SCHEDULE OF PRICES

Project Title: Repairs and Maintenance Date: October 9, 2018


Location: Malolos

Item/Description Qty Unit Unit Cost Total Costs


A. Site Preparation
Pavement Cutting - lm 27.84 -
Pavement Demolition
Asphalt Pavement - sq.m 204.04 -
Concrete Pavement
Thickness ≤ 75mm - sq.m 310.00 -
75mm to 150mm - sq.m 424.55 -
150mm and above - sq.m 677.30 -
Excavation
Depth < 1.20m - cu.m 253.37 -
1.2m < Depth < 2.0m - cu.m 403.08 -
2.0m < Depth < 2.5m - cu.m 518.24 -
2.5m < Depth < 3.0m - cu.m 633.42 -
Sub-total -
B. Surface Restoration
Backfill and Compaction - cu m 69.53 -
Sand Bedding - cu m 692.34 -
Pavement Restoration
Sub-base Coarse - cu m 664.49 -
Base Coarse - cu m 664.49 -
Concrete Restoration
Concrete Roadway (24 Mpa @ 3 days) - cu m 6,560.97 -
Concrete Roadway (24 Mpa @ 7 days) - cu m 6,061.37 -
Concrete Roadway (24 Mpa @ 14 days) - cu m 5,664.27 -
Concrete Sidewalk, Gutter & Curb(21 Mpa @ 28 days) - cu m 4,639.47 -
Asphalt Restoration
Hot Mix - cu m 6,240.71 -
Cold Mix - cu m 6,849.19 -
Sub-total -
C. Leak Repair
Cost includes fittings installation (2 - saddle clamp, pipe), dewatering.
Mainline
300mm (12 inØ) - set 2,095.44 -
250mm (10 inØ) - set 1,960.75 -
200mm (8 inØ) - set 1,714.29 -
150mm (6 inØ) - set 1,152.87 -
100mm (4 inØ) - set 951.45 -
75mm (3 inØ) - set 940.62 -
50mm (2 inØ) - set 668.99 -
Tubing
20mmØ (1/2inØ) - set 110.17 -
25mmØ (3/4inØ) - set 136.68 -
32mmØ (1inØ) - set 198.53 -
50mmØ (1 1/2inØ) - set 250.45 -
Sub-total -
D. Tapping Assembly for New Service Connection
Cost includes tapping and installation including service saddle clamps, corporation valve/stop & Tubing.
On 20mmØ (1/2inØ)
300mm (12 inØ) - set 458.84 -
250mm (10 inØ) - set 366.82 -
200mm (8 inØ) - set 296.81 -
150mm (6 inØ) - set 234.15 -
100mm (4 inØ) - set 156.81 -
75mm (3 inØ) - set 118.14 -
50mm (2 inØ) - set 98.80 -
On 25mmØ (3/4inØ)
300mm (12 inØ) - set 498.69 -
250mm (10 inØ) - set 406.67 -
200mm (8 inØ) - set 336.66 -
150mm (6 inØ) - set 273.99 -
100mm (4 inØ) - set 196.67 -
75mm (3 inØ) - set 157.99 -
50mm (2 inØ) - set 138.65 -
On 32mmØ (1inØ)
300mm (12 inØ) - set 566.54 -
250mm (10 inØ) - set 474.52 -
200mm (8 inØ) - set 404.51 -
150mm (6 inØ) - set 341.85 -
100mm (4 inØ) - set 264.50 -
75mm (3 inØ) - set 225.83 -
50mm (2 inØ) - set 206.50 -
Sub-total -
E. Service tubing
Cost includes pipe laying, backfilling and disinfection.
Service Tubing (on a Trench)
20mmØ (1/2inØ) - lm 15.74 -
25mmØ (3/4inØ) - lm 23.74 -
32mmØ (1inØ) - lm 35.60 -
Exposed Service Tubing
20mmØ (1/2inØ) GI Pipe - lm 46.01 -
25mmØ (3/4inØ) GI Pipe - lm 59.35 -
32mmØ (1inØ) GI Pipe - lm 66.69 -
GSP Casing for Canal Crossing
32mmØ (1inØ) GSP Casing - lm 232.03 -
40mmØ (1 1/4inØ) GSP Casing - lm 272.04 -
63mmØ (1 1/2inØ) GSP Casing - lm 312.05 -
Sub-total -
F. Meter Set Assembly
Standard Meter Set Assembly
Installation of Meter Set Assemby
20mmØ (1/2inØ) Water Meter - set 116.01 -
25mmØ (3/4inØ) Water Meter - set 138.03 -
Replacement of Existing Meter Set Assemby
20mmØ (1/2inØ) Water Meter - set 226.66 -
25mmØ (3/4inØ) Water Meter - set 256.02 -
Relocate and Reinstall of Existing Meter Set Assembly
20mmØ (1/2inØ) Water Meter - set 289.53 -
25mmØ (3/4inØ) Water Meter - set 304.00 -
Replacement of Appurtenance
20mmØ (1/2inØ) - pc 65.34 -
25mmØ (3/4inØ) - pc 92.02 -
32mmØ (1inØ) - pc 118.69 -
Replacement of Water Meter
20mmØ (1/2inØ) - pc 86.02 -
25mmØ (3/4inØ) - pc 112.70 -
Replacement of Corporation Stop
20mmØ (1/2inØ) - pc 172.04 -
25mmØ (3/4inØ) - pc 198.72 -
32mmØ (1inØ) - pc 225.39 -
Concrete Meter Base - set 334.64 -
Sub-total -
G. Disconnection
Padlock - ea 75.00 -
Plugging - ea 143.96 -
Meter Pull-out - ea 215.94 -
Sub-total -
H. Reconnection
Padlock - ea 38.50 -
Sub-total -
I. Meter Calibration
20mmØ (1/2inØ) Water Meter - ea 305.00 -
25mmØ (3/4inØ) Water Meter - ea 326.00 -
Sub-total -
TOTAL COST -
MATERIAL COST -
GRAND TOTAL -