Transmission Lines-A
Transmission Lines-A
B SUPPLY OF MATERIALS
1 Supply of tower parts
a) 'A' Type towers (MS Steel) 55464 324
(HT Steel) 59318 324
b) 'B' Type towers (MS Steel) 55464 37
(HT Steel) 59318 37
c) 'C' Type towers (MS Steel) 55464 37
(HT Steel) 59318 37
d) 'D' Type towers (MS Steel) 55464 27
(HT Steel) 59318 27
e) Extension pieces 55464
f) Supply of Bolts and Nuts 79625
2 Supply of tower accessories
a) Danger plate (one per tower) 308 425
b) Number plate (one per tower) 308 425
c) Phase plate (set of three per tower) 308 425
d) Anti climbing device (one set per tower) 7852 425
e) Circuit plate (one per circuit in case of two or more ckt) 308 425
d) Supply of pipe type earthing (60% of total No.) 2266 400
e) Supply of Counter poise earthing (40% of total No.) 6646 25
3 Supply of ACSR Moose Conductor (kM) 354086 1841
(=Route kM x 3 x No. of Ckts x No. of sub Condrs x 1.015)
4 Supply of 7/3.66mm GSS Ground wire (kM) 42602 307
(=Route kM x 2 x 1.015)
5 Supply of Insulators with Hardware
a) Single 'I' suspension Insulator strings (No. of suspn.x1) 26954 1854
b) Double 'I' Suspension Insulator Sring (No. Suspn. X 2) 48398 90
c) Single 'I' suspn. Pilot string (No. of 'D' type x 1) 23220 30
d) Double Tension string (No. of anchor x 2 x 3 x No. of Ckts) 59553 1224
e) Double 'V' suspn. Insulator string (Special Locations) 0
6 Supply of Conductor and GW Accessories
a) Mid span compression Joint for condr. (one No. for 3 kM) 950 1500
b) Mid span compression joint for GW (one No. for 8 kM) 297 185
c) Repair sleeves for Conductor (2 Nos. for every Route kM) 403 300
d) Flexible copper Earth bonds (2x 'A' type + 2x2xNo. of Anchor) 447 1056
e) Twin spacers for Conductor (6x No. of towers x 3 x Ckts) 913 18600
f) Twin Rigid spacer for Conductor (2 x No. of anchor x 2 x 3x Ckts) 488 1220
g) Vibration Damper for GW (No. Of towers x 2 x2) 409 1700
h) Earth wire suspension clamp ( No. 'A' towers x 2) 613 648
I) Earth wire tension clamps (No. of Anchor x 2 x 2) 584 412
j) Vibration Dampers for conductor 917 10200
k) Repair sleeves for ground wire 297 100
C ERECTION
1 Stringing of Conductor (Route kM) 183544 115.15
2 Stringing of GW (Route kM) 25000 115.15
3 Erection of Tower parts (Rate x total tonnage) 5354
D CIVIL WORKS Total Quantity
1 Excavations (9 times M20 concrete)
2 M20 Concrete (1:1½:3 Concrete) (Cu.M) 8513
3 1:3:6 Concrete (15% of M20 Concrete) in Cu.M 6520
4 Reinforcements (4% of weight of M20) in MT 63672
5 Benching
a) All kinds of soil except fissured rock 290
b) Fissured rock 483
6 Revetment works
a) Random Rubble Masonry (1:5 cement mortar) in Cu.M 4259
b) 1:2:4 Cement Concrete revetment 4300
c) Back filling and levelling 100
E TOTAL awarded COST
F OTHER EXPENSES Incurred /To be incurred
Preliminary studies such as Load flow, stability analysis, EMTS,
Protection coordination, Reactive compensation etc, Detailed Engg.
i)
Supervision of construction, testing and commissioning at 1.0% of
the awarded cost
ii) Detailed survey (Rs. Per kM) 50000
iii) Statutory clearances and charges. (% of total cost) 0.50
iv) Interest during construction (12% for 18 months)
G TOTAL COST
H TOTAL COST IN RS. LAKHS FOR 100 KM OF LINE
I COST PER KM OF THE LINE Rs. Lakhs
BTPS AND HIRIYUR for a distance of 115.15 Km as per
ences to be incurred
Total
Unit Weight 115.15
Quantity
7472000.00
130900
130900
130900
3337100
130900
906400
166150
651879408
13071998
49972716
4355820
696600
72892872
1425000
54945
120900
472032
16981800
595360
695300
397224
240608
9353400
29700
19000000
2500000
5167 27664118
Total Quantity
12037625
4735 40309481
714 4654498
382 24315700
1000 290000
2500 1207500
750 3194250
0 0
0 0
1274141712
12741417
5,757,500
6,370,709
152897005
1451908343
1260884362.04835
126.09
COST OF 400 KV, DC WITH QUAD ACSR MOOSE CONDUCTOR BETWEEN MANGALORE & HASSAN (179 kM)
per work award to contractor Plus Other expences to be incurred
Sl.No Particulars Unit Rate PLAIN AREA (Predominantly
Total
Unit Weight 179
Quantity
15242103
84240
28080
134680
1853280
56160
946080
619920
1144595038
16377228
0
46133755
0
534671172
4300000
90400
1128000
472032
36894000
4240000
1647360
128744
932064
57957120
34400
27528768
1101208
15860 63138660
Total Quantity
222855
35552 237878432
4037 21266916
2947 144416818
2970 279180
27290 7341010
11580 48242280
850 4937650
0
3704320640
37043206
8950000
18521603
666777715
4,435,613,165
2,477,996,181
247.80
ACTUAL QUOTED RATES FOR A 765 KV, SC LINE WITH QUAD CONDUCTOR FOR A 112 kM LENG
PICHHORE AND MALAPUR (Part of Bina-Malapur line)
WIND ZONE-4, TERRAIN CATEGORY-2
PLAIN AREA (Predominantly N
Sl.No Particulars
Quantity
19209 2151408
31825 445550
31825 254600
12731 165503
319 1371700
477 95400
111 188700
2320 3944000
4227 105675
96 240000
135 140400
159 15894435
438 3758040
955 33425
5700 68058000
4637 6654095
53538 62104080
7957 1710755
3507 22921752
1909 450524
2387 140833
1147 338365
193350 21655200
10828534
57564 199459260
62650 177612750
57564 1726920
62650 11277000
66892 14649348
133784 3612168
66892 334460
3041 717676
6082 358838
305 89975
305 89975
5322 1569990
360000 491097600
37398 8526744
23777 5896696
20964 10398144
30194 754850
58515 14628750
44467 1245076
15203 380075
1285 1092250
240 30720
741 188955
263 180944
2687 16928100
988 375440
315 431550
607 315640
611 102648
298386 596772
1188320288
11883203
5600000
5941601
5941601
142598435
1,360,285,128
1,214,540,293.14
121.45
Cost Comparison of EHV Transmission lines
PICHHORE AND
MALAPUR MANGALORE AND
Sl No Particulars
(Part of Bina- HASSAN
Malapur line)
4 Type of Conductor
4 Terrain Category 2 2
6 Wind Zone 4 2
400
115.15
Double Circuit
Moose ACSR
Twin
Plain
43.59
126.09