AL - FAHD COMPANY
WORKSHEET FOR PROPORTIONING OF AGGREGATES
PROJECT: UNAIZAH PLANT NO. 2
DESCRIPTION: BITUMINOUS BASE COURSE SUPERPAVE (1½" NMS)
AGG. # 1, ( 1½") AGG. # 2 (¾") AGG. # 3 (½") AGG. # 4 (C-Fine) AGG. # 5 (Fille
SIEVE ORIG. % USED ORIG. % USED ORIG. % USED ORIG. % USED ORIG.
GRAD. 15.0% GRAD. 25.0% GRAD. 18.0% GRAD. 38.0% GRAD.
3"
2"
1½" 100 15.0 100.0 25.0 100.0 18.0 100 38.0 100
1" 73.7 11.1 100.0 25.0 100.0 18.0 100 38.0 100
¾" 8.7 1.3 98.2 24.5 100.0 18.0 100.0 38.0 100.0
½" 0.8 0.1 35.4 8.8 100.0 18.0 100.0 38.0 100.0
3/8" 0.3 0.0 1.5 0.4 82.6 14.9 100.0 38.0 100.0
No. 4 0.2 0.0 0.6 0.2 24.7 4.4 98.6 37.5 100.0
No. 8 0.1 0.0 0.3 0.1 0.9 0.2 62.8 23.9 100.0
No. 10 0.0 0.0
No. 16 0.1 0.0 0.2 0.0 0.2 0.0 32.5 12.3 99.8
No. 30 0.1 0.0 0.1 0.0 0.1 0.0 16.1 6.1 98.5
No. 40
No. 50 0.0 0.0 0.0 0.0 0.1 0.0 7.6 2.9 93.5
No. 80
No. 100 0.0 0.0 0.0 0.0 0.0 0.0 3.3 1.2 79.0
No.200 0.0 0.0 0.0 0.0 0.0 0.0 2.3 0.9 68.2
OPORTIONING OF AGGREGATES
DATE: 01/04/2016
AGG. # 5 (Filler)
% USED COMBINED JOB SPEC'S.
4.0% GRADATION MIX MIN.- MAX.
4.0 16 15.0±4
3.9 10 9.4±4
3.7 7 6.2±4
3.2 4 4.8±2
2.7 3.6 4.2±1.5
R.E / CONSULTANT
CONTRACTOR : CONSULTANT :
AL- FAHD COMPANY
SIEVE ANALYSIS
SIEVE ANALYSIS
SIEVE ANALYSIS
SIEVE ANALYSIS
SIEVE ANALYSIS
AGG. # 1, ( 1") AGG. # 2 (¾") AGG. # 3 (3/8") AGG. # 4 (C-Fine) AGG. # 5 (Filler)
SIEVE ORIG. % USED ORIG. % USED ORIG. % USED ORIG. % USED ORIG.
GRAD. 37.5% GRAD. 4.0% GRAD. 10.0% GRAD. 46.0% GRAD.
3"
2"
1½"
1" 100.0 37.5 100 4.0 100 10.0 100 46.0 100
¾" 62.6 23.5 100.0 4.0 100 10.0 100 46.0 100
½" 2.1 0.8 39.9 1.6 100 10.0 100 46.0 100
3/8" 0.5 0.2 2.4 0.1 84.8 8.5 100 46.0 100
No. 4 0.3 0.1 0.5 0.0 15.8 1.6 97 44.7 100
No. 8
No. 10 0.2 0.1 0.3 0.0 0.6 0.1 49.6 22.8 100
No. 16
No. 30
No. 40 0.2 0.1 0.3 0.0 0.3 0.0 19.8 9.1 98.3
No. 50
No. 80 0.2 0.1 0.2 0.0 0.3 0.0 7.7 3.6 94.6
No. 100
No.200 0.1 0.05 0.2 0.01 0.2 0.02 5.5 2.51 86.2
PROPORTIONING OF AGGREGATES
DATE: 05/11/2016
AGG. # 5 (Filler)
% USED COMBINED JOB SPEC'S.
2.5% GRADATION MIX MIN.- MAX.
2.5 25 29±5 20 - 35
2.5 12 12±3 7 - 20
2.4 6 8 5 - 15
R.E / CONSULTANT
CONTRACTOR CONSULTANT
AL - FAHD COMPANY
WORKSHEET FOR PROPORTIONING OF AGGREGATES
PROJECT: PLANT- 1
DESCRIPTIOBITUMINOUS BASE COURSE CLASS - 'C' QUALITY TEST DATE: 31/5/2016
AGG. # 1, ( 1") AGG. # 2 (¾") AGG. # 3 (3/8") AGG. # 4 (C-Fine) AGG. # 5 (Filler) AGG. # 5 (D-Dand)
SIEVE ORIG. % USED ORIG. % USED ORIG. % USED ORIG. % USED ORIG. % USED ORIG. % USED COMBINED JOB
GRAD. 7.0% GRAD. 19.0% GRAD. 18.0% GRAD. 51.0% GRAD. 3.0% GRAD. 2.0% GRADATION MIX
3"
2"
1½"
1" 100.0 7.0 100 19.0 100 18.0 100 51.0 100 3.0 100 2.0 100.0 100
¾" 62.6 4.4 100.0 19.0 100.0 18.0 100.0 51.0 100.0 3.0 100.0 2.0 97.4 94±6
½" 2.1 0.1 39.9 7.6 100.0 18.0 100.0 51.0 100.0 3.0 100.0 2.0 81.7 84±6
3/8" 0.5 0.0 2.4 0.5 84.8 15.3 100.0 51.0 100.0 3.0 100.0 2.0 71.8 67±6
No. 4 0.3 0.0 0.5 0.1 15.8 2.8 97.3 49.6 100.0 3.0 100.0 2.0 57.6 53±5
No. 8
No. 10 0.3 0.1 0.6 0.1 49.6 25.3 100.0 3.0 99.9 2.0 30.5 32±4
No. 16
No. 30
No. 40 19.8 10.1 98.3 3.0 85.1 1.7 14.8 17±4
No. 50
No. 80 7.7 3.9 94.6 2.8 22.7 0.5 7.2 -
No. 100
No.200 0.1 0.0 0.2 0.0 0.2 0.0 5.5 2.8 86.2 2.6 0.8 0.0 5.5 5.5±1.5
31/5/2016
SPEC'S.
MIN.- MAX.
100
90 - 100
78 - 93
57 - 72
43 - 58
28 - 43
13 - 28
3-7
R.E / CONSULTANT
CONTRACTOR : CONSULTANT :
AL- FAHD COMPANY ALAMMAR
DATE ; 27/3/2015
MATERIAL DESCRIPTION HOT BIN # 1/2"
SAMPLE NO. 1 2 AVE
DATE:
MATERIAL DESCRIPTION HOT BIN # 4, ( C - FINE )
SAMPLE NO. 1 2 AVE.
WEIGHT OF SATURATED SURFACE DRY SAMPLE
IN AIR
gm A 500.0 500.0
DATE ; 27/3/2015
MATERIAL DESCRIPTION HOT BIN # 1"
SAMPLE NO. 1 2 AVE
DATE ; 27/3/2015
MATERIAL DESCRIPTION HOT BIN # 3/4"
SAMPLE NO. 1 2 AVE
BULK SP. GRAVITY (DRY BASIS) g/cc A/B-C 2.626 2.624 2.625
BULK SP. GRAVITY (SSD BASIS) g/cc B/B-C 2.661 2.661 2.661
APPARENT SPECIFIC GRAVITY g/cc A/A-C 2.721 2.724 2.722
(B-A)x100
ABSORPTION %
A
1.335 1.390 1.363
M.E. / CONTRACTOR M.E / CONSULTANT R.E / CONSULTANT
CONTRACTOR CONSULTANT
AL - FAHD COMPANY
WORKSHEET FOR PROPORTIONING OF AGGREGATES
PROJECT: BALADIYAH PROJECT
DESCRIPTION: BITUMINOUS BASE COURSE CLASS - 'B' QUALITY TEST DATE: 05/11/2016
AGG. # 1, ( 1") AGG. # 2 (¾") AGG. # 3 (3/8") AGG. # 4 (C-Fine) AGG. # 5 (Filler)
SIEVE ORIG. % USED ORIG. % USED ORIG. % USED ORIG. % USED ORIG. % USED COMBINED JOB SPEC'S.
GRAD. 32.0% GRAD. 4.0% GRAD. 10.0% GRAD. 51.0% GRAD. 3.0% GRADATION MIX MIN.- MAX.
3"
2"
1½"
1" 100.0 32.0 100 4.0 100 10.0 100 51.0 100 3.0 100.0 100 100
¾" 62.6 20.0 100.0 4.0 100 10.0 100 51.0 100 3.0 88 84±6 75 - 90
½" 2.1 0.7 39.9 1.6 100 10.0 100 51.0 100 3.0 66 71 65 - 80
3/8" 0.5 0.2 2.4 0.1 84.8 8.5 100 51.0 100 3.0 63 60±6 55 - 65
No. 4 0.3 0.1 0.5 0.0 15.8 1.6 97 49.6 100 3.0 54 50±6 35 - 60
No. 8
No. 10 0.2 0.1 0.3 0.0 0.6 0.1 49.6 25.3 100 3.0 28 29±5 20 - 35
No. 16
No. 30
No. 40 0.2 0.1 0.3 0.0 0.3 0.0 19.8 10.1 98.3 3.0 13 12±3 7 - 20
No. 50
No. 80 0.2 0.1 0.2 0.0 0.3 0.0 7.7 3.9 94.6 2.8 7 8 5 - 15
No. 100
No.200 0.1 0.04 0.2 0.01 0.2 0.02 5.5 2.79 86.2 2.59 5.4 5.5±1.5 3-7
M.E. / CONTRACTOR M.E / CONSULTANT R.E / CONSULTANT
CONTRACTOR
AL - FAHD COMPANY
WORKSHEET FOR PROPORTIONING OF AGGREGATES
PROJECT: PLANT- 4
DESCRIPTION: BITUMINOUS BASE COURSE CLASS - 'C' QUALITY TEST
AGG. # 1, ( 1") AGG. # 2 (¾") AGG. # 3 (3/8") AGG. # 4 (C-Fine) AGG. # 5 (Fille
SIEVE ORIG. % USED ORIG. % USED ORIG. % USED ORIG. % USED ORIG.
GRAD. 8.0% GRAD. 22.0% GRAD. 14.8% GRAD. 52.0% GRAD.
3"
2"
1½"
1" 100.0 8.0 100 22.0 100 14.8 100 52.0 100
¾" 62.6 5.0 100.0 22.0 100.0 14.8 100.0 52.0 100.0
½" 2.1 0.2 39.9 8.8 100.0 14.8 100.0 52.0 100.0
3/8" 0.5 0.0 2.4 0.5 84.8 12.6 100.0 52.0 100.0
No. 4 0.3 0.0 0.5 0.1 15.8 2.3 97.3 50.6 100.0
No. 8
No. 10 0.2 0.0 0.3 0.1 0.6 0.1 49.6 25.8 100.0
No. 16
No. 30
No. 40 0.2 0.0 0.3 0.1 0.3 0.0 19.8 10.3 98.3
No. 50
No. 80 0.2 0.0 0.2 0.1 0.3 0.0 7.7 4.0 94.6
No. 100
No.200 0.1 0.0 0.2 0.0 0.2 0.0 5.5 2.8 86.2
OPORTIONING OF AGGREGATES
DATE: 5/11/2016
AGG. # 5 (Filler)
% USED COMBINED JOB SPEC'S.
3.2% GRADATION MIX MIN.- MAX.
3.2 29 32±4 28 - 43
3.1 14 17±4 13 - 28
3.0 7 - -
R.E / CONSULTANT
CONTRACTOR : CONSULTANT :
AL- FAHD COMPANY
SIEVE ANALYSIS
SIEVE ANALYSIS
SIEVE ANALYSIS
SIEVE ANALYSIS
SIEVE ANALYSIS
NOTES:
3/8" TO 3/4" MATERIAL CONSISTS OF 3/8" TO 1/2" = 33% 1/2" TO 3/4" = 67%
3/4" TO3/8" MATERIAL CONSISTS OF 3/4" TO 1" = 33% 1" TO 1"1/2" = 67%
REMARKS :
SIEVE ANALYSIS
SIEVE ANALYSIS
DATE TESTED:
TEST
ORIGINAL AFTER TEST RETAINED PERCENT WEIGHTED
FRACTION
GRADING % SIEVE MASS, grams CLAY PERCENT CLAY
MASS, grams
SIEVE SIZE
PASSING RETAINED A B C
DATE TESTED:
TEST
ORIGINAL AFTER TEST RETAINED PERCENT WEIGHTED
FRACTION
GRADING % SIEVE MASS, grams CLAY PERCENT CLAY
MASS, grams
SIEVE SIZE
PASSING RETAINED A B C
1"1/2" No.4
1"1/2" 3/4" No.4
3/4" 3/8" No.4
3/8" No. 4 No.8
No. 4 No. 16 No.20
SIEVE ANALYSIS
DATE TESTED:
PERCENT OF
ORIGINAL WT. of TEST WT. of
ELONGATED WEIGHTED
GRADING % FRACTION ELONGATED
PIECES AFTER (AVERAGE % LOSS)
RETAINED BEFORE TEST AFTER TEST
TEST
SIEVE SIZE PERCENTAGE
PASSING RETAINED A B C D=(C/E)*100 E=(D*G)/100
1" 1/2" 3/4" 23.3 2000 32 1.600 0.373
3/4" 1/2" 36.2 1500 36 2.400 0.869
1/2" 3/8" 15.9 1000 30 3.000 0.478
3/8" NO. 4 24.5 300 4 1.333 0.327
100 TOTAL = 2.047
DATE TESTED:
PERCENT OF
ORIGINAL WT. of TEST WT. of
ELONGATED WEIGHTED
GRADING % FRACTION ELONGATED
PIECES AFTER (AVERAGE % LOSS)
RETAINED BEFORE TEST AFTER TEST
TEST
SIEVE SIZE PERCENTAGE
12" 3/4"
3/8" NO. 4
TOTAL =
SIEVE ANALYSIS
Test Class A B C D
Test Class A B C D
Test Class A B C D
MOISTURE %
0 0 0 0
100
LIQUID LIMIT = N.P
NO. BLOWS
GROUP INDEX =
20
10
MOISTURE CONTENT %
SAND EQUIVALENT
DATE TESTED:
DATE TESTED:
SIEVE ANALYSIS
METHOD - A
Specific Gravity of Fine Aggregates Sieve Mass - gms
G = 2.600 No. 8 ~ No. 16 44
Calibrated Volume of Cylinder No. 16 ~ No. 30 57
V= 100.00 No. 30 ~ No. 50 72
No. 50 ~ No. 100 17
TOTAL 190