PROJECT TITLE : PROPOSED WINDOW GRILLS

Location : Block 2 Waterdam Gordon Heights


Owner : MS. GINA GUANGA

BILL OF QUANTITIES (BOQ)


UNIT COST
ITEM NO. DESCRIPTION UNIT QTY TOTAL UNIT COST TOTAL AMOUNT
LABOR/EQPMNT
MATERIAL COST
COST

I Window Grills
1 Square Bar 1/2 x 1/2 KGS 408.90 53.00 20.00 73.00 29,849.70
2 Flat Bar Framing KGS 122.58 53.00 20.00 73.00 8,948.34
3 Red Oxide L 4.00 130.00 350.00 480.00 1,920.00
4 Quick Dry Enamel L 4.00 405.00 350.00 755.00 3,020.00
5 Patching / Smoothening lot 1.00 2,300.00 3,800.00 6,100.00 6,100.00
6 Welding Machine lot 1.00 3,000.00 3,000.00 3,000.00
7 PowerTools (Drill & Cutting) all 1.00 2,000.00 2,000.00 2,000.00
Consumables (Welding rod, Cutting
8 all 1.00 6,625.00 6,625.00 6,625.00
Disc, Grinding Disc,Drill bit, Screw)
Consumables for Painting (Paint Brush,
9 all 1.00 2,550.00 2,550.00 2,550.00
Roller)
SUB-TOTAL FOR ITEM NO. 1 64,013.04

TOTAL 64,013.04

Prepred By;

ELMER M. MARQUEZ
PRESIDENT / CEO
N5M DEVELOPER AND MAINTENANCE CORP.