2.5.2.4 Inspection Task Fluidizing Blower and Rotary Vane Feeder
2.5.2.4 Inspection Task Fluidizing Blower and Rotary Vane Feeder
Sr.no
Activity Status Remark
.
(OK/Not OK)
Fluidizing Blower
1 Check blower outlet valve is in open position(ok-valve is in open position)
2 Check for any oil leakage from blower (OK – No oil leakage)
3 Check for any accumulation of water around blower(ok-no water accumulation)
4 Check for any air leakage from air lines (Ok – no air leakage)
5 Check for abnormal sound from blower motor and blower internal (ok no abnormal sound)
6 Check blower body/blower motor for overheating (ok-no overheating)
7 Check physical condition of all pressure gauge ( OK- No damage)
8 Check the discharge air pressure should be 0.7kg/cm2
Note : Please enter the status as per defined OK condition given in bracket at the end of each statement
Jamnagar Division, J3, DTA
Other Observations:
1
2
3
4
5
Signature: Signature:
Checked by: Verified by: