EtaPRO Print Brochure US
EtaPRO Print Brochure US
EtaPRO Print Brochure US
Excessive Air
EtaPRO shows how your plant Preheating
is performing, how it should be
$227,000 / yr
performing, and what off-peak
performance is costing.
Internal
Bypassing
$189,200 / yr
How GP looks at your plant...
Combined Cycle
Power Plant
256.5 MW
1,778 MMBtu/h
Air Remov
Foul
20 Btu
$126,1
Worn Packing
25 Btu / kWh
Low HP Stm Flow $157,700 / yr
Failed Expansion Compressor (Bypassing)
Joint Fouling 93 Btu / kWh
HP Blade 109 Btu / kWh $1,108,490 / yr $586,570 / yr
Deposits $689,392 / yr
116 Btu / kWh
49 MW
Economizer
Fouling
$284,000 / yr
ater
749.2 MW
yr
437.2 T/h
Trending n Plant-specific diagnostic flow charts compatibility with NERC CIP security
with “live” data for troubleshooting of requirements
off-target performance n Menu-driven configuration with
The GP Difference
World-class power plant performance requires world-class engineering, technology, and support. With every
technology we develop, people remain the key differentiator to achieve success. Our Performance Engineering
team offers more than 800 man-years of experience and expertise that will help you get the most out of
your EtaPRO™ investment with training, consulting, project execution, and ongoing support. This is the GP
Difference – a commitment to product quality and customer support that provides value to our customers
year-in and year-out.
We don’t run the plant, we help make it run better: More efficient. More reliable. More output.
GP provides a full range of Performance Engineering, Training, and Remote Monitoring Services, including our
exclusive FastStart™ program to get your EtaPRO system providing immediate ROI. Our staff of Power Industry
experts provides services for:
n Advanced Performance Analysis & Diagnostics n VirtualPlant™ Model Development & Integration
n Remote Monitoring of Plant & Equipment n Plant Parametric & Design Studies
Performance & Operation n Nuclear Plant Performance Monitoring &
n Thermal Audits Thermodynamic Modeling
n Acceptance & Periodic Testing n GPiLearn™ Blended Learning Programs
n EtaPRO System Upgrades & Enhancements n Plant & Performance Engineer Training