1.3 - Secondary Buffer Tank 12 Mt-Model

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PRODUCED BY AN AUTODESK STUDENT VERSION

NOZZLE NOM. SCH./ FLANGES NOZZLES


SERVICE REMARKS
NO. BORE THK. STD. TYPE CLASS REINF. PROJ.
N1 TEMP. INDI. TRANSMITER 40 SCH.40 B16.5 WNRF 150# --- 200
N2 TEMP. INDI. TRANSMITER 40 SCH.40 B16.5 WNRF 150# --- 200
N3 PRE. INDI. TRANSMITER 40 SCH.40 B16.5 WNRF 150# --- 200
N4 HOT OIL RETURN 80 SCH.40 B16.5 WNRF 150# --- 200
N5 PSV 40 SCH.40 B16.5 WNRF 150# --- 200
N6 PI 40 SCH.40 B16.5 WNRF 150# --- 200
N7 VENT 25 SCH.40 B16.5 WNRF 150# --- 200
N8 HOT OIL SUPPLY 80 SCH.40 B16.5 WNRF 150# --- 200
N9 DRAIN 80 SCH.40 B16.5 WNRF 150# --- 200 WITH BLIND FLANGE
N10 INLET 200 SCH.40 B16.5 WNRF 150# --- 200
N11 OUTLET 100 SCH.40 B16.5 WNRF 150# --- 200

NOTES:

PRODUCED BY AN AUTODESK STUDENT VERSION


ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE SPECIFIED
PRODUCED BY AN AUTODESK STUDENT VERSION

1. FOR NOZZLE ORIENTATION REFER SHEET NO.**** (HOLD)


2. INSULATION CLEATS, LIFTING LUGS, EARTHING BOSSES AND NAME PLATE TO BE PROVIDED. INSULATION CLEATS
(RING TYPE) TO BE SUPPLIED LOOSE.
3. SURFACE TREATMENT (EXTERNAL): BLAST CLEANING OF SURFACE TO SA 2.5 FINISH. 2 COATS OF INORGANIC
ZINC SILICATE PRIMER (2 X 75 MIC DFT) FOLLOWED BY 2 COATS OF ALUMINUM (SILICON BASED, HEAT RESISTANT)
PAINT (2 X 50 MIC DFT) - FOR ALL EXTERNAL UN MACHINED CARBON STEEL SURFACES/ PARTS .
4. PHYSICAL & CHEMICAL TEST TO BE CONDUCTED FOR PLATE AS PER ASME CODE.
5. NOZZLES 50NB AND BELOW SHALL BE PROVIDED WITH 2 STIFFENERS PLATE SIZE 50W X 6THK AT 90 DEGREE
APART.80NB &ABOVE NOZZLES TO BE PROVIDED WITH R.F. PAD.
6. ALL BOLT HOLES TO STRADDLE PRINCIPAL CENTRE LINE OF EQUIPMENT.
ISMB200 (*)
ISMB200 (*)

SCOPE OF WORK :

1. DESIGN, ENGINEERING, PREPARATION & SUBMISSION OF DESIGN CALCULATIONS, FABRICATION DRAWINGS,


QUALITY ASSURANCE PLANS FOR APPROVAL, FABRICATION AS PER APPROVED DRAWINGS, OFFERING THE
SAME FOR INSPECTION & SHOP TESTING, SURFACE PREPARATION & PAINTING, SUPPLY AND ASSISTANCE
IN COMMISSIONING,CALIBRATION OF SECONDARY OIL BUFFER VESSEL OF 12 MT CAPACITY COMPLETE WITH
SKID GENERALLY AS PER THIS DATA SHEET.
2. VENDOR TO PROVIDE PERFORMANCE GUARANTEE FOR THE UNIT.

DESIGN LOAD FOR SUPPORTS


STATIC LOAD * VTS
DYNAMIC LOAD * VTS

PRODUCED BY AN AUTODESK STUDENT VERSION

You might also like