CONSTRUCTION & UPGRADATION OF EXISTING ROAD TO 2-LANE PAVED SHOULDER FROM KM 40+000 TO 61+100 IN

PROJECT NAME KAFER TO LAVA MORE OF NH 717A ON EPC BASIS UNDER SARDP NE PHASE"A" IN THE STATE OF WEST BENGAL
(PACKAGE-V A)
Implementing Agency National Highways & Infrastructure Development Corporation Limited

M/S CHAITANYA PROJECTS CONSULTANCY PVT LTD IN ASSOCIATION WITH MPG ENGINEERING CONSULTANCY PVT
AUTHORITY ENGINEER
LTD

EPC CONTRACTOR RCPL-SSIPL(JV)

Level Sheet of stretches recommended for payment under SG Top in SPS-03

Average
Diff SG top Diff SG top Diff SG top Average
S.No Chainage PCL FRL PCL on SG PCL Actual RL Actual RL Actual RL RHS to PCL to PCL LHS- to PCL RHS-6 Distance Distance
top LHS -6 +6 For RHS
Actual RL 6m m For LHS (m)
(m)

(KM) (M) (M) (M) (M) (M) (M) (M) (M)


Stretch-1 Ch. 40+060 to Ch. 40+230
1 40+060 1681.120 1680.685 1679.910 1679.879 1677.930 0.775 0.806 2.755
2 40+080 1679.877 1679.442 1678.395 1678.300 1678.295 1.047 1.142 1.147
3 40+100 1678.634 1678.199 1676.732 1676.732 1676.700 1.467 1.467 1.499
4 40+120 1677.391 1676.956 1674.844 1674.805 1674.800 2.112 2.151 2.156
5 40+140 1676.148 1675.713 1673.737 1673.690 1673.801 1.976 2.023 1.912
5.8 6
6 40+160 1674.909 1674.474 1673.254 1673.209 1673.299 1.220 1.265 1.175
7 40+180 1673.681 1673.246 1672.796 1672.695 1672.705 0.450 0.551 0.541
8 40+200 1672.463 1672.028 1671.780 1671.675 1671.750 0.248 0.353 0.278
9 40+220 1671.256 1670.821 1670.628 1670.540 1670.603 0.193 0.281 0.218
10 40+230 1670.656 1670.221 1669.874 1670.025 1670.006 0.347 0.196 0.215
Stretch-2 Ch. 40+900 to Ch. 40+940
11 40+900 1638.694 1638.259 1643.200 1642.890 1643.090 -4.941 -4.631 -4.831
12 40+920 1637.650 1637.215 1641.290 1641.340 1641.010 -4.075 -4.125 -3.795 6 5.5
13 40+940 1636.618 1636.183 1635.010 1634.900 1635.301 1.173 1.283 0.882
Stretch-3 Ch. 41+000 to Ch. 41+040
14 41+000 1633.590 1633.155 1635.067 1634.709 1635.121 -1.912 -1.554 -1.966
15 41+020 1632.587 1632.152 1633.700 1633.793 1633.590 -1.548 -1.641 -1.438 6 5
16 41+040 1631.584 1631.149 1632.300 1632.107 1632.401 -1.151 -0.958 -1.252
Stretch-4 Ch. 41+050 to Ch. 41+200

Stretch-5 Ch. 41+320 to Ch. 41+370 , Stretch-6 Ch. 41+370 to Ch.41+420 & Stretch-7 41+420 to 41+530
17 41+320 1614.829 1614.394 1607.785 1607.190 1607.400 6.609 7.204 6.994
18 41+340 1613.529 1613.094 1606.398 1606.901 1606.300 6.696 6.193 6.794
19 41+360 1612.229 1611.794 1605.118 1605.491 1605.001 6.676 6.303 6.793
20 41+380 1610.929 1610.494 1604.495 1604.407 1603.900 5.999 6.087 6.594
21 41+400 1609.629 1609.194 1601.884 1601.920 1601.700 7.310 7.274 7.494
22 41+420 1608.329 1607.894 1600.250 1600.207 1598.090 7.644 7.687 9.804
6 5.5
23 41+440 1607.029 1606.594 1598.862 1598.921 1598.800 7.732 7.673 7.794
24 41+460 1605.729 1605.294 1596.981 1596.970 1596.911 8.313 8.324 8.383
25 41+480 1604.429 1603.994 1596.417 1596.431 1596.401 7.577 7.563 7.593
26 41+500 1603.129 1602.694 1597.700 1597.601 1597.520 4.994 5.093 5.174
27 41+520 1601.829 1601.394 1597.320 1597.000 1597.290 4.074 4.394 4.104
28 41+530 1601.179 1600.744 1598.430 1598.630 1598.800 2.314 2.114 1.944
Stretch-8 Ch. 41+730 to 41+840
29 41+730 1589.239 1588.804 1588.301 1586.300 1587.800 0.503 2.504 1.004
30 41+750 1588.052 1587.617 1587.108 1585.109 1587.005 0.509 2.508 0.612
31 41+770 1586.835 1586.400 1586.828 1584.828 1586.910 -0.428 1.572 -0.510
32 41+790 1585.590 1585.155 1584.604 1584.250 1586.300 0.551 0.905 -1.145 6 6
33 41+810 1584.315 1583.880 1583.675 1583.250 1585.800 0.205 0.630 -1.920
34 41+830 1583.017 1582.582 1582.356 1582.365 1583.385 0.226 0.217 -0.803
35 41+840 1582.367 1581.932 1581.250 1581.870 1583.014 0.682 0.062 -1.082
Stretch-9 Ch. 42+100 to 42+140
36 42+100 1565.467 1565.032 1566.010 1566.090 1566.070 -0.978 -1.058 -1.038
37 42+120 1564.167 1563.732 1563.121 1563.123 1563.191 0.611 0.609 0.541 6 5
38 42+140 1562.867 1562.432 1563.490 1563.499 1563.422 -1.058 -1.067 -0.990
Stretch-10 Ch. 42+230 to 42+300
39 42+230 1557.017 1556.582 1553.900 1553.872 1553.871 2.682 2.710 2.711
40 42+250 1555.717 1555.282 1552.954 1552.960 1552.907 2.328 2.322 2.375
41 42+270 1554.417 1553.982 1553.400 1553.409 1553.418 0.582 0.573 0.564 6 4
42 42+290 1553.117 1552.682 1552.200 1552.260 1552.275 0.482 0.422 0.407
43 42+300 1552.467 1552.032 1553.012 1552.100 1551.870 -0.980 -0.068 0.162
Stretch-11 Ch. 42+370 to 42+410
44 42+370 1547.917 1547.482 1544.200 1544.180 1544.220 3.282 3.302 3.262
45 42+390 1546.617 1546.182 1543.300 1543.270 1543.340 2.882 2.912 2.842 4 5
46 42+410 1545.317 1544.882 1543.500 1543.460 1543.560 1.382 1.422 1.322
Stretch-12 Ch. 44+180 to 44+250
47 44+180 1498.396 1497.961 1497.500 1497.530 1497.480 0.461 0.431 0.481
48 44+200 1498.273 1497.838 1497.630 1497.600 1497.650 0.208 0.238 0.188
49 44+220 1498.390 1497.955 1497.830 1497.850 1497.900 0.125 0.105 0.055 6 6
50 44+240 1498.716 1498.281 1498.030 1498.060 1498.120 0.251 0.221 0.161
51 44+250 1498.893 1498.458 1498.120 1497.900 1497.856 0.338 0.558 0.602
Stretch-13 Ch. 44+470 to 44+660
Level Sheet of stretches recommended for payment under SG Top in SPS-03

Average
PCL on SG Actual RL Actual RL RHS Diff SG top Diff SG top Diff SG top Average Distance
S.No Chainage PCL FRL PCL Actual RL to PCL to PCL LHS- to PCL RHS-6 Distance
top LHS -6 +6 Actual RL 6m m For LHS (m) For RHS
(m)

(KM) (M) (M) (M) (M) (M) (M) (M) (M)


52 44+470 1505.823 1505.388 1505.600 1505.512 1505.580 -0.212 -0.124 -0.192
53 44+490 1505.451 1505.016 1505.200 1505.295 1505.320 -0.184 -0.279 -0.304
54 44+510 1504.720 1504.285 1504.200 1504.665 1504.272 0.085 -0.380 0.013
55 44+530 1503.921 1503.486 1504.010 1504.123 1504.095 -0.524 -0.637 -0.609
56 44+550 1503.122 1502.687 1502.950 1502.980 1502.930 -0.263 -0.293 -0.243
57 44+570 1502.323 1501.888 1502.300 1502.275 1502.350 -0.412 -0.387 -0.462 6 5.5
58 44+590 1501.665 1501.230 1501.100 1501.140 1501.212 0.130 0.090 0.018
59 44+610 1501.318 1500.883 1501.450 1501.417 1501.495 -0.567 -0.534 -0.612
60 44+630 1501.273 1500.838 1501.400 1501.420 1501.510 -0.562 -0.582 -0.672
61 44+650 1501.326 1500.891 1501.420 1501.495 1501.375 -0.529 -0.604 -0.484
62 44+660 1501.353 1500.918 1501.300 1501.300 1501.220 -0.382 -0.382 -0.302
Stretch-14 Ch. 45+330 to 45+500
63 45+330 1514.934 1514.499 1513.850 1513.658 1513.618 0.649 0.841 0.881
64 45+350 1515.938 1515.503 1514.675 1515.025 1514.985 0.828 0.478 0.518
65 45+370 1516.942 1516.507 1515.865 1516.014 1515.974 0.642 0.493 0.533
66 45+390 1517.986 1517.551 1516.847 1516.832 1516.792 0.704 0.719 0.759
67 45+410 1519.145 1518.710 1518.025 1517.985 1517.945 0.685 0.725 0.765
6 6
68 45+430 1520.417 1519.982 1519.658 1519.568 1519.528 0.324 0.414 0.454
69 45+450 1521.716 1521.281 1520.654 1520.848 1520.808 0.627 0.433 0.473
70 45+470 1523.015 1522.580 1522.021 1521.985 1521.945 0.559 0.595 0.635
71 45+490 1524.315 1523.880 1523.321 1523.021 1522.981 0.559 0.859 0.899
72 45+500 1524.964 1524.529 1523.800 1523.878 1523.838 0.729 0.651 0.691
Stretch-15 Ch. 47+430 to 47+540
82 47+430 1635.342 1634.907 1636.700 1641.280 1632.545 -1.793 -6.373 2.362
83 47+450 1636.217 1635.782 1638.500 1643.290 1634.721 -2.718 -7.508 1.061
84 47+470 1637.015 1636.580 1638.800 1643.188 1634.872 -2.220 -6.608 1.708
85 47+490 1637.734 1637.299 1639.600 1644.490 1635.672 -2.301 -7.191 1.627 5 3.5
86 47+510 1638.375 1637.940 1640.800 1645.490 1636.322 -2.860 -7.550 1.618
87 47+530 1638.937 1638.502 1640.986 1645.122 1636.121 -2.484 -6.620 2.381
88 47+540 1639.190 1638.755 1639.856 1644.862 1637.574 -1.101 -6.107 1.181
Stretch-16 Ch. 47+620 to 47+680 Builtup Area
89 47+620 1640.503 1640.068 1641.100 1641.245 1641.480 -1.032 -1.177 -1.412
90 47+640 1640.636 1640.201 1641.300 1641.482 1641.375 -1.099 -1.281 -1.174
6 6
91 47+660 1640.690 1640.255 1641.250 1641.150 1641.510 -0.995 -0.895 -1.255
92 47+680 1640.667 1640.232 1641.080 1641.169 1641.480 -0.848 -0.937 -1.248
Stretch-17 Ch. 48+830to 49+530
93 48+830 1702.959 1702.524 1699.600 1703.990 1694.291 2.924 -1.466 8.233
94 48+850 1704.259 1703.824 1700.800 1704.300 1695.836 3.024 -0.476 7.988
95 48+870 1705.557 1705.122 1700.994 1704.999 1695.991 4.128 0.123 9.131
96 48+890 1706.844 1706.409 1703.500 1703.500 1700.001 2.909 2.909 6.408
97 48+910 1708.121 1707.686 1700.010 1700.111 1700.111 7.676 7.575 7.575
98 48+930 1709.387 1708.952 1706.311 1710.190 1701.722 2.641 -1.238 7.230
99 48+950 1710.642 1710.207 1711.100 1712.090 1704.045 -0.893 -1.883 6.162
100 48+970 1711.890 1711.455 1708.900 1712.170 1703.922 2.555 -0.715 7.533
101 48+990 1713.137 1712.702 1710.400 1714.090 1705.999 2.302 -1.388 6.703
102 49+010 1714.384 1713.949 1711.900 1715.922 1706.077 2.049 -1.973 7.872
103 49+030 1715.631 1715.196 1714.232 1718.290 1709.109 0.964 -3.094 6.087
104 49+050 1716.878 1716.443 1715.200 1719.423 1710.272 1.243 -2.980 6.171
105 49+070 1718.124 1717.689 1716.300 1720.211 1711.872 1.389 -2.522 5.817
106 49+090 1719.371 1718.936 1715.400 1717.100 1713.100 3.536 1.836 5.836
107 49+110 1720.618 1720.183 1718.500 1722.200 1713.400 1.683 -2.017 6.783
108 49+130 1721.865 1721.430 1720.200 1724.200 1715.100 1.230 -2.770 6.330
109 49+150 1723.112 1722.677 1722.003 1726.090 1716.801 0.674 -3.413 5.876
110 49+170 1724.359 1723.924 1723.500 1727.109 1718.422 0.424 -3.185 5.502
5.5 5.5
111 49+190 1725.606 1725.171 1724.700 1728.790 1719.891 0.471 -3.619 5.280
112 49+210 1726.853 1726.418 1725.800 1729.922 1720.422 0.618 -3.504 5.996
113 49+230 1728.100 1727.665 1727.400 1731.801 1722.090 0.265 -4.136 5.575
114 49+250 1729.347 1728.912 1728.600 1728.728 1723.100 0.312 0.184 5.812
115 49+270 1730.594 1730.159 1726.400 1726.402 1724.800 3.759 3.757 5.359
116 49+290 1731.841 1731.406 1730.800 1730.809 1730.892 0.606 0.597 0.514
117 49+310 1733.088 1732.653 1734.100 1734.290 1729.872 -1.447 -1.637 2.781
118 49+330 1734.335 1733.900 1735.500 1740.100 1730.821 -1.600 -6.200 3.079
119 49+350 1735.581 1735.146 1738.500 1740.561 1737.500 -3.354 -5.415 -2.354
120 49+370 1736.828 1736.393 1741.292 1741.422 1738.400 -4.899 -5.029 -2.007
121 49+390 1738.069 1737.634 1740.521 1742.821 1739.490 -2.887 -5.187 -1.856
122 49+410 1739.276 1738.841 1741.010 1744.090 1738.800 -2.169 -5.249 0.041
123 49+430 1740.445 1740.010 1739.109 1742.009 1739.272 0.901 -1.999 0.738
124 49+450 1741.578 1741.143 1743.200 1746.100 1743.291 -2.057 -4.957 -2.148
125 49+470 1742.673 1742.238 1747.090 1747.291 1744.615 -4.852 -5.053 -2.377
126 49+490 1743.738 1743.303 1746.901 1749.001 1743.002 -3.598 -5.698 0.301
127 49+510 1744.799 1744.364 1746.500 1749.002 1743.422 -2.136 -4.638 0.942
128 49+530 1745.861 1745.426 1747.881 1750.600 1745.235 -2.455 -5.174 0.191
Stretch-18 Ch. 49+530to 49+880
Level Sheet of stretches recommended for payment under SG Top in SPS-03

Average
PCL on SG Actual RL Actual RL RHS Diff SG top Diff SG top Diff SG top Average Distance
S.No Chainage PCL FRL PCL Actual RL to PCL to PCL LHS- to PCL RHS-6 Distance
top LHS -6 +6 Actual RL 6m m For LHS (m) For RHS
(m)

(KM) (M) (M) (M) (M) (M) (M) (M) (M)


129 49+530 1745.861 1745.426 1747.881 1750.600 1745.235 -2.455 -5.174 0.191
130 49+550 1746.922 1746.487 1750.365 1753.303 1748.000 -3.878 -6.816 -1.513
131 49+570 1747.984 1747.549 1750.266 1752.690 1747.822 -2.717 -5.141 -0.273
132 49+590 1749.045 1748.610 1750.800 1750.801 1750.690 -2.190 -2.191 -2.080
133 49+610 1750.107 1749.672 1753.069 1753.071 1753.067 -3.397 -3.399 -3.395
134 49+630 1751.169 1750.734 1754.250 1754.298 1754.267 -3.516 -3.564 -3.533
135 49+650 1752.230 1751.795 1755.017 1755.091 1755.019 -3.222 -3.296 -3.224
136 49+670 1753.292 1752.857 1755.477 1755.479 1755.481 -2.620 -2.622 -2.624
137 49+690 1754.353 1753.918 1755.798 1755.809 1755.806 -1.880 -1.891 -1.888
138 49+710 1755.424 1754.989 1757.252 1756.258 1754.090 -2.263 -1.269 0.899 6 6
139 49+730 1756.540 1756.105 1757.870 1757.120 1754.181 -1.765 -1.015 1.924
140 49+750 1757.704 1757.269 1758.700 1763.010 1755.400 -1.431 -5.741 1.869
141 49+770 1758.915 1758.480 1760.030 1764.092 1757.090 -1.550 -5.612 1.390
142 49+790 1760.173 1759.738 1761.800 1764.902 1758.400 -2.062 -5.164 1.338
143 49+810 1761.470 1761.035 1762.500 1766.712 1759.200 -1.465 -5.677 1.835
144 49+830 1762.769 1762.334 1764.600 1767.732 1761.320 -2.266 -5.398 1.014
145 49+850 1764.068 1763.633 1764.800 1764.532 1761.102 -1.167 -0.899 2.531
146 49+870 1765.368 1764.933 1765.670 1768.190 1762.349 -0.737 -3.257 2.584
147 49+880 1766.018 1765.583 1766.201 1767.125 1763.500 -0.618 -1.542 2.083
Stretch-19 Ch. 54+030to 54+290
148 54+030 2008.281 2007.846 2013.100 2015.100 2011.084 -5.254 -7.254 -3.238
149 54+050 2008.155 2007.720 2014.010 2016.010 2011.994 -6.290 -8.290 -4.274
150 54+070 2007.803 2007.368 2014.000 2016.000 2011.984 -6.632 -8.632 -4.616
151 54+090 2007.226 2006.791 2014.812 2016.812 2012.796 -8.021 -10.021 -6.005
152 54+110 2006.425 2005.990 2014.100 2016.100 2012.084 -8.110 -10.110 -6.094
153 54+130 2005.402 2004.967 2012.117 2014.117 2010.101 -7.150 -9.150 -5.134
154 54+150 2004.302 2003.867 2009.954 2011.954 2007.938 -6.087 -8.087 -4.071
6 4
155 54+170 2003.202 2002.767 2008.267 2010.267 2006.251 -5.500 -7.500 -3.484
156 54+190 2002.102 2001.667 2007.100 2009.100 2005.084 -5.433 -7.433 -3.417
157 54+210 2001.002 2000.567 2005.021 2007.021 2003.005 -4.454 -6.454 -2.438
158 54+230 1999.969 1999.534 2003.521 2005.521 2001.505 -3.987 -5.987 -1.971
159 54+250 1999.070 1998.635 2003.100 2005.100 2001.084 -4.465 -6.465 -2.449
160 54+270 1998.302 1997.867 2001.826 2003.826 1999.810 -3.959 -5.959 -1.943
161 54+290 1997.667 1997.232 2000.500 2002.500 1998.484 -3.268 -5.268 -1.252
Stretch-20 Ch. 54+470 to 54+680
162 54+470 1997.908 1997.473 1996.000 1995.750 1995.729 1.473 1.723 1.744
163 54+480 1998.235 1997.800 1995.400 1995.600 1994.800 2.400 2.200 3.000
164 54+500 1998.990 1998.555 1996.100 1996.100 1995.909 2.455 2.455 2.646
165 54+520 1999.860 1999.425 1996.782 1997.701 1995.400 2.643 1.724 4.025
166 54+540 2000.745 2000.310 1995.201 1997.600 1995.610 5.109 2.710 4.700
167 54+560 2001.631 2001.196 1995.899 1997.600 1996.830 5.297 3.596 4.366
6 6
168 54+580 2002.516 2002.081 1996.161 1997.131 1997.159 5.920 4.950 4.922
169 54+600 2003.386 2002.951 1997.459 1997.570 1997.459 5.492 5.381 5.492
170 54+620 2004.168 2003.733 1998.270 1998.201 1998.079 5.463 5.532 5.654
171 54+640 2004.855 2004.420 1998.985 1998.997 1998.090 5.435 5.423 6.330
172 54+660 2005.445 2005.010 1999.481 1998.475 1998.590 5.529 6.535 6.420
173 54+680 2005.940 2005.505 2000.293 2000.281 2000.090 5.212 5.224 5.415
Stretch-21 Ch. 54+900 to 55+060
174 54+900 2006.580 2006.145 2005.200 2007.400 2005.130 0.945 -1.255 1.015
175 54+920 2006.742 2006.307 2005.010 2006.530 2004.130 1.297 -0.223 2.177
176 54+940 2007.134 2006.699 2005.291 2005.197 2005.371 1.408 1.502 1.328
177 54+960 2007.757 2007.322 2006.190 2006.217 2006.109 1.132 1.105 1.213
178 54+980 2008.611 2008.176 2004.101 2002.000 2002.090 4.075 6.176 6.086 6 6
179 55+000 2009.665 2009.230 2008.401 2008.855 2003.117 0.829 0.375 6.113
180 55+020 2010.745 2010.310 2009.810 2010.201 2005.190 0.500 0.109 5.120
181 55+040 2011.826 2011.391 2012.015 2012.020 2008.117 -0.624 -0.629 3.274
182 55+060 2012.906 2012.471 2009.100 2009.700 2009.226 3.371 2.771 3.245
Stretch-22 Ch. 56+290 to 56+630
183 56+290 1991.192 1990.757 1988.300 1991.300 1988.100 2.457 -0.543 2.657
184 56+310 1990.344 1989.909 1984.295 1990.295 1987.095 5.614 -0.386 2.814
185 56+330 1989.485 1989.050 1983.480 1986.480 1983.280 5.570 2.570 5.770
186 56+350 1988.585 1988.150 1982.657 1986.657 1983.457 5.493 1.493 4.693
187 56+370 1987.644 1987.209 1982.109 1985.409 1982.209 5.100 1.800 5.000
188 56+390 1986.662 1986.227 1980.549 1985.549 1982.349 5.678 0.678 3.878
189 56+410 1985.638 1985.203 1980.073 1984.673 1981.473 5.130 0.530 3.730
190 56+430 1984.573 1984.138 1980.908 1983.908 1980.708 3.230 0.230 3.430
191 56+450 1983.466 1983.031 1980.192 1983.192 1979.992 2.839 -0.161 3.039
5 4.5
192 56+470 1982.320 1981.885 1979.082 1982.082 1978.882 2.803 -0.197 3.003
193 56+490 1981.162 1980.727 1978.183 1981.183 1977.983 2.544 -0.456 2.744
194 56+510 1980.005 1979.570 1977.091 1980.091 1976.891 2.479 -0.521 2.679
195 56+530 1978.847 1978.412 1975.824 1978.824 1975.624 2.588 -0.412 2.788
196 56+550 1977.689 1977.254 1974.463 1977.463 1974.263 2.791 -0.209 2.991
197 56+570 1976.532 1976.097 1972.961 1975.961 1972.761 3.136 0.136 3.336
Level Sheet of stretches recommended for payment under SG Top in SPS-03

5 4.5
Average
PCL on SG Actual RL Actual RL RHS Diff SG top Diff SG top Diff SG top Average Distance
S.No Chainage PCL FRL PCL Actual RL to PCL to PCL LHS- to PCL RHS-6 Distance
top LHS -6 +6 Actual RL 6m m For LHS (m) For RHS
(m)

(KM) (M) (M) (M) (M) (M) (M) (M) (M)


198 56+590 1975.374 1974.939 1972.001 1975.001 1971.801 2.938 -0.062 3.138
199 56+610 1974.217 1973.782 1971.324 1974.324 1971.124 2.458 -0.542 2.658
200 56+630 1973.059 1972.624 1970.528 1971.847 1968.647 2.096 0.777 3.977
Stretch-23 Ch. 56+830 to 56+900
201 56+830 1961.483 1961.048 1961.010 1959.930 0.038 1.118
202 56+850 1960.315 1959.880 1959.030 1958.908 0.850 0.972
203 56+870 1959.131 1958.696 1957.858 1957.430 0.838 1.266 6 2
204 56+890 1957.932 1957.497 1956.423 1956.101 1.074 1.396
205 56+900 1957.326 1956.891 1956.030 1956.120 0.861 0.771
Stretch-24 Ch. 56+930 to 57+030
206 56+930 1955.485 1955.050 1953.807 1953.825 1953.104 1.243 1.225 1.946
207 56+950 1954.247 1953.812 1951.207 1951.846 1951.500 2.605 1.966 2.312
208 56+970 1953.010 1952.575 1950.127 1950.407 1950.320 2.448 2.168 2.255
5.5 5
209 56+990 1951.773 1951.338 1949.036 1949.400 1948.859 2.302 1.938 2.479
210 57+010 1950.730 1950.295 1948.214 1948.281 1949.125 2.081 2.014 1.170
211 57+030 1950.122 1949.687 1947.462 1947.510 1948.325 2.225 2.177 1.362
Stretch-25 Ch. 57+100 to 57+200
212 57+100 1951.370 1950.935 1950.510 1950.564 1950.152 0.425 0.371 0.783
213 57+120 1952.306 1951.871 1951.400 1951.350 1950.938 0.471 0.521 0.933
214 57+140 1953.241 1952.806 1952.462 1952.474 1952.062 0.344 0.332 0.744
6 4
215 57+160 1954.168 1953.733 1953.514 1953.351 1952.939 0.219 0.382 0.794
216 57+180 1955.078 1954.643 1954.035 1954.124 1953.712 0.608 0.519 0.931
217 57+200 1955.971 1955.536 1955.381 1955.380 1954.968 0.155 0.156 0.568
Stretch-26 Ch. 57+230 to 57+590
218 57+230 1957.280 1956.845 1957.454 1957.500 1956.321 -0.609 -0.655 0.524
219 57+250 1958.134 1957.699 1957.999 1957.874 1957.400 -0.300 -0.175 0.299
220 57+270 1958.986 1958.551 1959.231 1959.358 1958.800 -0.680 -0.807 -0.249
221 57+290 1959.838 1959.403 1959.868 1959.999 1959.200 -0.465 -0.596 0.203
222 57+310 1960.691 1960.256 1960.874 1961.258 1960.030 -0.618 -1.002 0.226
223 57+330 1961.543 1961.108 1961.784 1961.900 1960.874 -0.676 -0.792 0.234
224 57+350 1962.395 1961.960 1962.747 1962.874 1962.100 -0.787 -0.914 -0.140
225 57+370 1963.247 1962.812 1963.540 1963.687 1962.147 -0.728 -0.875 0.665
226 57+390 1964.100 1963.665 1964.541 1964.658 1963.147 -0.876 -0.993 0.518
227 57+410 1964.952 1964.517 1964.888 1964.987 1964.047 -0.371 -0.470 0.470 6 4.5
228 57+430 1965.804 1965.369 1965.500 1965.578 1964.874 -0.131 -0.209 0.495
229 57+450 1966.656 1966.221 1966.288 1966.369 1965.874 -0.067 -0.148 0.347
230 57+470 1967.515 1967.080 1967.014 1967.214 1966.587 0.066 -0.134 0.493
231 57+490 1968.404 1967.969 1967.874 1967.987 1967.587 0.095 -0.018 0.382
232 57+510 1969.325 1968.890 1968.235 1968.358 1968.125 0.655 0.532 0.765
233 57+530 1970.278 1969.843 1969.547 1969.600 1969.124 0.296 0.243 0.719
234 57+550 1971.264 1970.829 1970.585 1970.687 1970.047 0.244 0.142 0.782
235 57+570 1972.276 1971.841 1971.258 1971.300 1971.158 0.583 0.541 0.683
236 57+590 1973.290 1972.855 1972.578 1972.687 1972.087 0.277 0.168 0.768
Stretch-27 Ch. 57+730 to 57+900
237 57+730 1980.389 1979.954 1979.675 1980.524 1979.500 0.279 -0.570 0.454
238 57+750 1981.381 1980.946 1980.125 1981.300 1980.654 0.821 -0.354 0.292
239 57+770 1982.336 1981.901 1981.255 1982.014 1981.257 0.646 -0.113 0.644
240 57+790 1983.252 1982.817 1982.410 1983.300 1982.400 0.407 -0.483 0.417
241 57+810 1984.130 1983.695 1983.200 1983.925 1983.140 0.495 -0.230 0.555
5 4
242 57+830 1984.970 1984.535 1984.120 1984.800 1984.025 0.415 -0.265 0.510
243 57+850 1985.794 1985.359 1984.901 1985.900 1984.874 0.458 -0.541 0.485
244 57+870 1986.618 1986.183 1985.870 1986.600 1985.874 0.313 -0.417 0.309
245 57+890 1987.441 1987.006 1986.425 1987.475 1986.870 0.581 -0.469 0.136
246 57+900 1987.853 1987.418 1986.874 1987.900 1986.987 0.544 -0.482 0.431
Stretch-28 Ch. 57+950 to 58+170
247 57+950 1989.912 1989.477 1989.570 1989.569 1987.209 -0.093 -0.092 2.268
248 57+970 1990.735 1990.300 1990.464 1990.491 1989.020 -0.164 -0.191 1.280
249 57+990 1991.559 1991.124 1989.467 1989.867 1989.669 1.657 1.257 1.455
250 58+010 1992.382 1991.947 1990.169 1990.048 1990.097 1.778 1.899 1.850
251 58+030 1993.166 1992.731 1991.700 1991.862 1991.969 1.031 0.869 0.762
252 58+050 1993.829 1993.394 1992.672 1992.601 1992.719 0.722 0.793 0.675
6 6
253 58+070 1994.368 1993.933 1992.952 1992.900 1992.901 0.981 1.033 1.032
254 58+090 1994.783 1994.348 1993.706 1993.690 1993.609 0.642 0.658 0.739
255 58+110 1995.075 1994.640 1993.927 1993.907 1993.898 0.713 0.733 0.742
256 58+130 1995.283 1994.848 1994.064 1994.010 1994.091 0.784 0.838 0.757
257 58+150 1995.488 1995.053 1994.140 1994.130 1994.197 0.913 0.923 0.856
258 58+170 1995.694 1995.259 1994.029 1994.100 1994.177 1.230 1.159 1.082
Stretch-29 Ch. 58+330 to 58+400
259 58+330 2002.013 2001.578 2001.700 2001.500 2000.500 -0.122 0.078 1.078
260 58+350 2003.213 2002.778 2002.157 2002.047 2001.900 0.621 0.731 0.878
261 58+370 2004.413 2003.978 2003.578 2003.478 2003.174 0.400 0.500 0.804 5 3
262 58+390 2005.613 2005.178 2004.468 2004.368 2004.147 0.710 0.810 1.031
263 58+400 2006.213 2005.778 2005.617 2005.717 2004.870 0.161 0.061 0.908
Level Sheet of stretches recommended for payment under SG Top in SPS-03

Average
PCL on SG Actual RL Actual RL RHS Diff SG top Diff SG top Diff SG top Average Distance
S.No Chainage PCL FRL PCL Actual RL to PCL to PCL LHS- to PCL RHS-6 Distance
top LHS -6 +6 Actual RL 6m m For LHS (m) For RHS
(m)

(KM) (M) (M) (M) (M) (M) (M) (M) (M)


Stretch-30 Ch. 58+430 to 58+500
264 58+430 2008.014 2007.579 2008.527 2008.310 2006.521 -0.948 -0.731 1.058
265 58+450 2009.214 2008.779 2009.254 2009.037 2007.125 -0.475 -0.258 1.654
266 58+470 2010.414 2009.979 2010.821 2010.604 2009.030 -0.842 -0.625 0.949 5 3
267 58+490 2011.614 2011.179 2011.980 2011.763 2010.178 -0.801 -0.584 1.001
268 58+500 2012.214 2011.779 2012.145 2011.928 2010.963 -0.366 -0.149 0.816
Remarks

Withhold pending
approval of
P&P(Rev.09)

From 41+320 km t
41+500 filling to
be done for depth
>5M
Remarks

Ch. 44+470 to
44+610 Already
Paid In earlier SPS

Already Paid In
earlier SPS

Pending cutting ht
is more than 5 M

from 48+830 km
to 49+270 filling to
be done for depth
>5M
Remarks

Pending cutting
ht.>5M from
49+530 km to
49+570 km and
from 49+770 km
to 49+830 km,
hence not
recommended for
payment

Pending Cutting ht
is more than 5 M,
hence not
recommended for
payment

Filling pending for


ht >5M from
54+540 km to
54+680 km, hence
not recommended
for payment

Filling pending for


ht >5M from
54+980 km to
55+060 km, hence
not recommended
for payment

Filling pending for


ht >5M from
56+290 km to
56+410 km, hence
not recommended
for payment
Filling pending for
ht >5M from
56+290 km to
56+410 km, hence
not recommended
forRemarks
payment

Level could not be


taken as huge
filling is pending
Remarks