Waqas Habib: Career Profile
Waqas Habib: Career Profile
Career Profile
Job Experience
RECS (Pvt) Ltd, Reliance Engineering and Construction services
(ISO 9001:2008 QAIC/PK/20206-A)
Provision of Emergency Drain system line MOGAS MFM at PS-5 Mahoodkot PARCO Project Engr: 24
April 2019 - 31 October 31, 2019
– Schedule the project in logical steps and budget time required to meet deadlines
– Planned the fabrication & Erection Schedule of Piping spool and Structure & supervised all activities
related to project
– Determine labor requirements and dispatch workers to construction sites
Upgrade of Bulk oil storage depot at Daulatpur Project By Puma Energy): Project Engr: 01 Sep 2018
– 31 March 2019
– Planned the fabrication & Erection Schedule of Piping spool and Structure & supervised all activities
related to project.
– Supervised all activities regarding planning of shutdown and tie in activities.
– Coordinate site utilities with project Manager and took a part to final project walk through.
TDFC (Pvt) Ltd Technology Development & Fabrication Company Global Engineering Solutions
(ISO 9001 & ISO 14001, 2015)
Bucket Elevator Fauji Cement Company Limited (FCCL): Planning Engr: 02 June 2018 – 28-August
Fabrication & Erection of Bucket Elevator at C-F Silo Line-1 having 350 ton/h Lifting capacity
– Planned the Erection Schedule of Bucket Elevator at CF Silo & supervised all activities related to project.
– Supervised all activities regarding planning including Invoice billing.
– Analyzed the fabrication activity Bucket Elevator casing, Air slide, Buckets and Steel Platform Structure as
per drawing.
WHR-PP Fauji Cement Company Limited (FCCL): Asst. Planning Engr: 21 July 2017 – 28 May 2018
Installation of Sinoma Waste Heat Recovery Power Plant of 9 MW having 3 boilers including AQC, SP & Wartsila
and T/G at Line #01
– Planned the Erection Schedule of Boilers & Turbine.
– Supervised all activities regarding planning including Invoice billing.
– Analyzed the fabrication activity of boilers Ducts and Steel Platform Structure.
Premix Feed Bin Fauji Cement Company Limited (FCCL): Site Engineer: 21 sep 2017 – April 2018
Fabrication & Erection of Premix Feed Bin having 100 tons capacity storage for Raw Mill at Line # 01
– Planned the Erection Schedule for Premix Bin & supervised all activities regarding planning and erection.
– Controlled the Fabrication activity regarding Bin Shell and Steel Structure.
Waste Clinker Hopper Fauji Cement Company Limited (FCCL): Site Engineer:20 Dec 2017–30 March 2018
Fabrication & Erection of Waste Clinker Hopper for Clinker handling at Line # 01
– Scheduled the Erection Plans for Clinker Hopper & supervised all activities related to project.
– Monitored the Fabrication and erection activities of Storage Shell, Steel Structure, Stairs and Conveyor.
Bulk Loading Fauji Cement Company Limited (FCCL): Site Engineer: 20 Dec 2017 – 25 fab 2018
Fabrication & Erection of Bulk Loading System at Line # 01 Cement Silo
– Monitored all the activities regarding planning and execution of project.
Education:
Academic Activities:
SEMESTER PROJECT
– Perpetual motions tubewell which continue its motion without any external source.