‘mise020 3186 & 315C L. Excavators C.1C0000"-UP (MACHINE) POWERED BY 3046 Engine(SEBP3739 -42)- Documentacion
GECOLSA Gv Service Information System
Pantalla anterior
< Producto: EXCAVATOR
Modelo: 315¢ EXCAVATOR C)C03598
Configuracién: 315C & 315C L Excavators CJCO0002-UP (MACHINE)
POWERED BY 3046 Engine
Pruebas y Ajustes
315C Excavator Hydraulic System
Nimero de medio -RENR5519-08 Facha de publicacién -01/06/2007
Relief Valve (Main) - Test and Adjust
SMCS - 5069-025; 5069-081
Mlusteation 1 (200825521
Bienvenido: er461decl
Fecha de actualizacién -20/06/2007
102591958
Note: Adjustment screw (4) of main relief valve (8) must always be set to the maximum clockwise position.
All pressure adjustments of the main relief valve must be made with adjustment plug (6). Do not loosen.
Jocknut (5) or turn adjustment screw (4) of the main relief valve in order to adjust the main relief valve
Pressure setting.
Test
Note: Refer to Testing and Adjusting, "Specifications" for the pressure setting of the main relief valve.
1. Position the machine on level ground and stop the engine.
2. Release the pressure in the hydraulic system. Refer to Testing And Adjusting, "Hydraulic System Pressure
- Release".
hitpsss.cat.comsiswebsawebitechdoctechdoc_print_page jeprelurnurt=iseweb/siswebimediasearchimediaheaderin‘of-amesel jepAcalledpage:
1‘mise020 315C & 315C L Excavators CJC0000"-UP (MACHINE) POWERED BY 8046 Engine(SEBP3739 -42)- Documentacion
usta
1200764110
Pump compartment
(1) Pressure tap ¢right pump delivery pressure)
(2) Pressure tap (Left pump delivery pressure)
(3) Pressure tap (power shift pressure)
3. Attach a 60000 kPa (8700 psi) pressure gauge to pressure tap (I).
4, Start the engine.
5. Place the machine controls at the following settings: engine speed dial "10" and AEC switch OFF. Refer to
Testing and Adjusting, "Engine Performance - Test" for engine rpm settings.
6, Increase the hydraulic oil temperature to 55° + $°C (131° + 9°F).
7. Slowly move the joystick for the bucket to the BUCKET CLOSE position (full extension of the bucket
cylinder rod). Check the pressure gauge reading at pressure tap (1)
8, Return the joystick for the bucket to the NEUTRAL position.
9. Ifthe main relief valve pressure setting is not within the specification, adjust the main relief valve pressure
setting.
Adjust
hitpsss.cat comsiswebsswebitechdctechdoc_print_page jep?relurmurt=Isiewob/sioweb/mediasearchimediaheaderinfoframeselep&calledpage=l... 2/2‘mise020 318C & 315C L Excavators CC0000"-UP (MACHINE) POWERED BY 8046 Engine(SEBP3739 -42)- Documentacion
Mustration 3 1200825567
(6) Adjustment plug
() Locknat
(8) Main relief valve
1 In order to adjust the pressure setting of the main relief valve, loosen locknut (7) and tum adjustment plug
(6) until the pressure gauge reading at pressure tap (1) is the correct relief pressure.
Note: Turning adjustment plug (6) clockwise increases the pressure. Turning adjustment plug (6)
counterclockwise decreases the pressure.
Note: Always make final pressure adjustments on pressure rise.
2. Tighten lockmut (7) .
Temporary Setting of the Main Relief Valve
Note: A temporary setting of the main relief valve is required before any line relief valve can be adjusted.
1. The main relief valve pressure setting should be set to the correct specification. Refer to Testing and
Adjusting, "Specifications" for the pressure setting of the main relief valve. If the main relief valve is not
within the specification, adjust the main relief valve pressure setting to the correct pressure specification
before performing Step 2. Refer to Testing and Adjusting, "Relief Valve (Main) - Test and Adjust",
Ulustration 4 200825567
2. Loosen locknut (6) and turn adjustment screw (7) clockwise for one half tum, Tighten locknut (6) to the
specified torque.
‘Sun May 17 2020 08:57:56 GMT-0500 (hora estdndar de Colombia)
era6idect
Red orivada para icenciados del SIS.
hitpsss.cat comsisweblsswebitechdctechdoc_print_page jeprelurmut=Isiewob/sisweb/mediasearchimediaheaderinfoframeselepBcalledpage=l... 32