Code Description Unit Quantity Rate Amount: Sub Head: 13-Finishing
Code Description Unit Quantity Rate Amount: Sub Head: 13-Finishing
13.19 Rough cast plaster upto 10 m height above ground level with a mixture of sand
and gravel or crushed stone from 6 mm to 10 mm nominal size, dashed over
and including the fresh plaster in two layers, under layer 12 mm cement plaster
1:4 (1 cement : 4 coarse sand) and top layer 10 mm cement plaster 1:3 (1 cement
: 3 fine sand) mixed with 10% finely grounded hydrated lime by volume of cement.
13.19.1 Ordinary cement finish using ordinary cement
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Under layer 12 mm thick cement plaster
Cement mortar 1 : 4 (1 cement :
4 coarse sand)
3.9 Rate as per Item Number 3.9 of
SH: Mortars cum 0.144 3970.50 571.75
LABOUR
0155 Mason (average) day 0.67 467.00 312.89
0114 Beldar day 0.75 368.00 276.00
0101 Bhisti day 0.92 407.00 374.44
9999 Scaffolding and sundries L.S. 9.88 1.73 17.09
Top layer 10 mm thick cement plaster
Cement mortar 1 : 3 (1 cement :
3 fine sand)
3.3 Rate as per Item Number 3.3 of
SH: Mortars cum 0.12 4252.70 510.32
0155 Mason (average) day 0.61 467.00 284.87
0114 Beldar day 0.69 368.00 253.92
0101 Bhisti day 0.85 407.00 345.95
9999 Scaffolding and sundries L.S. 9.88 1.73 17.09
1179 Crushed stone 2.36 mm to 12.5 mm size cum 0.10 900.00 90.00
0101 Bhisti day 0.01 407.00 4.07
0777 Dry hydrated lime (factory made) quintal 0.09 280.00 25.20
9977 Carriage of lime L.S. 3.64 1.73 6.30
0155 Mason (average) day 0.50 467.00 233.50
0114 Beldar day 0.50 368.00 184.00
0101 Bhisti day 0.10 407.00 40.70
9999 Scaffolding and sundries L.S. 9.88 1.73 17.09
Labour for scooping
0123 Mason (brick layer) 1st class day 0.25 487.00 121.75