JADUAL KADAR HARGA

HARGA
KUANTITI SEUNIT KEKERAPAN JUMLAH (RM)
(RM)
BIL KETERANGAN

([1]X[2]X[3]) =
[1] [2] [3]
[4]

OPERASI DAN PENYELENGGARAAN

A KERJA-KERJA OPERASI DAN


SENGGARAAN SISTEM
PENYAMAN UDARA 'AIR
COOLED PACKAGE UNIT'
(ACPU) DAN
KELENGKAPANNYA DI
BANGUNAN PENTADBIRAN,
BANGUNAN WAD DAN UNIT
       
SUCI HAMA (CSSU)
MENGIKUT SENARAI SEMAK
(CHECKLIST) YANG
DIPERSETUJUI TERMASUK
PENGANTIAN HEPA FILTER
DI UNIT SUCI HAMA (CSSU)
MENGIKUT KEKERAPAN
YANG SYORKAN.

A.1 PENYELENGGARAAN
BULANAN ( 9 KALI PPM
BIASA) 9 9
RUJUK SENARAI SEMAK
(CHECKLIST) M40202)

A.2 PENYELENGGARAAN MAJOR


X 1 KALI ( BULAN TERAKHIR)
9 1
(RUJUK SENARAI SEMAK
(CHECKLIST) M40206)

B KERJA-KERJA OPERASI DAN


SENGGARAAN DAN        
BAIKPULIH SISTEM
PENYAMAN UDARA 'AIR
COOLED SPLIT UNIT (ACSU)'
DI BANGUNAN-BANGUNAN
HOSPITAL

PENYELENGGARAAN
SECARA 2 BULANAN
(BIMONTHLY)

(RUJUK SENARAI SEMAK


(CHECKLIST) M40132)

 B.1 ACSU 1.0HP. 38 4

 B.2 ACSU 1.5HP. 47 4

  B. ACSU 2.0HP.


23 4
3

  B. ACSU 2.5HP.


12 4
4

 B.5 ACSU 3.0HP. 10 4

 B.6 ACSU 3.5HP. 4 4

B.7 PORTABLE AIR PORTABLE


3 5
AIR CONDITIONER 1.5HP

B.8 PENYELENGGARAAN MAJOR


X 1 KALI (tidak termasuk
Portable Air Portable Air
Conditioner 1.5HP) 134 1

(RUJUK SENARAI SEMAK


(CHECKLIST) M40136)
C MENJALANKAN KERJA-
KERJA OPERASI DAN
SENGGARAAN BAGI
PEPASANGAN ELEKTRIK
DAN AKSESORI

TASK NO. ER3114 PUKAL 1


(INTERNAL) – MONTHLY AND

TASK NO. ER3124


(EXTERNAL) – MONTHLY

TASK NO. E31236

D MENJALANKAN KERJA-
KERJA OPERASI DAN
SENGGARAAN BAGI SISTEM
PELINDUNGAN KILAT
(LIGHTNING PROTECTION
SYSTEM) DAN SISTEM
PEMBUMIAN (EARTHING
SYSTEM) DENGAN MERUJUK
KEPADA HOSPITAL
ENGINEERING PLANNED
PREVENTINE MAINTENANCE
(HEPPM)

D.1 TASK NO. E35016 PUKAL 1

E MENJALANKAN KERJA-
KERJA OPERASI DAN
SENGGARAAN BAGI
JANAKUASA TUNGGU SEDIA
(GENERATOR SET) SECARA
MINGGUAN DENGAN
MERUJUK KEPADA
HOSPITAL ENGINEERING
PLANNED PREVENTINE
MAINTENANCE (HEPPM)
BAGI DUA (2) UNIT
JANAKUASA TUNGGU SEDIA.
1) BANGUNAN PENTADBIRAN
- 150KVA.

2) BANGUNAN WAD - 200KVA.

E.1 TASK NO. E31011 - WEEKLY 2 44


E.2 TASK NO. E31022 - MONTHLY 2 10

F KEPERLUAN KAKITANGAN
SEPENUH MASA DAN
PERALATAN LAIN BAGI    
KERJA-KERJA SENGGARAAN
ADALAH SEPERTI :

F.1 DUA (2) ORANG JURUTEKNIK


PENYAMAN UDARA 2 10
BERTAULIAH

 F.2 DUA (2) ORANG WIREMAN


2 10
BERTAULIAH (PW2/PW4)

F.3 SEORANG (1) CHARGEMAN


1 10
(A4)

F.4 SEORANG JURUTERA (1)


PERKHIDMATAN ELEKTRIK - 1 10
LAWATAN SEKALI SEBULAN

JUMLAH KESELURUHAN (RM)      