Pile/Conductor stick-up calculations (API RP2A WSD specifications Date: 03 Aug 21

BE-BB RAKER PILE STICK-UP (MODIFIED MAKE-UP)


P-2B+SELFPEN+IHC S350 - 100%, 80% & 60% ENERGY
Segment lgth Segment Wall thk Outside diam
(mm) label (mm) (mm)
Select hammer model, = 31
Hammer total static weight, = 40.0 MT 0 0 10 0 0 0 10 0
Hammer static weight on pile top, = 40.0 MT
CG of hammer above pile top, = 4,992 mm 0 0 10 0 0 0 10 0
Pile true batter, 1: 4.0  14.036 deg
Pile material yield stress, = 355.0 MPa 3500 EXT 50 914.4 3500 EXT 50 914.4
Pile modulus of elasticity, = 205,000 MPa
Max pile driving dynamic stress, 100% = 233.0 MPa 1727 P2-04 35 914.4 1727 P2-04 35 914.4
Max pile driving dynamic stress, 80% = 208.0 Mpa
Max pile driving dynamic stress, 60% = 181.0 Mpa 3841.53 P2-03b 45 914.4 3841.53 P2-03b 45 914.4
Effective length factor, = 2.1 (API RP2A recommendation)
Coefficient Cm, = 1.0 (API RP2A recommendation)
Stick-up length analysed, = 9.07 m = 29.75 ft
% horizontal load at top of pile/conductor, = 0.0 %

Pile Segment Length Pile Pile weight Moment Moment Total moment Static bending stress Static axial stress Combined Local buckling stress Radius of D/t
section length from pile top OD Wall thk above section due to pile wt due to hammer at pile section Actual Allowable Actual Allowable stress check Elastic Inelastic gyration
(mm) (mm) (mm) (mm) (kN) (kNm) (kNm) (kNm) (N/mm2) (N/mm2) (N/mm2) (N/mm2) (unity ratio) (N/mm2) (N/mm2) (mm)
Top of pile
0 0 0 0 10 0.0 0.0 0.0 0.0 0.00 266.25 -1,211.75 158.84 -5.69 #DIV/0! 355.0 5.0 0.0
0 0 10 0.0 0.0 475.1 475.1 0.00 266.25 -1,211.75 158.84 -5.69 #DIV/0! 355.0 5.0 0.0
0 0 0 0 10 0.0 0.0 475.1 475.1 0.00 266.25 -1,211.75 158.84 -5.69 #DIV/0! 355.0 5.0 0.0
0 0 10 0.0 0.0 475.1 475.1 0.00 266.25 -1,211.75 158.84 -5.69 #DIV/0! 355.0 5.0 0.0
EXT 3500 0 914.4 50 0.0 0.0 475.1 475.1 17.07 266.25 2.80 158.84 0.08 6,725.7 355.0 306.1 18.3
3,500 914.4 50 36.6 15.5 808.2 823.7 29.60 266.25 3.07 158.84 0.13 6,725.7 355.0 306.1 18.3
P2-04 1727 3,500 914.4 35 36.6 15.5 808.2 823.7 40.23 266.25 4.30 158.84 0.18 4,708.0 355.0 311.2 26.1
5,227 914.4 35 49.5 33.6 972.6 1,006.1 49.13 266.25 4.43 158.84 0.22 4,708.0 355.0 311.2 26.1
P2-03b 3841.53 5,227 914.4 45 49.5 33.6 972.6 1,006.1 39.51 266.25 3.49 158.84 0.17 6,053.1 355.0 307.8 20.3
9,069 914.4 45 85.8 96.6 1,338.2 1,434.7 56.34 266.25 3.77 158.84 0.24 6,053.1 355.0 307.8 20.3
Top of jacket leg

Total maximum static + dynamic pile stress = 293.1 MPa 100% Hammer Energy *** UC ≤ 1.0, Ok *** Weighted average r = 307.8 mm
*** Total static + dynamic stress ≤ Fy, Ok *** Kl/r = 61.9
Maximum D/t = 26.1
Total maximum static + dynamic pile stress = 268.1 MPa 80% Hammer Energy Cc = 106.8
*** Total static + dynamic stress ≤ Fy, Ok *** Allowable axial stress, Fa = 158.8 N/mm2
Page: Fe' = 275.7 N/mm2
Total maximum static + dynamic pile stress = 241.1 MPa 60% Hammer Energy
*** Total static + dynamic stress ≤ Fy, Ok ***
Pile/Conductor stick-up calculations (API RP2A WSD specifications Date: 03 Aug 21
BE-BB RAKER PILE STICK-UP (MODIFIED MAKE-UP)
P-2B+P-3+IHC S350 - 100%, 80% & 60% ENERGY
Segment lgth Segment Wall thk Outside diam
(mm) label (mm) (mm)
Select hammer model, = 31
Hammer total static weight, = 40.0 MT 3500 EXT 50 914.4 3500 EXT 50 914.4
Hammer static weight on pile top, = 40.0 MT
CG of hammer above pile top, = 4,992 mm 4154 P3-02 45 914.4 4154 P3-02 45 914.4
Pile true batter, 1: 4.0  14.036 deg
Pile material yield stress, = 355.0 MPa 13211 P3-01 35 914.4 13211 P3-01 35 914.4
Pile modulus of elasticity, = 205,000 MPa
Max pile driving dynamic stress, 100% = 233.0 MPa 1127 P2-04 35 914.4 1127 P2-04 35 914.4
Max pile driving dynamic stress, 80% = 208.0 Mpa
Max pile driving dynamic stress, 60% = 181.0 Mpa 1773 P2-03b 45 914.4 1773 P2-03b 45 914.4
Effective length factor, = 2.1 (API RP2A recommendation)
Coefficient Cm, = 1.0 (API RP2A recommendation)
Stick-up length analysed, = 23.77 m = 77.97 ft
% horizontal load at top of pile/conductor, = 0.0 %

Pile Segment Length Pile Pile weight Moment Moment Total moment Static bending stress Static axial stress Combined Local buckling stress Radius of D/t
section length from pile top OD Wall thk above section due to pile wt due to hammer at pile section Actual Allowable Actual Allowable stress check Elastic Inelastic gyration
(mm) (mm) (mm) (mm) (kN) (kNm) (kNm) (kNm) (N/mm2) (N/mm2) (N/mm2) (N/mm2) (unity ratio) (N/mm2) (N/mm2) (mm)
Top of pile
EXT 3500 0 914.4 50 0.0 0.0 0.0 0.0 0.00 266.25 2.80 40.62 0.07 6,725.7 355.0 306.1 18.3
3,500 914.4 50 36.6 15.5 808.2 823.7 29.60 266.25 3.07 40.62 0.20 6,725.7 355.0 306.1 18.3
P3-02 4154 3,500 914.4 45 36.6 15.5 808.2 823.7 32.34 266.25 3.39 40.62 0.22 6,053.1 355.0 307.8 20.3
7,654 914.4 45 75.9 72.2 1,203.5 1,275.7 50.09 266.25 3.70 40.62 0.30 6,053.1 355.0 307.8 20.3
P3-01 13211 7,654 914.4 35 75.9 72.2 1,203.5 1,275.7 62.30 266.25 4.70 40.62 0.38 4,708.0 355.0 311.2 26.1
20,865 914.4 35 174.3 473.1 2,460.8 2,933.9 143.28 266.25 5.69 40.62 0.77 4,708.0 355.0 311.2 26.1
P2-04 1127 20,865 914.4 35 174.3 473.1 2,460.8 2,933.9 143.28 266.25 5.69 40.62 0.77 4,708.0 355.0 311.2 26.1
21,992 914.4 35 182.7 521.8 2,568.1 3,089.9 150.90 266.25 5.77 40.62 0.80 4,708.0 355.0 311.2 26.1
P2-03b 1773 21,992 914.4 45 182.7 521.8 2,568.1 3,089.9 121.33 266.25 4.54 40.62 0.62 6,053.1 355.0 307.8 20.3
23,765 914.4 45 199.5 604.0 2,736.8 3,340.8 131.18 266.25 4.67 40.62 0.67 6,053.1 355.0 307.8 20.3
Top of jacket leg

Total maximum static + dynamic pile stress = 389.7 MPa 100% Hammer Energy *** UC ≤ 1.0, Ok *** Weighted average r = 309.6 mm
*** Total static + dynamic stress > Fy, Not ok *** Kl/r = 161.2
Maximum D/t = 26.1
Total maximum static + dynamic pile stress = 364.7 MPa 80% Hammer Energy Cc = 106.8
*** Total static + dynamic stress > Fy, Not ok *** Allowable axial stress, Fa = 40.6 N/mm2
Page: Fe' = 40.6 N/mm2
Total maximum static + dynamic pile stress = 337.7 MPa 60% Hammer Energy
*** Total static + dynamic stress ≤ Fy, Ok ***
Pile/Conductor stick-up calculations (API RP2A WSD specifications Date: 03 Aug 21
BE-BB RAKER PILE STICK-UP (MODIFIED MAKE-UP)
P-3+P-4+IHC S350 - 100%, 80% & 60% ENERGY
Segment lgth Segment Wall thk Outside diam
(mm) label (mm) (mm)
Select hammer model, = 31
Hammer total static weight, = 40.0 MT 0 0 10 0 0 0 10 0
Hammer static weight on pile top, = 40.0 MT
CG of hammer above pile top, = 4,992 mm 0 0 10 0 0 0 10 0
Pile true batter, 1: 4.0  14.036 deg
Pile material yield stress, = 355.0 MPa 3500 EXT 50 914.4 3500 EXT 50 914.4
Pile modulus of elasticity, = 205,000 MPa
Max pile driving dynamic stress, 100% = 233.0 MPa 21500 P4-01 45 914.4 21500 P4-01 45 914.4
Max pile driving dynamic stress, 80% = 208.0 Mpa
Max pile driving dynamic stress, 60% = 181.0 Mpa 2900 P3-02 45 914.4 2900 P3-02 45 914.4
Effective length factor, = 2.1 (API RP2A recommendation)
Coefficient Cm, = 1.0 (API RP2A recommendation)
Stick-up length analysed, = 27.90 m = 91.54 ft
% horizontal load at top of pile/conductor, = 0.0 %

Pile Segment Length Pile Pile weight Moment Moment Total moment Static bending stress Static axial stress Combined Local buckling stress Radius of D/t
section length from pile top OD Wall thk above section due to pile wt due to hammer at pile section Actual Allowable Actual Allowable stress check Elastic Inelastic gyration
(mm) (mm) (mm) (mm) (kN) (kNm) (kNm) (kNm) (N/mm2) (N/mm2) (N/mm2) (N/mm2) (unity ratio) (N/mm2) (N/mm2) (mm)
Top of pile
0 0 0 0 10 0.0 0.0 0.0 0.0 0.00 266.25 -1,211.75 29.09 -5.69 #DIV/0! 355.0 5.0 0.0
0 0 10 0.0 0.0 475.1 475.1 0.00 266.25 -1,211.75 29.09 -5.69 #DIV/0! 355.0 5.0 0.0
0 0 0 0 10 0.0 0.0 475.1 475.1 0.00 266.25 -1,211.75 29.09 -5.69 #DIV/0! 355.0 5.0 0.0
0 0 10 0.0 0.0 475.1 475.1 0.00 266.25 -1,211.75 29.09 -5.69 #DIV/0! 355.0 5.0 0.0
EXT 3500 0 914.4 50 0.0 0.0 475.1 475.1 17.07 266.25 2.80 29.09 0.17 6,725.7 355.0 306.1 18.3
3,500 914.4 50 36.6 15.5 808.2 823.7 29.60 266.25 3.07 29.09 0.23 6,725.7 355.0 306.1 18.3
P4-01 21500 3,500 914.4 45 36.6 15.5 808.2 823.7 32.34 266.25 3.39 29.09 0.25 6,053.1 355.0 307.8 20.3
25,000 914.4 45 240.1 736.9 2,854.4 3,591.3 141.01 266.25 4.99 29.09 0.81 6,053.1 355.0 307.8 20.3
P3-02 2900 25,000 914.4 45 240.1 736.9 2,854.4 3,591.3 141.01 266.25 4.99 29.09 0.81 6,053.1 355.0 307.8 20.3
27,900 914.4 45 267.5 915.5 3,130.4 4,045.8 158.86 266.25 5.21 29.09 0.91 6,053.1 355.0 307.8 20.3
Top of jacket leg

Total maximum static + dynamic pile stress = 397.1 MPa 100% Hammer Energy *** UC ≤ 1.0, Ok *** Weighted average r = 307.6 mm
*** Total static + dynamic stress > Fy, Not ok *** Kl/r = 190.5
Maximum D/t = 20.3
Total maximum static + dynamic pile stress = 372.1 MPa 80% Hammer Energy Cc = 106.8
*** Total static + dynamic stress > Fy, Not ok *** Allowable axial stress, Fa = 29.1 N/mm2
Page: Fe' = 29.1 N/mm2
Total maximum static + dynamic pile stress = 345.1 MPa 60% Hammer Energy
*** Total static + dynamic stress ≤ Fy, Ok ***
Pile/Conductor stick-up calculations (API RP2A WSD specifications Date: 03 Aug 21
BE-BB RAKER PILE STICK-UP (MODIFIED MAKE-UP)
P-4+P-5+IHC S350 - 100%, 80% & 60% ENERGY
Segment lgth Segment Wall thk Outside diam
(mm) label (mm) (mm)
Select hammer model, = 31
Hammer total static weight, = 40.0 MT 0 0 10 0 0 0 10 0
Hammer static weight on pile top, = 40.0 MT
CG of hammer above pile top, = 4,992 mm 3500 EXT 50 914.4 3500 EXT 50 914.4
Pile true batter, 1: 4.0  14.036 deg
Pile material yield stress, = 355.0 MPa 4723 P5-02 35 914.4 4723 P5-02 35 914.4
Pile modulus of elasticity, = 205,000 MPa
Max pile driving dynamic stress, 100% = 233.0 MPa 16777 P5-01 45 914.4 16777 P5-01 45 914.4
Max pile driving dynamic stress, 80% = 208.0 Mpa
Max pile driving dynamic stress, 60% = 181.0 Mpa 2900 P4-01 45 914.4 2900 P4-01 45 914.4
Effective length factor, = 2.1 (API RP2A recommendation)
Coefficient Cm, = 1.0 (API RP2A recommendation)
Stick-up length analysed, = 27.90 m = 91.54 ft
% horizontal load at top of pile/conductor, = 0.0 %

Pile Segment Length Pile Pile weight Moment Moment Total moment Static bending stress Static axial stress Combined Local buckling stress Radius of D/t
section length from pile top OD Wall thk above section due to pile wt due to hammer at pile section Actual Allowable Actual Allowable stress check Elastic Inelastic gyration
(mm) (mm) (mm) (mm) (kN) (kNm) (kNm) (kNm) (N/mm2) (N/mm2) (N/mm2) (N/mm2) (unity ratio) (N/mm2) (N/mm2) (mm)
Top of pile
0 0 0 0 10 0.0 0.0 0.0 0.0 0.00 266.25 -1,211.75 29.20 -5.69 #DIV/0! 355.0 5.0 0.0
0 0 10 0.0 0.0 475.1 475.1 0.00 266.25 -1,211.75 29.20 -5.69 #DIV/0! 355.0 5.0 0.0
EXT 3500 0 914.4 50 0.0 0.0 475.1 475.1 17.07 266.25 2.80 29.20 0.17 6,725.7 355.0 306.1 18.3
3,500 914.4 50 36.6 15.5 808.2 823.7 29.60 266.25 3.07 29.20 0.23 6,725.7 355.0 306.1 18.3
P5-02 4723 3,500 914.4 35 36.6 15.5 808.2 823.7 40.23 266.25 4.30 29.20 0.32 4,708.0 355.0 311.2 26.1
8,223 914.4 35 71.8 77.6 1,257.7 1,335.3 65.21 266.25 4.66 29.20 0.45 4,708.0 355.0 311.2 26.1
P5-01 16777 8,223 914.4 45 71.8 77.6 1,257.7 1,335.3 52.43 266.25 3.66 29.20 0.35 6,053.1 355.0 307.8 20.3
25,000 914.4 45 230.6 692.7 2,854.4 3,547.1 139.28 266.25 4.92 29.20 0.80 6,053.1 355.0 307.8 20.3
P4-01 2900 25,000 914.4 45 230.6 692.7 2,854.4 3,547.1 139.28 266.25 4.92 29.20 0.80 6,053.1 355.0 307.8 20.3
27,900 914.4 45 258.0 864.5 3,130.4 3,994.9 156.86 266.25 5.13 29.20 0.89 6,053.1 355.0 307.8 20.3
Top of jacket leg

Total maximum static + dynamic pile stress = 395.0 MPa 100% Hammer Energy *** UC ≤ 1.0, Ok *** Weighted average r = 308.2 mm
*** Total static + dynamic stress > Fy, Not ok *** Kl/r = 190.1
Maximum D/t = 26.1
Total maximum static + dynamic pile stress = 370.0 MPa 80% Hammer Energy Cc = 106.8
*** Total static + dynamic stress > Fy, Not ok *** Allowable axial stress, Fa = 29.2 N/mm2
Page: Fe' = 29.2 N/mm2
Total maximum static + dynamic pile stress = 343.0 MPa 60% Hammer Energy
*** Total static + dynamic stress ≤ Fy, Ok ***
Pile/Conductor stick-up calculations (API RP2A WSD specifications Date: 03 Aug 21
BE-BB RAKER PILE STICK-UP (MODIFIED MAKE-UP)
P-5+P-6+MHU S350 - 100%, 80% & 60% ENERGY
Segment lgth Segment Wall thk Outside diam
(mm) label (mm) (mm)
Select hammer model, = 31
Hammer total static weight, = 40.0 MT 0 0 10 0 0 0 10 0
Hammer static weight on pile top, = 40.0 MT
CG of hammer above pile top, = 4,992 mm 0 0 10 0 0 0 10 0
Pile true batter, 1: 4.0  14.036 deg
Pile material yield stress, = 355.0 MPa 3500 EXT 50 914.4 3500 EXT 50 914.4
Pile modulus of elasticity, = 205,000 MPa
Max pile driving dynamic stress, 100% = 233.0 MPa 16400 P6-01 35 914.4 16400 P6-01 35 914.4
Max pile driving dynamic stress, 80% = 208.0 Mpa
Max pile driving dynamic stress, 60% = 181.0 Mpa 2900 P5-02 35 914.4 2900 P5-02 35 914.4
Effective length factor, = 2.1 (API RP2A recommendation)
Coefficient Cm, = 1.0 (API RP2A recommendation)
Stick-up length analysed, = 22.80 m = 74.80 ft
% horizontal load at top of pile/conductor, = 0.0 %

Pile Segment Length Pile Pile weight Moment Moment Total moment Static bending stress Static axial stress Combined Local buckling stress Radius of D/t
section length from pile top OD Wall thk above section due to pile wt due to hammer at pile section Actual Allowable Actual Allowable stress check Elastic Inelastic gyration
(mm) (mm) (mm) (mm) (kN) (kNm) (kNm) (kNm) (N/mm2) (N/mm2) (N/mm2) (N/mm2) (unity ratio) (N/mm2) (N/mm2) (mm)
Top of pile
0 0 0 0 10 0.0 0.0 0.0 0.0 0.00 266.25 -1,211.75 44.36 -5.69 #DIV/0! 355.0 5.0 0.0
0 0 10 0.0 0.0 475.1 475.1 0.00 266.25 -1,211.75 44.36 -5.69 #DIV/0! 355.0 5.0 0.0
0 0 0 0 10 0.0 0.0 475.1 475.1 0.00 266.25 -1,211.75 44.36 -5.69 #DIV/0! 355.0 5.0 0.0
0 0 10 0.0 0.0 475.1 475.1 0.00 266.25 -1,211.75 44.36 -5.69 #DIV/0! 355.0 5.0 0.0
EXT 3500 0 914.4 50 0.0 0.0 475.1 475.1 17.07 266.25 2.80 44.36 0.13 6,725.7 355.0 306.1 18.3
3,500 914.4 50 36.6 15.5 808.2 823.7 29.60 266.25 3.07 44.36 0.19 6,725.7 355.0 306.1 18.3
P6-01 16400 3,500 914.4 35 36.6 15.5 808.2 823.7 40.23 266.25 4.30 44.36 0.26 4,708.0 355.0 311.2 26.1
19,900 914.4 35 158.7 404.0 2,369.0 2,773.0 135.42 266.25 5.53 44.36 0.71 4,708.0 355.0 311.2 26.1
P5-02 2900 19,900 914.4 35 158.7 404.0 2,369.0 2,773.0 135.42 266.25 5.53 44.36 0.71 4,708.0 355.0 311.2 26.1
22,800 914.4 35 180.3 523.2 2,645.0 3,168.2 154.72 266.25 5.75 44.36 0.80 4,708.0 355.0 311.2 26.1
Top of jacket leg

Total maximum static + dynamic pile stress = 393.5 MPa 100% Hammer Energy *** UC ≤ 1.0, Ok *** Weighted average r = 310.4 mm
*** Total static + dynamic stress > Fy, Not ok *** Kl/r = 154.3
Maximum D/t = 26.1
Total maximum static + dynamic pile stress = 368.5 MPa 80% Hammer Energy Cc = 106.8
*** Total static + dynamic stress > Fy, Not ok *** Allowable axial stress, Fa = 44.4 N/mm2
Page: Fe' = 44.4 N/mm2
Total maximum static + dynamic pile stress = 341.5 MPa 60% Hammer Energy
*** Total static + dynamic stress ≤ Fy, Ok ***