Professional Documents
Culture Documents
8.3 Operation Qualification Protocol For Dispensing Booth
8.3 Operation Qualification Protocol For Dispensing Booth
8.3 Operation Qualification Protocol For Dispensing Booth
CUSTOMER:
SUBMITTED BY:
PHARMA ENGINEERS
PLO T N O. 1 1 3 / A / 1 , L A NE 8 , P HA SE I I,
I DA C HE RLA PA LL I, H YD ERA BA D - 5 0 0 0 5 1 .
Te l N o.9 1 - 4 0 2 7 2 6 1 1 1 3 , 2 7 2 6 1 1 1 4
Page 2 of 4
Prepared By
Reviewed By
Reviewed By
Approved By
Client:
Page 3 of 4
TABLE OF CONTENT
1. OBJECTIVE ...............................................................................................................................4
Page 4 of 4
1. OBJECTIVE
RESULT
S NO ITEM TEST METHOD ACCEPTANCE CRITERIA
(YES/NO)
ON/OFF
Manually Switch Blower will ON/OFF as per switch
1. Operation of
ON / OFF operation
equipment
CFL Light Manually Switch CFL ON/OFF as per switch
2.
Operation ON / OFF operation.
The Range shall be
3. IP across Pre-Filter Physical Verification
1 to 6 mm
The Range shall be
4. IP across Fine Filter Physical Verification
5 to 15 mm
I.P across HEPA The Range shall be
5. Physical Verification
Filter 10 to 15 mm
Manually manipulate
If anyone blower trip, both the
6. Blower Trip the relay and observe
blowers stop with beep alarm
the functionality