Jamnagar Division, J3, DTA

Inspection Task-list Document No. 2.5.2.9

Petcoke BRU

Date: Name of Operator Shift:


Equipment no.:

Sr.no Activity Status Remark


(OK/Not OK)
Drive

1 Check gearbox oil leakage and check oil level (OK – No leakage, up to level mark)

2 Check for any abnormal sound (OK- No abnormal sound)

3 Check for gearbox temperature (OK-not overheated)

4 Check pressure gauge reading of each gearbox

5 Check for fluid coupling oil leakage ( OK – No leakage)

6 Check belt for any damage, cut and joint opening (OK- No damage, No Cut, No joint opening)

7 Check for any abnormal sound in belt and chain links.

Safety switches

1 Check physical condition of pull chord rope and pull chord switch ( OK – No damage)

2 Check physical condition of Zero Speed Switch ( ZSS) ( OK – No damage)

Hoist

Check physical condition of hoist

BRU Page 1
Lighting

Check lighting for physical damage & working condition (OK – No damage and working
1
properly)

Transfer chutes

1 Check chutes for puncture & material spillage (OK – No puncture, No material spillage)

2 Check chute liner bolts (OK - No missing liner plate bolts)

Electric Panel

Check the physical condition & door opening of electric panel (OK – No damage and No
1
doors found opened)

Exhaust Fan

1 Check the working status of Exhaust fan (OK – No damage and working properly)

Sump Pump

1 Check water level in sump pump reservoir (OK – No overflow condition)

Note : Please enter the status as per defined OK condition given in bracket and if N/OK then write down details in remark column.

Other Observations:

1
2

BRU Page 2
3
4
5

Signature: Signature:
Checked by: Verified by:

BRU Page 3