Checklist - Switching
Checklist - Switching
Checklist - Switching
: 609996-X)
No. 24, Jalan Alfa AU6/A, Pusat Perdagangan Subang Permai, Seksyen U6,
40150 Shah Alam, Selangor Darul Ehsan.
Tel: 03-7846 4055, 7846 1970 Fax: 03-7846 9020
REFERENCE
2. Put on the switching suit (jacket, helmets, glove etc) N/A √ X Satisfactory / Fail
4. Ensure the As-built Schematic Drawing is put up in S/S N/A √ X Satisfactory / Fail
6. Ensure the Log Book is available or make available in the S/S N/A √ X Satisfactory / Fail
7. Ensure the Locking Facilities is available and sufficient N/A √ X Satisfactory / Fail
8. Ensure the “DANGER” Sign is available and sufficient N/A √ X Satisfactory / Fail
9. Ensure the S/S lighting is available and sufficient N/A √ X Satisfactory / Fail
10. Ensure the S/S door is open and free from any obstruction N/A √ X Satisfactory / Fail
1. Inform OIC that High Voltage Switching is about to take place N/A √ X Satisfactory / Fail
2. Check and confirm the switching sequence to be performed N/A √ X Satisfactory / Fail
3. Ensure that the complete switching suit has been put on N/A √ X Satisfactory / Fail
4. S/S door is free from any obstruction in case of emergency N/A √ X Satisfactory / Fail
5. Instruct other co-workers to away from switching location N/A √ X Satisfactory / Fail
6. Then only the High Voltage Switching shall be performed N/A √ X Satisfactory / Fail
1. Inform OIC that High Voltage Switching has been carried out N/A √ X Satisfactory / Fail
2. Record in the Log Book on the switching operation carried out N/A √ X Satisfactory / Fail
3. Ensure that the S/S Room is in order and safe before leaving N/A √ X Satisfactory / Fail
REMARKS / RECOMMENDATIONS: