Professional Documents
Culture Documents
Régime Modifié
Régime Modifié
Déviation provisoire
Analysis Component
Storm Event Design Discharge 3.0000 m³/s
Roughness Segments
Station Elevation
(m) (m)
0+00 1 006.35
0+01 1 005.83
0+03 1 004.95
0+03 1 004.44
0+04 1 003.95
0+05 1 004.04
0+07 1 004.24
0+09 1 005.32
0+10 1 005.60
0+13 1 005.84
Component:Culvert-1
Culvert Summary
Computed Headwater Elevation1 015.22 m Discharge 3.0000 m³/s
Inlet Control HW Elev. 1 015.12 m Tailwater Elevation 1 004.44 m
Outlet Control HW Elev. 1 015.22 m Control Type Entrance Control
Headwater Depth/Height 0.70
Grades
Upstream Invert 1 014.37 m Downstream Invert 1 013.83 m
Length 18.00 m Constructed Slope 0.030000 m/m
Hydraulic Profile
Profile S2 Depth, Downstream 0.34 m
Slope Type Steep Normal Depth 0.31 m
Flow Regime Supercritical Critical Depth 0.54 m
Velocity Downstream 3.69 m/s Critical Slope 0.003707 m/m
Section
Section Shape Circular Mannings Coefficient 0.013
Section Material Concrete Span 1.22 m
Section Size 1200 mm Rise 1.22 m
Number Sections 3