Professional Documents
Culture Documents
Hesco Crane Inspection Checklist Boom Attachment Personnel Platform Inspection Form
Hesco Crane Inspection Checklist Boom Attachment Personnel Platform Inspection Form
Posted plate with all specifications (make, model, s/n, weight, capacity, date of Mfg., B30.23 Compliance)______________________________
Designed with 5-1 safety factor___________________________________________________________________________________________
Designed to minimize tipping___________________________________________________________________________________________
42” high top rail ______________________________________________________________________________________________________
Intermediate rail _____________________________________________________________________________________________________
4” toe board with expanded metal from the top of the toe board to the intermediate rail. ___________________________________________
Slip resistant drain-able floor with openings no larger than .5 in. ______________________________________________________________
Expanded metal openings not greater than .5 in.____________________________________________________________________________
Grab rail inside the entire perimeter_______________________________________________________________________________________
Access gate swings in if so fitted_________________________________________________________________________________________
Access gate restraining device and hinges_________________________________________________________________________________
Mounting by the Manufacturer__________________________________________________________________________________________
Rough edges smoothed________________________________________________________________________________________________
All welds free of defects _______________________________________________________________________________________________
Rigging must be at 5-1 if fitted___________________________________________________________________________________________
Levering to 10% regardless of boom angle__________________________________________________________________________________
Bolt Connections to AISC Spec. using ASTM A 325 or A 490 Bolts______________________________________________________________
Inspect platform after trial lift___________________________________________________________________________________________
Personnel Harness tie-offs _____________________________________________________________________________________________
Weatherproof compartment for operators manual for units with controls in the platform____________________________________________
Controls identified, protected, easily accessible, return to neutral when released and a Deadman Control_______________________________
Test Weight - ____________ lb. _________________________________________________________________________________________
Perform a 125% proof test ______________________________________________________________________________________________
Notes________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________