Project HS Risk Assessment
Project HS Risk Assessment
Project HS Risk Assessment
Mobilization of Man Unskilled person, personal injury, property M Medical& physical fit workers shall be YES
power damage deploying for this activity
Safety induction & site safety rules &
regulation shall be done prior to enter the site
Mandatory & required PPEs shall be used by
all workers
Gate pass for all the worker & staff shall be
provided
Tool box talk shall be conduct before start the
activity
Take work permit before start the activity
Material Handling Improper Handling M Work permit must be taken prior to start the YES
Fall of material Ensure Training on manual material shifting
Fall of person to workers by concern supervisors.
Project HS Risk Assessment
Storage of material Placing near access M Ensure the material should be placed on the YES
Falling hazard safe area.
Improper communication Ensure no material should be stacked in
Injuries access.
Material storage related safety poster should
be display at location.
Keep safe access & egress clean, neat.
Use of power tools Improper use of Electrical tools H All workmen trained to spot and report any YES
[Hammer machine, Cutter Fly particles defective plugs, discolored sockets or
Machine] Defective power tools damaged cable/equipment to manager.
Non guarded rotating parts Power tools should be inspected.
Eye injury Ensure all tools should have inspected tag.
Respiratory diseases Ensure only licensed holder electrician
Electrical shock allowed.
Electrical short circuit Make sure socket outlets are protected by a
safety switch.
Power tools & electrical table should be
inspected by electrician properly.
Make sure turning off the equipment will not
harm another worker.
Make sure all moving parts should have
stopped before touching the machine.
Ensure ELCB should be available in electrical
panel.
PPEs like – Safety shoe, Helmet, Hand gloves
etc.
Cutting of ceiling material Fly particles M Ensure only trained person should be allowing YES
by cutter machine Electrical shock for this job.
Defective tools Power tools training should be conducted.
Damaged electrical cable Ensure use of ELCB
Exposure to noise Electrical tools should be inspected prior to
Improper cutter machine start the work.
Ensure inspection tag should be providing to
power tools.
Do not use of damage electrical cable.
All rotation part should have wheel guard like-
Cutter machine, grinding machine.
Project HS Risk Assessment
Drilling in ceiling for Dust inhalation M Ensure only trained person allowed for work. YES
supporting Eye injuries Use of nose mask protect from dust.
Minor Injuries Proper use of goggle while doing drilling in
Falling hazard ceiling.
Fall of material / men from height Ensure use of safety harness at work at
Improper electrical tools height.
Electrical cable damaged Power tools should be inspected with tag
prior to start the work.
Do not allow damaged electrical cable.
Fixing of ceiling section Fall of material M Ensure proper supervision for work. YES
Minor injuries Job specific training should be conducted
Improper communication prior to start the work.
Only trained person should be allowed for
work.
Proper use of hand gloves.
PPEs- safety shoe, helmet, hand gloves,
Goggle, etc.
Fall of material M Ensure only trained person allowed for work. YES
Metal Ceiling Minor injuries Proper use of goggle, hand gloves while doing
Improper communication metal ceiling.
Ensure use of safety harness at work at
height.
Power tools should be inspected with tag
prior to start the work.
Project HS Risk Assessment
Electrical Panel installation Untrained/ unskilled workers H Ensure license holder electrician should be YES
Defective hand tools allowed.
Poor illumination All electrical work should be done by
Electrical shock electrician only.
Slip and trip Ensure TBT conducted before starting the
activity.
Cut & joint cables should be avoided from the
site and ELCB/RCCB should be provided on
Sub D. B’s.
Proper illumination should be providing.
PPEs- Safety shoe, rubber hand gloves etc.
Co2 type fire extinguisher should be available
near workplace.
Temporary Electrical cable Unsafe Electrical cable joints H Cut & joint cables should be avoided from the YES
management Unsafe Electrical cable laying site and ELCB/RCCB should be provided at
Voltage fluctuation site.
Electrical Shock Welding machines and grinding cables should
Electrical Short circuit not be mingling with each other.
Fire hazard MCB/ELCB should be provided on the main
panel to avoid the short circuit.
Electrical cable should overhead.
Co2 type fire extinguisher should be available
near workplace.
This HS Risk Assessment takes into account only those potential hazards that exist at the time it was conducted. A revised Risk Assessment will be
required if there is a significant change in working conditions, at critical stages during construction, or when High Risk Construction Work is
performed.
Project HS Risk Assessment