of Teaching Weeks: 16 Course Title: Advance Construction Technologies- III


Contact Hours: per week : L : S: 3 Course Code: AP-445
Contact Hours: per sem : L : 48 S: 0 IVth YEAR – 2021, Semester VII
Credit: 3 Studio Coordinator :Sanjay Mehra
Total Marks:100 (E=50 I=50) Studio Team: Sanjay Mehra

Objectives:
To Familiarise students with advancement in concrete construction for large span structures. to famliarise students with manufacture storage and transportantion of conctete. To
inform variuos equipments used in costruction . to familiarise students with construction management.

Pedagogy:
Coursework is divided into four modules: Module 1- Concrete as material its properties and its use in large span structures- types and forms of concrete structures. Module 2-
Manufacturing of concrete - on site and on site, precast concret e - pretensioning and post tensioning, transportation of concret blocks, storage and handling equipments. Module 3-
Equipments used - plant and machinary for material handling and erection on site, cranes, boomers, TBM concrete tunneling etc. Module 4- Construction management of site for
large span structures, site clearence, handling, planning of construction sequence, fixing and detailing . Following Buildings/ Structures can be used to demonstrate the learings -
Highrise Buildings in hybrid Construction, Overhead Metro Station Construction, Underground Metro station Construction, Stadium seating, Deep basement, metro tunneling, box
tunneling for underpass, composite structures, shells and dome construction in concrete, Exhibition Pavillions in concrete, Convention Centres, Cast in situ highrise in concrete

Expected Outcomes:
Students would understand the use of concrete in building construction. It shall help them understand the material and its variations, and how it can be used in various building
types.

TEACHING PLAN FOR SEMESTER I (Session 2021-22)

WEEK/D EXPECTED
S NO. ATE LECTURE /DISCUSSION ACTIVITY SUBMISSION MARKS OUTCOME REMARKS
1 WEEK 01 Structural System Design- planning, use of concrete in Understanding of
large span structure structural
systems

Studio 1

Studio 2 Sketches of various


structural system
types in concrete for
large span structures
2 WEEK 02 Prestressed ConcreteSystems choose A building/structure to
demonstrate the prestresses technology

Studio 1 Lecture-1 Grade

Studio 2 Lecture-2
Report on two
weeks lecture
progress
3 WEEK 03 Precast and pre Fab Concrete Technology Precast Building Examples study of
components

Studio 1 Lecture-1

Studio 2 Lecture-2

4 WEEK 04 Modular Coordintion and componemts designin various Modular system and manfactures with
concrete technologies components catalogue

Studio 1 Lecture-1 50

Studio 2 Lecture-2
Report on four
weeks lecture
progress
5 WEEK 05 Concrete - Manufacture, transportation and stortrage Presentation on Manufacturing of
Concrete
Presentation on Manufacturing of
Concrete

Studio 1 Lecture-1

Studio 2 Lecture-2

6 WEEK 06 Erection of precast concrete forms, shuttering and Shuttering systems miwan and other
scaffolding technologies - slip form construction

Studio 1 Lecture-1 grade

Bye laws and NBC relationship, Services and


NBC
Studio 2 Lecture-2
Report on two
weeks lecture
progress
7 WEEK 07 Consstruction safety in erection and its codes of Disscussion on safety codes and
practice, equipements practices

Studio 1 Lecture-1

Building Services and NBC


Studio 2 Lecture-2

8 WEEK 08 Dismantling of Conceret work and its methods Demolition and Dismantling systems and
technlogies- implosion systems

Studio 1 Lecture-1 100

Studio 2 Lecture-2
Mid term Report
submission -
8weeks work
9 WEEK 09 Costruction methods- excavation, tunneling, boring, Presentation on TBM and Deep
pinning for cables etc. excavation, pinning machines working
systems

Studio 1 Lecture-1

Studio 2 Lecture-2

10 WEEK 10 Batching plants- transit mixers, agitatiors, concrete Presentation on Batching plant and
pumps, gunniting, air compressors etc. concrete batch mixing

Studio 1 Lecture-1 grade


Byelaws and structural
stability- strength, earthquake
resistant codes
Studio 2 Lecture-2
Interim on two
weeks lecture
progress
11 WEEK 11 vertical lifting and horizontal belts and equipments used Conveyor belt and verticalifts discussion
for differet kinds of works

Studio 1 Lecture-1
Byelaws and structural
stability- strength, earthquake
resistant codes
Studio 2 Lecture-2

12 WEEK 12 Welding, steel deck shuttering and steel works Steel shuttteringand welding systens
equipments presentation

Studio 1 Lecture-1 Building Sanitation- sewerage, 50


water supply, drainage, rain
water harvesting, storage
tanks
Studio 2 Lecture-2
Interim on four
weeks lecture
progress
13 WEEK 13 Planning and scheduling for highrise buildings- major Discussion on construction stages in
construction stages Highrise building construction. critical
componemts and parts

Studio 1 Lecture-1

Development Controls and


building Byelaws
Discussion on construction stages in
Highrise building construction. critical
componemts and parts

Studio 2 Lecture-2

14 WEEK 14 Floor to floor working cycle fot vertical construction- work sequence and activity chart for
stages and scheduling of works floor and construction sequence

Studio 1 Lecture-1 grade

Studio 2 Lecture-2
Interim on two
weeks lecture
progress
15 WEEK 15 Services integration with structure and technology services and structure integration and
planning of services with construction
sequence

Studio 1 Lecture-1

Studio 2 Lecture-2

16 WEEK 16 Final Submission - Report on Concrete Construction - of


one building type in large span structure

Studio 1 200

Final report of
16 weeks
weeks lecture
Studio 2 Lecture-2
Discussion progress
400

Suggested Readings:-

Master Plan Delhi 2021


UBBL Building Bye Laws for Delhi 2016
National Building Code 2016
Earthquake Codes and other relevant BIS codes