Download as pdf
Download as pdf
You are on page 1of 2
INSPECTION REQUEST (ATERNATIONAL Willan To CEG INTERNATIONAL DESIGN AND BULD FOR CONSTRUCTION OF THREE(®) pig, Bojamboor Trading and TEMPORARY BUS DEPOTS AT VARIOUS SITE Contacting Co. 1 2019-c0526 BOJAMHOOR TRADING AND CONTRACTING __Ref No: BTCC.CEGIRCL.AKR.0004 Rev. 0 rrr | Structural | Architectural Ci Electrical Mech Plumbing Descriptions: Inspection for checking level & Surface Preparation at backflled Second layer at L4 administration building and mosque (part of ) at Al Khor (as per attached highlighted drawing) Lsopcoved Drawing No: _CO52G-BTCC-SKT-GN-AKR-EXT-0002_A MS Reference No. BTCC-CEG-MS-Cl-0002 Rev. 1 Inspecton Date; 2auan21 ITP Reference No. BTCC-CEGATP-CL-0002 Rev. 4 Inspecton Tine otoam = location: Alnor a Plaster Waterproofing Slab Ref Foundation _Kerbstone & Stet consete Priar Paniog Extema Laing : Tes: Blockwork. ‘Columns Leak Test Plinth. | Seaimt Form vt wat ockue ——lSunoy Windows Backfling coang Hevesi ming Ramp Retaining Wait Footing vecked By. (WamelSignature) INSPECTION REPORT Date: Time: [is Avproved EI) Approved wit Notes Lhe) Revise & Resubmit” ZO) Rejcies eColeRce § PRUPANATIOM = FOONO AT cee eres PLE CO bE CONF Reo é Inspector: Ona Name /Sionatue name Snare - A> [Date / Tims Date /Time LE) [21 [Received by the Contractor Project Manager. Date / Time: ‘Note: Approval ofthe above form/checiist does not relieve the Contractor from the Contractual Obligations. wepst-vro1 1. 27 SAN 2021 WHPSTH17-0¥ Inspection Request os-tay2019 20188 weeray ———— sree EBM go: 7 al - erro _— Peer cao - Se Pier mune — =p | oe —— eh | Sa . Z — - yi — ; — ts — LEVEL 11.05 —" Sn —_—— : a ee ‘count f | aL aa

You might also like