Professional Documents
Culture Documents
Water Supply Estimate
Water Supply Estimate
required Completion Certificate from Concerned Local authority on lumpsum turnk basis for Construction
of EWS & LIG Residential / Commercia tenement on Land Bearing Survey No. 13 at Bhandarli Site (1386),
Tal-Kalyan, Dist-Thane under PMAY
Nine
hundred
twenty two
148.51 i) 65 mm Rmt 922.00 136,926.00
Rupees and
Zero paisa
only
Nine
hundred
twenty two
165.42 ii) 80mm Rmt 922.00 152,517.00
Rupees and
Zero paisa
only
Nine
hundred
twenty two
45.33 iii) 100 mm dia Rmt 922.00 41,794.00
Rupees and
Zero paisa
only
One
thousand
three
hundred
222.36 iv) 150 mm Dia. Rmt 1343.00 298,629.00
forty three
Rupees and
Zero paisa
only
One
thousand
eight
hundred
382.18 v) 200 mm dia Rmt 1824.00 697,096.00
twenty four
Rupees and
Zero paisa
only.
Fifty Three
Rupees and
148.51 i) 65 mm Rmt 53.00 7,871.00
Zero Paisa
Only
fifty Three
Rupees and
165.42 ii) 80mm Rmt 53.00 8,767.00
Zero Paisa
Only
Sixty Two
Rupees and
45.33 iii) 100 mm dia Rmt 62.00 2,810.00
Zero Paisa
Only
Eighty Three
Rupees and
222.36 iv) 150 mm Dia. Rmt 83.00 18,456.00
Zero Paisa
Only
One
Hundred
382.18 v) 200 mm dia Rmt 109.00 Nine Rupees 41,658.00
and Zero
Paisa Only
providing and supplying D.I.fitting with ISI
mark socket pushion joints or flanged joints
confirming to table 12 to 31 of IS 9523/2000
MJP 2015- upto latest amendements including cost of
2016 ,Item SBR/EDPMtyton rings.fitting should be with
6 -
No.1-I ,Page internally oeinary portland cement mortar
no.97 lined and externally metallic zinc coating/zinc
rich paint with finishing layer of black bitumen
coating including transportation and all taxes
etc.complete
Three
thousand
sixteen
3 i) 200 mm Dia. Nos. 3016.00 9,048.00
rupees and
Zero paisa
only
Two
Thousand
Three
Hundred
5 ii) 150 mm Dia. Nos. 2371.00 11,855.00
Seventy One
Rupees and
Zero Paisa
Only
One
Thousand
Three
Hundred
2 iii) 100 mm dia Nos. 1316.00 2,632.00
Sixteen
Rupees and
Zero Paisa
Only
One
thousand
fifty six
4 iv) 80 mm Dia. Nos. 1056.00 4,224.00
Rupees and
Zero paisa
only
One
Thousand
Three
Hundred
4 v) 65 mm Dia. Nos. 1056.0 4,224.00
Sixteen
Rupees and
Zero Paisa
Only
Three
Thosand
One
Hundred
6.00 i) 200 mm Dia. Nos. 3118.0 18,708.00
Eighteen
Rupees and
Zero Paisa
Only
One
Thousand
Eight
Hundred
3.00 ii) 150 mm Dia. Nos. 1834.0 5,502.00
Thirty Four
Rpees and
Zero Paisa
Only
One
Thosand
One
Hundred
3.00 iii) 100 mm dia Nos. 1186.0 3,558.00
Eighty Six
Rupees and
Zero Paisa
Only
Nine
Hundred
Seventy
3.00 iv) 80 mm Dia. Nos. 978.0 2,934.00
Eight Rupees
and Zero
Paisa Only
Nine
Hundred
Seventy
8.00 v) 65 mm Dia. Nos. 978.0 7,824.00
Eight Rupees
and Zero
Paisa Only
One
Thousand
Seven
2.00 100 x 80 mm dia Nos. 1704.0 Hundred 3,408.00
Four Rupees
and Zero
Paisa Only
One
Thousand
Four
Hundred
3.00 80 x 80 mm dia Nos. 1445.0 4,335.00
Fourty Five
Rupees and
Zero Paisa
Only
Three
Thousand
Twenty
3.00 150 x 150 mm dia Nos. 3020.0 9,060.00
Rupees and
Zero Paisa
Only
Two
Thousand
Four
Hundred
2.00 150 x 80 mm dia Nos. 2445.0 4,890.00
Fourty Five
Rupees and
Zero Paisa
Only
Four
Thousand
Two
4.00 200 x 150 mm dia Nos. 4206.0 Hundred Six 16,824.00
Rupees and
Zero Paisa
Only
Providing double flange sluice valve
MJP 2015-
confirming for IS-2906/14846 including worn
2016 Item
7 gear arrangements as per test pressure ,
no-2-a, page
stainless steel spindle,cap,including all
no-211
taxes,transportation etc.complete
Four
Thousand
Four
Hundred
2 i) 65 mm Nos. 4454.0 8,908.00
Fifty Four
Rupees and
Zero Paisa
Only
Four
Thousand
Six Hundred
1 ii)80 mm Nos. 4604.0 4,604.00
Four Rupees
and Zero
Paisa
Six
Thousand
One Hundrd
1 iii) 100 mm dia Nos. 6131.0 Thirty One 6,131.00
Rupees and
Zero Paisa
Only
Nine
Thousand
One
Hundred
3 iv)150 mm Nos. 9195.0 27,585.00
ninety Five
Rupees and
Zero Paisa
Only
Sixteen
Thousand
Six Hundred
2 v)200 mm Nos. 16668.0 Sixty Eight 33,336.00
Rupees and
Zero Paisa
Only
One
Thousand
Eighty Eight
2 i) 65 mm Nos. 1088.0 2,176.00
Rupees and
Zero Paisa
Only
One
Thousand
Five
Hundred
1 ii)80 mm Nos. 1512.0 1,512.00
Twelve
Rupees and
Zero Paisa
Only
One
Thousand
Nine
Hundred
1 iii) 100 mm dia Nos. 1975.0 1,975.00
Seventy Five
Rupees ans
Zero Paisa
Only
Three
Thousand
One
3 iv)150 mm Nos. 3105.0 Hundred 9,315.00
five Rupees
and Zero
Paisa Only
Three
Thousand
Two
Hundred
2 v)200 mm Nos. 3230.0 6,460.00
Thirty
Rupees and
zero Paisa
Only
Five
Providing and constructing B.B. masonary Thousand
MJP 2015-16 valve chamber with 15 cm thick 1;3:6 One
Item No.1-- proportion PCC bedding,excluding excavation Hundred
9 9.00 Nos. 5129.0 46,161.00
A ,Page ,BB. Masonary in C.M 1:5 proportion precast Twenty Nine
no.343 RCC frame and cover ,etc. complete as directed Rupees and
by Engineer - in-charge.(600x450x900 mm) Zero Paisa
Only
Sixteen
Thousand
Five
Hundred
7 i)150 mm dia Nos. 16542 115,794.00
Forty Two
Rupees and
Zero Paisa
Only
Twelve
Thousand
Eight
Hundred
7 ii)80 mm dia Nos. 12855.0 89,985.00
Fifty Five
Rupees and
zero Paisa
Only
Twelve
Thousand
Eight
Hundred
2 iii)65 mm dia Nos. 12855.0 25,710.00
Fifty Five
Rupees and
zero Paisa
Only
Twelve
Providing and filling in the foundation with
DSR 2015- Hundred
sand of approved quality including watering,
2016,Item Fifty Four
11 977.282 compaction complete. Cum 1254.0 1,225,512.00
No-6,Page Rupees and
No-9 Zero Paisa
Only.
Total 3,513,619.00
Sectional
Agency
Engineer
Deputy Engineer Executive Engineer-I
KH & ADB
Mumbai
KH & ADB Thane KH & ADB Mumbai
Excavation for foundation in earth, soil of all types, sand, gravel and soft murum by
mechanical means including removing the excavated materials upto a distance of
50 meters beyond the building area and stacking and spreading as directed
1 dewatering, preparing the bed for the foundation and necessary backfilling,
ramming, watering complete excluding shoring and strutting.etc. complete. (Lift
upto 1.50 m)
Total 1272.54
Excavation for foundation in earth, soil of all types, sand, gravel and soft murum by
mechanical means including removing the excavated materials upto a distance of
50 meters beyond the building area and stacking and spreading as directed
2 dewatering, preparing the bed for the foundation and necessary backfilling,
ramming, watering complete including shoring and strutting.etc. complete. (Lift
from 1.50 to 3.0 m)
Total 169.672
Lowering laying & jointing with SBR ruber gaskets DI-k9 pipes of
various classes DI-k9/DI specials of following diameter in proper
position, grade & alingnment as directed by Engineer-in-charge
5
including conveyance of materilas form stores to site of work, including
cost of jointing material and rubber rings labour,giving hydraulic testing
etc. complete.
100 x 80 mm dia No 2 2
80 x 80 mm dia No 3 3
150 x 80 mm dia No 2 2
Providing double flange sluice valve confirming for IS-2906/14846 including worn
7 gear arrangements as per test pressure , stainless steel spindle,cap,including all
taxes,transportation etc.complete
80 mm dia No. 7 7
65 mm dia No. 2 2
Total 977.28
Filling in plinth and floors with approved excavated materials in 15 cm
12
to 20 cm layers including watering and compaction complete.
Total 424.18
2 402 To 02 5 5
5 02 TO 202 5 5
6 03 To 203 5 5
2 80 mm 0 165.42 165.42
Number of
Sr.No Description Nos Total Length of pipe
Pedestal
1 65 mm 1 148.51 51
2 80 mm 1 165.42 56
3 100 mm 1 45.33 16
4 150 mm 1 222.36 75
5 200 mm 1 382.18 128
Total Number of pedestal 326