Kingdom of Saudi Arabia Ministry of Education - Ha’il

University – Engineering College – Cooperative Training Unite

‫ جامعة حائل – كلية اهلندسة – وحدة التدريب التعاوني‬- ‫اململكة العربية السعودية – وزارة التعليم‬

Form Title: Monthly Progress Report Form No. MPR.01


Name of Intern: Mohammed Abdulmohsen Alghaslan UOH ID : 201608482
General administration of projects, operation and
Name of Organization:
maintenance
Name of Faculty Advisor: Dr. Amer Al-Damadi
Academic Department: Architectural Engineering
Report No. 4 out of 7
Period Covered: From 15 / 4 /2021 to 10 / 6 /2021
Cumulative number of hours worked by intern during the past month: ……
Each of the following five items must be at least thirty words in length and typed or written in
paragraph form (Additional photos, tables, drawings,…etc will be credited)
1. Describe your principal assignment and responsibilities during the last month?
- The training authority was changed to the Safari Contracting Company, and the first
working day was worked out with the supervising engineer Anas Al-Amer to supervise
the work in the tower and the administrative buildings and to agree to work with the
engineer.

-
2. What aspect of your training did you find most useful during this report period?
- That the training destination was changed due to the presence of more interest and a lot of
experience, buildings under finishing and benefiting from the engineers and their
experiences, and asking more questions to the engineer Anas, and some works were
visited for supervision, asking questions and gaining experience.

-
3. What aspects did you find most difficult, less interesting or less useful and why?
- Of course, after the training destination is changed, you have a new job and a new
environment, so it is difficult for you to adapt or work hard and not know the place of
work and the crew working on the project, but with the engineer Anas, there is no
difficulty, as he facilitates the ideas and clarifies them strongly. The installation of the
interior facade of marble and its installation in a mechanical way was visited.
-
4. Describe other professional growth opportunities (e.g., conferences, meetings, workshops)
that you were able to capitalize on during the past month and/or hope to have over the next
month.?
- A meeting was held with the engineer Anas Al-Amer to determine the work for the next
period and put forward some ideas such as calculating quantities for benefit and working
on AutoCAD for a scheme and according to the quantities of concrete and block.
5. Tell us what your training plan for the next month_12_/_7_/2021
____ to __12_/__8_/2021____ is. Also tell us what activities you will carry out to
accomplish the objectives outlined in this plan. (Ask your supervisor if necessary).
- The tower and administrative buildings will be supervised with the engineer Anas Al-
Amer and he started working on the AutoCAD program.
6. Other comments.
……………………………………………………………………………………………
The monthly report is to be completed and signed by the Intern every month, discussed with the Site
Supervisor, and then returned to the Faculty Advisor for review. It must be sent no later than the Sunday
following the month period it covers.

Signatures
Intern ……………………… Date …./…./……..
Site Supervisor ……………………… Date …./…./……..
Faculty Advisor ……………………… Date …./…./……..