Overdue COC (All Range)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 41

FY 2016-2021 COMPLETED CONTRACTS (WITH COMPLETION CERTIFICATE) WITH OVERDUE CERTIFICATE OF FINAL ACCEPTANCE

REGULAR INFRA - Region-Implemented


As of 27 August 2021

DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 15L00050 WIDENING OF SURIGAO- 28-Apr-2016 31-May-2016 30-Jun-2017 R.A. PAHATI CONST. & 1519 > 1 year
DAVAO COASTAL ROAD, SUPPLY, INC. (35843)
PANTUKAN SECTION,
COMPOSTELA VALLEY,
K1781+(-495)-K1781+385,
K1781+692-K1781+991
(AS PER RBIA STATION
LIMITS)
Region XI Regional Office 15L00119 RETROFITTING/STRENGT 19-Jun-2016 07-Sep-2016 07-Oct-2017 CHARIFER BUILDERS, 1420 > 1 year
HENING OF BALUTAKAY INC. (33498)
BRIDGE (B00136MN)
ALONG DAVAO-
COTABATO RD
(JCT.DIGOS-COTABAT
Region XI Regional Office 15L00120 REHAB./MAJOR REPAIR 17-Jul-2016 07-Sep-2016 07-Oct-2017 CHARIFER BUILDERS, 1420 > 1 year
OF EBREO BRIDGE INC. (33498)
(B00134MN) ALONG
DAVAO-COTABATO RD
(JCT. DIGOS-COT.
SECT.),DAVAO
Region XI Regional Office 15L00026 WIDENING OF DAANG 10-Sep-2016 19-Sep-2016 19-Oct-2017 R.A. PAHATI CONST. & 1408 > 1 year
MAHARLIKA SUPPLY, INC. (35843)
(MN),OLAYCON
SECTION,K 1403+140-K
1405+560, K 1407+615-K
1407+960,COMPOS

PCMA 8/27/2021 8:09:15 AM Page 1 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 15L00084 REHAB./IMPVT./CONST. 05-Oct-2016 07-Oct-2016 06-Nov-2017 RELY CONSTRUCTION & 1390 > 1 year
OF PANORAON-BUKAL SUPPLY (10433)
ROAD, COMPOSTELA
VALLEY 2ND LD,
COMPOSTELA VALLEY
Region XI Regional Office 15L00055 WIDENING OF BATASAN 24-Sep-2016 14-Oct-2016 13-Nov-2017 MAER SUMMIT 1383 > 1 year
BRIDGE (B00047MN) AND KONSTRUKT CO. (25262)
APPROACHES ALONG
PRES. DIOSDADO P.
MACAPAGAL NATIONAL
HIGHWAY, LUPON,
DAVAO ORIENTAL
Region XI Regional Office 15L00103 ROAD UPGRADING 30-Sep-2016 14-Oct-2016 13-Nov-2017 COASTLAND 1383 > 1 year
(GRAVEL TO CONCRETE) CONSTRUCTION &
OF TIBANBAN-LAVIGAN DEVELOPMENT CORP.
RD,DAVAO (11487)
ORIENTAL,STA. 1819+124
-STA. 1820+941
Region XI Regional Office 15L00029 ROAD UPGRADING 30-Sep-2016 17-Oct-2016 16-Nov-2017 WEE ENG 1380 > 1 year
(GRAVEL TO CONCRETE) CONSTRUCTION, INC.
OF MONTEVISTA- (16380)
COMPOSTELA-MATI
BDRY. ROAD,MAPAWA-
LANIPAO SECTION,
Region XI Regional Office 15L00101 CONC. OF BRGY. 23-Oct-2016 24-Oct-2016 23-Nov-2017 MAVERICK BUILDERS 1373 > 1 year
PROPER TO SITIO INCORPORATED
MANTAPAY,BINONDO (FORMERLY MAVERICK
(WITH COCONET SLOPE (14466)
PROTECTION),BAGANGA,
DAVAO ORIENT

PCMA 8/27/2021 8:09:15 AM Page 2 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 15L00117 CONCRETING OF 18-Sep-2016 14-Nov-2016 14-Dec-2017 P.L. SEBASTIAN 1352 > 1 year
SALAYSAY-DALAG- CONSTRUCTION, INC.
ARAKAN ROAD, DAVAO (FORMERLY: P.L.
CITY 3RD LD SEBASTIAN
CONSTRUCTION) (35840)
Region XI Regional Office 15L00054 CONSTRUCTION OF 07-Oct-2016 24-Nov-2016 24-Dec-2017 FFJJ CONSTRUCTION 1342 > 1 year
CASANGAY BRIDGE 2 (16712)
AND APPROACHES
ALONG DAANG
MAHARLIKA (MN),
COMPOSTELA VVALLEY,
MONTEVISTA,
COMPOSTELA VALLEY
Region XI Regional Office 15L00115 WIDENING OF PRES. 18-Nov-2016 01-Dec-2016 31-Dec-2017 MAER SUMMIT 1335 > 1 year
DIOSDADO P. KONSTRUKT CO. (25262)
MACAPAGAL
H'WAY,DAVAO ORIENTAL
2ND LD,STA.1750+142-
STA. 1751+047,STA.
Region XI Regional Office 15L00100 IMPVT./CONST. OF 23-Oct-2016 12-Dec-2016 11-Jan-2018 THREE W BUILDERS, 1324 > 1 year
DRAINAGE ALONG INC. (10722)
DAANG MAHARLIKA
(MN),DAVAO DEL NORTE
(L/S),STA. 1462+924.390-
STA. 14
Region XI Regional Office 15L00072 IMPVT./UPGRADING 15-Nov-2016 23-Dec-2016 22-Jan-2018 MAVERICK BUILDERS 1313 > 1 year
(GRAVEL TO CONC.) OF INCORPORATED
JCT. MENZI-DAHICAN- (FORMERLY MAVERICK
LAWIGAN RD LEADING (14466)
TO CINCO MASAO BEACH
RES

PCMA 8/27/2021 8:09:15 AM Page 3 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 15L00112 OPENING/CONSTRUCTIO 15-Jan-2017 16-Jan-2017 15-Feb-2018 MAVERICK BUILDERS 1289 > 1 year
N/REHAB. OF BAGANGA- INCORPORATED
BINONDO-BOUNDARY (FORMERLY MAVERICK
DAVAO (14466)
ORIENTAL/COMPOSTELA
VALLEY,DAVAO ORIEN
Region XI Regional Office 15L00056 WIDENING OF 30-Nov-2016 27-Jan-2017 26-Feb-2018 THREE W BUILDERS, 1278 > 1 year
TAGMANOK BRIDGE INC. (10722)
(B00079MN) &
APPROACHES ALONG
DAANG MAHARLIKA (MN),
COMPOSTELA VALLEY
KO
Region XI Regional Office 15L00104 CONCRETING OF 12-Feb-2017 13-Feb-2017 15-Mar-2018 MAVERICK BUILDERS 1261 > 1 year
BATAWAN INCORPORATED
PROPER,BRGY. (FORMERLY MAVERICK
BATAWAN- (14466)
NURSERY,BRGY.
BINONDO,DAVAO
ORIENTAL (1ST CONG.
DISTRICT)
Region XI Regional Office 15L00069 REHAB./RECONST./UPGR 18-Sep-2016 24-Feb-2017 26-Mar-2018 SNAS CONSTRUCTION 1250 > 1 year
ADING (ASPHALT TO AND SUPPLIES (38239) /
CONC.)ALONG DAVAO- MONOLITHIC
BUKIDNON RD,DAVAO CONSTRUCTION &
CITY STA.1625+420- CONCRETE PRODUCTS,
1628+051 INC. (5733)
Region XI Regional Office 15L00085 ROAD UPGRADING 19-Feb-2017 28-Feb-2017 30-Mar-2018 LEGACY 1246 > 1 year
(GRAVEL TO CONCRETE) CONSTRUCTION
OF DAVAO DEL NORTE- CORPORATION
COMPOSTELA VALLEY- (FORMERLY: LEGACY
AGUSAN DEL SUR RD, CONSTRUCTION) (22465)
LEADING

PCMA 8/27/2021 8:09:15 AM Page 4 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 16L00015 ROAD UPGRADING 20-Dec-2016 01-Mar-2017 31-Mar-2018 R.A. PAHATI CONST. & 1245 > 1 year
(GRAVEL TO CONCRETE) SUPPLY, INC. (35843)
OF FATIMA-MALABOG
ROAD,DAVAO CITY,
SECTION 1=STA.
1507+174-STA.
Region XI Regional Office 15L00032 ROAD UPGRADING 16-Jan-2017 10-Mar-2017 09-Apr-2018 AB APONESTO 1236 > 1 year
(GRAVEL TO CONCRETE) CONSTRUCTION, PARTS
OF NABUNTURAN- & SUPPLIES, INC.
MARAGUSAN (FORMERLY:AB
RD,CAMBAGANG- APONESTO
TARAGO SECTION,K CONSTRUCTION PARTS
1469+935-K & SUPPLY) (22998)
Region XI Regional Office 15L00058 CONST. OF OLAYCON 23-Oct-2016 30-Mar-2017 29-Apr-2018 MAER SUMMIT 1216 > 1 year
BRIDGE 2 AND KONSTRUKT CO. (25262)
APPROACHES ALONG
DAANG MAHARLIKA
(MN),COMPOSTELA
VALLEY,KO 1402+050-KO
Region XI Regional Office 15L00070 WIDENING OF DAVAO- 28-Mar-2017 30-Mar-2017 29-Apr-2018 TKS BUILDERS & 1216 > 1 year
COTABATO RD(DAVAO SUPPLIES (23415) /
CITY-JCT. DIGOS SECT.) THREE W BUILDERS,
INCLUDING ROAD RIGHT- INC. (10722)
OF-WAY (RROW),DAVAO
D
Region XI Regional Office 16L00014 IMPVT./CONST. OF 29-Mar-2017 31-Mar-2017 30-Apr-2018 THREE W BUILDERS, 1215 > 1 year
DRAINAGE ALONG INC. (10722)
SURIGAO DEL SUR
BDRY.-DAVAO ORIENTAL
COASTAL RD.,DAVAO
ORIENTAL, BOS

PCMA 8/27/2021 8:09:15 AM Page 5 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 15L00114 ROAD UPGRADING 21-Dec-2016 04-Apr-2017 04-May-2018 WEE ENG 1211 > 1 year
(GRAVEL TO CONCRETE) CONSTRUCTION, INC.
OF MONTEVISTA- (16380)
COMPOSTELA-MATI
BDRY.
ROAD,COMPOSTELA
VALLEY,STA.1
Region XI Regional Office 15L00071 WIDENING OF DAANG 16-Dec-2016 19-Apr-2017 19-May-2018 ALONZO 1196 > 1 year
MAHARLIKA (MN) CONSTRUCTION (32145) /
INCLUDING ROAD RIGHT- WEE ENG
OF-WAY (RROW) CONSTRUCTION, INC.
LANKILAAN-PASIAN (16380)
SECT.,COMPOSTEL
Region XI Regional Office 15L00075 WIDENING OF PUNTOD 30-Apr-2017 05-May-2017 04-Jun-2018 A.T. DUMLAO 1180 > 1 year
BRIDGE (B00076MN) & CONSTRUCTION, INC.
APPROACHES ALONG FORMERLYANDONI T. D
DAANG MAHARLIKA (34028)
ROAD
(MN),COMPOSTELA
VALLEY,
Region XI Regional Office 16L00026 CONST. OF DAVAO RIVER 17-Dec-2016 15-May-2017 14-Jun-2018 R.A. PAHATI CONST. & 1170 > 1 year
FLOOD CONTROL (STA. SUPPLY, INC. (35843)
1+000 TO STA. 1+520),
DAVAO CITY
Region XI Regional Office 15L00027 ROAD UPGRADING 31-Dec-2016 18-May-2017 17-Jun-2018 MAVERICK BUILDERS 1167 > 1 year
(GRAVEL TO CONCRETE) INCORPORATED
OF COMPOSTELA- (FORMERLY MAVERICK
CATEEL RD (14466)
(COMPOSTELA
SIDE),PANANSALAN-
NURSERY SEC

PCMA 8/27/2021 8:09:15 AM Page 6 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 15L00028 ROAD UPGRADING 31-Dec-2016 18-May-2017 17-Jun-2018 MAVERICK BUILDERS 1167 > 1 year
(GRAVEL TO CONCRETE) INCORPORATED
OF COMPOSTELA- (FORMERLY MAVERICK
CATEEL RD (14466)
(COMPOSTELA
SIDE),NURSERY-OSMENA
SECTION
Region XI Regional Office 15L00093 UPGRADING (GRAVEL TO 15-May-2017 24-May-2017 23-Jun-2018 AB APONESTO 1161 > 1 year
CONCRETE) OF CONSTRUCTION, PARTS
BANTACAN ROAD & SUPPLIES, INC.
LEADING TO TADIA (FORMERLY:AB
FALLS,NEW BATAAN, APONESTO
COMPOSTELA VALLEY CONSTRUCTION PARTS
& SUPPLY) (22998)
Region XI Regional Office 15L00076 WIDENING OF LINDA 30-Apr-2017 31-May-2017 30-Jun-2018 TAGUM BUILDERS 1154 > 1 year
BRIDGE (BOOO77MN) & CONTRACTORS CORP.
APPROACHES ALONG (FORMERLY: TAGUM
DAANG MAHARLIKA (34019) / THREE W
ROAD BUILDERS, INC. (10722)
(MN),COMPOSTELA
VALLEY,
Region XI Regional Office 16L00008 CONSTRUCTION OF 20-Dec-2016 02-Jun-2017 02-Jul-2018 MONOLITHIC 1152 > 1 year
SAYOTEHAN BRIDGE CONSTRUCTION &
ALONG MATI- CONCRETE PRODUCTS,
MARAGUSAN ROAD, INC. (5733) / MAER
DAVAO ORIENTAL 2ND SUMMIT KONSTRUKT
LD CO. (25262)

PCMA 8/27/2021 8:09:15 AM Page 7 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 15L00051 REHABILITATION/RECON 21-Jun-2017 07-Jul-2017 06-Aug-2018 FFJJ CONSTRUCTION 1117 > 1 year
STRUCTION OF (16712)
DAMAGED PAVED
NATIONAL ROADS
ALONG DAVAO-
COTABATO ROAD
(DAVAO CITY-JCT. DIGOS
SECTION), DAVAO DEL
SUR K1544+240 -
K1548+320 (AS PER RBIA
STATION LIMITS)
Region XI Regional Office 16L00021 CONST. OF MATI- 24-Feb-2017 28-Jul-2017 27-Aug-2018 MAVERICK BUILDERS 1096 > 1 year
TARRAGONA BYPASS INCORPORATED
ROAD (TAGABAKID- (FORMERLY MAVERICK
LUCATAN ROAD), (14466)
INCLUDING ROW, DAVAO
ORIENTAL 2ND LD
Region XI Regional Office 16L00006 CONC. FROM NATIONAL 15-Jul-2017 07-Aug-2017 06-Sep-2018 RELY CONSTRUCTION & 1086 > 1 year
JUNCTION ROAD,BRGY. SUPPLY (10433)
PANIKIAN-BRGY.
MARAGATAS (PHASE
2),DAVAO ORIENTAL (2ND
CONG.
Region XI Regional Office 16L00005 REHABILITATION/IMPROV 10-Nov-2016 11-Sep-2017 11-Oct-2018 RELY CONSTRUCTION & 1051 > 1 year
EMENT OF SAN JOSE- SUPPLY (10433)
SIMULAO ROAD, DAVAO
ORIENTAL 1ST LD

PCMA 8/27/2021 8:09:15 AM Page 8 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 15L00097 ROAD OPENING OF 18-May-2017 27-Oct-2017 26-Nov-2018 AB APONESTO 1005 > 1 year
MAWAB-MARAGUSAN- CONSTRUCTION, PARTS
CARAGA ROAD, BRGY. & SUPPLIES, INC.
TALIAN SECTION, (FORMERLY:AB
COMPOSTELA VALLEY APONESTO
1ST LD CONSTRUCTION PARTS
& SUPPLY) (22998) /
MAVERICK BUILDERS
INCORPORATED
(FORMERLY MAVERICK
(14466)
Region XI Regional Office 15L00031 ROAD UPGRADING 02-May-2017 27-Oct-2017 26-Nov-2018 AB APONESTO 1005 > 1 year
(GRAVEL TO CONCRETE) CONSTRUCTION, PARTS
OF NABUNTURAN- & SUPPLIES, INC.
MARAGUSAN RD, (FORMERLY:AB
CAMBAGANG APONESTO
SECT.,COMPOSTELA CONSTRUCTION PARTS
VALLEY K1 & SUPPLY) (22998) /
MAVERICK BUILDERS
INCORPORATED
(FORMERLY MAVERICK
(14466)
Region XI Regional Office 15L00030 ROAD UPGRADING 17-Jul-2017 27-Oct-2017 26-Nov-2018 AB APONESTO 1005 > 1 year
(GRAVEL TO CONCRETE) CONSTRUCTION, PARTS
OF NABUNTURAN- & SUPPLIES, INC.
MARAGUSAN (FORMERLY:AB
RD,KATIPUNAN- APONESTO
CAMBAGANG CONSTRUCTION PARTS
SECT.,COMPOSTELA & SUPPLY) (22998) /
MAVERICK BUILDERS
INCORPORATED
(FORMERLY MAVERICK
(14466)

PCMA 8/27/2021 8:09:15 AM Page 9 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 17L00026 CONST. OF SAYOTEHAN 24-Oct-2017 06-Nov-2017 06-Dec-2018 MAER SUMMIT 995 > 1 year
BRIDGE & APPROACHES KONSTRUKT CO. (25262)
ALONG MATI-
MARAGUSAN RD, DAVAO
ORIENTAL 2ND LD(PHASE
II-COMP
Region XI Regional Office 15L00041 WIDENING OF DAANG 15-Oct-2017 20-Nov-2017 20-Dec-2018 AB APONESTO 981 > 1 year
MAHARLIKA CONSTRUCTION, PARTS
(MN),BANLAG-OLAYCON & SUPPLIES, INC.
SECT., COMPOSTELA (FORMERLY:AB
VALLEY, INCLUDING APONESTO
ROAD RIGHT-OF-WA CONSTRUCTION PARTS
& SUPPLY) (22998)
Region XI Regional Office 15L00044 ROAD UPGRADING 15-May-2017 20-Nov-2017 20-Dec-2018 AB APONESTO 981 > 1 year
(GRAVEL TO CONCRETE) CONSTRUCTION, PARTS
OF MONTEVISTA-DNAS & SUPPLIES, INC.
ROAD, COMPOSTELA (FORMERLY:AB
VALLEY,STA.1421+069- APONESTO
1422+332 CONSTRUCTION PARTS
& SUPPLY) (22998)
Region XI Regional Office 15L00086 IMPVT. OF OFF- 25-Apr-2016 23-Nov-2017 23-Dec-2018 TWINA BUILDERS AND 978 > 1 year
CARRIAGEWAY ALONG SUPPLY, INC.
DAANG MAHARLIKA (MN), (FORMERLY: TWINA
COMPOSTELA VALLEY, BUILDERS AND SUPPLY)
K1410+158-K1410+324, (23897)
Region XI Regional Office 17L00186 CONST. OF 17 UNITS 10-Oct-2017 13-Dec-2017 12-Jan-2019 R. SEMILLA 958 > 1 year
RAINWATER CONSTRUCTION &
COLLECTION SYSTEM MARKETING (9263)
(RWCS), 1. BARANGAY
CABANTIAN BRGY. HALL;
ET. AL.

PCMA 8/27/2021 8:09:15 AM Page 10 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 17L00039 WIDENING (4-6 LANES) 30-Nov-2017 22-Dec-2017 21-Jan-2019 MAVERICK BUILDERS 949 > 1 year
OF DAANG MAHARLIKA INCORPORATED
(MN) (BRGY. POB. (FORMERLY MAVERICK
MONTEVISTA-BRGY. (14466)
LINOAN
SECT.),COMPOSTELA
Region XI Regional Office 17L00046 WIDENING (2-4 INTO 6 29-Nov-2017 22-Dec-2017 21-Jan-2019 MAVERICK BUILDERS 949 > 1 year
LANES) OF DAANG INCORPORATED
MAHARLIKA (MN) (BRGY. (FORMERLY MAVERICK
MAGSAYSAY (14466)
SECT.),COMPOSTELA
VALLEY 2ND DI
Region XI Regional Office 16L00023 OPENING OF TAGUGPO- 21-Dec-2016 06-Feb-2018 08-Mar-2019 ULTICON BUILDERS, 903 > 1 year
PIASUSUAN ROAD, INC. (17267)
COMPOSTELA VALLEY
2ND LD
Region XI Regional Office 16L00024 OPENING OF 02-Mar-2017 06-Feb-2018 08-Mar-2019 ULTICON BUILDERS, 903 > 1 year
PIASUSUAN- INC. (17267)
BINUGSAYAN ROAD,
COMPOSTELA VALLEY
Region XI Regional Office 16L00003 CONST./IMPVT./WIDENIN 12-May-2017 09-Feb-2018 11-Mar-2019 R.A. PAHATI CONST. & 900 > 1 year
G OF BACACA ROAD, SUPPLY, INC. (35843)
INCLUDING BACACA
CIRCUMFERENTIAL
ROAD LEADING TO
DAVAO CITY I
Region XI Regional Office 17L00045 WIDENING (2 INTO 4 19-Nov-2017 09-Feb-2018 11-Mar-2019 VICENTE T. LAO 900 > 1 year
LANES) OF SURIGAO- CONSTRUCTION (7040)
DAVAO COASTAL RD
BRGY. TAGNANAN-
BRGY.CADUNAN,
COMPOSTELA VALLEY

PCMA 8/27/2021 8:09:15 AM Page 11 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 17L00013 WIDENING (2 INTO 4-6 12-Feb-2018 12-Feb-2018 14-Mar-2019 ULTICON BUILDERS, 897 > 1 year
LANES) OF DIGOS- INC. (17267)
MAKAR ROAD INCLUDING
RROW (GUIHING-PALILI
SECT.),DAVAO DEL SUR
Region XI Regional Office 17L00012 WIDENING (2-4 INTO 6 02-Jan-2018 12-Feb-2018 14-Mar-2019 PREMIUM 897 > 1 year
LANES & 2-4 LANES) OF MEGASTRUCTURES INC.
DIGOS-MAKAR RD. (36079)
INCLUDING RROW
(BALUTAKAY-GUIHING
SECT.),
Region XI Regional Office 17L00033 REHAB./RECONST./UPGR 23-Sep-2017 12-Feb-2018 14-Mar-2019 RELY CONSTRUCTION & 897 > 1 year
ADING (ASPHALT TO SUPPLY (10433)
CONC.) OF DAMAGED
PAVED NAT'L. RD ALONG
DAVAO-BUKIDNON RD.,
(BR
Region XI Regional Office 15L00106 ROAD UPGRADING 30-Jun-2017 02-Mar-2018 01-Apr-2019 BISLIG VENTURE 879 > 1 year
(GRAVEL TO CONCRETE) CONSTRUCTION &
OF DEL PILAR (SAN DEV'T. INC. (36370) /
JUAN)-NEW CORTEZ-SAN RELY CONSTRUCTION &
JOSE-CARCOR LEADING SUPPLY (10433)
TO IN
Region XI Regional Office 17L00115 WIDENING (2 INTO 4 12-Jan-2018 12-Mar-2018 11-Apr-2019 MAVERICK BUILDERS 869 > 1 year
LANES) OF SURIGAO DEL INCORPORATED
SUR BDRY.-DAVAO OR. (FORMERLY MAVERICK
COASTAL RD INCL. (14466)
RROW (BRGY. LUCOD-
BRGY

PCMA 8/27/2021 8:09:15 AM Page 12 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 17L00114 WIDENING (2 INTO 4 24-Dec-2017 12-Mar-2018 11-Apr-2019 MAVERICK BUILDERS 869 > 1 year
LANES) OF SURIGAO DEL INCORPORATED
SUR BDRY.-DVO. OR. (FORMERLY MAVERICK
COASTAL RD INCL. (14466)
SLOPE PROTECTION &
RROW
Region XI Regional Office 17L00037 WIDENING (4 INTO 6 12-Jan-2018 26-Mar-2018 25-Apr-2019 R.A. PAHATI CONST. & 855 > 1 year
LANES) INCL. SUPPLY, INC. (35843)
REHAB./RECONST./UPGR
ADING (ASPHALT TO
CONCRETE) DAMAGED
PAVED NAT'L.
Region XI Regional Office 16L00017 OPENING/CONSTRUCTIO 15-Oct-2017 02-Apr-2018 02-May-2019 D.L CERVANTES 848 > 1 year
N OF ROAD AT BRGY. CONSTRUCTION
MANURIGAO-BOUNDARY CORPORATION
BAGANGA, COMPOSTELA (FORMERLY: (13799) / GP
VALLEY & H CONSTRUCTION
INCORPORATED
(FORMERLY: GP & H
CONSTRUCTION &
SUPPLY) (36141)
Region XI Regional Office 17L00027 CONST. OF BUSAY 25-Oct-2017 04-Apr-2018 04-May-2019 THREE W BUILDERS, 846 > 1 year
BRIDGE & APPROACHES INC. (10722) / H2
ALONG MATI- LANDMARK BUILDERS,
MARAGUSAN RD, DAVAO INC. (7400)
ORIENTAL 2ND LD
(PHASE II-COMPLET

PCMA 8/27/2021 8:09:15 AM Page 13 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 17L00087 WIDENING (2 INTO 6 08-Mar-2018 11-Apr-2018 11-May-2019 J.H. PAJARA 839 > 1 year
LANES) OF GABANAN CONSTRUCTION
BRIDGE (B00064MN) CORPORATION (1890) /
INCL. APPROACHES & MAVERICK BUILDERS
RROW ALONG DAANG INCORPORATED
MAHARLIKA (FORMERLY MAVERICK
(14466)
Region XI Regional Office 17L00136 WIDENING (2 INTO 6 03-Dec-2017 23-Apr-2018 23-May-2019 ST. GERRARD 827 > 1 year
LANES) OF BALUTAKAY- CONSTRUCTION GEN.
HAGONOY BRIDGE CONTRACTOR &
(B00165MN) INCL. DEVELOPMENT CORP.
APPROACHES & RROW (FORMERLY:ST.
ALONG DIGOS GERRARD
CONSTRUCTION) (31762)
Region XI Regional Office 15L00066 IMPVT./UPGRADING 10-Dec-2017 04-May-2018 03-Jun-2019 ULTICON BUILDERS, 816 > 1 year
(GRAVEL TO CONC.) OF INC. (17267)
ROAD SITIO PASOG-
LICUP-TAGBITAN AG-
SITIO TAGLUNA LEADING
TO PU
Region XI Regional Office 17L00084 WIDENING (4-5 INTO 6 11-Jan-2018 07-May-2018 06-Jun-2019 ST. GERRARD 813 > 1 year
LANES) INCL. CONSTRUCTION GEN.
REHAB./RECONST. OF CONTRACTOR &
DAMAGED PAVED NAT'L. DEVELOPMENT CORP.
RD & RROW OF DAVAO- (FORMERLY:ST.
COT. RD GERRARD
CONSTRUCTION) (31762)

PCMA 8/27/2021 8:09:15 AM Page 14 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 15L00080 WIDENING OF DAANG 05-Jun-2017 09-May-2018 08-Jun-2019 TAGUM BUILDERS 811 > 1 year
MAHARLIKA (MN) CONTRACTORS CORP.
INCLUDING ROAD RIGHT- (FORMERLY: TAGUM
OF-WAY (34019) / THREE W
(RROW),NABUNTURAN- BUILDERS, INC. (10722)
MAWAB BDRY.
SECTION,C
Region XI Regional Office 15L00088 WIDENING OF GOV. 20-Apr-2017 09-May-2018 08-Jun-2019 ULTICON BUILDERS, 811 > 1 year
MIRANDA BRIDGE 2 INC. (17267)
(B01270MN) &
APPROACHES ALONG
DAANG MAHARLIKA (MN),
DAVAO DEL NORT
Region XI Regional Office 17L00032 WIDENING (2 INTO 4 02-Mar-2018 30-May-2018 29-Jun-2019 RELY CONSTRUCTION & 790 > 1 year
LANES) OF DAVAO- SUPPLY (10433)
BUKIDNON RD
INCLUDING
REHAB./RECONST. OF
DAMAGED PAVED NAT'L.
RD.
Region XI Regional Office 15L00111 IMPROVEMENT/CONC. 23-Jul-2017 08-Jun-2018 08-Jul-2019 RELY CONSTRUCTION & 781 > 1 year
OF CATIGAN (JCT. SUPPLY (10433)
DAVAO-COTABATO RD)-
EDEN (UGUIS) LEADING
TO EDEN NATURE
PARK,TORIL
Region XI Regional Office 17L00174 CONSTRUCTION OF 29-Apr-2018 08-Jun-2018 08-Jul-2019 ULTICON BUILDERS, 781 > 1 year
TAGUM CITY FLYOVER INC. (17267)
ALONG AGUSAN-DAVAO
ROAD, DAVAO DEL
NORTE 1ST LD

PCMA 8/27/2021 8:09:15 AM Page 15 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 17L00137 WIDENING (2 INTO 4 23-May-2018 20-Jun-2018 20-Jul-2019 NRU BUILDERS AND 769 > 1 year
LANES) OF PAGAN CONSTRUCTION
GRANDE BRIDGE SUPPLIES (23164) /
(B00214MN) INCL. MONOLITHIC
APPROACHES & RROW CONSTRUCTION &
ALONG DAVAO-BUKI CONCRETE PRODUCTS,
INC. (5733)
Region XI Regional Office 15L00077 CONST. OF BUTUAN 14-Sep-2017 28-Jun-2018 28-Jul-2019 RELY CONSTRUCTION & 761 > 1 year
BRIDGE & APPROACHES SUPPLY (10433)
ALONG DAVAO-
SARANGANI COASTAL
ROAD (MALALAG-MALITA-
JAS-GLAN), D
Region XI Regional Office 16L00018 CONCRETING OF 11-Apr-2017 29-Jun-2018 29-Jul-2019 RELY CONSTRUCTION & 760 > 1 year
MARILOG-MAGSAYSAY- SUPPLY (10433)
ARAKAN ROAD, DAVAO
CITY 3RD LD
Region XI Regional Office 17L00091 WIDENING (2 INTO 4 27-Dec-2017 02-Jul-2018 01-Aug-2019 RELY CONSTRUCTION & 757 > 1 year
LANES) OF DAVAO- SUPPLY (10433)
BUKIDNON RD INCL.
SLOPE PROTECTION &
RROW,(BRGY.
BAGANIHAN SECT.)
Region XI Regional Office 17L00005 WIDENING (2-6 LANES) 16-Jan-2018 02-Jul-2018 01-Aug-2019 ALONZO 757 > 1 year
OF DAANG MAHARLIKA CONSTRUCTION (32145) /
(MN) INCL. RELY CONSTRUCTION &
REHAB./RECONST. OF SUPPLY (10433)
DAMAGED PAVED NAT'L.
RD & RROW

PCMA 8/27/2021 8:09:15 AM Page 16 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 17L00011 WIDENING (2 INTO 4-6 12-Dec-2017 02-Jul-2018 01-Aug-2019 ALONZO 757 > 1 year
LANES) OF DAANG CONSTRUCTION (32145) /
MAHARLIKA (MN) RELY CONSTRUCTION &
INCLUDING SUPPLY (10433)
REHAB./RECONST. OF
DAMAGED PAVED NAT'L
Region XI Regional Office 16L00022 OPENING/REHAB./IMPVT. 26-Feb-2017 09-Jul-2018 08-Aug-2019 RELY CONSTRUCTION & 750 > 1 year
OF CHROMITE-TAGARAS, SUPPLY (10433)
BRGY. PINTATAGAN &
BRGY. MAHAYAG ROAD,
DAVAO ORIENTAL 2ND
Region XI Regional Office 17L00157 CONST./IMPVT. OF MATI- 05-Jun-2018 12-Jul-2018 11-Aug-2019 ST. GERRARD 747 > 1 year
TARRAGONA BYPASS CONSTRUCTION GEN.
ROAD (TAGABAKID- CONTRACTOR &
LUCATAN RD) INCL. DEVELOPMENT CORP.
RROW, DAVAO ORIENTAL (FORMERLY:ST.
2ND LD GERRARD
CONSTRUCTION) (31762)
/ MAER SUMMIT
KONSTRUKT CO. (25262)
Region XI Regional Office 17L00117 WIDENING (2 INTO 6 18-May-2018 13-Aug-2018 12-Sep-2019 ULTICON BUILDERS, 715 > 1 year
LANES) OF PADADA BR INC. (17267)
(B00166MN) ALONG
DIGOS-MAKAR RD INCL.
APPROACHES &
RROW,DAVAO
Region XI Regional Office 16L00007 CONCRETING OF 21-Aug-2017 28-Aug-2018 27-Sep-2019 ALZAM ENTERPRISES 700 > 1 year
BARACATAN-CATIGAN- INCORPORATED
EDEN ROAD, DAVAO CITY (FORMERLY: ALZAM
3RD LD ENTERPRISES) (19113)

PCMA 8/27/2021 8:09:15 AM Page 17 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 15L00065 IMPVT./CONC. OF 02-Aug-2017 06-Sep-2018 06-Oct-2019 ALZAM ENTERPRISES 691 > 1 year
ADDITIONAL 2 LANES OF INCORPORATED
JCT. AGUSAN-DAVAO (FORMERLY: ALZAM
ROAD,KM. 48,BRGY. ENTERPRISES) (19113)
CANOCOTAN TO JCT.
SURIGAO-
Region XI Regional Office 17L00076 WIDENING (2 INTO 4 14-Feb-2018 06-Sep-2018 06-Oct-2019 MAVERICK BUILDERS 691 > 1 year
LANES) OF PRES. INCORPORATED
DIOSDADO P. (FORMERLY MAVERICK
MACAPAGAL NAT'L. (14466)
H'WAY INCL. SLOPE
PROTECTION & ROW (
Region XI Regional Office 17L00077 WIDENING (2 INTO 4 07-Apr-2018 06-Sep-2018 06-Oct-2019 MAVERICK BUILDERS 691 > 1 year
LANES) OF PRES. INCORPORATED
DIOSDADO P. (FORMERLY MAVERICK
MACAPAGAL NAT'L. (14466)
H'WAY INCL. SLOPE
PROTECTION & ROW (
Region XI Regional Office 17L00015 WIDENING 2 INTO 6 15-Dec-2017 07-Sep-2018 07-Oct-2019 MAVERICK BUILDERS 690 > 1 year
LANES OF DAVAO-COT. INCORPORATED
RD (DAVAO CITY-JCT. (FORMERLY MAVERICK
DIGOS SECT.) INCL. (14466)
ROAD RIGHT-OF-WAY
(RROW
Region XI Regional Office 15L00118 ROAD OPENING OF 21-Jul-2017 18-Sep-2018 18-Oct-2019 ULTICON BUILDERS, 679 > 1 year
MAWAB-MARAGUSAN- INC. (17267)
CARAGA ROAD
INCLUDING BRIDGE,
SITIO BANGLAS
SECTION, DAVAO
ORIENTAL

PCMA 8/27/2021 8:09:15 AM Page 18 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 15L00092 ROAD OPENING OF 18-Jul-2017 18-Sep-2018 18-Oct-2019 ULTICON BUILDERS, 679 > 1 year
MAWAB-MARAGUSAN- INC. (17267)
CARAGA ROAD,BRGY.
TALIAN-BRGY.
TAGDALONGDONG
SECT., COMPOSTELA
VALLE
Region XI Regional Office 17L00036 WIDENING (2-4 INTO 6 08-Apr-2018 07-Nov-2018 07-Dec-2019 D.L CERVANTES 629 > 1 year
LANES) OF DAANG CONSTRUCTION
MAHARLIKA (MN) INCL. CORPORATION
RROW (BRGY. (FORMERLY: (13799) / GP
HAGUIMITAN-BRGY. & H CONSTRUCTION
BAYLO SECT.), INCORPORATED
(FORMERLY: GP & H
CONSTRUCTION &
SUPPLY) (36141)
Region XI Regional Office 18L00165 CONSTRUCTION OF 31-Oct-2018 22-Nov-2018 22-Dec-2019 R. SEMILLA 614 > 1 year
RAINWATER COLLECTOR CONSTRUCTION &
SYSTEM, ISLAND MARKETING (9263)
GARDEN CITY OF SAMAL,
DAVAO DEL NORTE
Region XI Regional Office 17L00126 WIDENING (2 INTO 4 08-Jun-2018 12-Dec-2018 11-Jan-2020 R.A. PAHATI CONST. & 594 > 1 year
LANES) OF OLAYCON SUPPLY, INC. (35843) /
BRIDGE & APPROACHES GVDPM CONSTRUCTION
ALONG DAANG CORP. (FORMERLY: ZM
MAHARLIKA (MN) INCL. CONSTRUCTIO (9052)
RROW, COMP
Region XI Regional Office 17L00016 WIDENING OF 2-4 INTO 6 04-Apr-2018 28-Dec-2018 27-Jan-2020 TSQUARE 578 > 1 year
LANES OF DAVAO-COT. CONSTRUCTION
RD (DAVAO CITY-JCT. CORPORATION
DIGOS SECT.) INCL. (FORMERLY:T-SQUARE
REHAB./RECONST. OF BUILDERS) (14268)

PCMA 8/27/2021 8:09:15 AM Page 19 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 17L00151 CONST./CONC. OF 29-Dec-2017 15-Jan-2019 14-Feb-2020 R.A. PAHATI CONST. & 560 > 1 year
FATIMA-MALABOG ROAD SUPPLY, INC. (35843)
TO MABUHAY PAÑALUM-
PAQUIBATO ROAD INCL.
RROW, DAVAO CITY 2ND
LD
Region XI Regional Office 17L00020 WIDENING (4 TO 6 18-Apr-2018 17-Jan-2019 16-Feb-2020 BISLIG VENTURE 558 > 1 year
LANES) OF DAVAO RIVER CONSTRUCTION &
BRIDGE (B01458MN) & DEV'T. INC. (36370) /
APPR. ALONG DAVAO ROMA CONSTRUCTION &
CITY DIV. ROAD INCL. RR DEVELOPMENT
CORPORATION (6514)
Region XI Regional Office 17L00089 CONST./OPENING OF 25-Sep-2018 31-Jan-2019 01-Mar-2020 ULTICON BUILDERS, 544 > 1 year
TAGUGPO-PIASUSUAN INC. (17267)
RD INCL. CONST. OF
PIASUSUAN
BR.,NAPNAPAN,
PANTUKAN,COMPOSTEL
AV
Region XI Regional Office 17L00196 CONSTRUCTION OF 17-Dec-2018 26-Feb-2019 27-Mar-2020 BROSCO 518 > 1 year
EVACUATION CENTER, CONSTRUCTION AND
BRGY. MATTI, DIGOS DEVELOPMENT
CITY, DAVAO DEL SUR CORPORATION (24970)
Region XI Regional Office 17L00112 ROAD UPGRADING 10-Jun-2018 04-Mar-2019 02-Apr-2020 AB APONESTO 512 > 1 year
(GRAVEL TO CONCRETE) CONSTRUCTION, PARTS
OF MONTEVISTA-DNAS & SUPPLIES, INC.
RD (BRGY. CAMANSI- (FORMERLY:AB
BRGY. PROSPERIDAD APONESTO
SECT.),CO CONSTRUCTION PARTS
& SUPPLY) (22998)

PCMA 8/27/2021 8:09:15 AM Page 20 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 17L00006 WIDENING (2 TO 6 28-Mar-2018 08-Mar-2019 06-Apr-2020 AAA ROCK 508 > 1 year
LANES) OF DAANG CONSTRUCTION
MAHARLIKA (MN) INCL. CORPORATION
RROW (BRGY. RIZAL- (FORMERLY: DAVAO
BRGY. HAGUIMITAN ROCK MIXER
SECT.), COM ENTERPRISES) (19250) /
THREE W BUILDERS,
INC. (10722)
Region XI Regional Office 15L00074 WIDENING OF MAWAB 30-Apr-2017 19-Mar-2019 17-Apr-2020 A.T. DUMLAO 497 > 1 year
BRIDGE (B00078MN) & CONSTRUCTION, INC.
APPROACHES ALONG FORMERLYANDONI T. D
DAANG MAHARLIKA (MN), (34028)
COMPOSTELA VALLEY
Region XI Regional Office 18L00028 WIDENING (2 INTO 4 30-Dec-2018 19-Mar-2019 17-Apr-2020 MAVERICK BUILDERS 497 > 1 year
LANES) OF SURIGAO DEL INCORPORATED
SUR BDRY.-DVO. OR. (FORMERLY MAVERICK
COASTAL RD INCL. ROW (14466)
(BRGY. BACULIN-BRGY
Region XI Regional Office 18L00023 WIDENING (2 INTO 4 14-Dec-2018 21-Mar-2019 19-Apr-2020 R.A. PAHATI CONST. & 495 > 1 year
LANES & 4 LANES INTO 6 SUPPLY, INC. (35843) /
LANES) OF SURIGAO- NUEDA BUILDERS
DAVAO COASTAL RD CONSTRUCTION &
(BRGY. KINGKING-BRGY. SUPPLY INC. (39776)
M
Region XI Regional Office 16L00033 CONSTRUCTION OF 29-Sep-2018 11-Apr-2019 10-May-2020 CHARIFER BUILDERS, 474 > 1 year
DAVAO RIVER FLOOD INC. (33498) / FFJJ
CONTROL, DAVAO CITY CONSTRUCTION (16712)
Region XI Regional Office 16L00011 ROAD CONCRETING 11-Nov-2017 02-May-2019 31-May-2020 HEXAMINDZ 453 > 1 year
FROM JNH BRGY. SAN CORPORATION
MIGUEL-POBLACION (FORMERLY:KILUSANG
(WITH COCONET SLOPE MAGKAIBIG (31666)
PROTECTION &
GROUTED RIPRAP
PCMA 8/27/2021 8:09:15 AM Page 21 of 41
DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 15L00037 ROAD UPGRADING 26-Jun-2018 02-May-2019 31-May-2020 ULTICON BUILDERS, 453 > 1 year
(GRAVEL TO CONCRETE) INC. (17267)
OF KAPALONG-
TALAINGOD-VALENCIA
(BUKIDNON) RD,DAVAO
DEL NORTE, S
Region XI Regional Office 15L00038 ROAD UPGRADING 23-Apr-2018 02-May-2019 31-May-2020 ULTICON BUILDERS, 453 > 1 year
(GRAVEL TO CONCRETE) INC. (17267)
OF KAPALONG-
TALAINGOD-VALENCIA
(BUKIDNON) RD,DAVAO
DEL NORTE, ST
Region XI Regional Office 15L00039 ROAD UPGRADING 06-May-2018 02-May-2019 31-May-2020 ULTICON BUILDERS, 453 > 1 year
(GRAVEL TO CONCRETE) INC. (17267)
OF KAPALONG-
TALAINGOD-VALENCIA
(BUKIDNON) RD,DAVAO
DEL NORTE, STA
Region XI Regional Office 17L00009 WIDENING (2-4 INTO 6 24-May-2018 08-May-2019 06-Jun-2020 AB APONESTO 447 > 1 year
LANES) OF DAANG CONSTRUCTION, PARTS
MAHARLIKA (MN) INCL. & SUPPLIES, INC.
RROW,(BRGY. SAN JOSE- (FORMERLY:AB
BRGY. BANLAG SECT.),C APONESTO
CONSTRUCTION PARTS
& SUPPLY) (22998)
Region XI Regional Office 17L00010 WIDENING (4-6 LANES) 09-May-2018 08-May-2019 06-Jun-2020 AB APONESTO 447 > 1 year
OF DAANG MAHARLIKA CONSTRUCTION, PARTS
(MN) INCLUDING (RROW) & SUPPLIES, INC.
(BRGY. BANLAG-BRGY. (FORMERLY:AB
OLAYCON SECT.),COM APONESTO
CONSTRUCTION PARTS
& SUPPLY) (22998)

PCMA 8/27/2021 8:09:15 AM Page 22 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 17L00028 WIDENING (4-6 LANES) 03-May-2018 08-May-2019 06-Jun-2020 AB APONESTO 447 > 1 year
OF DAANG MAHARLIKA CONSTRUCTION, PARTS
(MN) INCLUDING RROW & SUPPLIES, INC.
(BRGY. TAPIA-BRGY. (FORMERLY:AB
BANKEROHAN NORTE APONESTO
SECT CONSTRUCTION PARTS
& SUPPLY) (22998)
Region XI Regional Office 17L00111 ROAD UPGRADING 15-Nov-2018 08-May-2019 06-Jun-2020 AB APONESTO 447 > 1 year
(GRAVEL TO CONCRETE) CONSTRUCTION, PARTS
OF MONTEVISTA-DNAS & SUPPLIES, INC.
RD (BRGY. CANIDKID- (FORMERLY:AB
BRGY. CAMANSI APONESTO
SECT.),COMPO CONSTRUCTION PARTS
& SUPPLY) (22998)
Region XI Regional Office 17L00038 WIDENING (4 INTO 6 03-Jun-2018 08-May-2019 06-Jun-2020 AB APONESTO 447 > 1 year
LANES) OF DAANG CONSTRUCTION, PARTS
MAHARLIKA (MN) INCL. & SUPPLIES, INC.
CONST. OF PEDESTRIAN (FORMERLY:AB
OVERPASS & RROW APONESTO
(BRGY. CONSTRUCTION PARTS
& SUPPLY) (22998)
Region XI Regional Office 15L00113 CONST. OF PILAN 01-Jun-2018 17-May-2019 15-Jun-2020 FGM BUILDERS 438 > 1 year
BRIDGE 2 & RESOURCES &
APPROACHES ALONG DEVELOPMENT CORP.
DAVAO-COTABATO ROAD (31807) / O. G. SANTOS
(DAVAO CITY-JCT. DIGOS CONSTRUCTION (2050)
SECT.),DAVAO
Region XI Regional Office 18L00090 WIDENING (2 INTO 4 31-Jan-2019 20-May-2019 18-Jun-2020 COASTLAND 435 > 1 year
LANES) OF PRES. CONSTRUCTION &
DIOSDADO P. DEVELOPMENT CORP.
MACAPAGAL NAT'L. (11487)
H'WAY INCL ROW (BRGY.
DAWAN,BRGY. IB

PCMA 8/27/2021 8:09:15 AM Page 23 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 18L00089 WIDENING (2 INTO 4 25-Jan-2019 20-May-2019 18-Jun-2020 COASTLAND 435 > 1 year
LANES) OF PRES. CONSTRUCTION &
DIOSDADO P. DEVELOPMENT CORP.
MACAPAGAL NAT'L. HI- (11487)
WAY INCL. ROW,(BRGY.
DAWAN SECT.
Region XI Regional Office 17L00197 CONSTRUCTION OF 10-Dec-2018 30-May-2019 28-Jun-2020 L & L CONSTRUCTION 425 > 1 year
EVACUATION CENTER, (15108)
BRGY. LOS AMIGOS,
DAVAO CITY
Region XI Regional Office 18L00031 WIDENING (2 INTO 4 01-Jun-2019 05-Jun-2019 04-Jul-2020 AB APONESTO 419 > 1 year
LANES) OF MONTEVISTA- CONSTRUCTION, PARTS
COMPOSTELA-MATI & SUPPLIES, INC.
BDRY. RD. INCL. ROW (FORMERLY:AB
(BRGY. OSMEÑA-BRGY. APONESTO
BANTC CONSTRUCTION PARTS
& SUPPLY) (22998)
Region XI Regional Office 18L00088 CONC. OF MACANGAO- 10-Jan-2019 14-Jun-2019 13-Jul-2020 H2 LANDMARK 410 > 1 year
TAGBOA-NEW VISAYAS- BUILDERS, INC. (7400)
SAN ISIDRO-CALAGASAN-
SABAT-MALIG-DON
MARIANO MARCOS RD,
INCL. R
Region XI Regional Office 15L00107 UPGRADING/RECONSTR 03-Aug-2018 14-Jun-2019 13-Jul-2020 RELY CONSTRUCTION & 410 > 1 year
UCTION/WIDENING OF SUPPLY (10433)
BUHANGIN-CABANTIAN-
COMMUNAL ROAD
LEADING TO D'LEONOR
INLAND RES

PCMA 8/27/2021 8:09:15 AM Page 24 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 18L00063 CONCRETING OF 12-Jan-2019 24-Jun-2019 23-Jul-2020 MAER SUMMIT 400 > 1 year
MONKAYO-BOSTON KONSTRUKT CO. (25262)
ROAD INCLUDING ROW,
PACKAGE B,
COMPOSTELA VALLEY
Region XI Regional Office 18L00072 CONC. OF UPPER 04-Mar-2019 24-Jun-2019 23-Jul-2020 MAER SUMMIT 400 > 1 year
TIBANBAN-OREGON- KONSTRUKT CO. (25262)
MAGDUG ROAD INCL.
CONST. OF UPPER
TIBANBAN BRIDGE &
ROW,DVO. ORIENTAL
Region XI Regional Office 18L00083 WIDENING (2 INTO 4 20-Feb-2019 02-Jul-2019 31-Jul-2020 MAVERICK BUILDERS 392 > 1 year
LANES) OF PRES. INCORPORATED
DIOSDADO P. (FORMERLY MAVERICK
MACAPAGAL NAT'L. HI- (14466)
WAY INCL. SLOPE
PROTECTION & ROW
Region XI Regional Office 18L00082 WIDENING (2 INTO 4 20-Feb-2019 02-Jul-2019 31-Jul-2020 MAVERICK BUILDERS 392 > 1 year
LANES) OF PRES. INCORPORATED
DIOSDADO P. (FORMERLY MAVERICK
MACAPAGAL NAT'L. HI- (14466)
WAY INCL. SLOPE
PROTECTION & ROW
Region XI Regional Office 18L00057 WIDENING (2 INTO 4 01-Feb-2019 02-Jul-2019 31-Jul-2020 MAVERICK BUILDERS 392 > 1 year
LANES) OF INCORPORATED
COMPOSTELA-CATEEL (FORMERLY MAVERICK
ROAD INCLUDING ROW, (14466)
DAVAO ORIENTAL

PCMA 8/27/2021 8:09:15 AM Page 25 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 16L00016 REHAB./IMPVT./CONST. 15-Sep-2017 04-Jul-2019 02-Aug-2020 RELY CONSTRUCTION & 390 > 1 year
OF BRGY. ANDAP-BRGY. SUPPLY (10433)
MANURIGAO WITH
BRIDGE COMPONENT,
COMPOSTELA VALLEY
1ST LD
Region XI Regional Office 17L00176 ROAD CONCRETING OF 28-Aug-2018 08-Jul-2019 06-Aug-2020 RELY CONSTRUCTION & 386 > 1 year
JCT. STO. NIÑO-GATONG- SUPPLY (10433)
IGANG-BUTAY-
NASILABAN, BRGY.
PALMA GIL, TALAINGOD,
DAVAO DE
Region XI Regional Office 17L00082 WIDENING (2 INTO 4 19-Dec-2017 10-Jul-2019 08-Aug-2020 MONOLITHIC 384 > 1 year
LANES) OF DAVAO- CONSTRUCTION &
BUKIDNON RD INCL. CONCRETE PRODUCTS,
RROW (BRGY. SALUMAY- INC. (5733)
BRGY. BAGANIHAN
SECT.) DAVA
Region XI Regional Office 18L00024 CONCRETING OF 18-May-2019 10-Jul-2019 08-Aug-2020 WEE ENG 384 > 1 year
MARAGUSAN-PANTUKAN CONSTRUCTION, INC.
ROAD (MARAGUSAN (16380)
SECTION) INCLUDING
ROW, COMPOSTELA
VALLEY
Region XI Regional Office 18L00002 WIDENING (4 INTO 6 16-Feb-2019 15-Jul-2019 13-Aug-2020 MAC BUILDERS (7249) 379 > 1 year
LANES) OF DIGOS-
MAKAR RD INCLUDING
RROW (GUIHING &
NORTHERN PALIGUE-
HARADA BUTAI

PCMA 8/27/2021 8:09:15 AM Page 26 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 17L00122 CONC./WIDENING 05-Mar-2018 01-Aug-2019 30-Aug-2020 ALFREGO BUILDERS & 362 181 - 365
(SUBSTANDARD TO SUPPLY (19284) / RELY Days
STANDARD) OF BRGY. CONSTRUCTION &
FATIMA,PAQUIBATO SUPPLY (10433)
DIST. GOING TO BRGY.
DALAGDAG-LAM
Region XI Regional Office 15L00116 CONST./IMPVT./UPGRADI 31-Oct-2018 12-Aug-2019 10-Sep-2020 ULTICON BUILDERS, 351 181 - 365
NG OF ISLAND GARDEN INC. (17267) Days
CITY OF SAMAL (IGACOS)
CIRCUMFERENTIAL
ROAD,DAVAO DEL
NORTE
Region XI Regional Office 18L00041 CONC. OF JCT. PADADA 08-Mar-2019 12-Aug-2019 10-Sep-2020 THREE W BUILDERS, 351 181 - 365
(ALONG DIGOS-MAKAR INC. (10722) / ALFREGO Days
RD)-KIBLAWAN-JCT. BUILDERS & SUPPLY
MALUNGON(ALONG (19284)
DIGOS-MAKAR RD)
BYPASS RD,PA
Region XI Regional Office 18L00033 WIDENING OF MANAT 20-Jun-2019 21-Aug-2019 19-Sep-2020 R.A. PAHATI CONST. & 342 181 - 365
BRIDGE (B00080MN) & SUPPLY, INC. (35843) / Days
APPROACHES ALONG NUEDA BUILDERS
MONTEVISTA- CONSTRUCTION &
COMPOSTELA-MATI SUPPLY INC. (39776) /
BDRY. RD INCL. ROW GVDPM CONSTRUCTION
CORP. (FORMERLY: ZM
CONSTRUCTIO (9052)
Region XI Regional Office 18L00027 CONCRETING OF CATEEL 22-May-2019 02-Sep-2019 01-Oct-2020 MAVERICK BUILDERS 330 181 - 365
DIVERSION ROAD INCORPORATED Days
INCLUDING ROW, DAVAO (FORMERLY MAVERICK
ORIENTAL (14466)

PCMA 8/27/2021 8:09:15 AM Page 27 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 18L00102 CONST. OF BRGY. 15-Jun-2019 02-Sep-2019 01-Oct-2020 GP & H CONSTRUCTION 330 181 - 365
MAHAYAHAY,MARAGUSA INCORPORATED Days
N-BRGY. SINGAPORE- (FORMERLY: GP & H
BRGY. ANITAPAN-BRGY. CONSTRUCTION &
MASCAREG-BRGY. SUPPLY) (36141)
CABUYUAN,INC
Region XI Regional Office 18L00116 DAANG MAHARLIKA (MN), 06-Jul-2019 12-Sep-2019 11-Oct-2020 RELY CONSTRUCTION & 320 181 - 365
K1457+128-K1459+750, SUPPLY (10433) Days
DAVAO DEL NORTE
Region XI Regional Office 17L00116 WIDENING (2 INTO 4 02-Nov-2018 16-Sep-2019 15-Oct-2020 RELY CONSTRUCTION & 316 181 - 365
LANES) OF SURIGAO DEL SUPPLY (10433) Days
SUR BDRY.-DVO. OR.
COASTAL RD INCL.
REHAB./RECONST. OF
DAMA
Region XI Regional Office 17L00096 CONST./OPENING/CONC. 28-Dec-2018 16-Sep-2019 15-Oct-2020 ULTICON BUILDERS, 316 181 - 365
OF MAWAB-MARAGUSAN- INC. (17267) Days
CARAGA RD,SITIO
TAGDALONGDONG-
BRGY. LANGAWISAN
SECT. INCL. C
Region XI Regional Office 15L00096 ROAD 24-Sep-2018 16-Sep-2019 15-Oct-2020 ULTICON BUILDERS, 316 181 - 365
OPENING/IMPVT./CONCR INC. (17267) Days
ETING OF MAWAB-
MARAGUSAN-CARAGA
ROAD,POBLACION
MAWAB & BRGY. ANDILI-
BRGY. N

PCMA 8/27/2021 8:09:15 AM Page 28 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 16L00020 CONSTRUCTION OF 11-Jun-2018 16-Sep-2019 15-Oct-2020 HEXAMINDZ 316 181 - 365
MATI-TARRAGONA CORPORATION Days
BYPASS ROAD (FORMERLY:KILUSANG
(LUCATAN-TAGABAKID MAGKAIBIG (31666)
ROAD), DAVAO ORIENTAL
1ST LD
Region XI Regional Office 17L00135 ROAD OPENING OF 21-Jun-2018 16-Sep-2019 15-Oct-2020 ULTICON BUILDERS, 316 181 - 365
BRGY. INC. (17267) Days
MAHAYAHAY,MARAGUSA
N-BRGY. SINGAPORE-
BRGY. ANITAPAN-BRGY.
MASCAREG-BRGY.
CABUYU
Region XI Regional Office 17L00102 CONST./OPENING OF 30-Oct-2018 16-Sep-2019 15-Oct-2020 ULTICON BUILDERS, 316 181 - 365
PIASUSUAN- INC. (17267) Days
BINUGSAYAN ROAD,
NAPNAPAN, PANTUKAN,
COMPOSTELA VALLEY
2ND LD
Region XI Regional Office 18L00039 CONCRETING OF 25-Dec-2018 17-Sep-2019 16-Oct-2020 R.A. PAHATI CONST. & 315 181 - 365
MONKAYO-BOSTON SUPPLY, INC. (35843) / Days
ROAD, PACKAGE A, NUEDA BUILDERS
INCLUDING ROW, CONSTRUCTION &
COMPOSTELA VALLEY SUPPLY INC. (39776)
Region XI Regional Office 15L00083 WIDENING OF DAANG 17-Jun-2017 27-Sep-2019 26-Oct-2020 RELY CONSTRUCTION & 305 181 - 365
MAHARLIKA (MN) SUPPLY (10433) Days
INCLUDING ROAD RIGHT-
OF -WAY (RROW),NEW
BALAMBAN-MAGDUM &
BINCUNGAN

PCMA 8/27/2021 8:09:15 AM Page 29 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 18L00068 CONST./OPENING OF 10-Aug-2019 04-Oct-2019 02-Nov-2020 MAVERICK BUILDERS 298 181 - 365
BAGANGA DIVERSION INCORPORATED Days
ROAD INCLUDING ROW, (FORMERLY MAVERICK
DAVAO ORIENTAL (14466)
Region XI Regional Office 15L00064 WIDENING (WITH 03-Oct-2016 08-Oct-2019 06-Nov-2020 BISLIG VENTURE 294 181 - 365
REHABILITATION) OF CONSTRUCTION & Days
DAVAO-BUKIDNON DEV'T. INC. (36370) /
RD,BUDA-MARAHAN MONOLITHIC
SECT.,DAVAO CITY; CONSTRUCTION &
SECT. 1-KO 1623+6 CONCRETE PRODUCTS,
INC. (5733)
Region XI Regional Office 17L00069 WIDENING (2 INTO 4 01-Apr-2018 11-Oct-2019 09-Nov-2020 ALGON ENGINEERING 291 181 - 365
LANES) OF DAVAO- CONSTRUCTION Days
BUKIDNON ROAD CORPORATION (00270)
INCLUDING RROW,
(BRGY. BUDA
SECT.),DAVAO CITY 3RD
L
Region XI Regional Office 18L00011 WIDENING (4 INTO 6 29-Jul-2019 11-Oct-2019 09-Nov-2020 JEJOR'S 291 181 - 365
LANES) OF DAVAO-COT. CONSTRUCTION Days
RD(DAVAO CITY-DIGOS CORPORATION (5143)
SECT.) INCLUDING
RROW,(SINAWILAN-
COGON S
Region XI Regional Office 17L00040 WIDENING (2-4 INTO 6 03-Feb-2018 11-Oct-2019 09-Nov-2020 ALGON ENGINEERING 291 181 - 365
LANES & 2 INTO 4 LANES) CONSTRUCTION Days
INCL. REHAB./RECONST. CORPORATION (00270)
OF DAMAGED PAVED
NAT'L. & RROW OF

PCMA 8/27/2021 8:09:15 AM Page 30 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 17L00063 CONC./WIDENING/IMPVT. 05-Jan-2019 29-Oct-2019 27-Nov-2020 RELY CONSTRUCTION & 273 181 - 365
OF BYPASS RD @ JCT. SUPPLY (10433) Days
DAVAO CITY DIVERSION
RD-TIGATTO RD-JCT.
DAVAO CITY DIVERSI
Region XI Regional Office 18L00078 WIDENING (2 INTO 4 18-Aug-2019 13-Nov-2019 12-Dec-2020 J.H. PAJARA 258 181 - 365
LANES) OF KINGKING BR. CONSTRUCTION Days
(B00197MN) & CORPORATION (1890) /
APPROACHES ALONG MAVERICK BUILDERS
SURIGAO-DAVAO INCORPORATED
COASTAL RD INC (FORMERLY MAVERICK
(14466)
Region XI Regional Office 17L00148 CONST. OF DRAINAGE 12-Oct-2018 14-Nov-2019 13-Dec-2020 GP & H CONSTRUCTION 257 181 - 365
(INCLUDING LENGTH INCORPORATED Days
GOING TO OUTFALL (FORMERLY: GP & H
ALONG DAANG CONSTRUCTION &
MAHARLIKA, DAVAO DEL SUPPLY) (36141) / ROMA
NORE 1ST LD CONSTRUCTION &
DEVELOPMENT
CORPORATION (6514)
Region XI Regional Office 17L00052 WIDENING 2-4 INTO 6 31-Mar-2018 14-Nov-2019 13-Dec-2020 THREE W BUILDERS, 257 181 - 365
LANES OF DAVAO-COT. INC. (10722) Days
RD (DAVAO CITY-JCT.
DIGOS SECT.) INCL.
RROW (BATO-COGON
SECT
Region XI Regional Office 17L00153 CONST./WIDENING/IMPVT 09-Jan-2019 14-Nov-2019 13-Dec-2020 THREE W BUILDERS, 257 181 - 365
. OF BYPASS RD @ JCT. INC. (10722) / CLTG Days
DAVAO CITY DIVERSION BUILDERS (16852)
RD-TIGATTO-JCT. DAVAO
CITY DIV. RD I

PCMA 8/27/2021 8:09:15 AM Page 31 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 18L00141 CONSTRUCTION OF 04-Jul-2019 21-Nov-2019 20-Dec-2020 PYRAMID 250 181 - 365
ROAD NETWORK CONSOLIDATED Days
INCLUDING FACILITIES, BUILDERS & GEN. MDSE.
UP MINDANAO, MINTAL, (15599)
DAVAO CITY
Region XI Regional Office 18L00013 WIDENING (2 INTO 4 16-Jul-2019 22-Nov-2019 21-Dec-2020 P.L. SEBASTIAN 249 181 - 365
LANES) OF DAVAO- CONSTRUCTION, INC. Days
BUKIDNON RD INCL. (FORMERLY: P.L.
SLOPE PROTECTION & SEBASTIAN
ROW (BRGY. BAGANIHAN CONSTRUCTION) (35840)
& BRGY.
Region XI Regional Office 18L00119 MATIAO-MAGSAYSAY 03-Jul-2019 25-Nov-2019 24-Dec-2020 MAER SUMMIT 246 181 - 365
COASTAL ROAD, KONSTRUKT CO. (25262) Days
INCLUDING ROW, DAVAO
ORIENTAL
Region XI Regional Office 17L00090 ROAD UPGRADING 21-Dec-2017 25-Nov-2019 24-Dec-2020 FFJJ CONSTRUCTION 246 181 - 365
(GRAVEL TO CONCRETE) (16712) Days
OF DEMOLOC-LITTLE
BAGUIO-ALABEL RD INCL.
RROW (BOLILA SECT.),
DA
Region XI Regional Office 18L00001 REHAB./RECONST. OF 19-Mar-2019 28-Nov-2019 27-Dec-2020 DREIRICH BUILDERS 243 181 - 365
DAMAGED PAVED RD (39521) / RELY Days
ALONG DVO.-COT. RD., CONSTRUCTION &
(DAVAO CITY-JCT. DIGOS SUPPLY (10433)
SECT.),ZONE III-TAGAB
Region XI Regional Office 17L00177 ROAD CONCRETING OF 01-Jul-2019 04-Dec-2019 02-Jan-2021 COASTLAND 237 181 - 365
JCT. STO. NIÑO-GATONG- CONSTRUCTION & Days
IGANG-BUTAY- DEVELOPMENT CORP.
NASILABAN, BARANGAY (11487)
PALMA GIL,TALAINGOD,
DVO. D

PCMA 8/27/2021 8:09:15 AM Page 32 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 17L00172 CONST. OF DAVAO CITY 06-May-2019 04-Dec-2019 02-Jan-2021 WEE ENG 237 181 - 365
COASTAL BYPASS RD @ CONSTRUCTION, INC. Days
JCT. DAVAO-COT. RD- (16380)
BAGO APLAYA-TALOMO-
MATINA APLAYA-ROXAS
A
Region XI Regional Office 17L00171 CONST. OF DAVAO CITY 11-Nov-2019 04-Dec-2019 02-Jan-2021 WEE ENG 237 181 - 365
COASTAL BYPASS RD @ CONSTRUCTION, INC. Days
JCT. DAVAO-COT. RD- (16380)
BAGO APLAYA-TA
Region XI Regional Office 17L00208 CONSTRUCTION/REHABI 22-Oct-2018 05-Dec-2019 03-Jan-2021 FFJJ CONSTRUCTION 236 181 - 365
LITATION OF WATER (16712) Days
SUPPLY (LEVEL II) IN
REGION XI, VARIOUS
LOCATION IN REGION XI
Region XI Regional Office 17L00220 REPLACEMENT OF 23-Dec-2018 06-Dec-2019 04-Jan-2021 BISLIG VENTURE 235 181 - 365
MANGALCAL BRIDGE & CONSTRUCTION & Days
APPROACHES INCL. DEV'T. INC. (36370)
RIGHT-OF-WAY
ACQUISITION ALONG
CARMEN ROAD, DAVAO
Region XI Regional Office 17L00216 CONST. OF PANGLAS 27-Dec-2018 06-Dec-2019 04-Jan-2021 BISLIG VENTURE 235 181 - 365
BRIDGE & APPROACHES CONSTRUCTION & Days
INCL. RIGHT-OF-WAY DEV'T. INC. (36370)
ACQUISITION ALONG
MABUHAY-PAÑALUM-
PAQUIBATO
Region XI Regional Office 17L00215 CONST. OF PAÑALUM II 11-Jan-2019 06-Dec-2019 04-Jan-2021 BISLIG VENTURE 235 181 - 365
BRIDGE & APPROACHES CONSTRUCTION & Days
INCL. RIGHT-OF-WAY DEV'T. INC. (36370)
ACQUISITION ALONG
MABUHAY-PAÑALUM-
PAQUIB
PCMA 8/27/2021 8:09:15 AM Page 33 of 41
DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 17L00083 WIDENING (2 INTO 4 03-Mar-2018 06-Dec-2019 04-Jan-2021 ALGON ENGINEERING 235 181 - 365
LANES) OF DAVAO- CONSTRUCTION Days
BUKIDNON RD INCL. CORPORATION (00270)
REHAB./RECONST./UPGR
ADING (ASPHALT TO
CONCRETE
Region XI Regional Office 18L00103 DAVAO CITY DIVERSION 10-Mar-2019 09-Dec-2019 07-Jan-2021 ECOMIXED 232 181 - 365
ROAD K1508+772- CONSTRUCTION AND Days
K1512+221, DAVAO CITY DEVELOPMENT
CORPORATION (41139) /
THREE W BUILDERS,
INC. (10722)
Region XI Regional Office 17L00127 OPENING/IMPVT./ROAD 13-Nov-2018 12-Dec-2019 10-Jan-2021 ULTICON BUILDERS, 229 181 - 365
UPGRADING (GRAVEL TO INC. (17267) Days
CONCRETE) OF ISLAND
GARDEN CITY OF SAMAL
(IGACOS) CIRC. RD.
Region XI Regional Office 17L00128 OPENING/IMPVT./CONC. 19-Nov-2018 12-Dec-2019 10-Jan-2021 COASTLAND 229 181 - 365
OF ACCESS RD LEADING CONSTRUCTION & Days
TO TAGPOPONGAN PORT DEVELOPMENT CORP.
INCL. RROW, ISLAND (11487)
GARDEN CITY OF SAMA
Region XI Regional Office 17L00054 OPENING/IMPVT./ROAD 13-Nov-2018 12-Dec-2019 10-Jan-2021 ULTICON BUILDERS, 229 181 - 365
UPGRADING (GRAVEL TO INC. (17267) Days
CONCRETE) OF ISLAND
GARDEN CITY OF SAMAL
(IGACOS) CIRC. ROA
Region XI Regional Office 17L00002 WIDENING (4-6 LANES) 15-Jun-2018 13-Dec-2019 11-Jan-2021 FFJJ CONSTRUCTION 228 181 - 365
OF DIGOS-MAKAR RD (16712) Days
INCL. REHAB./RECONST.
OF DAMAGED PAVED
NAT'L RD & RROW
(TALAS
PCMA 8/27/2021 8:09:15 AM Page 34 of 41
DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 17L00017 WIDENING 2-4 INTO 6 15-Dec-2017 13-Dec-2019 11-Jan-2021 VICENTE T. LAO 228 181 - 365
LANES OF DAVAO-COT. CONSTRUCTION (7040) Days
RD (DAVAO CITY-JCT.
DIGOS SECT.) INCL.
REHAB./RECONST. OF DA
Region XI Regional Office 17L00161 IMPVT. OF OFF- 15-Jun-2018 13-Dec-2019 11-Jan-2021 FFJJ CONSTRUCTION 228 181 - 365
CARRIAGEWAY ALONG (16712) Days
DAVAO-SARANGANI
COASTAL RD (MALALAG-
MALITA-JAS-GLAN RD)
INCL. REHAB.
Region XI Regional Office 17L00160 IMPVT. OF OFF- 15-Jun-2018 13-Dec-2019 11-Jan-2021 FFJJ CONSTRUCTION 228 181 - 365
CARRIAGEWAY ALONG (16712) Days
DAVAO-SARANGANI
COASTAL RD (MALALAG-
MALITA-JAS-GLAN RD)
INCL. REHAB.
Region XI Regional Office 17L00008 WIDENING (4 TO 6 15-Jun-2018 13-Dec-2019 11-Jan-2021 FFJJ CONSTRUCTION 228 181 - 365
LANES) OF DIGOS- (16712) Days
MAKAR RD INCLUDING
RROW (NEW BACLAYON-
TAGANSULE
SECT.),DAVAO DEL SU
Region XI Regional Office 17L00124 WIDENING (4 INTO 6 19-Feb-2019 13-Dec-2019 11-Jan-2021 C.T. LEONCIO 228 181 - 365
LANES) OF DAANG CONSTRUCTION & Days
MAHARLIKA (MN) (BRGY. TRADING (17371)
MAGDUM SECT.) INCL.
RROW,DAVAO DEL
NORTE 1S

PCMA 8/27/2021 8:09:15 AM Page 35 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 17L00003 WIDENING (4 TO 6 15-Jun-2018 13-Dec-2019 11-Jan-2021 FFJJ CONSTRUCTION 228 181 - 365
LANES) OF DIGOS- (16712) Days
MAKAR RD INCL. RROW
(POBLACION SULOP-NEW
BACLAYON SECT.),DVO.
DEL S
Region XI Regional Office 15L00036 WIDENING OF DIGOS- 16-Jul-2018 13-Dec-2019 11-Jan-2021 THREE W BUILDERS, 228 181 - 365
MAKAR RD, SULOP INC. (10722) Days
SECT., DAVAO DEL SUR,
INCLUDING ROAD RIGHT-
OF-WAY(RROW) STA.
1579+
Region XI Regional Office 15L00099 ROAD UPGRADING 18-Nov-2016 13-Dec-2019 11-Jan-2021 THREE W BUILDERS, 228 181 - 365
(ASPHALT TO INC. (10722) Days
CONCRETE) OF DAVAO-
SARANGANI COASTAL RD
(MALALAG-MALITA-JAS-
GLAN),NEW BAC
Region XI Regional Office 15L00087 WIDENING OF DIGOS- 14-Jun-2018 13-Dec-2019 11-Jan-2021 THREE W BUILDERS, 228 181 - 365
MAKAR ROAD INCLUDING INC. (10722) Days
ROAD RIGHT-OF-WAY
(RROW),NEW BACLAYON-
TAGANSULE
SECT.,DAVAO D
Region XI Regional Office 18L00092 CONSTRUCTION/IMPROV 09-Jun-2019 16-Dec-2019 14-Jan-2021 AB APONESTO 225 181 - 365
EMENT OF PIASUSUAN- CONSTRUCTION, PARTS Days
BINUGSAYAN ROAD, & SUPPLIES, INC.
COMPOSTELA VALLEY (FORMERLY:AB
APONESTO
CONSTRUCTION PARTS
& SUPPLY) (22998)

PCMA 8/27/2021 8:09:15 AM Page 36 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 17L00181 CONST./IMPVT./WIDENIN 30-May-2019 18-Dec-2019 16-Jan-2021 MONOLITHIC 223 181 - 365
G OF BYPASS ROAD @ CONSTRUCTION & Days
MALAGAMOT RD-JCT. CONCRETE PRODUCTS,
MUDIANG RD INCLUDING INC. (5733)
ROW, DAVAO CITY 2ND L
Region XI Regional Office 17L00121 WIDENING (2 INTO 4 18-Jan-2019 18-Dec-2019 16-Jan-2021 ABU CONSTRUCTION 223 181 - 365
LANES) OF HIJO BRIDGE (22313) Days
(B00209MN) INCL.
APPROACHES & RROW
ALONG SURIGAO-DAVAO
COAS
Region XI Regional Office 17L00004 REHAB./RECONST./WIDE 05-Nov-2019 19-Dec-2019 17-Jan-2021 THREE W BUILDERS, 222 181 - 365
NING OF DAANG INC. (10722) / CLTG Days
MAHARLIKA (MN) INCL. BUILDERS (16852)
SLOPE PROTECTION
(BRGY. CANOCOTAN-
BRGY. BINCU
Region XI Regional Office 17L00022 REHAB./RECONST./WIDE 31-Oct-2019 19-Dec-2019 17-Jan-2021 ST. GERRARD 222 181 - 365
NING OF DAANG CONSTRUCTION GEN. Days
MAHARLIKA (MN) INCL. CONTRACTOR &
SLOPE PROTECTION & DEVELOPMENT CORP.
RROW (BRGY. (FORMERLY:ST.
BINCUNGAN SECT GERRARD
CONSTRUCTION) (31762)
Region XI Regional Office 17L00007 IMPVT./UPGRADING 31-Oct-2018 20-Dec-2019 18-Jan-2021 ULTICON BUILDERS, 221 181 - 365
(GRAVEL TO CONCRETE) INC. (17267) Days
OF ISLAND GARDEN CITY
OF SAMAL (IGACOS)
CIRC. RD (EAST SIDE) D

PCMA 8/27/2021 8:09:15 AM Page 37 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 17L00064 CONC./WIDENING/IMPVT. 05-Mar-2019 23-Dec-2019 21-Jan-2021 ULTICON BUILDERS, 218 181 - 365
OF BYPASS ROAD @ INC. (17267) Days
BUHANGIN-TIGATTO-
MANDUG-CALLAWA-
FATIMA RD INCL.
RROW,DAVAO CI
Region XI Regional Office 18L00040 CONC. OF JCT. PADADA 26-Feb-2019 23-Dec-2019 21-Jan-2021 ALGON ENGINEERING 218 181 - 365
(ALONG DIGOS-MAKAR CONSTRUCTION Days
RD)-KIBLAWAN-JCT. CORPORATION (00270)
MALUNGON (ALONG
DIGOS-MAKAR RD)
BYPASS RD,
Region XI Regional Office 18L00007 CONCRETING OF 23-Sep-2019 27-Dec-2019 25-Jan-2021 PREMIUM 214 181 - 365
MAWAB-MACO BYPASS MEGASTRUCTURES INC. Days
ROAD, INCLUDING ROW, (36079)
COMPOSTELA VALLEY
Region XI Regional Office 15L00073 WIDENING OF DIGOS- 27-Dec-2019 31-Dec-2019 29-Jan-2021 MAVERICK BUILDERS 210 181 - 365
MAKAR ROAD INCLUDING INCORPORATED Days
ROAD RIGHT-OF-WAY (FORMERLY MAVERICK
(RROW) ZONE I-SAN (14466)
JOSE SECTION,DAVAO
DEL SU
Region XI Regional Office 17L00098 RECONST./CONC./WIDENI 19-Nov-2018 15-Jan-2020 13-Feb-2021 ALFREGO BUILDERS & 195 181 - 365
NG OF SLAUGHTER SUPPLY (19284) / RELY Days
HOUSE RD UNTIL F. CONSTRUCTION &
TORRES BR. INCL. SUPPLY (10433)
RROW, DAVAO CITY 1ST
LD (PAC

PCMA 8/27/2021 8:09:15 AM Page 38 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 17L00021 WIDENING (4 TO 6 31-Aug-2018 17-Jan-2020 15-Feb-2021 MAC BUILDERS (7249) 193 181 - 365
LANES) OF DIGOS Days
MAKAR RD INCL. CONST.
OF OFF-CARRIAGEWAY &
ROAD RIGHT-OF-WAY
(RROW)
Region XI Regional Office 17L00053 CONST./UPGRADING 30-Oct-2018 24-Jan-2020 22-Feb-2021 ULTICON BUILDERS, 186 181 - 365
(GRAVEL TO CONCRETE) INC. (17267) Days
OF MAWAB-MARAGUSAN-
CARAGA RD INCL. RROW,
BRGY. NEW LEYTE-
BRGY.
Region XI Regional Office 17L00065 WIDENING/RECONST./IM 11-Feb-2019 29-Jan-2020 27-Feb-2021 THREE W BUILDERS, 181 181 - 365
PVT. OF BYPASS RD @ INC. (10722) / CLTG Days
JCT. DAANG MAHARLIKA- BUILDERS (16852)
LICANAN-BUNAWAN-
MAHAYAG-INDANGAN-
CABANT
Region XI Regional Office 17L00073 CONST./WIDENING/IMPVT 30-Dec-2019 06-Feb-2020 07-Mar-2021 ER SALAC BUILDERS 173 91 - 180
. OF BYPASS RD @ JCT. CORPORATION (37948) / Days
DAVAO CITY DIV. RD- FFJJ CONSTRUCTION
TIGATTO RD-JCT. DAVAO (16712)
CITY DIV. RD INC
Region XI Regional Office 18L00016 CONC. OF DAVAO DEL 15-Jul-2019 11-Feb-2020 12-Mar-2021 MAC BUILDERS (7249) 168 91 - 180
NORTE-COMPOSTELA Days
VALLEY-AGUSAN DEL
SUR LEADING TO
VARIOUS TOURISM
SITES,SAN ISIDR

PCMA 8/27/2021 8:09:15 AM Page 39 of 41


DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 18L00176 CONSTRUCTION OF 15-Jan-2020 24-Feb-2020 25-Mar-2021 O. G. SANTOS 155 91 - 180
EVACUATION CENTER, CONSTRUCTION (2050) Days
BARANGAY SAOQUEGUE,
BAGANGA, DAVAO
ORIENTAL
Region XI Regional Office 17L00120 CONST./OPENING OF 23-Oct-2018 26-Feb-2020 27-Mar-2021 ULTICON BUILDERS, 153 91 - 180
MAWAB-MARAGUSAN- INC. (17267) Days
CARAGA RD. INCL.
RROW, SITIO DANGILAS
SECT., DAVAO ORIENTAL
1ST LD
Region XI Regional Office 17L00075 RECONST./CONC./WIDENI 06-Nov-2018 04-Mar-2020 03-Apr-2021 ST. GERRARD 146 91 - 180
NG OF SLAUGHTER CONSTRUCTION GEN. Days
HOUSE RD-UNTIL F. CONTRACTOR &
TORRES BR. INCL. DEVELOPMENT CORP.
WIDENING OF F.TORRES (FORMERLY:ST.
BR. & R GERRARD
CONSTRUCTION) (31762)
/ CLTG BUILDERS (16852)
Region XI Regional Office 18L00153 TAGUM CITY FLYOVER 04-May-2019 17-Mar-2020 16-Apr-2021 ULTICON BUILDERS, 133 91 - 180
ALONG AGUSAN-DAVAO INC. (17267) Days
ROAD, PACKAGE 2,
DAVAO DEL NORTE
Region XI Regional Office 18L00128 TAGUM CITY FLYOVER 04-May-2019 17-Mar-2020 16-Apr-2021 ULTICON BUILDERS, 133 91 - 180
ALONG AGUSAN-DAVAO INC. (17267) Days
ROAD, PACKAGE 1,
DAVAO DEL NORTE
Region XI Regional Office 18L00081 CONST. OF DRAINAGE 18-Apr-2019 23-Mar-2020 22-Apr-2021 ROMA CONSTRUCTION 127 91 - 180
ALONG TAGUM-PANABO & DEVELOPMENT Days
CIRCUMFERENTIAL CORPORATION (6514)
ROAD, K1459+850-
K1462+660, DAVAO DEL
NORTE
PCMA 8/27/2021 8:09:15 AM Page 40 of 41
DEFECTS
COMPLETION
IMPLEMENTING CONTRACT DATE OF LIABILITY
REGION CONTRACT NAME CERTIFICATE CONTRACTOR AGE AGE RANGE
OFFICE ID COMPLETION WARRANTY
(DATE ISSUED)
(END DATE + 30)
Region XI Regional Office 19L00152 CONSTRUCTION OF 31-Oct-2019 04-Jun-2020 04-Jul-2021 ULTICON BUILDERS, 54 31 – 60 Days
GRAVEL ROAD-TALIKUD INC. (17267)
CIRCUMFERENTIAL
ROAD, IGACOS, DAVAO
DEL NORTE
Region XI Regional Office 17L00142 RECONST./WIDENING/IM 19-Apr-2019 01-Jul-2020 31-Jul-2021 ALFREGO BUILDERS & 27 1 – 30 Day(s)
PVT. OF BYPASS RD AT SUPPLY (19284) / CLTG
JCT. DAANG MAHARLIKA- BUILDERS (16852)
ELIONG-JCT. ACACIA RD
INCL. RROW, DAVA
Region XI Regional Office 17L00143 RECONST./WIDENING/IM 25-Mar-2019 01-Jul-2020 31-Jul-2021 ALFREGO BUILDERS & 27 1 – 30 Day(s)
PVT. OF BYPASS RD AT SUPPLY (19284) / CLTG
JCT. DAANG MAHARLIKA- BUILDERS (16852)
ELIONG-JCT. ACACIA RD
INCL. RROW,DAVAO
Region XI Regional Office 19L00179 CONST. OF RAINWATER 02-Mar-2020 06-Jul-2020 05-Aug-2021 TWO DEGREES 22 1 – 30 Day(s)
COLLECTION SYSTEM CONSTRUCTION AND
(RWCS) ISLAND GARDEN SUPPLY (36734)
CITY OF SAMAL, DAVAO
DEL NORTE
Region XI Regional Office 17L00147 CONST. OF PAGAN 17-Dec-2019 06-Jul-2020 05-Aug-2021 R.D. POLICARPIO & 22 1 – 30 Day(s)
PEQUEÑO BRIDGE 2 COMPANY INC. (4414) /
(PARALLEL BRIDGE) ALGON ENGINEERING
INCL. APPROACHES & CONSTRUCTION
RROW ALONG DAVAO- CORPORATION (00270)
BUKIDNON RD,D
Total Number of Contracts : 204

PCMA 8/27/2021 8:09:15 AM Page 41 of 41

You might also like