Cagniog Damaged Perimter Fence

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

N

N
N

E
367
0
1
W E

40
00

SW

SE
00
40

40
00

00
40
CE S
EN
00 RF

40
40 E

00
T
IME
00 P ER
40
ED

40
G

00
0 0
47
67 00 28
50 MA
40 R DA
FO

40
NT

00
00
40 E ME
AC

47
L
EP

40
00

02
40 DR

0
0
E
OS
40
00 OP
PR

40
00
00
40

40
00
00
40

40
00

00
40 3390
39390 4000
4000
4000

40
4000

00
5 4000
4000 3
4000
40 4000

40
00 4000

00
0
208
40 00

30
00 40

20
40 2 00
00 40

40 ATDCI LOT 1 00
00 40
LOT 2779-C
40 AREA = 3,100.00 sq.m. 00
00 40

40 00
00 40
MA
40 IN 00
00 EN 40
T RA
40 NC 00
00 E 40

00
61 40
70
70 00
17
0 40 0
08
40
00 70
00
40
40
00 00
40
40
00 00
40
TECHNICAL DESCRIPTION 40
00 00
40
LOT 2779-C 40
0 0
40
00

LINE BEARING DISTANCE 40


00
40
00

1-2 S 44° - 35' E 47.02m 40


00
40
00

40
2-3 N 80° - 54' E 39.39m 00
40
00
4
3-4 S 53° - 17' W 70.08m
4-5 N 52° - 17' W 70.17m 1 PERIMETER FENCE LAYOUT PLAN
1 1 SCALE 1:400
5-1 N 56° - 36' E 47.67m

PROJECT TITLE: OWNER: SHEET CONTENTS: CADD BY: BAU86 REVISION: DRAWING NO.:
# DESCRIPTION DATE

PABLO YVES L. DUMLAO


CIVIL ENGINEER
PROPOSED:
PROPOSED REPLACEMENT FOR -PERIMETER FENCE LAYOUT PLAN
CHECKED BY:

APPROVED BY: A1
-WALL FOOTING DETAIL

A.T. DUMLAO CONSTRUCTION, INC.


PRC NO.: DATE: DAMAGED PERIMETER FENCE PABLO YVES L. DUMLAO II -COLUMN & FOOTING DETAIL
-TECHNICAL DESCRIPTION
DATE:
1-1
PTR NO.: DATE: TIN NO.: LOCATION: BRGY. CAGNIOG, SURIGAO DEL NORTE ADDRESS: BRGY. LUNA, SURIGAO CITY SCALE: AS SHOWN
5@50mm; 5@100mm;
±28500 5@150mm; 200mm REST
10mmØ LATERAL TIES O.C.
PROPOSED REPLACEMENT FOR DAMAGED PERIMETER FENCE

200
4-16mmØ VERT. MAIN BARS

±3000 ±3000 200


10-LAYER BARB WIRE
SPACED @ 100MM
10mm RE. BAR SPACED 5@50mm; 5@100mm;
@ 400mm B.W 5@150mm; 200mm REST
10mmØ LATERAL TIES O.C.

4-16mmØ VERT. MAIN BARS

NGL.
10 - LAYER CHB
2000

WALL CHB WALL CHB

800
EARTH EARTH

1000
4" x 8" x 16" CHB 75 75
3 LAYERS

10mmØ HOR. BARS @


6" CHB

NGL NGL
600

EVERY 3LAYERS

200
75
10mmØ VERT. BARS @
NGL. 400mm O.C. COMPACTED STONE

5-16mmØ REBARS
BOTH WAYS ON CENTER
800
TYPICAL ELEVATION PLAN 75 75
FILL FILL

600

75
800

800
50 50
3-10mmØ LONGITUDINAL
BARS W/ 10mmØ
TRANSVERSE BARS
SPACED @ 0.30m. O.C.

75
200
50
COMPACTED STONE 3 COLUMN & FOOTING DETAIL
1 1 SCALE 1:20
100 100 100
300
2 WALL FOOTING DETAIL
1 1 SCALE 1:10

PROJECT TITLE: OWNER: SHEET CONTENTS: CADD BY: BAU86 REVISION: DRAWING NO.:
# DESCRIPTION DATE

PABLO YVES L. DUMLAO


CIVIL ENGINEER
PROPOSED:
PROPOSED REPLACEMENT FOR -PERIMETER FENCE LAYOUT PLAN
CHECKED BY:

APPROVED BY: A1
-WALL FOOTING DETAIL

A.T. DUMLAO CONSTRUCTION, INC.


PRC NO.: DATE: DAMAGED PERIMETER FENCE PABLO YVES L. DUMLAO II -COLUMN & FOOTING DETAIL
-TECHNICAL DESCRIPTION
DATE:
1-1
PTR NO.: DATE: TIN NO.: LOCATION: BRGY. CAGNIOG, SURIGAO DEL NORTE ADDRESS: BRGY. LUNA, SURIGAO CITY SCALE: AS SHOWN
Project Name :Proposed Replacement for Damaged Perimeter Fence No. of Personnel Req'd: 1.00 Carpenter
Project Location :Cagniog Warehouse 2.00 Mason
Projected No. 1.00 Steelman
of Working Days : 38 days 3.00 Labor/Helper
BILL OF MATERIALS
Item Description Quantity Unit Unit Cost Material Cost Unit Labor Labor Cost Total Cost
Earth Works 3,616.20
Excavation
Foundation
Dimension
No. of Footing Volume
Length Width Depth
10 0.8 0.8 1 6.40
Note: 6mh/m³
450/day for skilled
300/day for non-skilled
Computation:
6.4cu.m. x 6mh/m³
= 38.40 mh

Manpower Required:
2 Labor 1.92 Man Days 300.00 1,152.00 1,152.00

Wall Footing
Dimension
Volume
Length Width Depth
28.5 0.3 0.8 6.84
Note: 6mh/m³
450/day for skilled
300/day for non-skilled
Computation:
6.84cu.m. x 6mh/m³
= 41.04 mh

Manpower Required:
2 Labor 2.052 Man Days 300.00 1,231.20 1,231.20

Backfill
Foundation
Dimension (Back Fill) Dimension (Column Dimension)
No. of Footing Volume Net Volume
Length Width Depth Length Width Depth
10 0.8 0.8 0.8 5.12 0.2 0.2 0.8 4.80
Note: 5mh/m³
450/day for skilled
300/day for non-skilled
Computation:
5.12cu.m. x 5mh/m³
= 24.00 mh

Manpower Required:
2 Labor 1.2 Man Days 300.00 720.00 720.00

Page 1 of 7
Project Name :Proposed Replacement for Damaged Perimeter Fence No. of Personnel Req'd: 1.00 Carpenter
Project Location :Cagniog Warehouse 2.00 Mason
Projected No. 1.00 Steelman
of Working Days : 38 days 3.00 Labor/Helper
BILL OF MATERIALS
Wall Footing
Dimension (Back Fill) Dimension (CHB Wall Dimension)
Volume Net Volume
Length Width Depth Length Width Depth
28.5 0.3 0.6 5.13 28.5 0.1 0.6 3.42
Note: 5mh/m³
450/day for skilled
300/day for non-skilled
Computation:
5.13cu.m. x 5mh/m³
= 17.10 mh

Manpower Required:
1 Labor 1.71 Man Days 300.00 513.00 513.00

Item Description Quantity Unit Unit Cost Material Cost Unit Labor Labor Cost Total Cost
Concrete Works 10,551.14
Foundation
Portland Cement 18 bags 260.00 4,680.00 4,680.00
Sand 0.96 cu.m. 1,000.00 960.00 960.00
Gravel 1.92 cu.m. 1,000.00 1,920.00 1,920.00

Dimension
No. of Footing Volume
Length Width Depth
10 0.8 0.8 0.3 1.92
Note: 8.54mh/m³
450/day for skilled
300/day for non-skilled
Computation:
1.92cu.m. x 8.54mh/m³
= 16.40 mh

Manpower Required:
1 Mason 1.64 Man Days 450.00 737.86 737.86
1 Labor 1.64 Man Days 300.00 491.90 491.90

Page 2 of 7
Project Name :Proposed Replacement for Damaged Perimeter Fence No. of Personnel Req'd: 1.00 Carpenter
Project Location :Cagniog Warehouse 2.00 Mason
Projected No. 1.00 Steelman
of Working Days : 38 days 3.00 Labor/Helper
BILL OF MATERIALS
Column
Portland Cement 10 bags 260.00 2,600.00
Sand 0.52 cu.m. 1,000.00 520.00
Gravel 1.04 cu.m. 1,000.00 1,040.00

Dimension
No. of Column Volume
Length Width Depth
10 0.2 0.2 2.6 1.04
Note: 8.54mh/m³
450/day for skilled
300/day for non-skilled
Computation:
1.04cu.m. x 8.54mh/m³
= 8.88 mh

Manpower Required:
1 Mason 0.89 Man Days 450.00 399.67 399.67
1 Labor 0.89 Man Days 300.00 266.45 266.45

Wall Footing
Portland Cement 16 bags 260.00 4,160.00
Sand 0.855 cu.m. 1,000.00 855.00
Gravel 1.71 cu.m. 1,000.00 1,710.00

Dimension
Volume
Length Width Depth
28.5 0.3 0.2 1.71
Note: 8.54mh/m³
450/day for skilled
300/day for non-skilled
Computation:
1.71cu.m. x 8.54mh/m³
= 14.60 mh

Manpower Required:
1 Mason 1.46 Man Days 450.00 657.15 657.15
1 Labor 1.46 Man Days 300.00 438.10 438.10

Page 3 of 7
Project Name :Proposed Replacement for Damaged Perimeter Fence No. of Personnel Req'd: 1.00 Carpenter
Project Location :Cagniog Warehouse 2.00 Mason
Projected No. 1.00 Steelman
of Working Days : 38 days 3.00 Labor/Helper
BILL OF MATERIALS
Item Description Quantity Unit Unit Cost Material Cost Unit Labor Labor Cost Total Cost
Formworks 15,402.40
Column
Phenolic Board 8.00 sheet 1,400.00 11,200.00 11,200.00
Concrete Nails # 2 1/2 2.00 kg 60.00 120.00 120.00
CWN #2 2.00 kg 60.00 120.00 120.00

Dimension
No. of Column Area
Length Width Depth
10 0.2 0.2 2.6 20.80
Note: 2.54mh/m²
450/day for skilled
300/day for non-skilled
Computation:
20.8m² x 2.54mh/m²
= 52.83 mh

Manpower Required:
1 Carpenter 5.28 Man Days 450.00 2,377.44 2,377.44
1 Labor 5.28 Man Days 300.00 1,584.96 1,584.96

Item Description Quantity Unit Unit Cost Material Cost Unit Labor Labor Cost Total Cost
Masonry Works 63,808.68
CHB Wall
4" CHB 1019 pcs 14.00 14,266.00 14,266.00
Portland Cement 39 bags 260.00 10,140.00 10,140.00
Sand 32.46 cu.m. 1,000.00 32,455.80 32,455.80

Dimension
Area
Length Depth
28.5 2.6 74.10
Note: 8m²/day
450/day for skilled
300/day for non-skilled
Computation:
74.1m² ÷ 8m²/day
= 9.26 days

Manpower Required:
2 Mason 4.63 Man Days 450.00 4,168.13 4,168.13
2 Labor 4.63 Man Days 300.00 2,778.75 2,778.75

Page 4 of 7
Project Name :Proposed Replacement for Damaged Perimeter Fence No. of Personnel Req'd: 1.00 Carpenter
Project Location :Cagniog Warehouse 2.00 Mason
Projected No. 1.00 Steelman
of Working Days : 38 days 3.00 Labor/Helper
BILL OF MATERIALS
Item Description Quantity Unit Unit Cost Material Cost Unit Labor Labor Cost Total Cost
Steel Works 28,040.92
Foundation
16mm RSB at 6.00 m. 11.00 length 330.00 3,630.00 3,630.00
#16 G.I. Tie Wire 1.42 kg 60.00 84.91 84.91

Reinf. Bar Cutting and Bending


No. of Req'd Reinf. Bar Reinf. Bar Reinf. Bar
Reinf. Bar Size
Footing Qty. Length Total Length Wgt. (Kg)
16mm RSB at 6.00 m. 10 10 0.65 65.00 102.59
Note: 0.07mh/kg
450/day for skilled
300/day for non-skilled
Computation:
102.59kg x 0.07mh/kg
= 7.18 mh

Reinf. Bar Installation


Dimension
No. of Footing Volume
Length Width Depth
10 0.8 0.8 0.3 1.92
Note: 0.07mh/m³
450/day for skilled
300/day for non-skilled
Computation:
1.92m³ x 0.07mh/m³
= 0.13 mh

Manpower Required:
1 Steel Man 0.73 Man Days 450.00 329.21 329.21

Column
10mm RSB at 6.00 m. 37.00 length 125.00 4,625.00 4,625.00
16mm RSB at 6.00 m. 22.00 length 330.00 7,260.00 7,260.00
#16 G.I. Tie Wire 6.64 kg 60.00 398.49 398.49

Reinf. Bar Cutting and Bending


No. of Req'd Reinf. Bar Reinf. Bar Reinf. Bar
Reinf. Bar Size
Column Qty. Length Total Length Wgt. (Kg)
10mm RSB at 6.00 m. 10 22 0.9 198.00 122.10
16mm RSB at 6.00 m. 10 4 3 120.00 189.40
Note: 0.07mh/kg
450/day for skilled
300/day for non-skilled

Page 5 of 7
Project Name :Proposed Replacement for Damaged Perimeter Fence No. of Personnel Req'd: 1.00 Carpenter
Project Location :Cagniog Warehouse 2.00 Mason
Projected No. 1.00 Steelman
of Working Days : 38 days 3.00 Labor/Helper
BILL OF MATERIALS
Computation:
189.4kg x 0.07mh/kg
= 13.26 mh

Reinf. Bar Installation


Dimension
No. of Column Volume
Length Width Depth
10 0.2 0.2 2.6 1.04
Note: 0.07mh/m³
450/day for skilled
300/day for non-skilled
Computation:
1.04m³ x 0.07mh/m³
= 0.07 mh

Manpower Required:
1 Steel Man 1.33 Man Days 450.00 599.89 599.89

CHB Wall
10mm RSB at 6.00 m. 40.00 length 125.00 5,000.00 5,000.00
10mm RSB at 6.00 m. 43.00 length 125.00 5,375.00 5,375.00
#16 G.I. Tie Wire 4.35 kg 60.00 260.83 260.83

Reinf. Bar Cutting and Bending


Req'd Reinf. Bar Reinf. Bar Reinf. Bar
Reinf. Bar Size
Qty. Length Total Length Wgt. (Kg)
Vertical Bars 10mm RSB at 6.00 m. 72 3 216.00 133.20
Horizontal Bars 10mm RSB at 6.00 m. 8 29 232.00 143.07
Note: 0.07mh/kg
450/day for skilled
300/day for non-skilled
Computation:
143.07kg x 0.07mh/kg
= 10.01 mh

Reinf. Bar Installation


Dimension
Volume
Length Width Depth
28.5 3 0.1 8.55
Note: 0.07mh/m³
450/day for skilled
300/day for non-skilled
Computation:
8.55m³ x 0.07mh/m³
= 0.60 mh

Page 6 of 7
Project Name :Proposed Replacement for Damaged Perimeter Fence No. of Personnel Req'd: 1.00 Carpenter
Project Location :Cagniog Warehouse 2.00 Mason
Projected No. 1.00 Steelman
of Working Days : 38 days 3.00 Labor/Helper
BILL OF MATERIALS
Manpower Required:
1 Mason 1.06 Man Days 450.00 477.59 477.59

Item Description Quantity Unit Unit Cost Material Cost Unit Labor Labor Cost Total Cost
Barbwire Fence 7,550.00
Barbwire Fence
10mm RSB at 6.00 m. 18.00 length 125.00 2,250.00 2,250.00
Barbwire 2.00 roll 2,500.00 5,000.00 5,000.00
#16 G.I. Tie Wire 5.00 kg 60.00 300.00 300.00

Reinf. Bar Cutting and Bending


Req'd Reinf. Bar Reinf. Bar Reinf. Bar
Reinf. Bar Size
Qty. Length Total Length Wgt. (Kg)
Vertical Bars 10mm RSB at 6.00 m. 72 1.3 93.60 57.72
Barbwire 10 28.5 285.00 51.51
Note: 0.07mh/kg
450/day for skilled
300/day for non-skilled
Computation:
51.51kg x 0.07mh/kg
= 3.61 mh

Reinf. Bar Installation


Dimension
Volume
Length Width Depth
28.5 1.3 0.1 3.71
Note: 0.07mh/m³
450/day for skilled
300/day for non-skilled
Computation:
3.71m³ x 0.07mh/m³
= 0.26 mh

Manpower Required:
1 Labor 0.39 Man Days 300.00 115.94 115.94

Direct Cost
Prepared by: Total Material Cost: 120,931.03
Total Labor Cost: 19,039.24
Aldrene R.S. Badilla Contingencies: 6998.51
Quantity Surveyor Indirect Cost
VAT (12%): 14,511.72

Total Project Cost: 161,480.51

Page 7 of 7