Professional Documents
Culture Documents
Cagniog Damaged Perimter Fence
Cagniog Damaged Perimter Fence
Cagniog Damaged Perimter Fence
N
N
E
367
0
1
W E
40
00
SW
SE
00
40
40
00
00
40
CE S
EN
00 RF
40
40 E
00
T
IME
00 P ER
40
ED
40
G
00
0 0
47
67 00 28
50 MA
40 R DA
FO
40
NT
00
00
40 E ME
AC
47
L
EP
40
00
02
40 DR
0
0
E
OS
40
00 OP
PR
40
00
00
40
40
00
00
40
40
00
00
40 3390
39390 4000
4000
4000
40
4000
00
5 4000
4000 3
4000
40 4000
40
00 4000
00
0
208
40 00
30
00 40
20
40 2 00
00 40
40 ATDCI LOT 1 00
00 40
LOT 2779-C
40 AREA = 3,100.00 sq.m. 00
00 40
40 00
00 40
MA
40 IN 00
00 EN 40
T RA
40 NC 00
00 E 40
00
61 40
70
70 00
17
0 40 0
08
40
00 70
00
40
40
00 00
40
40
00 00
40
TECHNICAL DESCRIPTION 40
00 00
40
LOT 2779-C 40
0 0
40
00
40
2-3 N 80° - 54' E 39.39m 00
40
00
4
3-4 S 53° - 17' W 70.08m
4-5 N 52° - 17' W 70.17m 1 PERIMETER FENCE LAYOUT PLAN
1 1 SCALE 1:400
5-1 N 56° - 36' E 47.67m
PROJECT TITLE: OWNER: SHEET CONTENTS: CADD BY: BAU86 REVISION: DRAWING NO.:
# DESCRIPTION DATE
APPROVED BY: A1
-WALL FOOTING DETAIL
200
4-16mmØ VERT. MAIN BARS
NGL.
10 - LAYER CHB
2000
800
EARTH EARTH
1000
4" x 8" x 16" CHB 75 75
3 LAYERS
NGL NGL
600
EVERY 3LAYERS
200
75
10mmØ VERT. BARS @
NGL. 400mm O.C. COMPACTED STONE
5-16mmØ REBARS
BOTH WAYS ON CENTER
800
TYPICAL ELEVATION PLAN 75 75
FILL FILL
600
75
800
800
50 50
3-10mmØ LONGITUDINAL
BARS W/ 10mmØ
TRANSVERSE BARS
SPACED @ 0.30m. O.C.
75
200
50
COMPACTED STONE 3 COLUMN & FOOTING DETAIL
1 1 SCALE 1:20
100 100 100
300
2 WALL FOOTING DETAIL
1 1 SCALE 1:10
PROJECT TITLE: OWNER: SHEET CONTENTS: CADD BY: BAU86 REVISION: DRAWING NO.:
# DESCRIPTION DATE
APPROVED BY: A1
-WALL FOOTING DETAIL
Manpower Required:
2 Labor 1.92 Man Days 300.00 1,152.00 1,152.00
Wall Footing
Dimension
Volume
Length Width Depth
28.5 0.3 0.8 6.84
Note: 6mh/m³
450/day for skilled
300/day for non-skilled
Computation:
6.84cu.m. x 6mh/m³
= 41.04 mh
Manpower Required:
2 Labor 2.052 Man Days 300.00 1,231.20 1,231.20
Backfill
Foundation
Dimension (Back Fill) Dimension (Column Dimension)
No. of Footing Volume Net Volume
Length Width Depth Length Width Depth
10 0.8 0.8 0.8 5.12 0.2 0.2 0.8 4.80
Note: 5mh/m³
450/day for skilled
300/day for non-skilled
Computation:
5.12cu.m. x 5mh/m³
= 24.00 mh
Manpower Required:
2 Labor 1.2 Man Days 300.00 720.00 720.00
Page 1 of 7
Project Name :Proposed Replacement for Damaged Perimeter Fence No. of Personnel Req'd: 1.00 Carpenter
Project Location :Cagniog Warehouse 2.00 Mason
Projected No. 1.00 Steelman
of Working Days : 38 days 3.00 Labor/Helper
BILL OF MATERIALS
Wall Footing
Dimension (Back Fill) Dimension (CHB Wall Dimension)
Volume Net Volume
Length Width Depth Length Width Depth
28.5 0.3 0.6 5.13 28.5 0.1 0.6 3.42
Note: 5mh/m³
450/day for skilled
300/day for non-skilled
Computation:
5.13cu.m. x 5mh/m³
= 17.10 mh
Manpower Required:
1 Labor 1.71 Man Days 300.00 513.00 513.00
Item Description Quantity Unit Unit Cost Material Cost Unit Labor Labor Cost Total Cost
Concrete Works 10,551.14
Foundation
Portland Cement 18 bags 260.00 4,680.00 4,680.00
Sand 0.96 cu.m. 1,000.00 960.00 960.00
Gravel 1.92 cu.m. 1,000.00 1,920.00 1,920.00
Dimension
No. of Footing Volume
Length Width Depth
10 0.8 0.8 0.3 1.92
Note: 8.54mh/m³
450/day for skilled
300/day for non-skilled
Computation:
1.92cu.m. x 8.54mh/m³
= 16.40 mh
Manpower Required:
1 Mason 1.64 Man Days 450.00 737.86 737.86
1 Labor 1.64 Man Days 300.00 491.90 491.90
Page 2 of 7
Project Name :Proposed Replacement for Damaged Perimeter Fence No. of Personnel Req'd: 1.00 Carpenter
Project Location :Cagniog Warehouse 2.00 Mason
Projected No. 1.00 Steelman
of Working Days : 38 days 3.00 Labor/Helper
BILL OF MATERIALS
Column
Portland Cement 10 bags 260.00 2,600.00
Sand 0.52 cu.m. 1,000.00 520.00
Gravel 1.04 cu.m. 1,000.00 1,040.00
Dimension
No. of Column Volume
Length Width Depth
10 0.2 0.2 2.6 1.04
Note: 8.54mh/m³
450/day for skilled
300/day for non-skilled
Computation:
1.04cu.m. x 8.54mh/m³
= 8.88 mh
Manpower Required:
1 Mason 0.89 Man Days 450.00 399.67 399.67
1 Labor 0.89 Man Days 300.00 266.45 266.45
Wall Footing
Portland Cement 16 bags 260.00 4,160.00
Sand 0.855 cu.m. 1,000.00 855.00
Gravel 1.71 cu.m. 1,000.00 1,710.00
Dimension
Volume
Length Width Depth
28.5 0.3 0.2 1.71
Note: 8.54mh/m³
450/day for skilled
300/day for non-skilled
Computation:
1.71cu.m. x 8.54mh/m³
= 14.60 mh
Manpower Required:
1 Mason 1.46 Man Days 450.00 657.15 657.15
1 Labor 1.46 Man Days 300.00 438.10 438.10
Page 3 of 7
Project Name :Proposed Replacement for Damaged Perimeter Fence No. of Personnel Req'd: 1.00 Carpenter
Project Location :Cagniog Warehouse 2.00 Mason
Projected No. 1.00 Steelman
of Working Days : 38 days 3.00 Labor/Helper
BILL OF MATERIALS
Item Description Quantity Unit Unit Cost Material Cost Unit Labor Labor Cost Total Cost
Formworks 15,402.40
Column
Phenolic Board 8.00 sheet 1,400.00 11,200.00 11,200.00
Concrete Nails # 2 1/2 2.00 kg 60.00 120.00 120.00
CWN #2 2.00 kg 60.00 120.00 120.00
Dimension
No. of Column Area
Length Width Depth
10 0.2 0.2 2.6 20.80
Note: 2.54mh/m²
450/day for skilled
300/day for non-skilled
Computation:
20.8m² x 2.54mh/m²
= 52.83 mh
Manpower Required:
1 Carpenter 5.28 Man Days 450.00 2,377.44 2,377.44
1 Labor 5.28 Man Days 300.00 1,584.96 1,584.96
Item Description Quantity Unit Unit Cost Material Cost Unit Labor Labor Cost Total Cost
Masonry Works 63,808.68
CHB Wall
4" CHB 1019 pcs 14.00 14,266.00 14,266.00
Portland Cement 39 bags 260.00 10,140.00 10,140.00
Sand 32.46 cu.m. 1,000.00 32,455.80 32,455.80
Dimension
Area
Length Depth
28.5 2.6 74.10
Note: 8m²/day
450/day for skilled
300/day for non-skilled
Computation:
74.1m² ÷ 8m²/day
= 9.26 days
Manpower Required:
2 Mason 4.63 Man Days 450.00 4,168.13 4,168.13
2 Labor 4.63 Man Days 300.00 2,778.75 2,778.75
Page 4 of 7
Project Name :Proposed Replacement for Damaged Perimeter Fence No. of Personnel Req'd: 1.00 Carpenter
Project Location :Cagniog Warehouse 2.00 Mason
Projected No. 1.00 Steelman
of Working Days : 38 days 3.00 Labor/Helper
BILL OF MATERIALS
Item Description Quantity Unit Unit Cost Material Cost Unit Labor Labor Cost Total Cost
Steel Works 28,040.92
Foundation
16mm RSB at 6.00 m. 11.00 length 330.00 3,630.00 3,630.00
#16 G.I. Tie Wire 1.42 kg 60.00 84.91 84.91
Manpower Required:
1 Steel Man 0.73 Man Days 450.00 329.21 329.21
Column
10mm RSB at 6.00 m. 37.00 length 125.00 4,625.00 4,625.00
16mm RSB at 6.00 m. 22.00 length 330.00 7,260.00 7,260.00
#16 G.I. Tie Wire 6.64 kg 60.00 398.49 398.49
Page 5 of 7
Project Name :Proposed Replacement for Damaged Perimeter Fence No. of Personnel Req'd: 1.00 Carpenter
Project Location :Cagniog Warehouse 2.00 Mason
Projected No. 1.00 Steelman
of Working Days : 38 days 3.00 Labor/Helper
BILL OF MATERIALS
Computation:
189.4kg x 0.07mh/kg
= 13.26 mh
Manpower Required:
1 Steel Man 1.33 Man Days 450.00 599.89 599.89
CHB Wall
10mm RSB at 6.00 m. 40.00 length 125.00 5,000.00 5,000.00
10mm RSB at 6.00 m. 43.00 length 125.00 5,375.00 5,375.00
#16 G.I. Tie Wire 4.35 kg 60.00 260.83 260.83
Page 6 of 7
Project Name :Proposed Replacement for Damaged Perimeter Fence No. of Personnel Req'd: 1.00 Carpenter
Project Location :Cagniog Warehouse 2.00 Mason
Projected No. 1.00 Steelman
of Working Days : 38 days 3.00 Labor/Helper
BILL OF MATERIALS
Manpower Required:
1 Mason 1.06 Man Days 450.00 477.59 477.59
Item Description Quantity Unit Unit Cost Material Cost Unit Labor Labor Cost Total Cost
Barbwire Fence 7,550.00
Barbwire Fence
10mm RSB at 6.00 m. 18.00 length 125.00 2,250.00 2,250.00
Barbwire 2.00 roll 2,500.00 5,000.00 5,000.00
#16 G.I. Tie Wire 5.00 kg 60.00 300.00 300.00
Manpower Required:
1 Labor 0.39 Man Days 300.00 115.94 115.94
Direct Cost
Prepared by: Total Material Cost: 120,931.03
Total Labor Cost: 19,039.24
Aldrene R.S. Badilla Contingencies: 6998.51
Quantity Surveyor Indirect Cost
VAT (12%): 14,511.72
Page 7 of 7