WORKS INSTRUCTIONS / CHECKLIST SWITCHING FOR 33KV SWITCHGEAR

REFERENCE

CLIENT Malakoff Utilities Sdn. Bhd.

INSTALLATION MDS1 (H10), MDS2 (G04) AND MDS3 (F08)

PARTICULARS TAMCO VCB Rating: 36 KV Type: XLPE/SWA/SCT/PE

ITEM JOB DESCRIPTION / CHECKLIST COMMENTS REMARKS

Preliminary Preparation For High Voltage Switching

1. AP or CP is physically and mentally healthy and stable N/A √ X Satisfactory / Fail

2. Put on the switching suit (jacket, helmets, glove etc) N/A √ X Satisfactory / Fail

3. Ensure the communication device is functioning N/A √ X Satisfactory / Fail

4. Ensure the As-built Schematic Drawing is put up in S/S N/A √ X Satisfactory / Fail

5. Ensure the necessary testing equipment is functioning N/A √ X Satisfactory / Fail

6. Ensure the Log Book is available or make available in the S/S N/A √ X Satisfactory / Fail

7. Ensure the Locking Facilities is available and sufficient N/A √ X Satisfactory / Fail

8. Ensure the “DANGER” Sign is available and sufficient N/A √ X Satisfactory / Fail

9. Ensure the S/S lighting is available and sufficient N/A √ X Satisfactory / Fail

10. Ensure the S/S door is open and free from any obstruction N/A √ X Satisfactory / Fail

Safety Precaution Before Carrying Out High Voltage Switching

1. Inform OIC that High Voltage Switching is about to take place N/A √ X Satisfactory / Fail

2. Check and confirm the switching sequence to be performed N/A √ X Satisfactory / Fail

3. Ensure that the complete switching suit has been put on N/A √ X Satisfactory / Fail

4. S/S door is free from any obstruction in case of emergency N/A √ X Satisfactory / Fail

5. Instruct other co-workers to away from switching location N/A √ X Satisfactory / Fail

6. Then only the High Voltage Switching shall be performed N/A √ X Satisfactory / Fail

Confirmation After Carrying Out High Voltage Switching

1. Inform OIC that High Voltage Switching has been carried out N/A √ X Satisfactory / Fail

2. Record in the Log Book on the switching operation carried out N/A √ X Satisfactory / Fail

3. Ensure that the S/S Room is in order and safe before leaving N/A √ X Satisfactory / Fail

4. High Voltage Switching operation completed N/A √ X Satisfactory / Fail

REMARKS / RECOMMENDATIONS:

TESTED BY: WITNESSED BY:

DATE TESTED: DATE: