Rakesh Kumar Choubey - BDET Presentation 5th June
Rakesh Kumar Choubey - BDET Presentation 5th June
Bridge Deck Erection Technology – Best International Practices, Webinar lecture series from 29th May to 3rd July 2021
EXAMPLE-
1. LAUNCHING GIRDER
2. LIFTING FRAME
3. BRIDGE BUILDER
4. MOVABLE SCAFFOLDING SYSTEM
5. FULL SPAN LAUNCHER
6. WING LAUNCHER
ETC.
SELECTION OF BDE
Bridge Deck Erection Technology – Best International Practices, Webinar lecture series from 29th May to 3rd July 2021
TYPE OF BRIDGE
UNDER SLUNG
UNDER SLUNG LG
OVER SLUNG LG OVER SLUNG LG
LG
INTERFACE OF STRUCTURAL DESIGNER AND
BDE MANUFACTURER/DESIGNERS
Bridge Deck Erection Technology – Best International Practices, Webinar lecture series from 29th May to 3rd July 2021
• DEFLECTION
• DEFLECTION CHECKING OF LG AND BDE SHALL BE CARRIED OUT DURIING EACH SPAN ERECTION.
• DEFLECTION DURING ERECTION OF SPAN SHALL BE LIMITED TO L/400.
• DEFLECTION DURING AUTOLAUNCHING SHALL BE LIMITED TO L/250.
• OVERTURNING MOMENT-
• FACTOR OF SAFETY AGAINST OVER TURNING SHALL BE TAKEN AS 1.33.
• STRUCTURAL BEHAVIOUR-
• STRUCTURAL BEHAVIOUR OF LG AND ITS SUPPORTS SHALL BE DOCUMENTED ON REGULAR BASIS.
CHECKLIST DURING EXECUTION
Bridge Deck Erection Technology – Best International Practices, Webinar lecture series from 29th May to 3rd July 2021
PROJECTS
BALANCE
SIMPLY
CANTILEVER/EXTR CABLESTAY
SUPPORTED/CONTINUO
ADOSED
US SPAN PRECAST
SEGMENTAL
SHARAVATHI SAHIBGANJ ZUARI CABLE STAY
EXTRADOSED- EXTRA-DOSED BRIDGE
BC BRIDGE BRIDGE
BANGALORE- NIDIGATTA-
ZUARI PKG 1 ZUARI PKG 2 ZUARI PKG 3
NIDIGATTA (PKG 1) MYSORE (PKG-2)
PROJECTS
SAHIBGANJ APPROACHES
ZUARI PKG 1
LAUNCHING WING
GIRDER LAUNCHER
LAUNCHING LAUNCHING
GIRDER GIRDER
MOVABLE
OVER SLUNG UNDER SLUNG UNDER SLUNG SCAFFOLDING
LG LG OVER SLUNG LG (STAGING) SYSTEM (MSS)- NOT
OVER SLUNG LG USED
SHARAVATHI EXTRADOSED-BC BRIDGE
Bridge Deck Erection Technology – Best International Practices, Webinar lecture series from 29th May to 3rd July 2021
WING LAUNCHER
PRECAST SPINE AND WING SUPER STRUCTURE
Bridge Deck Erection Technology – Best International Practices, Webinar lecture series from 29th May to 3rd July 2021
UNDER SLUNG
PRECAST SPINE AND WING SUPER STRUCTURE
Bridge Deck Erection Technology – Best International Practices, Webinar lecture series from 29th May to 3rd July 2021
SAHIBGANJ APPROACHES-
LENGTH-1.96KM
MAX SPAN LENGTH-45M
DECK WIDTH – 28M
SUPER STRUCTURE TYPE -
PRECAST SPINE WING
TYPE OF BDE USED-
1. OVER SLUNG LAUNCHING
GIRDER
2. WING LAUNCHER
PRECAST SEGMENT SUPER STRUCTURE
Bridge Deck Erection Technology – Best International Practices, Webinar lecture series from 29th May to 3rd July 2021