15.

150

5.100 1.750 2.355 5.695

W3 V2 W3 W3 V2

D1 0.9 X 2.10 (Meters)


W.C D3 D2 0.75 X 2.10 (Meters)
1.50 X 1.30 M
D1 1.20 X 2,10 (Meters)
W1 1.50 X 1.20 (Meters)
2.625

FASTTAG ISSUANCE ROOM TOILET


4.85 X 2.25 M 1.30 X 1.80 M
W2 1.20 X 1.20 (Meters)
D3
W3 1.00 X 1.20 (Meters)
V1 0.6 X 0.60 (Meters)
W
5.458

D1 OPEN OFFICE
5.445 X 5.0 M
URINAL

450
Lintel Beam
D3 UP DOWN

1200
100
2.835

450
RECEPTION

PASSAGE 1.30 M WIDE D1

Main Reinforcement
1200

PLAN
W3 W3 W3 W3

150
LAYOUT PLAN

C C

230 8 mm dia 250 mm c/c Striups

300mmX230mm 12 mm dia 6 nos


10mm dia bars @ 175mm c/c
alternate bars bent up at L/7 Column

345

Brick Work 12 mm dia 250 mm

450
460

225
Minimun 600 mm
(1:6 Cement Mortar)

from hard soil


c/c Bothways
575
PCC 1:4:8 150 PCC 1:4:8

150

75
1:2:3
750 1500

C C

SECTION OF COLUMN
L/7

REINFORCEMENT DETAIL SECTION OF WALL


L/7

10mm dia bars @ 200mm c/c


alternate bars bent up at L/7

Client : Authority Engineeer : EPC Contractor : Design Director : Proof Consultant : Project Drg No. : SCC/2020/NH-99/Toll Plaza/05
TASPL
DATE : June'2020 REVISION:
Toll Plaza Building
DESIGNED DRAWN CHECKED APPROVED
REV DATE DESCRIPTION IN THE STATE OF
NO JHARKHAND ON EPC (B.E. Civil) New Delhi - 110003 D.K R.T