Project Sukh Chayn Residence Islamabad: (Mughals)
Project Sukh Chayn Residence Islamabad: (Mughals)
INTRODUCTION
PROJECT NAME: SUKH CHAYN RESIDENCE ISLAMABAD
LOCATION: ISLAMABAD
PLUMBING AND FIRE FIGHTING (MUGHALS) SUB CONTECTOR: FIZZA DEVELOPERS PVT LTD.
BUILDING STRUCTURE
TWO APARTMENT BUILDINGS JOINT WITH CONNECTING BRIDGES
2ND FLOOR TOTAL APARTMENTS =24 (3 BED APT = 8, 2 BED APT = 12, 1 BED
APT =4)
3RD TO 8TH TYPICAL FLOOR EACH FLOOR APARTMENTS =24 (3 BED APT = 8, 2 BED APT = 12, 1 BED
APT =4)
9TH FLOOR TOTAL APARTMENTS =16 (3 BED APT = 8, 2 BED APT = 8)
ALL PLUMBING FIXTURES, AUTOMATIC WATER LEVEL CONTROLER, ALL WATER PUMPS
FIRE FIGHTING:
ALL PUMPS, VALVES, FIRE HOSE CABINET WITH REEL, SPRINKLERS, ZCV’s, FIRE EXTINGUISHERS, LANDING
VALVES WITH CABINET, BREECHING INLET.
PLUMBING
1. COLD WATER SUPPLY SYSTEM:
Source of water: 2no. Tube well in basement 3, city water supply, water tanker
Water storage: 2no. Underground water tanks in basement 3(Capacity 90,000 UK Gallon
& 87,750 UK Gallons respectively), 2 no. overhead water tank in pent
house level 01.
2 pump sets (1duty & 1 stand by) transfer the water underground water to overhead water
tank in Pent House level 01 floor throw 2 separate pipe lines.
There is total 4 booster pump sets (1+1) supply the cold water to 8 th floor, 9th floor, Pent House
level 01 floor and Pent House Level 02 Floor All Apartments Bath Rooms, showers, Kitchens,
electrical water heaters and LDRY (W/M).
Cold water supply to All Other floors Apartments throw gravity form overhead water tank.
Each Service Area has Access Panel at Ceiling Level for the future maintenance.
Every Flat has individual Gate Valve for Main Incoming Line at Corridors.
Every Toilet / Kitchen has individual Gate Valve for maintenance works.
P.P.R. Pipes shall be used for Internal Water Supply System & P.E. Pipes shall be used for
External Network.
Rain Water (only Shaft No. 28) shall be collect in Rainwater tank, after treated shall
further be used for Irrigation. (Controlled by BMS). Other Rain Water Outlets
(Scupper Drain) sourcing outside, shall have Free Discharge.
U.P.V.C. Pipes shall be used for Soil, Waste, Vent & Rain Water Drainage System &
P.V.C. Class E Pipes shall be used for External Drainage System.
Each building have one overhead water tank and 2 pumps VFD Control in the pent house floor.
B1 to B3 & 9th Floor Each Floor 6 Nos. FIRE HOSE REAL CABINET
Ground floor to 8th Floor Each Floor 8 Nos. FIRE HOSE REAL CABINET
B3 to 9th Floor All Floors cover with Fire Sprinkler system
Basement Level 03, 02 & 01 is divided into 5 Zones providing ZCV’s (Zone Control Valve).
Basement Level 03, 02 & 01 is fully covered with Upright Type Sprinklers.
Each Apartment consists of separate Gate Valve for Fire Line & Access Panel at entrance.
Pent house level 1 & 2 All Bed Rooms covered with Side Wall type Fire Sprinkler.
Dry Type & CO2 Type Fire Extinguishers shall be placed in Corridor’s Area.
K Type Fire Extinguishers shall be used in Kitchen Area.
Auto Dry Powder Ceiling Mounted Fire Extinguisher shall be placed in Electrical Rooms.
Pendant Type Sprinklers shall be used in Flat’s Entrance Lobby & Passage Way.
2 No.s Separate Wet Risers shall be used from Top Level to each part of the building.
Each floor shall be divided into 2 Zones providing ZCV Assembly.
Fire Test Drain Line for complete system shall be connected to Basement Level 03 Underground
Water Tank.
Each building have 1 dry riser landing valve cabinet with canvas hose in the stair case.
Ground Floor External Area Cover with 2 Way Pillar Hydrant
2 Breeching inlet for fire department connections
2 breeching inlet for dry riser system
Black Steel Seamless Fire Pipes shall be used (Schedule 40, ASTM A53).
7. INSTALLATION & FIXING
All Plumbing Fixtures, All Plumbing Pumps (Centrifugal Pumps, Submersible Pumps, Booster
Pumps), Fire Fighting VFD Pumps, Fire Fighting Valves, ZCV’s, Fire Sprinklers, Breeching inlets,
Fire Hose Cabinet, Fire Extinguishers, Landing Valve.
8. TESTING AND COMMESSIONING
All Plumbing Pumps (Centrifugal Pumps, Submersible Pumps, Booster Pumps), Fire Fighting VFD
Pumps, Fire Fighting Valves, ZCV’s, Fire Sprinklers, Breeching inlets, Gas Cocks Testing and
Commissioning.
9. MISCELLANEOUS Work
UPVC Pipe Sleeves
Core Cutting
Equipment Tagging
Shop Drawings
As Built Drawing
10. BOTTLENECKS
Testing and Commissioning Of Provided Equipment
Water Supply Piping In Walls
Soil, Waste and Vent Piping Suspended From Slab