Download as pdf
Download as pdf
You are on page 1of 1
Republic ee he « Philippines eames of va Soman OFFICE OF THE MAYOR Final Inspection Report _. 5 2021 LGSF-DRRAP GL C,SASMUAN | wt EL eampanca APRIL 12, 2021 Date:_Bok 7; Date Time: oie : sived by: rare . = FINAL INSPECTION REPORT PROJECT NAME : PURCHASING OF GA\ D IRON (G.I) SHEETS & OTHER MATERIALS TO BE DISTRIBUTED TO THE ED HOUSEHO! ING THE ONSLAUGHT OF TYPHOON ULYSESS LOCATION : SASMUAN, PAMPANGA — CONTRACT PRICE : Pay, (Original/Revised) CONTRACTOR : A.M, ONG CONSTRUCTION & TRADING DATE OF INSPECTION : APRIL 12, 2021 Date of Certificate of Completion: APRIL 12,2021 Findings : Provide here a Narrative of the Inspectorate Team's findings. Attach the Team’s Previous Inspection Report(s) indicating defects/deficiencies observed by The Inspectorate Teamafter the one year Defects Liability Period, and repair works done by the Contractor. This will be the basis of the issuance of the Certificate of Acceptance. We, hefeby undersigned member/s of the Inspectorate Team, conducted a Final Inspection on the above stated project after the one year Defects Liability Period, and found the project to be from any defects/deficiencies that are due to poor workmanship, use of poor quality materials, and non-compliance with Plans and Specification of the Contract.

You might also like