REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE SECRETARY
MANILA
MAR 262010
DEPARTMENT ORDER SUBJECT: Amendments to Department Order
No. 55, Series of 1989 re: Submission
No. 21 of Materials Quality Control Reports
Series of 2<:2:J N. ,.;I./U and Other Related Documents

In line with and in furtherance of the decentralization policy of the Department,


and for a more efficient implementation of our Quality Assurance Program (QAP), the
following quality control reports and documents relative to on-going construction and
maintenance projects undertaken/implemented by the District Engineering and City
Offices shall no longer be submitted to the Undersecretary of the Area concerned thru
the Bureau of Research and Standards (BRS) as required under D.O. No. 55, series of
1989; instead, these documents shall be submitted up to the Regional level only:

1. Monthly Materials Reports (MMRs) which shall include the following:

a) Summary report of field tests performed

b) Status of tests

c) Work Sheets of all tests listed in (a)

d) Test Reports on concrete samples

e) Inspection Reports/Certifications pertaining to quality control

1) Work Sheets for concrete and asphalt mix design including adjustments
made during construction

g) Materials Quality Control Progress Report

2. Contract Documents including a copy of the Contract, Plans and


Specifications (to be submitted prior to the start of the projects)

3. Change or Extra Work Order that will affect the minimum testing
requirements (to be submitted upon approval of the order)

However, for projects implemented by the Project Management Offices (PMOs)


and Regional Project Management Offices (RPMOs) of the Department [e.g. pump
priming projects that typically involve numerous regular and/or special items of works
(SPLs), utilization of new products/technologies, relatively large project contract amount
(in Millions of Pesos), and considerably longer contract time/duration (one year or
more)], all the above-mentioned quality control reports/documents for the projects
henceforth should be submitted to the BRS for evaluation, monitoring and file purposes.
D.O. No. 21 8.2010 P2.2

The task of reviewing/evaluating the accuracy, veracity and timeliness of the


aforementioned quality control reports/documents has been assigned/delegated to the
Quality Assurance Units (QAUs), which will be included and considered as crucial
parameters/criteria in the Annual Rating of Quality Control in Project Implementation of
the Regional/District Offices. As such, the concerned Regional Offices must have
complete records or copies of said documents on file, specifically at their respective
Materials Quality Control and Hydrology Division (MQCHD), readily available at all
times for the conduct of the regular quarterly QAU project inspection/assessment.

The concerned Regional Offices shall submit to the BRS within the first week of
each month the hereto-attached prescribed Form on Monitoring of Quality Assurance
(QA) Implementation by the District Engineering and City Offices in DPWH
Infrastructure Projects indicating vital data/information obtained from the project
documents that are strictly required under other pertinent policies/issuances of the
Department.

This order supersedes D.O. No. 55, series of 1989 and shall take effect
immediately.

(L~LGO
Acting Secretary

I WINOU00393
"" 11111 I

Attachment: As stated.
Attachment: D. O. No. 21 8.2010
BRS FORM QA-1

MONITORING OF QUALITY ASSURANCE (QA) IMPLEMENTATION BY THE


DISTRICT ENGINEERING & CITY OFFICES IN·DPWH INFRASTRUCTURE PROJECTS

Name of Project: _
Implementing Office: Project Cost: ~ _

CONCERN REMARKS
• Accreditation of PE/PI A

• Accreditation of Contractors' /Consultants'


ME B

• Limits of Assignment of PE/PI/ME C

(Continue on separate sheet/s if necessary)


• ,Current or latest sanction(s) imposed on
DPWH PE/PI/ME or Contractor's/ME

(Continue on separate sheet/s if necessary)


• Approval of BRS on Special Items of Works
(SPL) 0

(Continue on separate sheet/s if necessary)


.
• Accreditation of Private Testing Laboratory
and Batching Plants E

• Compliance to Minimum Testing


Requirements F

(Continue on separate sheet/s if necessary)


A
D.O. No. 73, s. 1998
B
D.O. No. 184, s. 1999
C
D.O. No. 42, s. 2007 and D.O. No. 41, s. 2006
o
D.O. No. 43, s. 2006
D.O. No. 253, s. 2003 and D.O. No. 26, s. 1989
DPWH Secretary's Memorandum dated 25 January 1989