This document provides a schedule of prices for repair and maintenance work with estimates for various items:
1. Item costs are provided for site preparation including pavement cutting, demolition, and excavation. Surface restoration costs are given for backfilling, sand bedding, pavement and concrete restoration.
2. Leak repair costs are estimated based on pipe diameter for both mainlines and tubing. Tapping assembly costs are provided for new service connections depending on tubing diameter and mainline size.
3. Service tubing installation costs are provided for trench and exposed piping as well as casing for canal crossings.
This document provides a schedule of prices for repair and maintenance work with estimates for various items:
1. Item costs are provided for site preparation including pavement cutting, demolition, and excavation. Surface restoration costs are given for backfilling, sand bedding, pavement and concrete restoration.
2. Leak repair costs are estimated based on pipe diameter for both mainlines and tubing. Tapping assembly costs are provided for new service connections depending on tubing diameter and mainline size.
3. Service tubing installation costs are provided for trench and exposed piping as well as casing for canal crossings.
This document provides a schedule of prices for repair and maintenance work with estimates for various items:
1. Item costs are provided for site preparation including pavement cutting, demolition, and excavation. Surface restoration costs are given for backfilling, sand bedding, pavement and concrete restoration.
2. Leak repair costs are estimated based on pipe diameter for both mainlines and tubing. Tapping assembly costs are provided for new service connections depending on tubing diameter and mainline size.
3. Service tubing installation costs are provided for trench and exposed piping as well as casing for canal crossings.
This document provides a schedule of prices for repair and maintenance work with estimates for various items:
1. Item costs are provided for site preparation including pavement cutting, demolition, and excavation. Surface restoration costs are given for backfilling, sand bedding, pavement and concrete restoration.
2. Leak repair costs are estimated based on pipe diameter for both mainlines and tubing. Tapping assembly costs are provided for new service connections depending on tubing diameter and mainline size.
3. Service tubing installation costs are provided for trench and exposed piping as well as casing for canal crossings.
Project Title: Repairs and Maintenance Date: October 9, 2018
Location: Malolos
Item/Description Qty Unit Unit Cost Total Costs
A. Site Preparation Pavement Cutting - lm 27.84 - Pavement Demolition Asphalt Pavement - sq.m 204.04 - Concrete Pavement Thickness ≤ 75mm - sq.m 310.00 - 75mm to 150mm - sq.m 424.55 - 150mm and above - sq.m 677.30 - Excavation Depth < 1.20m - cu.m 253.37 - 1.2m < Depth < 2.0m - cu.m 403.08 - 2.0m < Depth < 2.5m - cu.m 518.24 - 2.5m < Depth < 3.0m - cu.m 633.42 - Sub-total - B. Surface Restoration Backfill and Compaction - cu m 69.53 - Sand Bedding - cu m 692.34 - Pavement Restoration Sub-base Coarse - cu m 664.49 - Base Coarse - cu m 664.49 - Concrete Restoration Concrete Roadway (24 Mpa @ 3 days) - cu m 6,560.97 - Concrete Roadway (24 Mpa @ 7 days) - cu m 6,061.37 - Concrete Roadway (24 Mpa @ 14 days) - cu m 5,664.27 - Concrete Sidewalk, Gutter & Curb(21 Mpa @ 28 days) - cu m 4,639.47 - Asphalt Restoration Hot Mix - cu m 6,240.71 - Cold Mix - cu m 6,849.19 - Sub-total - C. Leak Repair Cost includes fittings installation (2 - saddle clamp, pipe), dewatering. Mainline 300mm (12 inØ) - set 2,095.44 - 250mm (10 inØ) - set 1,960.75 - 200mm (8 inØ) - set 1,714.29 - 150mm (6 inØ) - set 1,152.87 - 100mm (4 inØ) - set 951.45 - 75mm (3 inØ) - set 940.62 - 50mm (2 inØ) - set 668.99 - Tubing 20mmØ (1/2inØ) - set 110.17 - 25mmØ (3/4inØ) - set 136.68 - 32mmØ (1inØ) - set 198.53 - 50mmØ (1 1/2inØ) - set 250.45 - Sub-total - D. Tapping Assembly for New Service Connection Cost includes tapping and installation including service saddle clamps, corporation valve/stop & Tubing. On 20mmØ (1/2inØ) 300mm (12 inØ) - set 458.84 - 250mm (10 inØ) - set 366.82 - 200mm (8 inØ) - set 296.81 - 150mm (6 inØ) - set 234.15 - 100mm (4 inØ) - set 156.81 - 75mm (3 inØ) - set 118.14 - 50mm (2 inØ) - set 98.80 - On 25mmØ (3/4inØ) 300mm (12 inØ) - set 498.69 - 250mm (10 inØ) - set 406.67 - 200mm (8 inØ) - set 336.66 - 150mm (6 inØ) - set 273.99 - 100mm (4 inØ) - set 196.67 - 75mm (3 inØ) - set 157.99 - 50mm (2 inØ) - set 138.65 - On 32mmØ (1inØ) 300mm (12 inØ) - set 566.54 - 250mm (10 inØ) - set 474.52 - 200mm (8 inØ) - set 404.51 - 150mm (6 inØ) - set 341.85 - 100mm (4 inØ) - set 264.50 - 75mm (3 inØ) - set 225.83 - 50mm (2 inØ) - set 206.50 - Sub-total - E. Service tubing Cost includes pipe laying, backfilling and disinfection. Service Tubing (on a Trench) 20mmØ (1/2inØ) - lm 15.74 - 25mmØ (3/4inØ) - lm 23.74 - 32mmØ (1inØ) - lm 35.60 - Exposed Service Tubing 20mmØ (1/2inØ) GI Pipe - lm 46.01 - 25mmØ (3/4inØ) GI Pipe - lm 59.35 - 32mmØ (1inØ) GI Pipe - lm 66.69 - GSP Casing for Canal Crossing 32mmØ (1inØ) GSP Casing - lm 232.03 - 40mmØ (1 1/4inØ) GSP Casing - lm 272.04 - 63mmØ (1 1/2inØ) GSP Casing - lm 312.05 - Sub-total - F. Meter Set Assembly Standard Meter Set Assembly Installation of Meter Set Assemby 20mmØ (1/2inØ) Water Meter - set 116.01 - 25mmØ (3/4inØ) Water Meter - set 138.03 - Replacement of Existing Meter Set Assemby 20mmØ (1/2inØ) Water Meter - set 226.66 - 25mmØ (3/4inØ) Water Meter - set 256.02 - Relocate and Reinstall of Existing Meter Set Assembly 20mmØ (1/2inØ) Water Meter - set 289.53 - 25mmØ (3/4inØ) Water Meter - set 304.00 - Replacement of Appurtenance 20mmØ (1/2inØ) - pc 65.34 - 25mmØ (3/4inØ) - pc 92.02 - 32mmØ (1inØ) - pc 118.69 - Replacement of Water Meter 20mmØ (1/2inØ) - pc 86.02 - 25mmØ (3/4inØ) - pc 112.70 - Replacement of Corporation Stop 20mmØ (1/2inØ) - pc 172.04 - 25mmØ (3/4inØ) - pc 198.72 - 32mmØ (1inØ) - pc 225.39 - Concrete Meter Base - set 334.64 - Sub-total - G. Disconnection Padlock - ea 75.00 - Plugging - ea 143.96 - Meter Pull-out - ea 215.94 - Sub-total - H. Reconnection Padlock - ea 38.50 - Sub-total - I. Meter Calibration 20mmØ (1/2inØ) Water Meter - ea 305.00 - 25mmØ (3/4inØ) Water Meter - ea 326.00 - Sub-total - TOTAL COST - MATERIAL COST - GRAND TOTAL -