COST OF 400 KV, DC line WITH TWIN ACSR MOOSE CONDUCTOR BETWEEN BTPS AND HIRIYUR for a distanc

work award to contractor Plus other expences to be incurred

Sl.No, Particulars Unit Rate PLAIN AREA (Predomina

Total Length of the Line kMs -115.15

A Design & Testing of towers

B SUPPLY OF MATERIALS
1 Supply of tower parts
a) 'A' Type towers (MS Steel) 55464 324
(HT Steel) 59318 324
b) 'B' Type towers (MS Steel) 55464 37
(HT Steel) 59318 37
c) 'C' Type towers (MS Steel) 55464 37
(HT Steel) 59318 37
d) 'D' Type towers (MS Steel) 55464 27
(HT Steel) 59318 27
e) Extension pieces 55464
f) Supply of Bolts and Nuts 79625
2 Supply of tower accessories
a) Danger plate (one per tower) 308 425
b) Number plate (one per tower) 308 425
c) Phase plate (set of three per tower) 308 425
d) Anti climbing device (one set per tower) 7852 425
e) Circuit plate (one per circuit in case of two or more ckt) 308 425
d) Supply of pipe type earthing (60% of total No.) 2266 400
e) Supply of Counter poise earthing (40% of total No.) 6646 25
3 Supply of ACSR Moose Conductor (kM) 354086 1841
(=Route kM x 3 x No. of Ckts x No. of sub Condrs x 1.015)
4 Supply of 7/3.66mm GSS Ground wire (kM) 42602 307
(=Route kM x 2 x 1.015)
5 Supply of Insulators with Hardware
a) Single 'I' suspension Insulator strings (No. of suspn.x1) 26954 1854
b) Double 'I' Suspension Insulator Sring (No. Suspn. X 2) 48398 90
c) Single 'I' suspn. Pilot string (No. of 'D' type x 1) 23220 30
d) Double Tension string (No. of anchor x 2 x 3 x No. of Ckts) 59553 1224
e) Double 'V' suspn. Insulator string (Special Locations) 0
6 Supply of Conductor and GW Accessories
a) Mid span compression Joint for condr. (one No. for 3 kM) 950 1500
b) Mid span compression joint for GW (one No. for 8 kM) 297 185
c) Repair sleeves for Conductor (2 Nos. for every Route kM) 403 300
d) Flexible copper Earth bonds (2x 'A' type + 2x2xNo. of Anchor) 447 1056
e) Twin spacers for Conductor (6x No. of towers x 3 x Ckts) 913 18600
f) Twin Rigid spacer for Conductor (2 x No. of anchor x 2 x 3x Ckts) 488 1220
g) Vibration Damper for GW (No. Of towers x 2 x2) 409 1700
h) Earth wire suspension clamp ( No. 'A' towers x 2) 613 648
I) Earth wire tension clamps (No. of Anchor x 2 x 2) 584 412
j) Vibration Dampers for conductor 917 10200
k) Repair sleeves for ground wire 297 100
C ERECTION
1 Stringing of Conductor (Route kM) 183544 115.15
2 Stringing of GW (Route kM) 25000 115.15
3 Erection of Tower parts (Rate x total tonnage) 5354
D CIVIL WORKS Total Quantity
1 Excavations (9 times M20 concrete)
2 M20 Concrete (1:1½:3 Concrete) (Cu.M) 8513
3 1:3:6 Concrete (15% of M20 Concrete) in Cu.M 6520
4 Reinforcements (4% of weight of M20) in MT 63672
5 Benching
a) All kinds of soil except fissured rock 290
b) Fissured rock 483
6 Revetment works
a) Random Rubble Masonry (1:5 cement mortar) in Cu.M 4259
b) 1:2:4 Cement Concrete revetment 4300
c) Back filling and levelling 100
E TOTAL awarded COST
F OTHER EXPENSES Incurred /To be incurred
Preliminary studies such as Load flow, stability analysis, EMTS,
Protection coordination, Reactive compensation etc, Detailed Engg.
i)
Supervision of construction, testing and commissioning at 1.0% of
the awarded cost
ii) Detailed survey (Rs. Per kM) 50000
iii) Statutory clearances and charges. (% of total cost) 0.50
iv) Interest during construction (12% for 18 months)
G TOTAL COST
H TOTAL COST IN RS. LAKHS FOR 100 KM OF LINE
I COST PER KM OF THE LINE Rs. Lakhs
BTPS AND HIRIYUR for a distance of 115.15 Km as per
ences to be incurred

PLAIN AREA (Predominantly Normal Soil)

Total
Unit Weight 115.15
Quantity

7472000.00

5.69 1844 102251212


3.38 1095 64960328
9.04 334 18551599
6.30 233 13827026
9.90 366 20316463
6.90 255 15143885
10.78 291 16143352
8.81 238 14109973
356.47 19771252
229 18252518

130900
130900
130900
3337100
130900
906400
166150
651879408

13071998

49972716
4355820
696600
72892872

1425000
54945
120900
472032
16981800
595360
695300
397224
240608
9353400
29700
19000000
2500000
5167 27664118
Total Quantity
12037625
4735 40309481
714 4654498
382 24315700

1000 290000
2500 1207500

750 3194250
0 0
0 0
1274141712

12741417

5,757,500
6,370,709
152897005
1451908343
1260884362.04835
126.09
COST OF 400 KV, DC WITH QUAD ACSR MOOSE CONDUCTOR BETWEEN MANGALORE & HASSAN (179 kM)
per work award to contractor Plus Other expences to be incurred
Sl.No Particulars Unit Rate PLAIN AREA (Predominantly

Total Length of the Line kMs -179 Nos

A Design & Testing of Towers


A SUPPLY OF MATERIALS
1 Supply of tower parts
a) 'A' Type towers (MS Steel) 75966 121
(HT Steel) 87367 121
b) 'B' Type towers (MS Steel) 75966 166
(HT Steel) 87367 166
c) 'C' Type towers (MS Steel) 75966 78
(HT Steel) 87367 78
d) 'D' Type towers (MS Steel) 75966 95
(HT Steel) 87367 95
Special and Modified towers 75966
e) Extension pieces 75966
f) Supply of Bolts and Nuts 93631
2 Supply of tower accessories
a) Danger plate (one per tower) 162 520
b) Number plate (one per tower) 54 520
c) Phase plate (set of three per tower) 259 520
d) Anti climbing device (one set per tower) 3564 520
e) Circuit plate (one per circuit in case of two or more ckt) 108 520
d) Supply of pipe type earthing (60% of total No.) 2160 438
e) Supply of Counter poise earthing (40% of total No.) 3780 164
3 Supply of ACSR Moose Conductor (kM) 261037 4385
(=Route kM x 3 x No. of Ckts x No. of sub Condrs x 1.015)
4 Supply of 7/3.66mm GSS Ground wire (kM) 44820 365
(=Route kM x 2 x 1.015)
5 Supply of Insulators with Hardware
a) Single 'I' suspension Insulator strings (No. of suspn.x1)
b) Double 'I' Suspension Insulator Sring (No. Suspn. X 2) 47807 965
c) Single 'I' suspn. Pilot string (No. of 'D' type x 1)
d) Quad Tension string (No. of anchor x 2 x 3 x No. of Ckts) 111669 4788
e) Double 'V' suspn. Insulator string (Special Locations)
7 Supply of Conductor and GW Accessories
a) Mid span compression Joint for condr. (one No. for 3 kM) 5000 860
b) Mid span compression joint for GW (one No. for 8 kM) 400 226
c) Repair sleeves for Conductor (2 Nos. for every Route kM) 4000 282
d) Flexible copper Earth bonds (2x 'A' type + 2x2xNo. of Anchor) 447 1056
e) Quad spacers for Conductor (6x No. of towers x 3 x Ckts) 22000 1677
f) Quad Rigid spacer for Conductor (2 x No. of anchor x 2 x 3x Ckts) 5000 848
g) Vibration Damper for GW (No. Of towers x 2 x2) 4160 396
h) Earth wire suspension clamp ( No. 'A' towers x 2) 242 532
I) Earth wire tension clamps (No. of Anchor x 2 x 2) 1596 584
j) Vibration Dampers for conductor 74880 774
k) Repair sleeves for ground wire 400 86
B ERECTION
1 Stringing of Conductor (Route kM) 153792 179.00
2 Stringing of GW (Route kM) 6152 179.00
3 Erection of Tower parts (Rate x total tonnage) 3981
C CIVIL WORKS Total Quantity
1 Excavations (9 times M20 concrete)
2 M20 Concrete (1:1½:3 Concrete) (Cu.M) 6691
3 1:3:6 Concrete (15% of M20 Concrete) in Cu.M 5268
4 Reinforcements (4% of weight of M20) in MT 49000
5 Benching
a) All kinds of soil except fissured rock 94
b) Fissured rock 269
6 Revetment works
a) Random Rubble Masonry (1:5 cement mortar) in Cu.M 4166
b) 1:2:4 Cement Concrete revetment 5809
c) Back filling and levelling 100
D TOTAL awarded COST
E OTHER EXPENSES Incurred /To be incurred
Preliminary studies such as Load flow, stability analysis, EMTS,
Protection coordination, Reactive compensation etc, Detailed Engg.
i)
Supervision of construction, testing and commissioning at 1.0% of
the awarded cost
ii) Detailed survey and Check survey (Rs. Per kM) 50000 179
iii) Statutory clearances and charges. (% of total cost) 0.50
iv) Interest during construction (12% for 18 months)
F TOTAL COST
G TOTAL COST IN RS. LAKHS FOR 100 KM OF LINE
H COST PER KM OF THE LINE Rs. Lakhs
GALORE & HASSAN (179 kM) as
xpences to be incurred
PLAIN AREA (Predominantly Normal Soil)

Total
Unit Weight 179
Quantity

15242103

8.08 978 74307206


7.00 847 74020992
13.35 2215 168285201
11.39 1890 165159276
11.76 917 69693943
15.05 1174 102553307
15.07 1432 108763941
16.36 1554 135785791
2163 164340286
1995.00 151552170
694 64938894

84240
28080
134680
1853280
56160
946080
619920
1144595038

16377228

0
46133755
0
534671172

4300000
90400
1128000
472032
36894000
4240000
1647360
128744
932064
57957120
34400

27528768
1101208
15860 63138660
Total Quantity
222855
35552 237878432
4037 21266916
2947 144416818

2970 279180
27290 7341010

11580 48242280
850 4937650
0
3704320640

37043206

8950000
18521603
666777715
4,435,613,165
2,477,996,181
247.80
ACTUAL QUOTED RATES FOR A 765 KV, SC LINE WITH QUAD CONDUCTOR FOR A 112 kM LENG
PICHHORE AND MALAPUR (Part of Bina-Malapur line)
WIND ZONE-4, TERRAIN CATEGORY-2
PLAIN AREA (Predominantly N
Sl.No Particulars
Quantity

Total Length of the Line kMs -112 112


1 Detailed survey and check survey (Rs. Per kM) 112
2 Soil investigations
a) Fissured Rock 14
b) Hard Rock 8
c) Other types of soils 13
3 Benching
a) Fissured Rock (Cu.M) 4300
b) Hard Rock (Cu.M) 200
c) Other types of soils (Cu.M) 1700
4 Protection to Tower footing
a) Random Rubble Masonry (Cu.M) 1700
b) M15 Concrete with top seal of revetment 25
c) Back filling and gap leveling (Cu.M) 2500
5 Foundations
a) Excavations (Cu.M):
i) Dry soil 1040
ii) Wet soil 99965
iii) Dry fissured rock 8580
iv) Hard Rock 35
b) M20 Concrete 11940
c) M10 Concrete 1435
d) Supply and placing of reinforcements (MT) 1160
6 Installation of stubs etc. (MT) 215
7 Transportation and erection of towers and accessories 6536
8 Earthing of towers
a) Pipe type earthing 236
b) Counter poise earthing 59
9 Installation of tower accessories 295
Stringing of ACSR Moose Conductor and EW (kM) with
10 112
Insulators etc.
11 Transportation and other charges
12 Supply of Materials
i) Supply of tower parts, Mild Steel (MT) 3465
ii) Supply of tower parts, HT Steel (MT) 2835
iii) Stubs and cleats, Mild Steel (MT) 30
iv) Stubs and cleats, HT steel (MT) 180
v) Bolts and Nuts
a) Hexagonal Bolts and Nuts including step bolts and spring washers 219
b) Anti theft bolts and nuts 27
c) Bolts and Nuts for stubs 5
vi) Supply of earthing for towers
a) Pipe type earthing (No) 236
b) Counter poise earthing (No) 59
vii) Tower accessories (No)
a) Number plate (one per tower) 295
b) Phase plate (set of three per tower) 295
c) Anti climbing device (one set per tower) 295
viii) ACSR Moose Conductor (kM) 1364.16
ix) 7/3.66 mm GSS Ground wire (kM) 228
x) Hardware fittings (No)
a) Single 'V' string suspension 248
b) Double 'I' suspension string 496
c) Single 'I' suspension pilot string 25
d) Quad tension string 250
e) Double 'V' suspension insulator string 28
f) Single 'V' suspension pilot string 25
xi) Accessories for conductor and earthwire
a) Mid span compression Joint for condr. 850
b) Mid span compression joint for GW 128
c) Repair sleeves for Conductor 255
d) Flexible copper Earth bonds 688
e) Quad spacer damper for Conductor 6300
f) Quad Rigid spacer for Conductor 380
g) Vibration Damper for GW 1370
h) Earth wire suspension clamp 520
I) Earth wire tension clamps 168
xii) Supply of wind measuring instruments 2
13 Total awarded cost
14 OTHER EXPENSES incurred & to be incurred
Preliminary studies such as Load flow, stability analysis, EMTS, Protection
i) coordination, Reactive compensation etc, Detailed Engg. Supervision of
construction, testing and commissioning at 1.0% of the awarded cost
ii) Detailed survey and Check survey (Rs. Per kM) 50000
iii) Statutory clearances and charges. (% of total cost) 0.50
iv) Design & Testing charges at 0.5 % of the contract value 0.50
Interest during construction (12% for 18 months)
TOTAL COST of the line
TOTAL COST of 100 kM of the line
COST PER KM OF THE LINE Rs. Lakhs
ONDUCTOR FOR A 112 kM LENGTH BETWEEN
Bina-Malapur line)
GORY-2
PLAIN AREA (Predominantly Normal Soil)

Unit Rate TOTAL COST in Rs

19209 2151408

31825 445550
31825 254600
12731 165503

319 1371700
477 95400
111 188700

2320 3944000
4227 105675
96 240000

135 140400
159 15894435
438 3758040
955 33425
5700 68058000
4637 6654095
53538 62104080
7957 1710755
3507 22921752

1909 450524
2387 140833
1147 338365
193350 21655200
10828534

57564 199459260
62650 177612750
57564 1726920
62650 11277000

66892 14649348
133784 3612168
66892 334460
3041 717676
6082 358838

305 89975
305 89975
5322 1569990
360000 491097600
37398 8526744

23777 5896696
20964 10398144
30194 754850
58515 14628750
44467 1245076
15203 380075

1285 1092250
240 30720
741 188955
263 180944
2687 16928100
988 375440
315 431550
607 315640
611 102648
298386 596772
1188320288

11883203

5600000
5941601
5941601
142598435
1,360,285,128
1,214,540,293.14
121.45
Cost Comparison of EHV Transmission lines
PICHHORE AND
MALAPUR MANGALORE AND
Sl No Particulars
(Part of Bina- HASSAN
Malapur line)

1 Voltage class 765 400

2 Length 112 179

3 Circuits Single Circuit Double Circuit

4 Type of Conductor

a) Size Moose ACSR Moose ACSR

b) Number of Conductors per Phase Twin Quad

4 Terrain Category 2 2

5 Plain /Hilly Plain Hilly

6 Wind Zone 4 2

7 Tower weights in MT - Per KM 58.13 73.58

8 Cost per KM in Rs Lakhs 121.45 247.80


BTPS AND
HIRIYUR

400

115.15

Double Circuit

Moose ACSR

Twin

Plain

43.59

126.09