Pemeriksaan Tube Boiler. - Martech 20T-Vol.1-summary
Pemeriksaan Tube Boiler. - Martech 20T-Vol.1-summary
Pemeriksaan Tube Boiler. - Martech 20T-Vol.1-summary
BOILER
Quantity : 1 Unit
Mnf. : Martech
Type/model : Martech 20T
Capacity : Steam 20 T/H
Boiler Condition : As Shutdown day 4th to 8th
Tube Quantity : 1414 on drum VST001 and VST 002
METHOD
1. Borescope Video and Photos of all tubing accessible.
Optic Borescope probe camera Ø 6.0 mm, L=5000 mm
2. Ultrasonic Wall Thickness Meter
3. Magnaflux Red Dye Penetrant Kit
4. Visual Inspection of Tube Chamber
MANPOWER
6 persons
Aripin Tanjung-Level III NDT
Ari Herdiana -Level II NDT
Burhanudin- Level II NDT
Syaripudin– General Inspector
Rahman JatnikA-Project Manager
Gilang S. Ward-Gen. Assistant
CONTENT:
BOILER MARTECH 20T-SHCEME
BOILER TUBE MAPING ON DRUM VST 001 AND VST 002
BORESCOPE PHOTOS-Typical tube conditions of all tube inspected.
BOILER TUBE CHAMBER
RED DYE PENETRANT
ULTRASONIC WALL THICKNESS MEASUREMENT
VISUAL INSPECTION PADA TUBE CHAMBER
SUMMARY
FINDING
CONCLUSION
RECOMMENDATION
Drum VSL 001
deposit
Camera hook
Ujung tube No. B-19 di drum VST 001 Deposit air boiler tergerus hook
deposit air boiler bercampur deposit tube atau karat. ketebalan sekitar 5 mm