Final Inspection Report
_. 5 2021 LGSF-DRRAP
GL C,SASMUAN
| wt EL eampanca APRIL 12, 2021
Date:_Bok 7; Date
Time: oie :
sived by: rare
. = FINAL INSPECTION REPORT
PROJECT NAME : PURCHASING OF GA\ D IRON (G.I) SHEETS
& OTHER MATERIALS TO BE DISTRIBUTED TO THE
ED HOUSEHO! ING THE ONSLAUGHT
OF TYPHOON ULYSESS
LOCATION : SASMUAN, PAMPANGA —
CONTRACT PRICE : Pay,
(Original/Revised)
CONTRACTOR : A.M, ONG CONSTRUCTION & TRADING
DATE OF INSPECTION : APRIL 12, 2021
Date of Certificate of Completion: APRIL 12,2021
Findings : Provide here a Narrative of the Inspectorate Team's
findings. Attach the Team’s Previous Inspection
Report(s) indicating defects/deficiencies observed by
The Inspectorate Teamafter the one year Defects
Liability Period, and repair works done by the
Contractor. This will be the basis of the issuance of the
Certificate of Acceptance.
We, hefeby undersigned member/s of the Inspectorate Team, conducted a Final
Inspection on the above stated project after the one year Defects Liability Period, and
found the project to be from any defects/deficiencies that are due to poor workmanship,
use of poor quality materials, and non-compliance with Plans and Specification of the
Contract.