NDT BUYBACK TEAM WORK PROCEDURES

START

BUY BACK TEAM


ENGINEERING
PPC
REVIEW MDRR (EXISTING REPAIR) REPAIR
WITHIN OR OUT OF LIMIT QA
1. PART OF AIRPLAN E DAMAGE NDT GRP
2. DATE AND HISTORICAL(SR,EA,FEC)
3.DAMAGE LOCATIO N
4.DAMAGE DESCRIPTION
5.DAMAGE DETAIL(SIZE)
6.REPAIR DESCRIPTION (PERMANENT
or INTERIM or TEMPO RARY)
7. MAN HO UR S
8.CONSUMABLE MATERIAL AND
REPLACE NEW PART(P/N & S/N)
9.LOCATIO N: HM OR LM

YES NO
WITHIN BUYBACK OUT OF
LIMIT NDT LIMIT

REPAIR REPLACE

NDT IN SPECTION METHOD


1.EDDY CURRENT(ET) 1.NEW PART
2.ULTRASONIC(UT)
3 HFEC ROTOR TEST
2 PERMANENT REPAIR
NDT 4.PULSE ECHO 3 SR-MANUFACTURE
5. BOND TEST

ISSUED WO, AND CREATE


PPC TASK CARD for NDT RE
ENG-PE INSPECTION
(REF: WO BUY BACK NDT)

PERFORM
NDT RE-INSPECTION
NDT
TEAM

YES NO
ISSUED NEW MDRR (Ref
BUYBACK WO NO & N/R) DURING INSPECTION
PRELIMINARY REPAIR AND FOUND NEW DAMAGE
PPC DAMGE EVALUATION
ENG-PE
REPAIR

CONTACT OEM/ MANUFACTURE NO


REQUEST REPAIR INSTRUCTION WITHIN
AND CREATE THE ENGINEERING LIMIT REPAIR,
PRODUCT QA,
ENGINEER
ENG STR
BME DO REPAIR, RESTORE THE
YES SURFACE AS IS AND CLOSE
WO/MDRR

REPAIR,
QA,
PAINTING
DO REPAIR AND
DO REPAIR, RESTORE THE
RESTORE THE
SURFACE AS IS AND CLOSE
SURFACE AS IS
WO/MDRR
FAA-8100
REPAIR,
QA,
ENG-BME

RECORD THE RESULTS AND


COMPLETE ALL DOCUMENT
SCAN AND SAVE TO DATA
BASE
PPC

SUBMIT TO DGCA
FOR APROVAL AND
RTS

FINISH AIRCRAFT RETURN TO SERVICE