Accident Data Update
Accident Data Update
6
14
13
15
49
35
15
10
26
9
15
207
TYPE
Drowning/Suffocation
Died Crushed/Strucked by Object
Hit or crushed by machinaries
Hit or crushed by machinaries
Falling From Height
Falling From Height
Died Crushed/Strucked by Object
Electrocution
Struck by lightning
Electrocution
Falling From Height
Drowning/Suffocation
Falling From Height
Stung by hornet
Falling From Height
Falling From Height
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
Total
CAUSES
No information
No information
No information
No information
No information
No information
Structure Failure
No safework of procedure / No SOP
No or lack Supervision
No safework of procedure / No SOP
Failure in the crane's foundation
No safework of procedure / No SOP
No safework of procedure / No SOP
No safework of procedure / No SOP
Unsafe Workplace
No safework of procedure / No SOP
Poor Site Management
No safework of procedure / No SOP
No safework of procedure / No SOP
No information
No information
No safework of procedure / No SOP
No safework of procedure / No SOP
No information
No safework of procedure / No SOP
No safework of procedure / No SOP
No safework of procedure / No SOP
Unsafe Workplace
No safework of procedure / No SOP
No safework of procedure / No SOP
Failure of structure
No or lack Supervision
No information
No information
Poor Site Management
Unsafe Workplace
Untrained / Unskilled Worker
No information
No safework of procedure / No SOP
No information
Failed to perform risk analysis/assessment
Structure Failure
Failed/Wrong wear PPE
Unsafe workplace
Failed/Wrong wear PPE
Failed to perform risk analysis/assessment
No safework of procedure / No SOP
1) Unsafe Workplace
2) No safework of procedure / No SOP
No information
Natural Event/ Weather
Fails to provide PE Design for a floor support structure
No safework of procedure / No SOP
Untrained / Unskilled Worker
Poor Site Management
No information
Failed/Wrong wear PPE
Poor Site Management
Failed/Wrong wear PPE
No or lack Supervision
2. No or lack Supervision
No information
Poor Machineries and Vehicle Maintainance
Safety helmet used was broken due to the impact
No safework of procedure / No SOP
No safework of procedure / No SOP
Failed/Wrong wear PPE
1) Failed/Wrong wear PPE
2)No safework of procedure / No SOP
Natural Event/ Weather
No information
No information
No safework of procedure / No SOP
No or lack Supervision
No information
No information
1) Unsafe Workplace
2)Poor Site Management
Unsafe act
201
No safework of procedure / No SOP
Poor Machineries and Vehicle Maintainance
No information
1)No or lack Supervision
2)Failed/Wrong wear PPE
Failure to hoisting system
There were signs of a break in the lanyards
No safework of procedure / No SOP
No information
Workers Behaviour/ Unsafe Act
1) No or lack Supervision
2) Unsafe Workplace
No safework of procedure / No SOP
No information
Poor Site Management
Poor Site Management
Poor Site Management
1) No safework of procedure / No SOP
2) No or lack Supervision
3) Poor Site Management
No information
Failed/Wrong wear PPE
No information
1) No safework of procedure / No SOP
2) Failed to comply HIRARC
Failed/Wrong wear PPE
Poor Site Management
No safework of procedure / No SOP
No safework of procedure / No SOP
Poor Machineries and Vehicle Maintainance
1) Failed/Wrong wear PPE
2) Poor Site Management
No or lack Supervision
1) Poor Site Management
2) No safework of procedure / No SOP
Unsafe Workplace
No information
Untrained / Unskilled Worker
No safework of procedure / No SOP
No information
No safework of procedure / No SOP
No information
i. No safework of procedure / No SOP
ii. Unsafe Workplace
i. No safework of procedure / No SOP
ii. Failed to comply HIRARC
i) Poor Site Management
ii) Failed/Wrong wear PPE
iii) No safework of procedure / No SOP
No information
Poor Site Management
Workers Behaviour/ Unsafe Act
No information
i) Untrained / Unskilled Worker
ii) Failed/Wrong wear PPE
No safework of procedure / No SOP
Poor Site Management
No information
i) No safework of procedure / No SOP
ii) Unsafe Workplace
Poor Site Management
No SHO/SSS
i. Unsafe Workplace
ii. Failed/Wrong wear PPE
iii. No safework of procedure / No SOP
Structure Failure
No information
i. No safework of procedure / No SOP
ii. Failed to comply HIRARC
Poor Site Management
i. Poor Site Management
ii. No safework of procedure / No SOP
iii. No or lack Supervision.
No information
No safework of procedure / No SOP
i. No safework of procedure / No SOP
ii. Untrained / Unskilled Worker
iii. Failed/Wrong wear PPE
No information
No information
No safework of procedure / No SOP
No information
No information
No information
No information
No information
No information
A floor structure suddenly collapsed. The victim was buried by concrete.
No safe procedures
The incident happened during strong winds as the victim was trying to avoid a falling wooden support.
The victim fell into an uncovered manhole while doing works of cleaning up construction wastes.
The victim who was doing concrete works suddenly fell to the ground.
No safe work procedures while carrying out 'T-Beam' concrete works.
The luffing boom suddenly fell on top of the two victims that were situated directly under the crane.
No safe work procedure.
Victim fell down to the ground along with the man-basket. Crane is not well maintained and inspected before been used.
The Single Line Block (Small Block) fell onto the victim's head. No safe work procedures
The wire rope fell off the drum causing the iron pipes to fall onto the victim.
Proper maintenance has not been carried out onto the winch.
The crane operator did not realize that the victim was underneath the container.
No safe work procedures
Failure in the crane's foundation
No safe work procedures
No safe work procedures
No safe work procedures
Working conditions that are not sufficiently safe
No safe work procedures
The lift entrance opening was not covered properly
No safe work procedures
No practical control measures for works at height
No information
No information
No safe work procedures for piling works
No safe working procedure for lifting works were provided as well as the weight of the lifted load exceeded the permitted limi
No information
No safe work procedure
No safe work procedure
No safe work procedure
Unsafe working area
No safe work procedure
Lifting excessive load
Failure of structure
No supervision for working at height
No information
No information
Accident occured due to a lorry entering the emergency lane and hitting the worker while the worker was placing trafic cones
on the road.
Work premises seems watery and through observation it was found that severe electrical wiring was not properly maintained
and fully inspected by a competent person.
No information
No safe work procedures
No information
Failed to do hazard identification, risk assessment and risk control over the work to be done.
Brickwork of the wall was not properly done
Failure to wear Personal Protective Equipment (PPE). Unsafe workplace
The victim was working in the open and no lightning detector at the scene
No information
-Not wearing safety harness when working at height -Railing is not installed on the scaffold to prevent fall
Unsafe act for not wearing safety harness when working at height
2. Lack of supervision
2. The employer has failed to fully exercise supervision over the workers.
The victim did not wear harness while working at height during mold installation works
No lightning arrester near the open area
Safety harness was not hook at the place provided
No information
Failure of machine during operation
Safety helmet used was broken due to the impact
No safe work procedure
No safe work procedure
The victim fail to put safety harness while working at height
1) Victim did not put any safety harness on him while working on the platform.
2)Weight of a sand-filled bucket has exceed the safe working load for the loading platform
Environmental factors
No information
No information
1)No safe work procedures for dredging the river bank.
2)No supervision
No information
No information
1) Unsafe working condition
2)Inadequate supply of PPE to the workers
Unsafe act
No information
Fail to comply with safe operating procedure
Swing lock pin was loosen causing the crane boom to fall down
No information
1)No supervision by employer.
2)Did not wear safety harness
Failure to hoisting system
There were signs of a break in the lanyards
No safe work procedure
No information
Unsafe act
1) Lack of supervision from the employer. 2) Floor opening
No information
The victim was not wearing any PPE equipment
No information
1) No safe operating procedure for working inside the trench
2) Fail to conduct HIRARC
Fail to wear safety harness while working at height
Fail to provide warning sign
No safe work procedure
No safe work procedure
breakage af wire rope
1) Safety harness was not hooked on the life line 2) No stopper on the open edge
No information
i. No SOP
ii. Failure to provide a safe workplace to its staff
i. No SOP ii. No HIRARC
i) Improper use of working platform ii) No PPE iii) scaffold installation is not according to specification by PE
No information
No railing on the scaffold
the car found to be speedy
No information
i) no record on training for working at height ii) not wearing PPE
i. No site registration number ( construction site) ii. Fail to produce SOP iii. Fail to produce training records. iv. Fail to produce
PPE records
i. No SOP for sewerage construction ii. No SOP for rescue works in sewer hole if there is emergency. iii. No training to workers
for sewerage activity iv. No valid CF for the hoisting machineries.
i. The brick wall work was not fully assembled and there is no stiffner or support to support the brick wall
No information
i. Failure to observe SOP. ii. Existing HIRARC failures for truck operator risk for load-lifting activities
*no information
Inspection and investigation at the scene found that the demolished structure measuring 2.5 x 2.3 x 0.15 m with a weight
estimated 1500 kg.
" no related SOPs. ii. No system; permit to work 'to work in high places. iii. PPE usage; safety harness is unsafe, not clinging to
any safe place.
i Failed to provide SOP for work platform installation work ii. Failure to provide 'lifeline' for transport to avoid falling. "
"i Failed to place vehicle control measures out into the premises. ii. Failure to appoint Site Safety Supervisor (SSS) "
"i. There is no SOP for the opening of the 'diagonal prop'. ii. No PIC for supervision and review of WPC works. iii. No PE
calculation for recommendation support for 'weight and design' for 'WPC base' "
"i) Failure to investigate the Site Safety Supervisor (SSS) ii. The site has yet to be registered with JKKP
i. Employers and employees fail to comply with SOP and HIRARC work.
ii. No supervion while work is in progress.
iii. The victim is resting in an inappropriate place.
1. Employers fail to maintain a safe working system to ensure the safety of the employees working at height.
2. The failure of the contractor to provide adequate training for all employees working at height.
i. The aluminum ladder on the scaffold used to level 1 was damaged (bent) causing the stairs to become unstable and sway.
ii. The scaffold installed as entrance to the a 1st floor was not installed by competent scaffolding operators.
iii. Mounted scaffold was not well maintained.
iv. The employer failed to conduct risk assessment (HIRARC) on the installation and maintenance of scaffolds.
v. The site failed to appoint a full-time safety site supervisor.
1. Employer failed to provide Safe Work Procedure for electrical wiring work activities and conduit pipe installation.
2. Employer failed to appoint a Site Safety Supervisor (SSS)
1. HIRARC on RE Wall installation activities should be reviewed. 2. The employer must conduct an internal investigation to
prevent the same accident from recurring.
1. Employer failed to conduct HIRARC for culvert installation and other related work activities.
1. Victims have been provided with safety hardness and have been given information regarding the PPE.
2. The main employer has provided access to the rooftop area by using aerial platform machinery.
3. The main employer does not provide a 'life-line' in the roof area during the work.
4. Employer does not provide a specific training record for all employees working at a high.
1. Review HIRARC for working in high places.
2. The employer failed to establish a Safe Work Procedure.
3. The employer failed to provide working at height training.
4. The employers failed to provide safe access to the upper floors of buildings.
1. There is a pile of iron sled and there is no lighting in the area during work activities in the early morning.
2. No HIRARC & SOP for both major and direct employers for 'loading / unloading iron sled' work activities.
3. Supervision and monitoring for iron loading / unloading iron sled work activities should be carried out by the main employe
and contractor.
4. Internal accident investigation report should be conducted immediately for the main and direct employer.5. Warning signs
prohibit workers from getting off the machinery during work activities should be carried out in the area (if practical), and if
necessary to get off the machinery, a safe work radius should be held.
1. Majikan ada mengadakan Traffic Management Plan (TMP) dan melantik TMO.
2. Signage yang dinyatakan dalam TMP ada di pasang oleh pihak kontraktor.
3. Pihak kontraktor telah menambah baik tahap keselamatan dengan memasang delineator string bagi menggantikan blinker y
sering kali mengalami vandalisme.
4. Keadaan permukaan jalan adalah sedikit curam dan berselekoh serta cuaca gelap dan hujan renyai berkemungkinan
penyebab kenderaan hilang kawalan.
1. Employers fail to build temporary barriers to prevent landslides / land failures.
2. The employer fails to supervise during the plumbing work
3. The employer fails to establish a Safe Working Procedure for plumbing work.
4. Employers fail to conduct risk analysis / HIRARC for plumbing work
5. The employer is instructed to conduct an internal investigation and hold all necessary documents and come to the office for
the purpose of recording conversations and further investigations.
1. There is no effect of landslides on the slope near the place the machinery is placed.
2. There are no procedures related to the repair of damaged machinery during use at this construction site.
3. The roller compactor repair activity is not done in the place provided.
4. There is no monitoring of the repair work activities.