 25 Pa
(0.1 in water).
The fabric material shall be tested independently to reaction to fire tests in accordance with
BS EN ISO 1716 and BS EN 13823 to achieve an “A2-s1, d0” classification in accordance
with BS EN 13501-1+A1 in accordance with A11 of Approved Document B (Volumes 1 & 2)
2006 Edition ‘Fire Safety’ to England & Wales Building Regulations 2000.
The fabric material shall be tested independently for fire propagation to BS 476-6+A1, and
for surface spread of flame to BS 476-7 to achieve National Class ‘0’ in accordance with
A13(b) of Approved Document B (Volumes 1 & 2) 2006 Edition ‘Fire Safety’ to England &
Wales Building Regulations 2000.
Fabric type is EFP™ 2/A2 a glass fibre fabric coated with a micronised aluminium filled fire
retardant polyurethane 455 g/m2 (0.093 lbs/ft2) –5% +10%.
Optional extras:
x Voice warning:
Audio or spoken multi message facility when mains or emergency power is available.
x Beam protection and obstruction warning:
A beam detector, with delay timer which will sound in the event of any obstruction
being placed in the barrier drop line when mains or emergency power is available.
x Visual alert system:
Light warning system when mains or emergency power is available.
x Split drop delay:
To partially deploy to pre-determined level to permit escape, and initial smoke
containment. After delay fully deploys to its fire operational position when mains, or
emergency power is available.
x Emergency retract:
Touch button retract facility for multi-escape and emergency service ingress/egress
when mains or emergency power is available.
Manufacturers:
Subject to compliance with all requirements set out in this specification, manufacturers
offering products may be incorporated into the work are limited to the following:
x Coopers Fire Limited, Edward House, Penner Road, Havant Hampshire, PO9 1QZ,
United Kingdom. Tel +44 (0)23 9245 4405, Fax: +44 (0)23 9249 2732, Email:
sales@coopersfire.com, Web: http://www.coopersfire.com
Warranty:
The manufacturer shall submit a written warranty for a period of one (1) year. If any part of
the works of this section, including design, fabrication or installation are sublet to any party,
such party shall provide a collateral warranty equivalent to the warranty.
x The fabric used within the barrier assemblies shall be tested to BS 476-6+A1
x The fabric used within the barrier assemblies shall be tested to BS 476-7
Approving standards:
This is to provide clearance to energize the Smoke curtains for Green Line Elevated which are installed on the following
levels:
Al Riffa – Platform
Al Riffa – Concourse
Al Riffa - Entrance
This clearance is only for the purpose of Testing and Commissioning. The curtains may not be used for any
other purposes, and may not be energized in the absence of Techtrade’s personnel.
For any further clarification or information, please do not hesitate to contact the undersigned.
Regards,
Elias Najjar
Managing Director