Project HS Risk Assessment

Project Name: Sandvik Pvt Ltd


Activity: Ceiling work

Major Work Activity Potential Hazards Risk Possible Controls Controlled


Score Risk Score
Site Access Security M  All visitors to sign in/out and all person should YES
General and Adjacent Neighbors, Public and employee’s injuries have ID tags while entry on site.
Tenancy Specific Site  Security guard present when physical and
Access electrical system is jeopardized.
 Maintain complaints procedure records.
 Obtain relevant council approvals and display
at site entry.
 Safety Induction should be conducted.
 Health check-up should be done before
entering site.
Project HS Risk Assessment

Major Work Activity Potential Hazards Risk Possible Controls Controlled


Score Risk Score
Vehicle movement at site Vehicle license should be check. M  Driver license should be check. YES
Ensure no use of mobile phone while driving.  Speed limits should be only 10 kmph while
Improper horn entering in gate.
 Stopper must be use.
 Vehicle parking should be designed near entry
gate.
 PPEs. safety helmet, safety shoes should be
wear driver while entry in material gate.
 Horn should be proper.

Mobilization of Man Unskilled person, personal injury, property M  Medical& physical fit workers shall be YES
power damage deploying for this activity
 Safety induction & site safety rules &
regulation shall be done prior to enter the site
 Mandatory & required PPEs shall be used by
all workers
 Gate pass for all the worker & staff shall be
provided
 Tool box talk shall be conduct before start the
activity
 Take work permit before start the activity
Material Handling Improper Handling M  Work permit must be taken prior to start the YES
Fall of material  Ensure Training on manual material shifting
Fall of person to workers by concern supervisors.
Project HS Risk Assessment

Improper Communication  Ensure all the person will properly have


Minor injuries trained.
Serious injury  Ensure PPE`s like hand Gloves, shoulder pad.
 Keep safe access & egress clean, neat & tidy

 Proper stacking of materials


 Use of appropriate PPEs such as nose mask,
safety goggles, rubber hand gloves, safety
shoes, helmet, etc.

Storage of material Placing near access M  Ensure the material should be placed on the YES
Falling hazard safe area.
Improper communication  Ensure no material should be stacked in
Injuries access.
 Material storage related safety poster should
be display at location.
 Keep safe access & egress clean, neat.

 Proper stacking of materials [ Like- Brick


block, Marble Slab, tile]
 Fire extinguisher must be display in storage
area.
 Proper light should be available in store area.
 PPEs- Safety helmet, Shoe, Shoulder pad,
Hand gloves.
 Ensure stand use for marble slab.
 Do not stack material in access.
 Proper illumination should be provided.
Project HS Risk Assessment

Use of power tools Improper use of Electrical tools H  All workmen trained to spot and report any YES
[Hammer machine, Cutter Fly particles defective plugs, discolored sockets or
Machine] Defective power tools damaged cable/equipment to manager.
Non guarded rotating parts  Power tools should be inspected.
Eye injury  Ensure all tools should have inspected tag.
Respiratory diseases  Ensure only licensed holder electrician
Electrical shock allowed.
Electrical short circuit  Make sure socket outlets are protected by a
safety switch.
 Power tools & electrical table should be
inspected by electrician properly.
 Make sure turning off the equipment will not
harm another worker.
 Make sure all moving parts should have
stopped before touching the machine.
 Ensure ELCB should be available in electrical
panel.
PPEs like – Safety shoe, Helmet, Hand gloves
etc.
Cutting of ceiling material Fly particles M  Ensure only trained person should be allowing YES
by cutter machine Electrical shock for this job.
Defective tools  Power tools training should be conducted.
Damaged electrical cable  Ensure use of ELCB
Exposure to noise  Electrical tools should be inspected prior to
Improper cutter machine start the work.
 Ensure inspection tag should be providing to
power tools.
 Do not use of damage electrical cable.
 All rotation part should have wheel guard like-
Cutter machine, grinding machine.
Project HS Risk Assessment

 Use of ear plug prevent from noise.


 Proper use of hand gloves.
 PPEs- Helmet, shoe, goggle, hand gloves etc.

Drilling in ceiling for Dust inhalation M  Ensure only trained person allowed for work. YES
supporting Eye injuries  Use of nose mask protect from dust.
Minor Injuries  Proper use of goggle while doing drilling in
Falling hazard ceiling.
Fall of material / men from height  Ensure use of safety harness at work at
Improper electrical tools height.
Electrical cable damaged  Power tools should be inspected with tag
prior to start the work.
 Do not allow damaged electrical cable.

Fixing of ceiling section Fall of material M  Ensure proper supervision for work. YES
Minor injuries  Job specific training should be conducted
Improper communication prior to start the work.
 Only trained person should be allowed for
work.
 Proper use of hand gloves.
 PPEs- safety shoe, helmet, hand gloves,
Goggle, etc.
Fall of material M  Ensure only trained person allowed for work. YES
Metal Ceiling Minor injuries  Proper use of goggle, hand gloves while doing
Improper communication metal ceiling.
 Ensure use of safety harness at work at
height.
 Power tools should be inspected with tag
prior to start the work.
Project HS Risk Assessment

Fall of material M  Ensure proper supervision for work. YES


Minor injuries  Job specific training should be conducted
Mineral Fiber Tile Improper communication prior to start the work.
 Only trained person should be allowed for
work.
 Proper use of hand gloves.
 PPEs- safety shoe, helmet, hand gloves,
Goggle, etc.
Working at height Fall of person/ fall of material from height. H  Work at height Training should conducted YES
Slip and trip hazard. before starting job.
Minor injuries  Only trained, authorized worker allowed to
work at height
 Use of fall prevention mechanism such as
safety harness, etc. wherever required.
 Use of fall protection devices such as
temporary work platforms or scaffolding,
wherever possible.
 Use of appropriate PPEs such as safety shoes,
hard hats, hand gloves etc.
 Securing or safe keeping, as appropriate, of
working.
 tools, material, equipment, etc. to be used
while working.
 Climb with both hands. If you need a tool or
materials, climb first and then have someone
pass the item to you
 Make sure you place the scaffold on a firm,
level surface
 Training / briefing of workmen on working at
height and use of all the above.
Project HS Risk Assessment

Electrical Panel installation Untrained/ unskilled workers H  Ensure license holder electrician should be YES
Defective hand tools allowed.
Poor illumination  All electrical work should be done by
Electrical shock electrician only.
Slip and trip  Ensure TBT conducted before starting the
activity.
 Cut & joint cables should be avoided from the
site and ELCB/RCCB should be provided on
Sub D. B’s.
 Proper illumination should be providing.
 PPEs- Safety shoe, rubber hand gloves etc.
 Co2 type fire extinguisher should be available
near workplace.

Temporary Electrical cable Unsafe Electrical cable joints H  Cut & joint cables should be avoided from the YES
management Unsafe Electrical cable laying site and ELCB/RCCB should be provided at
Voltage fluctuation site.
Electrical Shock  Welding machines and grinding cables should
Electrical Short circuit not be mingling with each other.
Fire hazard  MCB/ELCB should be provided on the main
panel to avoid the short circuit.
 Electrical cable should overhead.
 Co2 type fire extinguisher should be available
near workplace.

This HS Risk Assessment takes into account only those potential hazards that exist at the time it was conducted. A revised Risk Assessment will be
required if there is a significant change in working conditions, at critical stages during construction, or when High Risk Construction Work is
performed.
Project HS Risk Assessment

Signed: …………………………………. Print Name: ………………………………………… Date: …………………

You might also like