PENAWARAN JASA PEMBANGUNAN FASILITAS INSTRUMENTASI PADA AREA SUMUR NKT-01 TW CEPU FIELD
PT. PERTAMINA EP ASSET 4
No Uraian Pekerjaan Index Volume Start Bulan ke-1 Bulan ke-2 Bulan ke-3 Bulan ke-4 Bulan ke-5 Bulan ke-6 Bulan ke-7
Qty Unit S-Curve 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
A PEKERJAAN PERSIAPAN
1 Survey Engineer 0.05% 7E-05 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Instrument Engineer 0.03% 2 md
Electrical Engineer 0.03% 2 md
B PEKERJAAN ENGINEERING 0.74% 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
1 Desain Fire and Gas System 0.00%
Instrument Engineer 0.16% 5 md
2 Desain Well Head Control Panel 0.00%
Instrument Engineer 0.16% 5 md
3 Desain ShutDown Valve System 0.00%
Instrument Engineer 0.10% 3 md
4 Desain Solar Cell System 0.00%
Electrical Engineer 0.10% 3 md
5 Desain Lighting System 0.00%
Electrical Engineer 0.06% 2 md
6 Desain Monitoring System 0.00%
Instrument Engineer 0.16% 5 md
ACTUAL PROGRESS 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
ACTUAL CUMULATIVE PROGRESS 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Ir. Suroso
Direktur