2021 - 31 Juli 2021

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 422

0 Basic Level

1 Elementary Level
2 Intermediate Level
3 Upper Intermediate Level
4 Advance Level

rec 615
ak1304

df1725

evrc2a
uc504
axion

c264

t200
nama

f6
Ahmad Solihin 1 3 3 4 1 4 2 2 4
Andi Wira Pradana 1 4 2 4 3 4 2 2 4
Fakhrurrozy 1 1 1 1 1 1 2 2 1
Ilham Firdaus 1 3 1 4 3 4 2 2 4
Riza Nurfaisal 1 2 1 3 1 4 2 2 4
Sumarno Dwi Saputra 1 2 1 3 2 4 3 2 4
Yosefariko 1 2 1 3 1 4 2 2 4

Hardware Engineering

0 Basic Level
1 Elementary Level
2 Intermediate Level
3 Upper Intermediate Level
4 Advance Level
setup panel acos
wiring ct vt meter
setup peripheral

wiring panel rtu

setup panel rtu


setup panel rtu

status kubikel
wiring control
setup panel
gelar kabel
rtu gi gh

kubikel
kontrol
gi gh

gi gh

nama
kp

Ahmad Solihin 4 4 4 3 3 4 4 3 3
Andi Wira Pradana 4 4 4 3 3 4 4 3 3
Fakhrurrozy 4 4 3 4 4 3 4 4 4
Ilham Firdaus 4 4 4 3 3 4 4 3 3
Riza Nurfaisal 3 4 3 3 3 3 3 3 3
Sumarno Dwi Saputra 3 4 3 3 3 3 3 3 3
Yosefariko 3 4 3 3 3 3 3 3 3

Soft Skill

0 Basic Level
1 Elementary Level
2 Intermediate Level
3 Upper Intermediate Level
4 Advance Level

event monitoring
analisa rab hpe

pembuatan wp

Proficiency
dokumentasi

komunikasi
pekerjaan

dokumen
disposisi

level
rks

nama

Ahmad Solihin 1 3 4 4 4 4 83.3%


Andi Wira Pradana 2 2 4 3 4 2 70.8%
Fakhrurrozy 2 2 2 3 4 2 62.5%
Ilham Firdaus 2 2 4 3 4 2 70.8%
Riza Nurfaisal 4 2 4 3 3 2 75.0%
Sumarno Dwi Saputra 2 2 4 3 3 2 66.7%
Yosefariko 2 2 4 3 3 2 66.7%

Outside Field Scada RTU

0 Basic Level
1 Elementary Level
2 Intermediate Level
3 Upper Intermediate Level
4 Advance Level
catu daya sistem
scada database

elektro mekanik
communication

mikrokontroller
scada protokol

operasi sistem

manuver
jaringan
proteksi
scada
nama

Ahmad Solihin 4 4 4 3 2 3 4 4 4
Andi Wira Pradana 2 3 2 3 3 3 4 3 2
Fakhrurrozy 1 2 1 4 1 3 4 1 1
Ilham Firdaus 2 3 2 4 2 3 4 3 2
Riza Nurfaisal 2 3 2 4 2 3 4 3 2
Sumarno Dwi Saputra 2 3 2 3 2 3 4 3 2
Yosefariko 3 3 2 3 2 3 4 3 2
Software Engineering

rec523aab

ase2000
fxd2000

vamp51

moxa-n
siecom
rec523
neopis

iectest
rt200p
p200c
p200

r200
noja

ptcc

4 2 2 4 4 4 4 2 2 4 1 1 4 4 4
4 1 2 4 4 4 4 2 2 4 1 2 4 4 4
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
4 1 1 4 4 4 4 2 2 4 1 1 4 4 4
4 1 1 4 4 4 4 2 2 4 1 1 4 3 4
4 1 1 4 4 4 4 2 2 4 1 1 4 3 4
4 1 1 4 4 4 4 2 2 4 1 1 4 3 4
Proficiency
wiring panel

level
acos

4 90.0%
4 90.0%
4 95.0%
4 90.0%
4 80.0%
4 80.0%
4 80.0%

# proficiency level
Proficiency
manajemen
sepam s20

sepam s40

micom-p

multilin
vitzpro

level
resiko
k3

nr
4 2 2 2 2 2 2 2 73.5%
4 2 2 2 2 2 2 1 61.8%
4 1 1 1 1 1 1 1 42.6%
4 2 2 2 2 2 2 1 61.8%
4 2 2 2 2 2 2 1 61.8%
4 2 2 2 2 2 2 1 60.3%
4 2 2 2 2 2 2 1 61.8%
6
17
Proficiency
level

72.9%
75.0%
27.1%
70.8%
65.6%
67.7%
65.6%
ciency level
outside field
engineering
engineering
hardware

scada rtu
software

soft skill
nama

Ahmad Solihin 0.729 0.9 0.833 0.735


Andi Wira Pradana 0.75 0.9 0.708 0.618
Fakhrurrozy 0.271 0.95 0.625 0.426
Ilham Firdaus 0.708 0.9 0.708 0.618
Riza Nurfaisal 0.656 0.8 0.75 0.618
Sumarno Dwi Saputra 0.677 0.8 0.667 0.603
Yosefariko 0.656 0.8 0.667 0.618
TUJUAN :
1. Mengetahui berapakah beban kerja yang diterima oleh bagian rtu ?
2. Mengetahui berapakah jumlah kebutuhan tenaga kerja yang optimal berdasarkan beban kerja mengg

DASAR TEORI :
Analisis beban kerja adalah proses menetapkan jumlah jam kerja-orang (man-hours) yang dibut
waktu tertentu. Analisis beban kerja bertujuan untuk menentukan berapa jumlah perkerja yang
dan berapa beban yang tepat dilimpahkan kepada satu orang pekerja. Dengan diketahuinya beb
tenaga kerja atau kekurangan tenaga kerja.

Sebagai salah satu acuan, beban tenaga kerja sebaiknya mendekati atau sama dengan 100% (Su
kerja yang dimana akan terjadi 3 kemungkinan yaitu :
1. Beban kerja saat pengukuran = 100 %
Bila hal itu terjadi maka jumlah tenaga kerja dan beban kerja pada saat pengukuran sudah baik,
kebutuhan volume pekerjaan
2. Beban kerja saat pengukuran > 100%
Hal ini menUnjukan bahwa jumlah tenaga kerja dan beban kerja pada saat pengukuran rata – ra
penambahan tenaga kerja, karena tenaga kerja yang ada menerima beban kerja yang berlebiha
3. Beban kerja pengukuran < 100%
Bila hal ini terjadi berarti jumlah tenaga kerja dan beban tenaga kerja pada saat pengukuran ber
untuk menyeimbangkan beban kerja dan tenaga kerja
Full Time Equivalent adalah salah satu metode analisis beban kerja yang berbasiskan waktu den
pekerjaan kemudian waktu tersebut dikonversikan ke dalam indeks nilai FTE.
Nilai FTE terbagi menjadi 3 jenis yaitu overload, normal, dan underload. Berdasarkan pedoman
Kepegawaian Negara pada tahun 2010, total nilai indeks FTE yang berada di atas nilai 1,28 diang
1,28 dianggap normal sedangkan jika nilai indeks FTE berada diantara nilai 0 sampai dengan 0,9
kurang
Untuk mendapatkan nilai FTE dari suatu proses kerja adalah sebagai berikut:
𝑇𝑜𝑡𝑎𝑙 𝐻𝑜𝑢𝑟𝑠 = (𝐹𝑟𝑒𝑞𝑢𝑒𝑛𝑐𝑦 𝑥 𝑝𝑟𝑜𝑐𝑒𝑠𝑠 𝑡𝑖𝑚𝑒 𝑥 𝑤𝑜𝑟𝑘𝑖𝑛𝑔 𝑑𝑎𝑦𝑠 𝑐𝑢𝑟𝑟𝑒𝑛𝑡 𝑦𝑒𝑎𝑟𝑠) / 60
𝐹𝑇𝐸 = 𝑇𝑜𝑡𝑎𝑙 ℎ𝑜𝑢𝑟𝑠 / 𝐸𝑓𝑓𝑒𝑐𝑡𝑖𝑓𝑒 𝐻𝑜𝑢𝑟𝑠 In 𝑦𝑒𝑎𝑟
KARAKTERISTIK TIM RTU
FUN
sarkan beban kerja menggunakan metode full time equivalent (FTE) ?
Spv. RTU
Ae, JT Har RTU
(man-hours) yang dibutuhkan untuk merampungkan beban kerja dalam Ae, JT Power Suplay dan
pa jumlah perkerja yang dibutuhkan untuk menyelesaikan suatu pekerjaan Mitra Kerja
Dengan diketahuinya beban kerja, dapat diketahui apakah terjadi kelebihan TOT

u sama dengan 100% (Sutalaksana et al. 1979). Dimana perhitungan tenaga JAM EFEKTIF KERJA :

PERHITU
pengukuran sudah baik, artinya jumlah tenaga kerja sudah sesuai dengan
Total Hari Tahun
Cuti Tahunan
aat pengukuran rata – rata diatas normal yang artinya harus ada Libur Hari Besar dan Cuti
an kerja yang berlebihan
Libur Hari Minggu
ada saat pengukuran berlebih dan apabila diperlukan dilakukan pengurangan Total Hari Kerja
Jam Kerja Pertahun (perh
g berbasiskan waktu dengan cara mengukur lama waktu penyelesaian Efektif Kerja
FTE. Total Jam Efektif Kerja
Total Menit Efektif Kerja
Berdasarkan pedoman analisis beban kerjayang dikeluarkan oleh Badan
da di atas nilai 1,28 dianggap overload, berada diantara nilai 1 sampai dengan
lai 0 sampai dengan 0,99 dianggap underload atau beban kerjanya masih

rikut:
60
KARAKTERISTIK TIM RTU : ELEMEN KERJA :
FUNGSI JUMLAH NO

Spv. RTU 1 1 Pemeliharaan Preventif dan K


Ae, JT Har RTU 2 2 Pemeliharaan Preventif dan K
Ae, JT Power Suplay dan Pendukung 2 3 Pemeliharaan Preventif dan K
Mitra Kerja 1 4 Pemeliharaan Preventif dan K
TOTAL 6 5 Pemeliharaan Preventif dan K
6 Pemeliharaan Preventif dan K
AM EFEKTIF KERJA : 7 Pemeliharaan Preventif dan K

PERHITUNGAN JUMLAH SATUAN 8 Pemeliharaan Preventif dan K


9 Integrasi Keypoint Pontianak
Total Hari Tahun 365 Hari 10 Integrasi Keypoint Singkawan
Cuti Tahunan 12 Hari 11 Integrasi Keypoint Sanggau
Libur Hari Besar dan Cuti Bersama 20 Hari 12 Integrasi Keypoint Ketapang
Libur Hari Minggu 52 Hari 13 Integrasi GI - GH Pontianak
Total Hari Kerja 281 Hari 14 Integrasi GI - GH Singkawang
am Kerja Pertahun (perhari 8 jam ) 2248 Jam 15 Integrasi GI - GH Sanggau
Efektif Kerja 95 % 16 Integrasi GI - GH Ketapang
Total Jam Efektif Kerja 2135.6 Jam
Total Menit Efektif Kerja 128136 Jam
ALLOWANCE ( KELONGGARAN ) :
AKTIFITAS UTAMA

Pemeliharaan Preventif dan Korektif Keypoint Pontianak


Pemeliharaan Preventif dan Korektif Keypoint Singkawang
Pemeliharaan Preventif dan Korektif Keypoint Sanggau
Pemeliharaan Preventif dan Korektif Keypoint Ketapang
Pemeliharaan Preventif dan Korektif GI - GH Pontianak
Pemeliharaan Preventif dan Korektif GI - GH Singkawang
Pemeliharaan Preventif dan Korektif GI - GH Sanggau
Pemeliharaan Preventif dan Korektif GI - GH Ketapang
Integrasi Keypoint Pontianak
Integrasi Keypoint Singkawang
Integrasi Keypoint Sanggau Total Allowance ( Menit )
Integrasi Keypoint Ketapang
Integrasi GI - GH Pontianak
Integrasi GI - GH Singkawang
Integrasi GI - GH Sanggau
Integrasi GI - GH Ketapang
GGARAN ) :
LIST KEGIATAN P

Pembuatan WP, Dokumen Terkait da


Persiapan Alat Kerja, APD dan Briefi
Inspeksi Kebersihan Panel dan Lingku
Inspeksi Kondisi Fisik Rtu, Battery da
Inspeksi Kondisi Mekanik dan TX, RX
Download Event Data
Kalibrasi Status dan Metering
Pengujian TC Dengan AC Suplay Men
Pengujian Kapasitas Batere AC Supla
Pengujian TC Dengan AC Suplay Off /
Pengecekan Common Suplay
19220.4 Input Data Realisasi Pemeliharaan
Mobilisasi ke Site Area
Mobilisasi Balik ke Basecamp Site Ar
Group Berangkat
Point
Personil
Frekuensi
Total Wa

LIST KEGIATAN

Pembuatan WP, Dokumen Terkait da


Persiapan Alat Kerja, APD dan Briefi
Power Up Perangkat RTU
Pembuatan dan Upload Data Setting
Pengujian PTP Lokal
Pengujian PTP Master
Penggelaran Material
Wiring Panel Kubikel
Wiring Panel RTU
Pembuatan Master Kabel dan Selong
Input Data Realisasi Integrasi
Mobilisasi PP ke Site Area
Mobilisasi Balik ke Basecamp Site Ar
Group Berangkat
Point
Personil
Total Wa
LIST KEGIATAN

Pembuatan WP, Dokumen Terkait da


Persiapan Alat Kerja, APD dan Briefi
Inspeksi Kebersihan Panel dan Lingku
Inspeksi Kondisi Fisik Rtu, Battery da
Inspeksi Kondisi Mekanik dan TX, RX
Download Event Data
Kalibrasi Status dan Metering
Pengujian TC Dengan AC Suplay Men
Pengujian Kapasitas Batere AC Supla
Pengujian TC Dengan AC Suplay Off /
Pengecekan Common Suplay
Input Data Realisasi Pemeliharaan
Mobilisasi ke Site Area
Mobilisasi Balik ke Basecamp Site Ar
x Gangguan
Point
Personil
Frekuensi
Total Wa
KEYPOINT GI - GH
LIST KEGIATAN PREVENTIF
PTK SKW SGU KTP PTK SKW
WP, Dokumen Terkait dan legalisasi 20 20 20 20 20 20
lat Kerja, APD dan Briefing Pelaksanaan Pekerjaan 15 15 15 15 15 15
bersihan Panel dan Lingkungan 10 10 10 10 10 10
ndisi Fisik Rtu, Battery dan Acos 15 15 15 15 15 15
ndisi Mekanik dan TX, RX Counting 15 15 15 15 15 15
vent Data 15 15 15 15 15 15
atus dan Metering 5 5 5 5 25 25
C Dengan AC Suplay Menyala / sd Rele Bantu 5 5 5 5 0 0
apasitas Batere AC Suplay Off 45 45 45 45 45 45
C Dengan AC Suplay Off / sd Rele Bantu 5 5 5 5 30 30
Common Suplay 0 0 0 0 20 20
Realisasi Pemeliharaan 10 10 10 10 10 10
e Site Area 90 300 480 360 90 300
Balik ke Basecamp Site Area 90 300 480 360 90 300
ngkat 52.5 23.75 14.75 11.75 12 5.5
210 95 59 47 24 11
2 2 2 2 2 2
2 1 1 1 2 1
Total Waktu 172200 58900 47200 31960 29760 11440

KEYPOINT GI - GH
LIST KEGIATAN INTEGRASI
PTK SKW SGU KTP PTK SKW
WP, Dokumen Terkait dan legalisasi 20 20 20 20 20 20
lat Kerja, APD dan Briefing Pelaksanaan Pekerjaan 15 15 15 15 15 15
erangkat RTU 30 30 30 30 30 30
dan Upload Data Setting 15 15 15 15 120 120
TP Lokal 20 20 20 20 300 300
TP Master 25 25 25 25 300 300
n Material 0 0 0 0 120 120
el Kubikel 0 0 0 0 720 720
el RTU 0 0 0 0 720 720
Master Kabel dan Selongsong 0 0 0 0 120 120
Realisasi Integrasi 10 10 10 10 10 10
P ke Site Area 90 300 480 360 90 300
Balik ke Basecamp Site Area 90 300 480 360 90 300
ngkat 0 0 2 3 6 1
0 0 2 3 6 1
2 2 2 2 4 4
Total Waktu 0 0 2460 2970 61560 11100
KEYPOINT GI - GH
LIST KEGIATAN KOREKTIF
PTK SKW SGU KTP PTK SKW
WP, Dokumen Terkait dan legalisasi 20 20 20 20 20 20
lat Kerja, APD dan Briefing Pelaksanaan Pekerjaan 15 15 15 15 15 15
bersihan Panel dan Lingkungan 10 10 10 10 10 10
ndisi Fisik Rtu, Battery dan Acos 15 15 15 15 15 15
ndisi Mekanik dan TX, RX Counting 15 15 15 15 15 15
vent Data 15 15 15 15 15 15
atus dan Metering 5 5 5 5 25 25
C Dengan AC Suplay Menyala / sd Rele Bantu 5 5 5 5 0 0
apasitas Batere AC Suplay Off 45 45 45 45 45 45
C Dengan AC Suplay Off / sd Rele Bantu 5 5 5 5 30 30
Common Suplay 0 0 0 0 20 20
Realisasi Pemeliharaan 10 10 10 10 10 10
e Site Area 90 300 480 360 90 300
Balik ke Basecamp Site Area 90 300 480 360 90 300
11.3 4.65 2.95 2.25 0.7 0.55
226 93 59 45 14 11
2 2 2 2 2 2
1 1 1 1 1 1
Total Waktu 7684 7068 6608 3960 560 902
GI - GH
SATUAN PARAMETER NILAI
SGU KTP
20 20 Menit Total Waktu Aktifitas 699606
15 15 Menit Total Waktu Tersedia 128136
10 10 Menit Total Allowance 19220.4
15 15 Menit FTE 5.6098708
15 15 Menit Beban Kerja Saat ini 0.9349785
15 15 Menit
25 25 Menit KESIMPULAN :
0 0 Menit 1. Beban Kerja (Preventif, Korektif dan Integrasi) Bagian RTU Saat ini Berdasarkan
45 45 Menit Metode Full Time Equivalent adalah sebesar 93,49 %
30 30 Menit 2. Total Kebutuhan Tenaga Kerja Pada Bagian Ini Berdasarkan Perhitungan
20 20 Menit Metode FTE Adalah Sebanyak 6 Orang
10 10 Menit
480 360 Menit
480 360 Menit
7 5.5 Kali
14 11 Lokasi
2 2 Orang
1 1 Kali
19600 12760

GI - GH
SATUAN
SGU KTP
20 20 Menit
15 15 Menit
30 30 Menit
120 120 Menit
300 300 Menit
300 300 Menit
120 120 Menit
720 720 Menit
720 720 Menit
120 120 Menit
10 10 Menit
480 360 Menit
480 360 Menit
9 9 Kali
9 9 Lokasi
4 4 Orang
106380 102060
GI - GH
SATUAN
SGU KTP
20 20 Menit
15 15 Menit
10 10 Menit
15 15 Menit
15 15 Menit
15 15 Menit
25 25 Menit
0 0 Menit
45 45 Menit
30 30 Menit
20 20 Menit
10 10 Menit
480 360 Menit
480 360 Menit
0.65 0.5 Kali
13 10 Lokasi
2 2 Orang
1 1 Kali
1534 940
RTU Saat ini Berdasarkan

sarkan Perhitungan
TOTAL
NO MATERIAL STATUS
OK RUSAK
1 232 to 485 converter 1 0
2 BATTERY CHARGER 24 10 A 0 2
3 BATTERY CHARGER 48 10 A 1 2
4 CARD ACAI RTU DFE 14 0
5 CARD DI 24 RTU DFE 2 0
6 CARD DI 48 RTU DFE 22 0
7 CARD DI 48 RTU SELL 4 0
8 CARD DO RTU DFE 14 2
9 CARD DO RTU SELL 1 0
10 CARD EXTENDERT COM 1 0
11 CNV 9 converter 25 0
12 DC Konverter 110 to 48 5 0
13 DC Konverter 48 to 12 11 0
14 kabel duck 18 0
15 Kabel kontrol 80 0
16 Kabel Lan 100 0
17 Kabel modbus 0 0
18 Kabel NYAF 0,75 3 0
19 Kabel NYAF 1,5 6 0
20 Kabel NYHY 0 0
21 kontaktor 48 0 0
SCADA:
22 mcb 9 0
kantor :1
23 PANEL ABB 7 gh
0 jawi : 1
24 PANEL ADVC 2 0
25 PANEL RTU 2 Meter 2 0
26 PANEL ENTEC 2 0
27 PANEL PTCC 8 0
28 PANEL RECLOSER COOPER 3 0
29 POWER METER ACUVIM L 3 0
30 POWER METER DFE 3 0
31 POWER METER SCHNEIDER 2 0
32 PSU 24 RTU DFE 3 0
33 PSU 48 RTU DFE 8 0
34 PSU 48 RTU SELL 2 0
35 Relay Kontaktor 110 Vdc 199 0
36 Relay Kontaktor 220 Vac 0 0
37 Relay Kontaktor 48 Vdc 74 0
38 Rs 232 to Rs 485 Converter 2 0
39 RTU ABB 2W 6 0
40 RTU ABB 3W 0 1
41 RTU ADVC 2 SCHNEIDER 0 1
SCADA:
42 RTU DFE 7 kantor
3 :2
badau : 1
43 RTU ETR300 ENTEC 0 2
tanjung :1
44 RTU F6 COOPER 0 parindu
5 :1
45 RTU FXD COOPER 0 1
46 RTU INTEK UC504 5 2
47 RTU INTEK UC504 61850 3 0
48 RTU PTCC SCHNEIDER 0 4
49 RTU SIMULATOR SCHNEIDER 7 0
50 Selongsong Label 3 0
51 Socket Relay 202 0
52 skund ferrule 5 0
53 skund I 5 0
54 skund y 5 0
55 SUBRACK RTU DFE 10 RU 7 0
56 SUBRACK RTU DFE 5 RU 5 0
57 SUBRACK RTU SELL 4 RU 2 0
58 SWITCHGEAR DUMMY SCHNEIDER 1 0
59 Terminal Block 10 mm 148 0
60 Terminal Block 10 mm fuse 59 0
kontaktor Awal 5
rs 232 to 485
dan panel Terpasang 5
acos maret
Gudang 0
kayu manis 1 30 desember 2020
sonora 1 04 januari 2021
antibar 1 07 januari 2021
simpang 4 1 12 januari 2021
km 9 wajok 1 1 16 Februarii 2021

Lokasi Lokasi
Terpasang Terpasang

:
1
:1

batre 7 ah Awal 34 batre 12 ah


yuasa Terpasang 30 yuasa
september Gudang 4 november
sui bundung 2 30 september 2020
setom 2 30 september 2020
pinang luar 2 01 oktober 2020
: dinkes paru 2 19 oktober 2020
2 alambana 2 19 oktober 2020
1
:1 tower karya 2 23 oktober 2020
:1 sekolah islamiyah 2 06 november 2020
sd 09 2 18 november 2020
mawan 2 25 november 2020
gonis rabu 2 25 november 2020
koci 2 04 november 2020
anzon 2 03 desember 2020
Lokasi kedukul 2 03 desember 2020 Lokasi
Terpasang meranti 2 04 desember 2020 Terpasang
simpang ledo 2 17 desember 2020
Awal 8 Awal
cnv 9
Terpasang 6 converter Terpasang
Gudang 2 Gudang
tanjung 1 15 maret 2021 sekayam
parindu 1 15 maret 2021 switching tayap
sekayam 1 16 maret 2021 switching sungai besar
tajok kayong 1 23 maret 2021 gh bengkayang
kebong 1 24 maret 2021 gh sanggau ledo
juang 1 24 maret 2021 switching melano
switching teluk batang
gh sekadau
gh sejangkung
gh tekarang

Lokasi
Terpasang

Awal 28 Awal
battery 7ah
Terpasang 27 eks upgade Terpasang
Gudang 1 Gudang
3w biomas 2 15 november 2020 mensere
samudra 2 10 desember 2020 badau
3w rsud pemangkat 2 11 desember 2020 pal 20
semberang 2 11 desember 2020 camat jelimpo
3w rsud sambas 2 11 desember 2020 aur
3w vincent 2 12 desember 2020 dogom
lirang 2 12 desember 2020 pelangi
smp sarim 2 31 desember 2020 kampet
beliung 2 04 januari 2021 smp 1 pinyuh
sepakat point 2 04 januari 2021
wonobaru 2 04 januari 2021
kaisar 1 09 januari 2021
3w area pontianak 2 11 januari 2021 Lokasi
lestari 2 18 januari 2021 Terpasang
44 110 to 48 Awal 27
19 converter Terpasang 22
25 maret Gudang 5
2 16 maret 2021 tanjung 1
2 22 maret 2021 parindu 1
2 23 maret 2021 sekayam 1
2 23 maret 2021 suak payung 1
2 24 maret 2021 tayap 1
1 26 maret 2021 juang 1
1 27 maret 2021 pltd tayap 1
4 23 maret 2021 sungai besar 1
1 31 maret 2021 kebong 1
2 01 april 2021 sw melano 1
sw teluk batang 1
gh pemangkat 1
Lokasi gh tebas 1
Terpasang gh sejangkung 1
gh ambawang 1
gh untan 1
gh tekarang 1
gh rcc 1
gh ngabang 1
gh kuala dua 1
gh jawi 1
gh mempawah 1

SCADA:
malenggang
bioskop
balai kijang
mantas
petai patah
sudirman
kenanga pinoh
dinkes pinoh
sungai putri
simpang saut
28 kedukul
tanjung sanggau
batre 12 ah Awal 84
16 sungai duri yuasa Terpasang 83
12 pasar gunung februari Gudang 1
2 31 maret 2021 bukit tiga 2
2 05 april 2021 sagatani 2
2 07 april 2021 sempalit 2
1 08 april 2021 lo nam 2
2 12 april 2021 radio pantai 1
2 15 april 2021 kota niaga 1
2 25 april 2021 bintang mas 4 2
2 26 april 2021 sucitro 2
1 28 april 2021 alambana 2
sei kelambu 2
bentunai 2
kkr 2
bupati kubu raya 1
bali mas 3 2
magister 2
polsek sintang 2
balai kijang 2
malenggang 2
bioskop 2
sudirman 2
petai patah 2
Lokasi
Terpasang mantas 2
engkadin 2
kedukul 2
melayu 2
sungai jawi 2
panglima libau 2
dharma bakti 2
kenanga pinoh 2
dinkes pinoh 2
pinoh 2
sempayuk 2
sentagi 2
pak karta 2
sungai putri 2
marong 2
simpang saut 2
batu daya 2
pulau kumbang 2
kendawangan 2
sui nanjung 2
senyawan 2
sempalai 2
#rencana dc to dc konverter
48 to 12 Awal 27
converter Terpasang 16
maret Gudang 11
15 maret 2021 tanjung 1
15 maret 2021 parindu 1
16 maret 2021 sekayam 1
22 maret 2021 suak payung 1
22 maret 2021 tayap 1
23 maret 2021 juang 1
23 maret 2021 pltd tayap 1
24 maret 2021 sungai besar 1
24 maret 2021 kebong 1
26 maret 2021 sw melano 1
27 maret 2021 sw teluk batang 1
30 maret 2021 gh sejangkung 1
31 maret 2021 Lokasi gh ambawang 1
31 maret 2021 Terpasang gh untan 1
31 maret 2021 gh tekarang 1
01 april 2021 gh rcc 1
01 april 2021
05 april 2021
07 april 2021
08 april 2021
26 april 2021
28 april 2021

Awal 40
batre 7 ah
yuasa mei Terpasang 40
Gudang 0
19 februari 2021 kapuas melawi 2
19 februari 2021 polsek siantan 2
19 februari 2021 berdikari 2
19 februari 2021 bandara 2
22 februari 2021 pal v 2
23 februari 2021 landak 2
24 februari 2021 sekuyang 2 SCADA:
antibar
24 februari 2021 perigi parit 2 SCADA:
prona
25 februari 2021 aruk 2 SCADA:
trisula
02 maret 2021 segarau sungai 2 SCADA:
ks tubun
03 maret 2021 bon bin 2 SCADA:
mess alri
04 maret 2021 katedral 2 SCADA:
tanah hitam
10 maret 2021 akbid 2 SCADA:
sekumbak
10 maret 2021 kayu manis 2 SCADA:
sungai daun
10 maret 2021 mowilex 2 SCADA:
merubung
12 maret 2021 alhikmah 2 SCADA:
sekanan
15 maret 2021 rambutan 2 SCADA:
sasak
16 maret 2021 sepakat wahidin 2
16 maret 2021 kanalisasi 2
22 maret 2021 citra siantan 2
22 maret 2021
Lokasi
22 maret 2021 Terpasang
22 maret 2021
22 maret 2021
23 maret 2021
23 maret 2021
23 maret 2021
23 maret 2021
23 maret 2021
23 maret 2021
23 maret 2021
24 maret 2021
24 maret 2021
24 maret 2021
25 maret 2021
25 maret 2021
27 maret 2021
27 maret 2021
27 maret 2021
31 maret 2021
31 maret 2021
31 maret 2021
31 maret 2021
Awal
inverter 1,5
kw Terpasang
Gudang
15 maret 2021 gh tanjung
15 maret 2021 switching teluk batang
16 maret 2021 gh sekayam
22 maret 2021 gh pln sekadau
22 maret 2021 switching tayap
23 maret 2021
23 maret 2021
24 maret 2021
24 maret 2021
26 maret 2021
27 maret 2021
31 maret 2021
31 maret 2021 Lokasi
01 april 2021 Terpasang
01 april 2021
05 april 2021

Awal
batre 12 ah
yuasa mei Terpasang
Gudang
24 mei 2021 anjungan dalam
25 mei 2021 syaiful
31 mei 2021 kecurit
15 juni 2021 sungai bundung
15 juni 2021 setom
17 juni 2021 timanggong
SCADA:
17 juni 2021 sangkuk
antibar
SCADA:
22 juni 2021 berembang kota
prona
SCADA:
22 juni 2021 tanjung sanggau
trisula
SCADA:
22 juni 2021 sungai duri
ks tubun
SCADA:
07 juli 2021 pasar gunung
mess alri
SCADA:
15 juli 2021 sungai pangkalan pekong
tanah hitam
SCADA:
19 juli 2021 sungai keran
sekumbak
SCADA:
19 juli 2021 barito
sungai daun
SCADA:
21 juli 2021 ayani singkawang
merubung
SCADA:
27 juli 2021 hermansyah
sekanan
SCADA:
27 juli 2021 gereja para rasul
sasak
27 juli 2021 brigif
29 juli 2021 titi
03 agustus 2021 3w auri
camat timur
Lokasi
tarakan
Terpasang
sungai bulan
poltek sambas
taruna
semangau
lembang
balai gemuruh
setia
jembatan besi
tanjung aruk
senangi SCADA:
merpati
3w dhafin SCADA:
bea cukai
sentebang hulu SCADA:
mitra me
jeruju besar
transmigrasi SCADA:
al azhar
rimbawan SCADA:
dinasty
metro perdana SCADA:
lingga
bea cukai SCADA:
sungai as
camat jelimpo
rumah dinas gubernur
kalis
7
5
2
1 29 juli 2020
1 24 november 2020
1 02 Desember 2020
1 02 Desember 2020
1 04 Desember 2020

218

85
84
1
2 24 mei 2021
2 24 mei 2021
2 24 mei 2021
2 24 mei 2021
2 24 mei 2021
2 24 mei 2021
2 24 mei 2021
2 31 mei 2021
2 07 juni 2021
2 07 juni 2021
2 07 juni 2021
2 07 juni 2021
2 07 juni 2021
2 07 juni 2021
2 07 juni 2021
2 07 juni 2021
2 08 juni 2021
2 08 juni 2021
2 08 juni 2021
2 08 juni 2021
2 09 juni 2021
2 09 juni 2021
2 09 juni 2021
2 12 juni 2021
2 15 juni 2021
2 21 juni 2021
2 21 juni 2021
2 21 juni 2021
2 22 juni 2021
2 22 juni 2021
2 22 juni 2021
SCADA: 2 22 juni 2021
merpati
SCADA: 2 22 juni 2021
bea cukai
SCADA: 2 22 juni 2021
mitra medika
2 29 juni 2021
SCADA: 2 30 juni 2021
al azhar
SCADA: 2 30 juni 2021
dinasty
SCADA: 2 30 juni 2021
lingga
SCADA: 2 01 juli 2021
sungai asam
2 06 juli 2021
2 08 juli 2021
2 02 agustus 2021
PENGUJIAN DAN SETTING

LOKASI KETERANGAN

RTU PTCC remote setting rtu ptcc


RTU P200 remote setting rtu p200
RTU P200C remote setting rtu p200c
RTU R200 remote setting rtu r200
RTU RT200P remote setting rtu rt200p
KANTOR UP2D pengujian setting icd file micom p142
KANTOR UP2D pengujian protokol 61850 rtu intek
BATTERY RTU ERROR

LOKASI JUMLAH SEL LOKASI

bad n replace 66 dinasti


trip tw 3 dan tw 4 106 kridasana
SANGGAU 68 al falah
KETAPANG 52
KETERANGAN

rtu error
rtu rusak
bootloop
INTEGRASI

LOKASI KETERANGAN

integrasi scada bus 1 gi sekadau integrasi ts,tm dan tc 6 kubikel dan multi site rtu
integrasi scada bus 1 gi sintang integrasi ts,tm dan tc 10 kubikel dan multi site rtu
integrasi scada gh ukhoi integrasi ts,tm dan tc 3 kubikel dan multi site rtu
integrasi scada gh pemuar integrasi ts,tm dan tc 3 kubikel dan multi site rtu
integrasi scada gh sungai ayak integrasi ts,tm dan tc 3 kubikel dan multi site rtu
integrasi scada bus 2 gi tayan integrasi ts,tm dan tc 6 kubikel dan multi site rtu
integrasi scada bus 2 gi sanggau integrasi ts,tm dan tc 6 kubikel dan multi site rtu
ACOS

LOKASI KETERANGAN

Akbid penggantian panel acos


anugerah bunda penggantian panel acos
whanabakti penggantian panel acos
Puskesmas Pekong penggantian panel acos
Taman Pos penggantian panel acos
Alambana penggantian panel acos
Patok 40 penggantian panel acos
sekolah islamiyah penggantian panel acos
TS, TM, DAN TC

LOKASI KETERANGAN

cb tani pengecekan wiring tc


dogom pengecekan dengan switchgear
marau pengecekan iec test
melapi pengecekan setting update firmware
pemahan pengecekan setting update firmware
sugiono pengecekan wiring status ac fail dan tc
CARD AC/DC

LOKASI KETERANGAN

Sungai Jawi card mgmt battery drop


SAUNAN card mgmt battery drop
AL-FALAH card mgmt battery drop
Engkadin card mgmt battery drop
MANMODEL SINGKAWANG card mgmt battery drop
SENYAWAN SAMBAS card mgmt battery drop
POS LANTAS SAMBAS card mgmt battery drop
SAIFUL card mgmt battery drop
ANJUNGAN DALAM card mgmt battery drop
MULIA card mgmt battery drop
INVERTER

LOKASI KETERANGAN

GH Megamall klaim garansi inverter dan battery pabrikan


GH Semparuk klaim garansi inverter dan battery pabrikan
GH Sanggau Ledo klaim garansi inverter dan battery pabrikan
GH tekarang klaim garansi inverter dan battery pabrikan
GH Sejangkung klaim garansi inverter dan battery pabrikan
PLTD Tayap klaim garansi inverter dan battery pabrikan
GI Ketapang klaim garansi inverter dan battery pabrikan
GH Siduk klaim garansi inverter dan battery pabrikan
PLTD Melano klaim garansi inverter dan battery pabrikan
Switching Melano klaim garansi inverter dan battery pabrikan
GH Sekayam klaim garansi inverter dan battery pabrikan
GH Parindu klaim garansi inverter dan battery pabrikan
GH Juang klaim garansi inverter dan battery pabrikan
GH Sawai Lama klaim garansi inverter dan battery pabrikan
GH Sawai Baru klaim garansi inverter dan battery pabrikan
PADAM SECTION JARINGAN TIDAK STABIL

LOKASI KEYPOINT SECTION PADAM

kuala tolak Sungai putri - kuala tolak


Pemahan Pengatapan - pemahan
Saunan Imam bonjol 2 - saunan
Paoh Gonid rabu - paoh
cahaya utara parit gandu - cahaya utara
sui keran mimiland - sei keran
camat jelimpo batas sanggau - camat jelimpo
kedukul semuntai - gh semuntai
silat simpang silat - silat
kendawangan sui nanjung - kendawangan
sui daun madak - sui daun
serukam sebale - serukam
batas balai tayap - batas balai
kp jawa lingga - kp jawa
retret lingga - kp jawa
kenore taman - kenore
2020 2021
cb kp total cb kp total
6 15 21 8 18 26
2 18 20 4 14 18
5 19 24 2 20 22
1 23 24 4 16 20
2 20 22 3 13 16
3 11 14 3 15 18
0 20 20 1 18 19
3 17 20 0 0 0
3 20 23 0 0 0
4 26 30 0 0 0
1 15 16 0 0 0
1 17 18 0 0 0

31 221 252 25 114 139

99.50%

99.40%

99.30%
99.21%
99.20% 0.991
0.9915 99.14
99.10% 99.08%
99.08%
99.00%

98.90%
99.40%

99.30%
99.21%
99.20% 0.991
0.9915 99.14
99.10% 99.08%
99.08%
99.00%

98.90%

98.80%

98.70%

98.60%

98.50%
1 2

99.50%

99.29%
99.30%

99.18%
99.10% 99.08%
99.08%

98.90%

98.70%

98.50%
1 2
99.15 99.18 99.21 99.22
# rekap tc bulanan

BERHASIL TC
BULAN TOTAL TC CB GAGAL TC CB % KEBERHASILAN TC
CB
JANUARI 864 856 8 99.07%
FEBRUARI 767 763 4 99.48%
MARET 809 807 2 99.75%
APRIL 861 857 4 99.54%
MEI 640 637 3 99.53%
JUNI 733 730 3 99.59%
JULI 720 719 1 99.86%
AGUSTUS
SEPTEMBER
OKTOBER
NOVEMBER
DESEMBER
TOTAL 5394 5369 25
% BERHASIL 99.54%

KEBERHASILAN TC CB 2021
100.10%

99.90% 0.998611111111111
0.997527812113721
99.70%
0.995907230559345
0.9953542392566780.9953125
0.994784876140808 0.995365220615499
0.9951 0.9954
99.50% 0.994865211810013
0.994671403197158 0.9947
0.994547106937292
0.994262295081967 0.9944 0.9946
0.994
0.9935
99.30% 0.992642550582465
0.9924
0.990740740740741
99.10% 0.9913
0.990740740740741

98.90%

98.70%

98.50%
1 2 3 4 5 6 7 8 9

bulanan komulatif target komulatif

KEBERHASILAN TC KP 2021
99.50%

99.40% 99.35% 99.33%


99.27% 0.9931 0.9933
99.30% 0.993
99.25%
99.21% 0.9925 0.9927
0.9921 0.9922 99.22% 99.22%
99.20% 0.9918 99.20%
0.9915 99.14% 99.16%
99.10% 99.08% 99.08%
99.12%
99.08%
99.00%

98.90%
99.40% 99.35% 99.33%
99.27% 0.9931 0.9933
99.30% 0.993
99.25%
99.21% 0.9925 0.9927
0.9921 0.9922 99.22% 99.22%
99.20% 0.9918 99.20%
0.9915 99.14% 99.16%
99.10% 99.08% 99.08%
99.12%
99.08%
99.00%

98.90%

98.80%

98.70%

98.60%

98.50%
1 2 3 4 5 6 7 8 9

bulanan komulatif target komulatif

KEBERHASILAN TC CB DAN KP 2021


99.50%
99.39% 99.39% 99.39%
99.34%
99.29% 99.31%
99.30% 99.26% 99.29%
99.27%
99.24%
99.21%
99.18%
99.10% 99.08%
99.08%

98.90%

98.70%

98.50%
1 2 3 4 5 6 7 8 9

bulanan komulatif

% KEBERHASILAN TC PROGNOSA % KEBERHASILAN TC CB


BULAN TOTAL TC CB BERHASIL TC CB CB KOMULATIF

JANUARI 864 856 99.07% 99.07%


FEBRUARI 767 763 99.48% 99.26%
MARET 809 807 99.75% 99.43%
APRIL 861 857 99.54% 99.45%
MEI 640 637 99.53% 99.47%
JUNI 733 730 99.59% 99.49%
JULI 720 719 99.86% 99.54%
PROGNOSA AGUSTUS 698 697 99.86% 99.57%
PROGNOSA SEPTEMBER 717 717 100.00% 99.62%
PROGNOSA OKTOBER 712 712 100.00% 99.65%
PROGNOSA NOVEMBER 709 710 100.14% 99.70%
PROGNOSA DESEMBER 713 714 100.14% 99.73%
99.25 99.27 99.3 99.31 99.33 99.34

REALISASI TARGET TOTAL TC BERHASIL TC GAGAL TC


% KEBERHASILAN TC
KOMULATIF KOMULATIF KEYPOINT KEYPOINT KEYPOINT
99.07% 99.13% 1950 1932 18 99.08%
99.26% 99.24% 1772 1758 14 99.21%
99.43% 99.35% 2178 2158 20 99.08%
99.45% 99.40% 2187 2171 16 99.27%
99.47% 99.44% 1991 1978 13 99.35%
99.49% 99.46% 2230 2215 15 99.33%
99.54% 99.47% 2401 2383 18 99.25%
99.51%
99.54%
99.59%
99.62%
99.68%
14709 14595 114
99.22%

CB 2021 YOY JUM


9
8
611111111111 8

7
0.9968
0.9962 6
0.9959 6
0.995365220615499
0.9951 0.9954
11810013
0.9947 5
5
4 4
4

3
2 2 2
2
1
1

0
7 8 9 10 11 12 JANUARI FEBRUARI MARET APRIL M

target komulatif

KP 2021 YOY JUM


30

0.9936 0.9938
0.9933 0.9934 25
0.993 0.9931 23
9.25%
99.22% 20 2
20 19
18 18
16
15
15 14

10
0.9936 0.9938
0.9933 0.9934 25
0.993 0.9931 23
9.25%
99.22% 20 2
20 19
18 18
16
15
15 14

10

0
7 8 9 10 11 12 JANUARI FEBRUARI MARET APRIL

target komulatif

AN KP 2021 YOY JUMLAH


30
9.39%
26
25 24
99.31%
21
20
20
18

15

10

0
7 8 9 10 11 12 JANUARI FEBRUARI MAR

mulatif

OSA % KEBERHASILAN TC CB % KEBERHASILAN TC PROGNOSA % KEBERHASILAN TC KP


TARGET TOTAL TC KP BERHASIL TC KP KP
KOMULATIF KOMULATIF

99.07% 1950 1932 99.08% 99.08%


99.26% 1772 1758 99.21% 99.14%
99.43% 2178 2158 99.08% 99.12%
99.45% 2187 2171 99.27% 99.16%
99.47% 1991 1978 99.35% 99.20%
99.49% 2230 2215 99.33% 99.22%
99.54%
99.68% 1558 1548 99.36% 99.24%
99.57% 1927 1916 99.43% 99.26%
99.62% 1905 1895 99.48% 99.28%
99.65% 1797 1789 99.55% 99.31%
99.70% 1877 1869 99.57% 99.33%
99.73% 1860 1853 99.62% 99.35%
99.36 99.38

REALISASI TARGET TOTAL TC TOTAL TC


TOTAL TC % KEBERHASILAN TC
KOMULATIF KOMULATIF BERHASIL GAGAL
99.08% 99.15% 2814 2788 26 99.08%
99.14% 99.18% 2539 2521 18 99.29%
99.12% 99.21% 2987 2965 22 99.26%
99.16% 99.22% 3048 3028 20 99.34%
99.20% 99.25% 2631 2615 16 99.39%
99.22% 99.27% 2963 2945 18 99.39%
99.22% 99.30% 3121 3102 19 99.39%
99.31%
99.33%
99.34%
99.36%
99.38%
20103 19964 139
99.31%

YOY JUMLAH KEGAGALAN TC CB (2020 vs 2021)

4 4

3 3 3 3 3

2 2

1 1 1 1

0 0 0 0 0 0
MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER

2020 2021

YOY JUMLAH KEGAGALAN TC KP (2020 vs 2021)

26

23

20 20 20 20
19
18
17 17
16
15 15
4
13
11
26

23

20 20 20 20
19
18
17 17
16
15 15
4
13
11

0 0 0 0 0
RI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER

2020 2021

YOY JUMLAH KEGAGALAN TC CB DAN KP (2020 vs 2021)

24 24
22 22
20 20 20
19
18 18
16
14

FEBRUARI MARET APRIL MEI JUNI JULI

2020 2021

OSA % KEBERHASILAN TC KP
TARGET
KOMULATIF

99.08%
99.14%
99.12%
99.16%
99.20%
99.22%
99.24%
99.38%
99.26%
99.28%
99.31%
99.33%
99.35%
# trend keberhasilan tc tahunan

CB KP
KOMULATIF TAHUN
TC BERHASIL GAGAL TC BERHASIL
99.08% 2017 9178 8440 738 9937 8681
99.18% 2018 9862 9243 619 13939 13089
99.21% 2019 7290 7188 102 23323 22850
99.24% 2020 9210 9179 31 35375 35154
99.27% 2021 5394 5369 25 14709 14595
99.29%
99.31%

TREND % KEBERHASILAN TC CB DAN KP


102.00%

100.00%
99.43% 99.31%
98.00% 98.12%

96.00%

94.00% 93.83%

92.00%

90.00%
89.57%

88.00%

86.00%

84.00%
2017 2018 2019 2020 2021

1 1 TREND KUMULATIF GAGAL TC CB DAN KP


0 0 2500
NOVEMBER DESEMBER

2000 1994

1500 1469

1000

575
500
17
15 252
139
0
2017 2018 2019 2020 2021
1000

575
500
17
15 252
139
0
2017 2018 2019 2020 2021

0 0
NOVEMBER DESEMBER

20
19

JULI
# rekap gagal tc cb bulanan

KP JUMLAH
% BERHASIL tanggal gagal tc cb
GAGAL GAGAL
1256 1994 89.57% 1/4/2021 13:26 kembayan
850 1469 93.83% 1/5/2021 19:45 tani
473 575 98.12% 1/6/2021 12:57 bodok
221 252 99.43% 1/8/2021 16:41 persada
114 139 99.31% 1/25/2021 18:03 putussibau
1/25/2021 18:03 dedai
` 1/25/2021 18:07 pawan 2
1/26/2021 16:27 husein hamzah
2/14/2021 5:26 unicoco
P
2/16/2021 19:25 putussibau
2/18/2021 17:51 arteri
2/27/2021 1:06 semparuk
99.31% 3/30/2021 18:43 korek
3/30/2021 18:52 melati 2 ambawang
4/8/2021 19:06 adi sucipto kd
4/11/2021 17:36 dedai
4/19/2021 11:51 rengas
4/21/2021 13:26 binjai
5/2/2021 19:08 putussibau
5/15/2021 13:45 dedai
5/15/2021 13:40 putussibau
6/11/2021 20:15 putussibau
6/19/2021 12:20 pawan 8
6/19/2021 12:27 pawan 10
2021 7/8/2021 15:01 pemuar

N KP

139

2021
139

2021
cause kode register
dioda bridge kubikel down o 4
Fuse common control putus a 7
tcs non aktif t 6
minus coil putus dirangkaian compartment kubikel p 4
backbone data putus u 5
backbone data putus u 5
backbone data putus u 5
Fuse common control putus a 7
dioda bridge kubikel down o 4
soket fuse common dilepas petugas v 6
Fuse common control putus a 7
operasi close dari tombol mekanik bawah x 4
link data provider tidak stabil f 5
link data provider tidak stabil f 5
Fuse common control putus a 7
link data provider tidak stabil f 5
rtu out of pool w 1
backbone data putus u 5
link data provider tidak stabil f 5
link data provider tidak stabil f 5
link data provider tidak stabil f 5
link data provider tidak stabil f 5
server scada down j 3
server scada down j 3
minus coil putus dirangkaian compartment kubikel p 4
% Penyebab
penyebab gagal tc cb 2021 jumlah register
Kegagalan
link data provider tidak stabil 7 28.00% 1
backbone data putus 4 16.00% 2
Fuse common control putus 4 16.00% 3
dioda bridge kubikel down 2 8.00% 4
minus coil putus dirangkaian compartment kubikel 2 8.00% 5
tcs non aktif 1 4.00% 6
soket fuse common dilepas petugas 1 4.00% 7
rtu out of pool 1 4.00%
operasi close dari tombol mekanik bawah 1 4.00%
socket rele bantu scada kendor 0 0.00%
kabel common legrand kendur 0 0.00%
power inverter down 0 0.00%
spring charge harus diengkol 0 0.00%
rele belum di reset 0 0.00%
do rtu tidak bekerja 0 0.00%
iec error 0 0.00% proses pindah link kom
server scada down 2 8.00% type
router scada down 0 0.00%
tc exceed = 0 0 0.00%
type tc tidak bersesuaian 0 0.00%
proses pindah link komunikasi main backup 0 0.00%
spring ch
frame tc error 0 0.00% p
rele bantu dilepas 0 0.00% kabel com
socket rele
scada server lag 0 0.00% operasi close dari tom

soket fuse comm

minus coil putus dirangkaian c


dioda
Fuse com
b
link data
rtu periphetotal (rtu + peripheral)
Juli 2020 4 5 9
Juli 2021 1 4 5
gagal tc cb 2021
bidang
1 2 3 4 5 6 7 8 9 10
rtu 0 0 0 1 0 0 0
telco 0 0 0 0 0 0 0
master 0 0 0 0 0 2 0
mekanik 2 2 0 0 0 0 1
provider 3 0 2 2 3 1 0
lainnya 1 1 0 0 0 0 0
peripheral 2 1 0 1 0 0 0

PENYEBAB GAGAL TC CB 2021

scada server lag 0.00%


rele bantu dilepas 0.00%
frame tc error 0.00%
proses pindah link komunikasi main backup 0.00%
type tc tidak bersesuaian 0.00%
tc exceed = 0 0.00%
router scada down 0.00%
server scada down 8.00%
iec error 0.00%
do rtu tidak bekerja 0.00%
rele belum di reset 0.00%
spring charge harus diengkol 0.00%
power inverter down 0.00%
kabel common legrand kendur 0.00%
socket rele bantu scada kendor 0.00%
operasi close dari tombol mekanik bawah 4.00%
rtu out of pool 4.00%
soket fuse common dilepas petugas 4.00%
tcs non aktif 4.00%
minus coil putus dirangkaian compartment kubikel 8.00%
dioda bridge kubikel down 8.00%
Fuse common control putus 16.00%
backbone data putus 16.00%
link data provider tidak stabil 28.00%
0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00%

Column CC

SEBARAN GAGAL TC CB 2021


rtu; 0.04
peripheral; 0.16 master; 0.08
SEBARAN GAGAL TC CB 2021
rtu; 0.04
peripheral; 0.16 master; 0.08

lainnya; 0.08
mekanik; 0.2

provider; 0.44

list cause gagal tc cb akibat rtu dan 2021


2020
peripheral (s/d 24 juli)
rele belum di reset 1 0
do rtu tidak bekerja 3 0
rtu out of pool 0 1

Fuse common control putus 6 4


socket rele bantu scada kendor 0 0
kabel common legrand kendur 3 0
power inverter down 0 0
rele bantu dilepas 1 0

gagal tc cb total 31 25
gagal tc cb akibat rtu dan peripheral 14 5
partisipasi kegagalan tc cb 45.16% 20.00%

TREND KEGAGALAN TC CB (RTU DAN PERIPHERAL)


10
9
9
8
7
6
5 5
5
4 4
4
3
2
1
1
0
rtu peripheral total (rtu + peripheral)

Juli 2020 Juli 2021


4 4
4
3
2
1
1
0
rtu peripheral total (rtu + peripheral)

Juli 2020 Juli 2021


# rekap gagal tc kp bulanan

sebaran
total tanggal gagal tc kp
11 12 kegagalan
1 4.00% 1/7/2021 14:30 monterado
0 0.00% 1/10/2021 13:44 sungai putri
2 8.00% 1/10/2021 22:17 3w area pontianak
5 20.00% 1/14/2021 7:11 mimiland
11 44.00% 1/18/2021 16:59 air upas
2 8.00% 1/19/2021 7:34 teluk barak
4 16.00% 1/19/2021 22:40 batu tajam 2
1/21/2021 18:15 brimob
1/21/2021 18:35 sugiono
1/23/2021 7:59 sugiono
1/25/2021 2:29 malenggang
1/25/2021 17:44 mulia
1/25/2021 17:54 sp1
1/25/2021 18:03 gonis rabu
1/25/2021 18:03 pln sukdana
1/25/2021 18:05 nanga mau
1/25/2021 18:05 silat
1/28/2021 9:43 malenggang
2/1/2021 21:26 batu tajam
2/3/2021 9:15 silat
2/10/2021 2:08 batu tajam
2/10/2021 18:46 marong
2/16/2021 8:15 polsek sintang
2/16/2021 9:13 batu tajam
2/17/2021 20:19 batu tajam
2/18/2021 12:24 3w rs jeruju
2/20/2021 20:15 sungai putri
2/24/2021 9:23 malenggang
28.00% 2/26/2021 18:39 pengatapan
25.00% 30.00% 2/26/2021 18:36 kendawangan
2/28/2021 16:47 keadilan
2/28/2021 18:08 halte
3/2/2021 18:31 segitiga
3/3/2021 3:06 pengatapan
3/4/2021 17:00 engkonis
3/5/2021 18:17 lingga
3/5/2021 18:36 bioskop
3/11/2021 17:54 wonodadi
3/12/2021 13:09 engkonis
3/14/2021 11:54 gonis rabu
3/14/2021 20:35 polsek sintang
3/15/2021 8:35 asam besar
3/17/2021 22:43 beduai balkar
3/17/2021 23:47 engkonis
3/18/2021 4:49 sungai nanjung
3/18/2021 9:11 sungai duri
3/18/2021 21:10 timanggong
3/21/2021 16:29 kenore
3/24/2021 13:14 kuala tolak
3/27/2021 12:55 air upas
3/29/2021 14:50 halte
3/31/2021 14:57 kenore
4/1/2021 18:27 beduai balkar
4/1/2021 23:03 kuala tolak
4/3/2021 9:07 mulia
4/3/2021 14:12 kendawangan
4/3/2021 16:47 sepaok
4/11/2021 17:33 gonis rabu
4/11/2021 19:21 melayu
4/11/2021 20:17 sidas
4/15/2021 7:43 melayu
4/16/2021 17:25 pekong duri
4/17/2021 10:20 kenore
4/19/2021 18:11 silat
9 10972500 4/21/2021 16:09 silat
5 1097250 4/21/2021 16:52 yolly
4 164000 4/27/2021 16:06 marong
44.44% 4/30/2021 7:36 batu tajam
5/4/2021 13:25 ambangah
5/5/2021 15:15 pak karta
5/6/2021 11:50 marong
5/6/2021 21:23 simpang 3 monterado
5/13/2021 0:51 silat
5/18/2021 17:00 sungai nangka
5/20/2021 22:20 silat
5/21/2021 12:44 silat
1/23/2021 10:04 segitiga
1/23/2021 23:21 paoh
1/24/2021 11:55 paoh
5/28/2021 21:31 silat
5/28/2021 22:39 pemahan
6/4/2021 15:58 kenore
6/6/2021 6:07 kenore
6/6/2021 11:12 jembatan kuning
6/7/2021 16:31 gonis rabu
6/8/2021 18:10 kuala tolak
6/9/2021 15:25 beliung
6/11/2021 19:28 mowilex
6/13/2021 22:36 kalis
6/16/2021 18:19 sasak
6/16/2021 23:27 parit tengkawang
6/21/2021 22:31 boro
6/26/2021 14:16 cuka
6/27/2021 21:36 kampet
6/29/2021 17:49 pesaguan
6/30/2021 9:40 yolly
7/1/2021 15:53 sepaok
7/1/2021 19:09 silat
7/5/2021 23:03 pemahan
7/8/2021 13:58 simpang 3 monterado
7/9/2021 12:55 sebangki
7/12/2021 12:07 silat
7/14/2021 4:36 sungai nangka
7/14/2021 5:19 sungai keran
7/15/2021 11:22 tanah putih
7/18/2021 22:08 polsek siantan
7/20/2021 22:59 simpang tae
7/21/2021 0:22 asam besar
7/22/2021 20:56 camat jelimpo
7/23/2021 20:40 wanabhakti
7/24/2021 14:42 silat
28/07/2021 xx:xx:xx 3w rsud pemangkat
28/07/2021 xx:xx:xx sekadau
30/07/2021 xx:xx:xx kalis
cause kode register
hlt aktif bt 6
link data provider tidak stabil aa 5
batere drop ab 7
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
mcb posisi off bu 6
minus coil hilang di limit switch ap 4
minus coil hilang di limit switch ap 4
link data provider tidak stabil aa 5
backbone data putus bv 5
backbone data putus bv 5
backbone data putus bv 5
backbone data putus bv 5
backbone data putus bv 5
backbone data putus bv 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
lock mekanik aktif bl 4
batere drop ab 7
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
minus coil hilang di limit switch ap 4
hlt aktif bt 6
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
backbone data putus bv 5
backbone data putus bv 5
mekanik keras al 4
rtu error bk 1
link data provider tidak stabil aa 5
fuse common putus ai 7
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
rtu error bk 1
link data provider tidak stabil aa 5
rtu error bk 1
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
tc harus reset bw 1
tc harus reset bw 1
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
backbone data putus bv 5
backbone data putus bv 5
mechanism fail bi 4
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
lock mekanik aktif bl 4
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
tc harus reset bw 1
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
mechanism fail bi 4
batere drop ab 7
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
tegangan card charging drop br 7
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
link data provider tidak stabil aa 5
fuse common putus ai 7
rtu error bk 1
scada server lag bp 3
scada server lag bp 3
link data provider tidak stabil aa 5
posisi tuas mekanik tegak lurus am 4
link data provider tidak stabil aa 5
limit switch bermasalah av 4
link data provider tidak stabil aa 5
batere drop ab 7
% Penyebab
list penyebab gagal tc kp 2021 jumlah register
Kegagalan
link data provider tidak stabil 75 65.79% 1
backbone data putus 10 8.77% 2
minus coil hilang di limit switch 3 2.63% 3
rtu error 4 3.51% 4
batere drop 4 3.51% 5
hlt aktif 2 1.75% 6
tc harus reset 3 2.63% 7
fuse common putus 2 1.75%
mekanik keras 1 0.88%
mechanism fail 2 1.75%
lock mekanik aktif 2 1.75%
mcb posisi off 1 0.88%
pumping 0 0.00% live load
ats
tc exceed = 0 0 0.00% ioa status tidak bersesu
motor tidak bekerja 0 0.00% scem data unkn
type tc tidak bersesu
router scada down 0 0.00% modem masih full du
selepas pekerjaan mcb tidak dinaikkan 0 0.00% link radio putus saat h
konektor batere ke
frame tc error 0 0.00% status switch tidak sesuai dengan
gangguang masif provider 0 0.00% modem over
limit switch bermas
counting rtu stop 0 0.00% ampere motor b
kabel vt acos ke
posisi tuas mekanik tegak lurus 1 0.88% ups selter d
server scada down 0 0.00% ioa tc tidak bersesu
spt editor d
lock disable aktif 0 0.00% lock disable
spt editor down 0 0.00% server scada d
posisi tuas mekanik tegak
ioa tc tidak bersesuaian 0 0.00% counting rtu
ups selter down 0 0.00% gangguang masif pro
frame tc
kabel vt acos kendor 0 0.00% selepas pekerjaan mcb tidak dinai
ampere motor besar 0 0.00% router scada d
motor tidak be
limit switch bermasalah 1 0.88% tc excee
pum
modem over heat 0 0.00% mcb posi
status switch tidak sesuai dengan tank 0 0.00% lock mekanik
mechanism
konektor batere kendor 0 0.00% mekanik k
link radio putus saat hujan 0 0.00% fuse common p
tc harus r
modem masih full duplex 0 0.00% hlt
type tc tidak bersesuaian 0 0.00% batere
rtu
scem data unknown 0 0.00% minus coil hilang di limit sw
backbone data p
ioa status tidak bersesuaian 0 0.00% link data provider tidak s
ats aktif 0 0.00%
live load aktif 0 0.00%
operasi 2 protokol 0 0.00%
syn check aktif 0 0.00%
interlock minimal ampere open 0 0.00%
soket kabel kontrol kendur 0 0.00%
setting database off 0 0.00%
vt satu sisi 0 0.00%
scada server lag 2 1.75%
soket kabel data kendur 0 0.00%
tegangan card charging drop 1 0.88%
trip isolated aktif 0 0.00%
rtu periphetotal (rtu + peripheral)
Juli 2020 18 16 34
Juli 2021 7 7 14
bulan
bidang
1 2 3 4 5 6 7 8 9 10
rtu 0 0 3 2 0 1 1
telco 0 0 0 0 0 0 0
master 0 0 0 0 0 0 2
mekanik 2 2 1 1 1 1 2
provider 13 10 15 13 12 11 11
lainnya 2 1 0 0 0 0 0
peripheral 1 1 1 0 0 2 2

PENYEBAB GAGAL TC KP 2021

live load aktif 0.00%


ats aktif 0.00%
ioa status tidak bersesuaian 0.00%
scem data unknown 0.00%
type tc tidak bersesuaian 0.00%
modem masih full duplex 0.00%
link radio putus saat hujan 0.00%
konektor batere kendor 0.00%
status switch tidak sesuai dengan tank 0.00%
modem over heat 0.00%
limit switch bermasalah 0.88%
ampere motor besar 0.00%
kabel vt acos kendor 0.00%
ups selter down 0.00%
ioa tc tidak bersesuaian 0.00%
spt editor down 0.00%
lock disable aktif 0.00%
server scada down 0.00%
posisi tuas mekanik tegak lurus 0.88%
counting rtu stop 0.00%
gangguang masif provider 0.00%
frame tc error 0.00%
selepas pekerjaan mcb tidak dinaikkan 0.00%
router scada down 0.00%
motor tidak bekerja 0.00%
tc exceed = 0 0.00%
pumping 0.00%
mcb posisi off 0.88%
lock mekanik aktif 1.75%
mechanism fail 1.75%
mekanik keras 0.88%
fuse common putus 1.75%
tc harus reset 2.63%
hlt aktif 1.75%
batere drop 3.51%
rtu error 3.51%
minus coil hilang di limit switch 2.63%
backbone data putus 8.77%
link data provider tidak stabil
0.00% 10.00% 20.00% 30.00% 40.00% 50.00% 60.00%

Column DE
0.00% 10.00% 20.00% 30.00% 40.00% 50.00% 60.00%

Column DE

SEBARAN GAGAL TC KP
peripheral rtu
lainnya6% m aster
6%
3% 2%
mekanik
9%

provider
75%

list cause gagal tc kp akibat rtu dan peripheral 2020 2021


(s/d 31 juli)
counting rtu stop 0 0
interlock minimal ampere open 2 0
rtu error 31 4
tc harus reset 0 3

batere drop 18 4
fuse common putus 1 2
kabel vt acos kendor 0 0
konektor batere kendor 0 0
tegangan card charging drop 7 1

gagal tc kp total 221 114


gagal tc kp akibat rtu dan peripheral 59 14
partisipasi kegagalan tc kp 26.70% 12.28%
TREND KEGAGALAN TC KP (RTU DAN PERIPHERAL)
40
35 34

30
25
20 18
16
15 14

10 7 7
5
0
rtu peripheral total (rtu + peripheral)

Juli 2020 Juli 2021


# rekap downtime bulanan

sebaran menit
total bulan lokasi
11 12 kegagalan downtime
7 6.14% 1 RSUD SAMBAS 34560
0 0.00% 1 ANTIBAR 4508.9833333
2 1.75% 1 KAPUAS PALACE 130.95
10 8.77% 1 MARAU 44640
85 74.56% 1 ENGKADIN 519.95
3 2.63% 1 SUNGAI JAWI 234.1
7 6.14% 2 GH PLTD SAWAI
14399.40
LAMA
2 GH SIDUK 1,437.13
2 RSUD SAMBAS 1,307.90
2 MARAU 44640
2 ENGKADIN 382.98
2 SUNGAI JAWI 805.53
GH PLTD SAWAI
3 12960.00
LAMA
3 GH SEKAYAM 2595.00
3 PLTD TELUK MELANO 36,904.53
3 SETIA 20,551.85
3 NANGA MAU 4320
4 GH SIDUK 700.80
4 PELANGI SINGKAWAN 35,614.28
4 ALAMBANA 6,454.32
4 WONOBARU 2,064.20
5 ALAMBANA 7521.2333333
5 WONOBARU 916.63333333
6 GH MEGAMALL 12169.43
6 PELANGI SINGKAWAN 10507.383333
6 TITI 21396.666667
6 TAMAN SEKADAU 3359.75
6 ALAMBANA 168.43333333
6 WONOBARU 169.03333333
7 GI SEI RAYA 1233.75
7 DR SUDARSO 4076.2833333

65.79%
60.00% 70.00%
60.00% 70.00%
25
11
14
56.00%
cause kode
rtu error aaa
suplay ac dc down aab
rtu error aaa
kerusakan port komunikasi aad
kerusakan card rtu aac
kerusakan card rtu aac
suplay ac dc down aab
suplay ac dc down aab
rtu error aaa
kerusakan port komunikasi aad
kerusakan card rtu aac
kerusakan card rtu aac
suplay ac dc down aab
suplay ac dc down aab
operasi aae
rtu error aaa
operasi aae
operasi aae
rtu error aaa
rtu error aaa
rtu error aaa
rtu error aaa
rtu error aaa
suplay ac dc down aab
rtu error aaa
rtu error aaa
rtu error aaa
rtu error aaa
rtu error aaa
kerusakan port komunikasi aad
rtu error aaa
keterangan downtime

RTU ERROR (SF6 INVALID; INTEK TIDAK MENIGIRIM DATA)


MCB ACOS BERMASALAH
RTU ERROR
SUSPECT PORT KOMUNIKASI RUSAK
CARD RECTIFIER
CARD RECTIFIER
INVERTER DOWN
INVERTER DOWN
RTU ERROR (SF6 INVALID; INTEK TIDAK MENIGIRIM DATA)
SUSPECT PORT KOMUNIKASI RUSAK[44640]
CARD RECTIFIER
CARD RECTIFIER
INVERTER DOWN
INVERTER DOWN
BARU DINYALAKAN KEMBALI TANGGAL 26 MARET 2021
RTU ERROR
DIMATIKAN PETUGAS, 3 HARI RTU MATI
MODEM SEMPAT DIPINDAH KE SUNGAI PUTRI
RTU ERROR
RTU ERROR
RTU ERROR
RTU ERROR
RTU ERROR
COMMON SUPPLY PUTUS
RTU ERROR
RTU ERROR
RESTART RTU
RTU ERROR
RTU ERROR
COM SERIAL RTU RUSAK
PROTOKOL KONVERTER ERROR
juni 2020 190931.33683
juni 2021 325940.48333
TOTAL
BULAN KP GI GH HARI DOWNTIME
WAKTU
JANUARI 408 59 31 20846880 84593.98
FEBRUARI 409 60 28 18910080 62972.95
MARET 409 60 31 20936160 77331.38
APRIL 409 60 30 20260800 44833.60
MEI 411 60 31 21025440 8437.87
JUNI 411 60 30 20347200 47770.70
JULI 411 60 31 21025440 5310.03
AGUSTUS
SEPTEMBER
OKTOBER
NOVEMBER
DESEMBER

AVAILABILITY 2021
100.200%
0.99959868299228 0.99974744723534
6 9
100.000%
0.99778717523493
0.99666987395084 6 0.99765222241881
99.800%
0.99594212739108 0.99630632440078 99.77%
5 2 99.73% 99.73%
5 99.63% 99.63% 99.67%
99.600% 99.59% 9
99.54%
99.48%
99.400% 99.42%
99.36%
99.30%
99.200% 99.24%
99.18%
99.12%
99.06%
99.000% 99.00%

98.800%
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEM

bulanan target komulatif komulatif

BULAN TOTAL WAKTU WAKTU % AV PROGNOSA % AV


DOWNTIME

JANUARI 20846880 84593.983333 99.59% 99.59%


FEBRUARI 18910080 62972.95 99.67% 99.63%
MARET 20936160 77331.383333 99.63% 99.63%
APRIL 20260800 44833.6 99.78% 99.67%
MEI 21025440 8437.8666667 99.96% 99.73%
JUNI 20347200 47770.7 99.77% 99.73%
JULI 21025440 5310.033 99.97% 99.77%
PROGNOSA AGUSTUS 20799360 17431 99.92% 99.79%
PROGNOSA SEPTEMBER 20724000 19979 99.90% 99.80%
PROGNOSA OKTOBER 20849600 12105 99.94% 99.81%
PROGNOSA NOVEMBER 20790987 14030 99.93% 99.83%
PROGNOSA DESEMBER 20788196 13066 99.94% 99.84%

2021
list penyebab downtime 2021 2020
(s/d 30 juni)
rtu error 148,798.92
suplay ac dc down 48,069.95
kerusakan card rtu 1,942.57
kerusakan port komunikasi 90,513.75
operasi 41,925.33

jumlah downtime 735,999.40 331,250.52 404,748.89


54.99%

JUMLAH MENIT DOWNTIME RTU


800,000.00 735,999.40
700,000.00
600,000.00
500,000.00
400,000.00
331,250.52
300,000.00
200,000.00
100,000.00
-
2020 2021
(s/d 30 juni)

jumlah downtime
REALISASI TARGET
% AV list penyebab downtime 2021 menit
KOMULATIF KOMULATIF
99.594% 99.59% 99.00% rtu error 148,798.92
99.667% 99.63% 99.06% suplay ac dc down 48,069.95
99.631% 99.63% 99.12% kerusakan card rtu 1,942.57
99.779% 99.67% 99.18% kerusakan port komunikasi 90,513.75
99.960% 99.73% 99.24% operasi 41,925.33
99.765% 99.73% 99.30%
99.975% 99.77% 99.36%
99.42%
99.48%
99.54%
99.60%
99.72%

99.72%
99.60%
99.54%
99.48%
%

SEPTEMBER OKTOBER NOVEMBER DESEMBER

TARGET

99.72%
99.72%
% Penyebab
Kegagalan
44.92%
14.51%
0.59%
27.32%
12.66%
NO UP3 ULP SISTEM2 GI/GH/PL/SW JENIS TYPE2 TANGGAL INTEGRASI
PENGGANTIAN BATERE TERAKHIR HAR 1 HAR 2 BACKUP DC JAM OPERASI JUMLAH KUBIKEL INC TRAFO PENYULANG INC KIT KOPEL STATUS INTEGRASI SURVEY
154 PONTIANAK PTK KOTA KHATULISTIWA ACOS ANTONIUS ACOS 24 2 0 2 0 0 BELUM BELUM
19 PONTIANAK PTK KOTA KHATULISTIWA ACOS ASTON ACOS T200 24 Oktober 2019 24 Oktober 2019 24 2 0 2 0 0 SUDAH SUDAH
21 PONTIANAK PTK KOTA KHATULISTIWA ACOS BANDARA ACOS T200 24 Oktober 2019 21 Februari 2019 24 2 0 2 0 0 SUDAH SUDAH
153 PONTIANAK PTK KOTA KHATULISTIWA ACOS BANK BI ACOS 24 2 0 2 0 0 BELUM BELUM
159 PONTIANAK PTK KOTA KHATULISTIWA ACOS BUMI RAYA MALL ACOS 24 2 0 2 0 0 BELUM BELUM
24 PONTIANAK SIANTAN KHATULISTIWA ACOS DOK ACOS T200 25 Oktober 2019 25 Oktober 2019 24 2 0 2 0 0 SUDAH SUDAH
156 PONTIANAK SIANTAN KHATULISTIWA ACOS HOK TONG ACOS 24 2 0 2 0 0 BELUM BELUM
20 PONTIANAK PTK KOTA KHATULISTIWA ACOS KAPUAS PALACE ACOS T200 24 Oktober 2019 24 Oktober 2019 24 2 0 2 0 0 SUDAH SUDAH
25 PONTIANAK MEMPAWAH KHATULISTIWA ACOS KKJ ACOS T200 25 Oktober 2019 25 Oktober 2019 24 2 0 2 0 0 SUDAH SUDAH
150 PONTIANAK PTK KOTA KHATULISTIWA ACOS MAHKOTA ACOS 24 2 0 2 0 0 BELUM BELUM
PONTIANAK PTK KOTA KHATULISTIWA ACOS MEGA MALL ACOS 24 2 0 2 0 0 BELUM SUDAH
23 PONTIANAK PTK KOTA KHATULISTIWA ACOS ORCHARD GAJAHMADA ACOS T200 24 Oktober 2019 24 Oktober 2019 24 2 0 2 0 0 SUDAH SUDAH
152 PONTIANAK MEMPAWAH KHATULISTIWA ACOS PELABUHAN KIJING ACOS 24 2 0 2 0 0 BELUM BELUM
26 PONTIANAK SIANTAN KHATULISTIWA ACOS POKPHAND ACOS T200 14 januari 2020 14 januari 2020 24 2 0 2 0 0 SUDAH SUDAH
22 PONTIANAK PTK KOTA KHATULISTIWA ACOS PONTIANAK MALL ACOS T200 24 Oktober 2019 24 Oktober 2019 24 2 0 2 0 0 SUDAH SUDAH
151 PONTIANAK PTK KOTA KHATULISTIWA ACOS PT GAMMA ACOS 24 2 0 2 0 0 BELUM BELUM
158 PONTIANAK PTK KOTA KHATULISTIWA ACOS TRANSMART ACOS 24 2 0 2 0 0 BELUM BELUM
155 PONTIANAK MEMPAWAH KHATULISTIWA ACOS UNI COCO DAN SARI PATI ACOS 24 2 0 2 0 0 BELUM BELUM
149 PONTIANAK JAWI KHATULISTIWA ACOS UPB ACOS 24 2 0 2 0 0 BELUM BELUM
9 PONTIANAK MEMPAWAH KHATULISTIWA CB KARANGAN SW 24 1 0 1 0 0 BELUM SUDAH
12 PONTIANAK MEMPAWAH KHATULISTIWA CB MANDOR SW 24 1 0 1 0 0 BELUM SUDAH
8 PONTIANAK MEMPAWAH KHATULISTIWA CB MENJALIN SW 24 1 0 1 0 0 BELUM SUDAH
10 PONTIANAK NGABANG KHATULISTIWA CB PAHAUMAN SW 24 1 0 1 0 0 BELUM SUDAH
11 PONTIANAK MEMPAWAH KHATULISTIWA CB SEGEDONG SW 24 1 0 1 0 0 BELUM SUDAH
5 PONTIANAK SIANTAN KHATULISTIWA GH AMBAWANG GH DF1725IED 10/16/18 09 Mei 2019 31 maret 2021 dc to dc converter 110 to 48 24 6 0 6 0 0 SUDAH SUDAH
38 SINGKAWANG BENGKAYANG KHATULISTIWA GH BENGKAYANG GH UC 504-G 01/26/18 23 maret 2021 24 3 0 3 0 0 SUDAH SUDAH
1 PONTIANAK PTK KOTA KHATULISTIWA GH CEMARA GH DF1725IED 2016 24 Mei 2018 22 april 2021 dc to dc converter 110 to 48 24 23 0 22 0 1 SUDAH SUDAH
3 PONTIANAK PTK KOTA KHATULISTIWA GH JAWI GH DF1725IED 2016 30 Mei 2018 03 maret 2021 dc to dc converter 110 to 48 24 14 0 12 0 2 SUDAH SUDAH
78 SANGGAU PINOH ISOLATED GH JUANG GH UC 504-G November 2019 November 2019 23 maret 2021 dc to dc converter 110 to 48 24 3 0 3 0 0 SUDAH SUDAH
65 SANGGAU BALKAR ISOLATED GH KANTOR BALKAR/SEKAYAM GH UC 504-G November 2019 November 2019 16 maret 2021 dc to dc converter 110 to 48 24 4 0 4 0 0 SUDAH SUDAH
66 SANGGAU SEKADAU ISOLATED GH KANTOR SEKADAU GH UC 504-G November 2019 November 2019 23 maret 2021 24 4 0 4 0 0 SUDAH SUDAH
74 SANGGAU SINTANG ISOLATED GH KANTOR SINTANG/CUT NYAK DIEN GH 24 5 0 5 0 0 BELUM SUDAH
45 SINGKAWANG DURI KHATULISTIWA GH KARIMUNTING GH 24 2 0 2 0 0 BELUM SUDAH
76 SANGGAU SINTANG ISOLATED GH KEBONG GH UC 504-G 19 Agustus 2020 24 maret 2021 dc to dc converter 110 to 48 24 2 0 2 0 0 SUDAH SUDAH
48 SINGKAWANG BENGKAYANG KHATULISTIWA GH LEDO GH 24 2 0 2 0 0 BELUM SUDAH
2 PONTIANAK RASAU KHATULISTIWA GH KUALA DUA GH DF1725IED 2016 08 maret 2021 08 maret 2021 dc to dc converter 110 to 48 24 12 0 12 0 0 SUDAH SUDAH
61 SANGGAU SGU KOTA ISOLATED GH MELIAU GH 24 4 0 4 0 0 BELUM SUDAH
27 PONTIANAK PTK KOTA KHATULISTIWA GH MEGAMALL GH UC 504-G Desember 2019 Desember 2019 28 april 2021 24 4 0 4 0 0 SUDAH SUDAH
148 PONTIANAK MEMPAWAH KHATULISTIWA GH MEMPAWAH GH DF1725IED 18 Juni 2020 22 april 2021 dc to dc converter 110 to 48 24 5 0 5 0 0 SUDAH SUDAH
belum terpasang dc
75 SANGGAU SINTANG ISOLATED GH MENYURAI GH AXION 09/29/18 29/09/2018 konverter 24 13 0 9 2 2 SUDAH SUDAH
4 PONTIANAK NGABANG KHATULISTIWA GH NGABANG GH AXION 07/25/18 25/07/2018 07 april 2021 06 juli 2021 dc to dc converter 110 to 48 24 6 0 6 0 0 SUDAH SUDAH
60 SANGGAU SGU KOTA ISOLATED GH PARINDU GH UC 504-G November 2019 November 2019 15 maret 2021 dc to dc converter 110 to 48 24 2 0 2 0 0 SUDAH SUDAH
89 SANGGAU PINOH ISOLATED GH PEMUAR GH 24 3 0 3 0 0 BELUM SUDAH
37 SINGKAWANG PEMANGKAT KHATULISTIWA GH PEMANGKAT GH DF1725IED 2017 01 November 2017 30 maret 2021 dc to dc converter 110 to 48 24 3 0 3 0 0 SUDAH SUDAH
6 PONTIANAK PTK KOTA KHATULISTIWA GH RCC GH UC 504-G 10/12/18 09 Mei 2019 02 maret 2021 dc to dc converter 110 to 48 24 6 0 6 0 0 SUDAH SUDAH
40 SINGKAWANG BENGKAYANG KHATULISTIWA GH SAMALANTAN GH 24 3 0 3 0 0 BELUM BELUM
57 SINGKAWANG SAMBAS KHATULISTIWA GH SAJINGAN GH UC 504-G 08 oKTOBER 2020 22 juni 2021 24 2 0 2 0 0 SUDAH SUDAH
49 SINGKAWANG BENGKAYANG KHATULISTIWA GH SANGGAU LEDO GH UC 504-G Desember 2019 Desember 2019 24 maret 2021 24 4 0 4 0 0 SUDAH SUDAH
44 SINGKAWANG PEMANGKAT KHATULISTIWA GH SELAKAU GH 24 2 0 2 0 0 BELUM SUDAH
50 SINGKAWANG BENGKAYANG KHATULISTIWA GH SELUAS GH 24 2 0 2 0 0 BELUM SUDAH
46 SINGKAWANG SAMBAS KHATULISTIWA GH SEJANGKUNG GH UC 504-G Desember 2019 Desember 2019 31 maret 2021 dc to dc converter 110 to 48 24 2 0 2 0 0 SUDAH SUDAH
41 SINGKAWANG PEMANGKAT KHATULISTIWA GH SEMPARUK GH 24 2 0 2 0 0 BELUM SUDAH
43 SINGKAWANG PEMANGKAT KHATULISTIWA GH SENTEBANG GH 24 2 0 2 0 0 BELUM SUDAH
belum terpasang dc
63 SANGGAU SGU KOTA ISOLATED GH SEMBOJA GH AXION 05/06/18 06/05/2018 konverter 24 25 0 10 10 5 SUDAH SUDAH
70 SANGGAU SEKADAU ISOLATED GH SUNGAI AYAK GH 24 3 0 3 0 0 BELUM SUDAH
71 SANGGAU SINTANG ISOLATED GH SUNGAI UKHOI GH 24 3 0 3 0 0 BELUM SUDAH
122 KETAPANG KTP KOTA ISOLATED GH SUKAHARJA GH DF1725IED 09/05/18 dc to dc converter 110 to 48 24 15 0 4 9 2 SUDAH SUDAH
59 SANGGAU SGU KOTA ISOLATED GH TANJUNG GH UC 504-G November 2019 November 2019 15 maret 2021 dc to dc converter 110 to 48 24 3 0 3 0 0 SUDAH SUDAH
39 SINGKAWANG PEMANGKAT KHATULISTIWA GH TEBAS GH DF1725IED 2017 01 November 2017 31 maret 2021 dc to dc converter 110 to 48 24 3 0 3 0 0 SUDAH SUDAH
82 SANGGAU PUTUSSIBAU ISOLATED GH TEPUAI GH 24 2 0 2 0 0 BELUM SUDAH
42 SINGKAWANG PEMANGKAT KHATULISTIWA GH TEKARANG GH UC 504-G Desember 2019 Desember 2019 01 april 2021 dc to dc converter 110 to 48 24 2 0 2 0 0 SUDAH SUDAH
7 PONTIANAK PTK KOTA KHATULISTIWA GH UNTAN GH DF1725IED 21 Januari 2020 21 Januari 2020 01 april 2021 dc to dc converter 110 to 48 24 6 0 6 0 0 SUDAH SUDAH
36 SINGKAWANG BENGKAYANG KHATULISTIWA GI BENGKAYANG GI DF1725IED 2016 21 juni 2021 dc 48 gi 24 10 2 7 0 1 SUDAH SUDAH
146 KETAPANG KTP KOTA ISOLATED GI KENDAWANGAN GI 24 8 1 6 0 1 BELUM SUDAH
141 PONTIANAK JAWI KHATULISTIWA GI CENDANA GI C264 15 januari 2021 15 januari 2021 dc 48 gi 24 8 1 6 0 1 SUDAH SUDAH
121 KETAPANG KTP KOTA ISOLATED GI KETAPANG GI UC 504-G 17 januari 2020 17 januari 2020 dc 48 gi 24 13 1 6 5 1 SUDAH SUDAH
30 PONTIANAK PTK KOTA KHATULISTIWA GI KOTA BARU GI DF1725IED 2016 02 maret 2021 24 27 3 17 0 7 SUDAH SUDAH
33 PONTIANAK NGABANG KHATULISTIWA GI NGABANG GI DF1725IED 2016 24 mei 2021 24 10 2 7 0 1 SUDAH SUDAH
31 PONTIANAK SIANTAN KHATULISTIWA GI PARIT BARU GI DF1725IED 2016 01 Februari 2018 26 april 2021 24 15 2 12 0 1 SUDAH SUDAH
147 SINGKAWANG SKW KOTA KHATULISTIWA GI PLTU 3 GI UC 504-G 10 Desember 2020 07 juni 2021 dc to dc converter 110 to 48 24 7 1 6 0 0 SUDAH SUDAH

35 SINGKAWANG SAMBAS KHATULISTIWA GI SAMBAS GI DF1725IED 2016 21 juni 2021 24 21 3 15 0 3 SUDAH SUDAH

142 SANGGAU SGU KOTA KHATULISTIWA GI SANGGAU BUS 2 GI 24 6 1 4 0 1 BELUM SUDAH

142 SANGGAU SGU KOTA KHATULISTIWA GI SANGGAU GI AK 1304 20 Agustus 2020 dc 48 gi 24 8 1 3 3 1 SUDAH SUDAH

28 PONTIANAK PTK KOTA KHATULISTIWA GI SEI RAYA GI DF1725IED 2016 01 Februari 2018 25 februari 2021 24 39 3 28 0 8 SUDAH SUDAH
143 SANGGAU SEKADAU ISOLATED GI SEKADAU GI 24 6 1 4 0 1 BELUM SUDAH
28 PONTIANAK PTK KOTA KHATULISTIWA GI SEI RAYA BUS 5 GI 24 5 0 3 0 2 SUDAH SUDAH
32 PONTIANAK MEMPAWAH KHATULISTIWA GI SENGGIRING GI DF1725IED 2016 28 april 2021 24 20 3 12 0 5 SUDAH SUDAH

29 PONTIANAK SIANTAN KHATULISTIWA GI SIANTAN GI DF1725IED 2016 22 april 2021 24 21 2 13 1 5 SUDAH SUDAH

144 SANGGAU SINTANG ISOLATED GI SINTANG GI 24 10 1 8 0 1 BELUM SUDAH


34 SINGKAWANG SKW KOTA KHATULISTIWA GI SINGKAWANG GI DF1725IED 2016 09 juni 2021 24 28 3 17 2 6 SUDAH SUDAH
145 KETAPANG SUKADANA ISOLATED GI SUKADANA GI UC 504-G 23 November 2020 dc to dc converter 110 to 48 24 8 1 6 0 1 SUDAH SUDAH
58 SANGGAU SGU KOTA KHATULISTIWA GI TAYAN BUS 2 GI 24 6 1 4 0 1 BELUM SUDAH

58 SANGGAU SGU KOTA KHATULISTIWA GI TAYAN GI AXION 01/19/18 19/01/2018 07 juli 2021 24 4 1 3 0 0 SUDAH SUDAH

134 KETAPANG KTP KOTA ISOLATED PLTD AIR HITAM PL 12 2 0 1 1 0 BELUM BELUM

135 KETAPANG TB TITI ISOLATED PLTD AIR UPAS PL 24 2 0 1 1 0 BELUM SUDAH

84 SANGGAU PUTUSSIBAU ISOLATED PLTD BADAU PL 24 0 BELUM BELUM

136 KETAPANG SANDAI ISOLATED PLTD BALAI BEKUAK PL 12 3 0 2 1 0 BELUM BELUM

68 SANGGAU SEKADAU ISOLATED PLTD BALAI SEPUAK PL 12 0 BELUM SUDAH


14 PONTIANAK RASAU ISOLATED PLTD BATU AMPAR PL 24 2 0 1 1 0 BELUM SUDAH

114 SANGGAU PUTUSSIBAU ISOLATED PLTD BELIKAI PL 12 0 BELUM BELUM

69 SANGGAU SEKADAU ISOLATED PLTD BELITANG PL 12 3 0 2 1 0 BELUM SUDAH


91 SANGGAU PINOH ISOLATED PLTD BORA PL 12 2 0 1 1 0 BELUM SUDAH
109 SANGGAU PUTUSSIBAU ISOLATED PLTD BUNUT PL 12 0 BELUM BELUM
51 SINGKAWANG BENGKAYANG ISOLATED PLTD CEMPAKA PUTIH PL 12 3 0 2 1 0 BELUM BELUM
139 KETAPANG KTP KOTA ISOLATED PLTD DUSUN BESAR PL 12 0 BELUM BELUM
110 SANGGAU PUTUSSIBAU ISOLATED PLTD EMBALOH PL 12 0 BELUM BELUM
64 SANGGAU BALKAR ISOLATED PLTD ENGKAHAN PL 24 3 0 2 1 0 BELUM SUDAH
100 SANGGAU SINTANG ISOLATED PLTD JASA PL 12 4 0 3 1 0 BELUM BELUM
87 SANGGAU PUTUSSIBAU ISOLATED PLTD JONGKONG PL 12 4 0 3 1 0 BELUM SUDAH
106 SANGGAU PINOH ISOLATED PLTD KALAN PL 12 0 BELUM BELUM
107 SANGGAU PINOH ISOLATED PLTD KAYAN PL 12 0 BELUM BELUM
108 SANGGAU PINOH ISOLATED PLTD KEMANGAI PL 12 0 BELUM BELUM
140 KETAPANG KTP KOTA ISOLATED PLTD KENDAWANGAN KANAN PL 12 0 BELUM BELUM
96 SANGGAU SINTANG ISOLATED PLTD KETUNGAU PL 12 0 BELUM BELUM
77 SANGGAU PINOH ISOLATED PLTD KOTA BARU PL 24 6 0 5 1 0 BELUM SUDAH
92 SANGGAU SGU KOTA ISOLATED PLTD KUALA BUAYAN PL 12 0 BELUM BELUM
88 SANGGAU PUTUSSIBAU ISOLATED PLTD LANJAK PL 12 4 0 3 1 0 BELUM SUDAH
111 SANGGAU PUTUSSIBAU ISOLATED PLTD LANJAK PL 12 3 0 2 1 0 BELUM SUDAH
54 SINGKAWANG DURI ISOLATED PLTD LEMUKUTAN PL 12 3 0 2 1 0 BELUM BELUM
102 SANGGAU PINOH ISOLATED PLTD MANUKUNG PL 12 0 BELUM BELUM
127 KETAPANG SUKADANA ISOLATED PLTD MELANO PL UC 504-G 11 Januari 2020 11 Januari 2020 26 maret 2021 24 2 0 2 0 0 SUDAH SUDAH
125 KETAPANG TB TITI ISOLATED PLTD MENTAWA PL 12 2 0 1 1 0 BELUM BELUM
73 SANGGAU SINTANG ISOLATED PLTD MENYURAI PL 24 2 0 1 1 0 BELUM SUDAH
103 SANGGAU PINOH ISOLATED PLTD NANGA ELLA PL 12 0 BELUM BELUM
113 SANGGAU PUTUSSIBAU ISOLATED PLTD NANGA ERAK PL 12 0 BELUM BELUM
115 SANGGAU PUTUSSIBAU ISOLATED PLTD NANGA KANTUK PL 12 0 BELUM BELUM
99 SANGGAU SINTANG ISOLATED PLTD NANGA LEBANG PL 12 0 BELUM BELUM
90 SANGGAU PINOH ISOLATED PLTD NANGA SAYAN PL 12 2 0 1 1 0 BELUM SUDAH
93 SANGGAU SINTANG ISOLATED PLTD NANGA SILAT PL 12 0 BELUM BELUM
95 SANGGAU SINTANG ISOLATED PLTD NG MERAKAI PL 12 0 BELUM BELUM
117 SANGGAU PUTUSSIBAU ISOLATED PLTD NIBUNG PL 12 0 BELUM BELUM
13 PONTIANAK RASAU ISOLATED PLTD PADANG TIKAR PL 24 2 0 1 1 0 BELUM SUDAH
116 SANGGAU PUTUSSIBAU ISOLATED PLTD PIASAK PL 12 0 BELUM BELUM
16 PONTIANAK RASAU ISOLATED PLTD PULAU LIMBUNG PL 12 0 BELUM BELUM
119 SANGGAU PUTUSSIBAU ISOLATED PLTD PULAU MAJANG PL 12 0 BELUM BELUM
81 SANGGAU PUTUSSIBAU ISOLATED PLTD SAWAI BARU PL UC 504-G November 2019 November 2019 belum terpasang dc 24 8 0 2 6 0 SUDAH SUDAH
konverter
belum terpasang dc
80 SANGGAU PUTUSSIBAU ISOLATED PLTD SAWAI LAMA PL UC 504-G November 2019 November 2019 konverter 24 7 0 7 0 0 SUDAH SUDAH
112 SANGGAU PUTUSSIBAU ISOLATED PLTD SEBERUANG PL 12 0 BELUM BELUM
86 SANGGAU PUTUSSIBAU ISOLATED PLTD SEMITAU BARU PL 24 4 0 3 1 0 BELUM SUDAH
85 SANGGAU PUTUSSIBAU ISOLATED PLTD SEMITAU LAMA PL 24 2 0 1 1 0 BELUM SUDAH
94 SANGGAU SINTANG ISOLATED PLTD SENANING PL 12 0 BELUM BELUM
17 PONTIANAK RASAU ISOLATED PLTD SEPUK LAUT PL 12 0 BELUM BELUM

101 SANGGAU PINOH ISOLATED PLTD SERAWAI PL 12 0 BELUM BELUM

79 SANGGAU PINOH ISOLATED PLTD SIDOMULYO PL UC 504-G November 2019 November 2019 24 maret 2021 belum terpasang dc 24 5 0 3 2 0 SUDAH SUDAH
konverter
98 SANGGAU SINTANG ISOLATED PLTD SINAR PEKAYAU PL 12 0 BELUM BELUM
67 SANGGAU SEKADAU ISOLATED PLTD SUAK PAYUNG PL UC 504-G November 2019 November 2019 22 maret 2021 dc to dc converter 110 to 48 24 7 0 5 2 0 SUDAH SUDAH
123 KETAPANG KTP KOTA ISOLATED PLTD SUKAHARJA PL 24 0 BELUM SUDAH
130 KETAPANG SANDAI ISOLATED PLTD TAJOK KAYONG/TAYAP PL UC 504-G Desember 2019 Desember 2019 23 maret 2021 dc to dc converter 110 to 48 24 4 0 3 1 0 SUDAH SUDAH
15 PONTIANAK RASAU ISOLATED PLTD TANJUNG SALEH PL 12 0 BELUM BELUM
138 KETAPANG KTP KOTA ISOLATED PLTD TANJUNG SATAI PL 12 2 0 1 1 0 BELUM BELUM
97 SANGGAU SINTANG ISOLATED PLTD TEBIDAH PL 12 0 BELUM BELUM
NO UP3 ULP SISTEM2 GI/GH/PL/SW JENIS TYPE TANGGAL INTEGRASI
PENGGANTIAN BATERE TERAKHIR HAR 1 HAR 2 HAR 3 SOH 1 SOH 2 JAM OPERASI JUMLAH KUBIKEL STATUS INTEGRASI
RENCANA 2019
1 KETAPANG SUKAHARJA SUTOYO LBS 24 1 BELUM
2 KETAPANG SUKAHARJA SEPAKAT LBS 24 1 BELUM
3 KETAPANG SUKAHARJA JEMBATAN PAWAN 1 LBS 24 1 BELUM
4 KETAPANG SUKAHARJA GUSTI HAMZAH LBS 24 1 BELUM
5 KETAPANG SUKAHARJA SEI JAWI LBS 24 1 BELUM
328 SINGKAWANG SKW KOTA KHATULISTIWA 11 LBS MOTORIZED SIECOM 2016 08 November 2019 30 maret 2021 74 70 24 1 SUDAH ###
7 KETAPANG SUKAHARJA PELANG LBS 24 1 BELUM
8 KETAPANG SUKAHARJA M TOHIR 2 LBS 24 1 BELUM
9 KETAPANG SUKAHARJA PESAGUAN KIRI LBS 24 1 BELUM
10 KETAPANG SUKAHARJA PESAGUAN KOTA LBS 24 1 BELUM
11 KETAPANG SUKAHARJA BANDAR LAUT LBS 24 1 BELUM
12 KETAPANG SUKAHARJA HARAPAN BARU LBS 24 1 BELUM
324 SINGKAWANG SKW KOTA KHATULISTIWA 45 LBS MOTORIZED SIECOM 2016 08 November 2019 07 juni 2021 68 61 24 1 SUDAH ###
312 SINGKAWANG SKW KOTA KHATULISTIWA A YANI LBS MOTORIZED SIECOM 2016 07 juni 2021 07 juni 2021 100 100 24 1 SUDAH ###
15 KETAPANG SUKAHARJA PAGAR MENTIMUN LBS 24 1 BELUM
16 KETAPANG SUKAHARJA SEI TENGAR LBS 24 1 BELUM
1261 PONTIANAK KAKAP KHATULISTIWA AGRO LBS MOTORIZED ADVC 2016 15 Januari 2020 02 februari 2021 11 mei 2021 26 juli 2021 100 100 24 1 SUDAH ###
18 KETAPANG SUKAHARJA SMA KENDAWANGAN LBS 24 1 BELUM
19 KETAPANG SUKAHARJA KERTARAJA LBS 24 1 BELUM
20 KETAPANG SUKAHARJA SENTRAL PLN LBS 24 1 BELUM
21 KETAPANG SUKAHARJA MAKAM PAHLAWAN LBS 24 1 BELUM
22 KETAPANG SUKAHARJA TRANSITO LBS 24 1 BELUM
23 KETAPANG SUKAHARJA GATOT SUBROTO LBS 24 1 BELUM
24 KETAPANG SUKAHARJA PIERE TENDEAN LBS 24 1 BELUM
1072 PONTIANAK SIANTAN KHATULISTIWA AIR ITAM RECLOSER ADVC 2016 16 februari 2021 100 100 24 1 SUDAH ###
26 KETAPANG SUKAHARJA AGOES DJAM LBS 24 1 BELUM
27 KETAPANG SUKAHARJA SPG LBS 24 1 BELUM
947 PONTIANAK SIANTAN KHATULISTIWA air putih ex SAIGON RECLOSER ADVC 2016 04 Januari 2021 20 januari 2021 10 mei 2021 100 100 24 1 SUDAH ###
236 KETAPANG TB TITI AIR UPAS AIR UPAS RECLOSER ADVC 19-06-2019 19 Juni 2019 24 1 SUDAH ###
30 KETAPANG SUKAHARJA YAMAHA LBS 24 1 BELUM
928 PONTIANAK PTK KOTA KHATULISTIWA AKBID LBS MOTORIZED ADVC Juli 2012 19 juli 2021 18 januari 2021 19 april 2021 100 100 24 1 SUDAH ###
32 KETAPANG SUKAHARJA MURNI LBS 24 1 BELUM
33 KETAPANG SUKAHARJA IMAM BONJOL 1 LBS 24 1 BELUM
948 PONTIANAK SIANTAN KHATULISTIWA AKPER YARSI LBS MOTORIZED PTCC 2016 19 Oktober 2020 09 februari 2021 10 mei 2021 02 agustus 2021 100 100 24 1 SUDAH ###
35 KETAPANG SUKAHARJA PASAR SUKAHARJA LBS 24 1 BELUM
36 KETAPANG KTP KOTA SUKAHARJA POLRES LBS 3-WAY 24 1 BELUM
37 KETAPANG SUKAHARJA KOPERASI LBS 24 1 BELUM
38 KETAPANG SUKAHARJA KANTOR CAMAT LBS 24 1 BELUM
39 KETAPANG SUKAHARJA MT HARYONO LBS 24 1 BELUM
40 KETAPANG SUKAHARJA BERINGIN LBS 24 1 BELUM
41 KETAPANG SUKAHARJA JUNJUNG BUIH LBS 24 1 BELUM
42 KETAPANG SUKAHARJA TAMAN KOTA LBS 24 1 BELUM
43 KETAPANG SUKAHARJA BUPATI LBS 24 1 BELUM
953 PONTIANAK PTK KOTA KHATULISTIWA AL AZHAR LBS MOTORIZED P 200 08/08/18 15 mei 2020 28 januari 2021 29 april 2021 02 juli 2021 69 61 24 1 SUDAH ###
45 KETAPANG KTP KOTA SUKAHARJA BUPATI LBS 3-WAY 24 1 BELUM
46 KETAPANG SUKAHARJA PERINTIS LBS 24 1 BELUM
1244 PONTIANAK PTK KOTA KHATULISTIWA AL HIKMAH LBS MOTORIZED P 200 C 06-02-2019 27 juli 2021 03 februari 2021 05 mei 2021 27 juli 2021 100 100 24 1 SUDAH ###
48 KETAPANG SUKAHARJA AL FALAH LBS 24 1 BELUM
1045 PONTIANAK SIANTAN KHATULISTIWA ALAMBANA LBS MOTORIZED ADVC 2016 25 februari 2021 11 februari 2021 17 mei 2021 86 91 24 1 SUDAH ###
50 KETAPANG SUKAHARJA SEJAHTERA LBS 24 1 BELUM
51 KETAPANG SUKAHARJA SUTOMO LBS 24 1 BELUM
47 KETAPANG KTP KOTA SUKAHARJA AL-FALAH LBS MOTORIZED FXD2000 06 Oktober 2019 06 Oktober 2019 25 maret 2021 0 0 24 1 SUDAH ###
53 KETAPANG SUKAHARJA SAUNAN LBS 24 1 BELUM
54 KETAPANG SUKAHARJA IMAM BONJOL 2 LBS 24 1 BELUM
979 PONTIANAK SIANTAN KHATULISTIWA AMBANGAH RECLOSER ADVC 2016 07 Oktober 2019 09 februari 2021 19 mei 2021 02 agustus 2021 100 100 24 1 SUDAH ###
56 KETAPANG SUKAHARJA PANGKAL PAWAN 11 LBS 24 1 BELUM
57 KETAPANG SUKAHARJA KARYATANI 2 LBS 24 1 BELUM
58 KETAPANG SUKAHARJA KARYATANI 1 LBS 24 1 BELUM
1161 PONTIANAK NGABANG KHATULISTIWA AMBARANG RECLOSER ADVC 08/28/18 28/08/2018 02 maret 2021 100 100 24 1 SUDAH ###
60 KETAPANG SUKAHARJA PASIR LBS 24 1 BELUM
1225 PONTIANAK JAWI KHATULISTIWA AMPERA LBS MOTORIZED ADVC 2016 24 Oktober 2018 02 februari 2021 11 mei 2021 26 juli 2021 77 78 24 1 SUDAH ###

LBS 24 1 BELUM
62 KETAPANG SUKAHARJA JEMBATAN KUNING
63 KETAPANG SUKAHARJA MULIA KERTA LBS 24 1 BELUM
64 KETAPANG SUKAHARJA M TOHIR 1 LBS 24 1 BELUM
65 KETAPANG SUKAHARJA PENCUCIAN LBS 24 1 BELUM
389 SINGKAWANG SKW KOTA KHATULISTIWA ANEKA SARI LBS MOTORIZED SIECOM 2016 08 November 2019 07 juni 2021 58 57 24 1 SUDAH ###
67 KETAPANG SUKAHARJA PAKACONG LBS 24 1 BELUM
68 KETAPANG SUKAHARJA INDOTANI LBS 24 1 BELUM
1128 PONTIANAK NGABANG KHATULISTIWA ANGKAMAN LBS MOTORIZED ADVC 2016 27 Mei 2019 07 april 2021 100 100 24 1 SUDAH ###
70 KETAPANG SUKAHARJA SAWIT LBS 24 1 BELUM

LBS 24 1 BELUM
71 KETAPANG SUKAHARJA SP 1

LBS 24 1 BELUM
72 KETAPANG SUKAHARJA SP 2

LBS 24 1 BELUM
73 KETAPANG SUKAHARJA SP 5
74 KETAPANG SUKAHARJA MKJ/BUTAMI LBS 24 1 BELUM
75 KETAPANG TB TITI SUKAHARJA MELAYU LBS MOTORIZED 24 1 BELUM
1111 PONTIANAK MEMPAWAH KHATULISTIWA ANJUNGAN DALAM LBS MOTORIZED FXD2000 29 Oktober 2019 24 mei 2021 24 mei 2021 100 100 24 1 SUDAH ###
77 KETAPANG SUKAHARJA POROS JL R 15 LBS 24 1 BELUM

LBS 24 1 BELUM
78 KETAPANG SUKAHARJA ABUT
79 KETAPANG SUKAHARJA PERCABANGAN JLR 16 LBS 24 1 BELUM
80 KETAPANG SUKAHARJA SP 3 LBS 24 1 BELUM
81 KETAPANG SUKAHARJA POROS JLR 16 LBS 24 1 BELUM
1131 PONTIANAK MEMPAWAH KHATULISTIWA ANTIBAR LBS MOTORIZED FXD2000 14-10-2017 03 februari 2021 0 0 24 1 SUDAH ###

LBS 24 1 BELUM
83 KETAPANG SUKAHARJA ALAS 2

LBS 24 1 BELUM
84 KETAPANG SUKAHARJA MAT YASIN 2
85 KETAPANG SUKAHARJA MASUK BANDARA LBS 24 1 BELUM

KTP KOTA LBS 3-WAY 24 1 BELUM


86 KETAPANG SUKAHARJA BANDARA

PTK KOTA 24 1
922 PONTIANAK KHATULISTIWA ANUGERAH BUNDA LBS MOTORIZED PTCC 2016 07 Juni 2019 28 januari 2021 29 april 2021 02 juli 2021 100 100 SUDAH ###
88 KETAPANG SUKAHARJA DAHLAN LBS 24 1 BELUM
959 PONTIANAK PTK KOTA KHATULISTIWA ANZON LBS MOTORIZED PTCC 2016 03 desember 2020 27 januari 2021 29 april 2021 30 juni 2021 100 100 24 1 SUDAH ###

SAMBAS RECLOSER ADVC 10/23/18 22 juni 2021 22 juni 2021 100 100 24 1
506 SINGKAWANG SAJINGAN ARUK SAJINGAN SUDAH ###
91 KETAPANG SUKAHARJA PEJUANG LBS 24 1 BELUM
92 KETAPANG SUKAHARJA MARTADINATA LBS 24 1 BELUM
93 KETAPANG SUKAHARJA PASAR TUAN-TUAN LBS 24 1 BELUM
94 KETAPANG SUKAHARJA KERATON LBS 24 1 BELUM
95 KETAPANG SUKAHARJA TERATAI LBS 24 1 BELUM
1420 KETAPANG TB TITI AIR UPAS ASAM BESAR LBS MOTORIZED P 200 09 November 2020 24 1 SUDAH ###
97 KETAPANG SUKAHARJA SINDUR LBS 24 1 BELUM
98 KETAPANG SUKAHARJA BULUH LBS 24 1 BELUM
29 KETAPANG KTP KOTA SUKAHARJA ASANA LBS 3-WAY ABB REC-615 07 Oktober 2019 07 Oktober 2019 24 1 SUDAH ###
100 KETAPANG SUKAHARJA GAJAH MADA 1 LBS 24 1 BELUM
101 KETAPANG SUKAHARJA GAJAH MADA 2 LBS 24 1 BELUM
711 SANGGAU SGU KOTA KHATULISTIWA AUR RECLOSER F6 12 April 2021 12 April 2021 12 April 2021 100 100 24 1 SUDAH ###
103 KETAPANG SUKAHARJA MULYA LBS 24 1 BELUM
104 KETAPANG SUKAHARJA PANGKAL PAWAN 9 LBS 24 1 BELUM
105 KETAPANG SUKAHARJA SD 3 TEMPURUKAN LBS 24 1 BELUM
106 KETAPANG SUKAHARJA KALIBUNTU LBS 24 1 BELUM
107 KETAPANG SUKAHARJA TOLAK PAWAN 9 LBS 24 1 BELUM
108 KETAPANG SUKAHARJA PANGKAL PAWAN 10 LBS 24 1 BELUM
110 KETAPANG SUKAHARJA PANJAITAN LBS 24 1 BELUM
111 KETAPANG SUKAHARJA AGUS SALIM LBS 24 1 BELUM
112 KETAPANG SUKAHARJA GG DELI LBS 24 1 BELUM
113 KETAPANG SUKAHARJA SUGIONO LBS 24 1 BELUM
1016 PONTIANAK PTK KOTA KHATULISTIWA AURI LBS 3-WAY REC523 AAB 2016 08 juni 2021 01 februari 2021 04 mei 2021 21 juli 2021 100 100 24 1 SUDAH ###
115 KETAPANG SUKAHARJA TEGAS 1 LBS 24 1 BELUM
116 KETAPANG SUKAHARJA TEGAS 2 LBS 24 1 BELUM
117 KETAPANG SUKAHARJA KOPLING SJM UPB LBS 24 1 BELUM
118 KETAPANG SUKAHARJA SJM LBS 24 1 BELUM
119 KETAPANG SUKAHARJA N-1 LBS 24 1 BELUM
120 KETAPANG SUKAHARJA ALAS 1 LBS 24 1 BELUM
121 KETAPANG SUKAHARJA TAMBAK UDANG LBS 24 1 BELUM
122 KETAPANG SUKAHARJA SEI AWAN LBS 24 1 BELUM
909 PONTIANAK PTK KOTA KHATULISTIWA BAIDURI LBS MOTORIZED P 200 08/08/18 03 agustus 2020 13 januari 2021 14 april 2021 06 juli 2021 100 100 24 1 SUDAH ###
124 KETAPANG SUKAHARJA TELUK KAWAH LBS 24 1 BELUM
125 KETAPANG SUKAHARJA TEMPURUKAN LBS 24 1 BELUM
87 KETAPANG KTP KOTA SUKAHARJA BAKSO JHON/HALTE LBS MOTORIZED VAMP 51 06/22/18 14 Januari 2020 24 1 SUDAH ###
127 KETAPANG SUKAHARJA SEI PUTRI LBS 24 1 BELUM
128 KETAPANG SUKAHARJA SEI BAKAU LBS 24 1 BELUM
129 KETAPANG SUKAHARJA TOLAK PAWAN 5 LBS 24 1 BELUM
329 SINGKAWANG PEMANGKAT KHATULISTIWA BALAI DESA RECLOSER ADVC 01 Oktober 2019 01 Oktober 2019 03 maret 2021 100 100 24 1 SUDAH ###
131 KETAPANG SUKAHARJA SPBU SIDUK LBS 24 1 BELUM
132 KETAPANG MELANO PARIT TIMUR MELANO LBS 24 1 BELUM
133 KETAPANG MELANO PENJALAAN LBS 24 1 BELUM

LBS 24 1 BELUM
134 KETAPANG MELANO KANTOR MELANO
135 KETAPANG MELANO PEMANGKAT LBS 24 1 BELUM
136 KETAPANG MELANO PULAU KUMBANG LBS 24 1 BELUM
480 SINGKAWANG SAMBAS KHATULISTIWA BALAI GEMURUH RECLOSER F6 10/23/18 21 juni 2021 21 juni 2021 100 100 24 1 SUDAH ###
138 KETAPANG SUKADANA MELANO SEI PADUAN LBS MOTORIZED 24 1 BELUM
139 KETAPANG MELANO GUNUNG SEMBILAN LBS 24 1 BELUM
140 KETAPANG MELANO KAMPUNG TENGAH LBS 24 1 BELUM
141 KETAPANG MELANO TELOK BATANG KOTA LBS 24 1 BELUM
142 KETAPANG MELANO PAKET 2 LBS 24 1 BELUM
AKTIFITAS HARIAN (TIPE) a
b
c
d
e
f
g

minggu NO WAKTU TIPf

1 1 senin, 4 januari 2021 c


1 2 senin, 4 januari 2021 c
1 3 senin, 4 januari 2021 c
1 4 senin, 4 januari 2021 c
1 5 senin, 4 januari 2021 c
1 6 senin, 4 januari 2021 d
1 7 senin, 4 januari 2021 d
1 8 selasa, 5 januari 2021 d
1 9 rabu, 6 januari 2021 d
1 10 kamis, 7 januari 2021 c
2 11 jumat, 8 januari 2021 d

2 12 sabtu, 9 januari 2021 c


2 13 senin, 11 januari 2021 a
2 14 senin, 11 januari 2021 a
2 15 senin, 11 januari 2021 a
2 16 senin, 11 januari 2021 a
2 17 senin, 11 januari 2021 a
2 18 senin, 11 januari 2021 a
2 19 senin, 11 januari 2021 a
2 20 senin, 11 januari 2021 a
2 21 senin, 11 januari 2021 d
2 22 selasa, 12 januari 2021 a
2 23 selasa, 12 januari 2021 a
2 24 selasa, 12 januari 2021 a
2 25 selasa, 12 januari 2021 a

a
2 26 selasa, 12 januari 2021
2 27 selasa, 12 januari 2021 a
2 28 selasa, 12 januari 2021 a
2 29 selasa, 12 januari 2021 c
2 30 rabu, 13 januari 2021 d
2 31 rabu, 13 januari 2021 a
2 32 rabu, 13 januari 2021 a
2 33 rabu, 13 januari 2021 a
2 34 rabu, 13 januari 2021 a
2 35 rabu, 13 januari 2021 a
2 36 rabu, 13 januari 2021 a
2 37 rabu, 13 januari 2021 a
2 38 kamis, 14 januari 2021 a
2 39 kamis, 14 januari 2021 a
2 40 kamis, 14 januari 2021 a
2 41 kamis, 14 januari 2021 a
2 42 kamis, 14 januari 2021 a
2 43 kamis, 14 januari 2021 a
2 44 kamis, 14 januari 2021 a
2 45 kamis, 14 januari 2021 d
2 46 kamis, 14 januari 2021 d

e
3 47 jumat, 15 januari 2021
3 48 jumat, 15 januari 2021 d
3 49 senin, 18 januari 2021 a
3 50 jumat, 15 januari 2021 b
3 51 jumat, 15 januari 2021 b
3 52 jumat, 15 januari 2021 b
3 53 jumat, 15 januari 2021 b
3 54 jumat, 15 januari 2021 b
3 55 jumat, 15 januari 2021 b
3 56 jumat, 15 januari 2021 b
3 57 jumat, 15 januari 2021 b

a
3 58 senin, 18 januari 2021
3 59 senin, 18 januari 2021 a
3 60 senin, 18 januari 2021 a

a
3 61 senin, 18 januari 2021
3 62 senin, 18 januari 2021 a
3 63 senin, 18 januari 2021 a
3 64 senin, 18 januari 2021 a
3 65 senin, 18 januari 2021 c

c
3 66 senin, 18 januari 2021
3 67 senin, 18 januari 2021 d

a
3 68 selasa, 19 januari 2021
3 69 selasa, 19 januari 2021 a
3 70 selasa, 19 januari 2021 a
3 71 selasa, 19 januari 2021 a

a
3 72 selasa, 19 januari 2021
3 73 selasa, 19 januari 2021 a
3 74 selasa, 19 januari 2021 a

a
3 75 selasa, 19 januari 2021
3 76 selasa, 19 januari 2021 e
3 77 selasa, 19 januari 2021 c
3 78 selasa, 19 januari 2021 c

a
3 79 rabu, 20 januari 2021
3 80 rabu, 20 januari 2021 a
3 81 rabu, 20 januari 2021 a

a
3 82 rabu, 20 januari 2021
d
3 83 rabu, 20 januari 2021
3 84 rabu, 20 januari 2021 d
3 85 rabu, 20 januari 2021 d
3 86 kamis, 21 januari 2021 a
3 87 kamis, 21 januari 2021 a

a
3 88 kamis, 21 januari 2021
3 89 kamis, 21 januari 2021 a
3 90 kamis, 21 januari 2021 a
3 91 kamis, 21 januari 2021 a
3 92 kamis, 21 januari 2021 a
3 93 kamis, 21 januari 2021 a
3 94 kamis, 21 januari 2021 d

d
3 95 kamis, 21 januari 2021
4 96 jumat, 22 januari 2021 d
4 97 senin, 25 januari 2021 a
4 98 senin, 25 januari 2021 a
4 99 senin, 25 januari 2021 a
4 100 senin, 25 januari 2021 a
4 101 senin, 25 januari 2021 a
4 102 senin, 25 januari 2021 a
4 103 senin, 25 januari 2021 a
4 104 senin, 25 januari 2021 a
4 105 senin, 25 januari 2021 d

a
4 106 selasa, 26 januari 2021

a
4 107 selasa, 26 januari 2021
4 108 selasa, 26 januari 2021 a
4 109 selasa, 26 januari 2021 a

a
4 110 selasa, 26 januari 2021
4 111 selasa, 26 januari 2021 a
4 112 selasa, 26 januari 2021 a
4 113 selasa, 26 januari 2021 a
4 114 selasa, 26 januari 2021 a

d
4 115 selasa, 26 januari 2021
4 116 rabu, 27 januari 2021 a
4 117 rabu, 27 januari 2021 a
4 118 rabu, 27 januari 2021 a
4 119 rabu, 27 januari 2021 a
4 120 rabu, 27 januari 2021 a

a
4 121 rabu, 27 januari 2021
4 122 rabu, 27 januari 2021 a
4 123 rabu, 27 januari 2021 a
4 124 rabu, 27 januari 2021 d
4 125 rabu, 27 januari 2021 d
4 126 rabu, 27 januari 2021 d
4 127 kamis, 28 januari 2021 a
4 128 kamis, 28 januari 2021 a
4 129 kamis, 28 januari 2021 a
4 130 kamis, 28 januari 2021 a
4 131 kamis, 28 januari 2021 a
4 132 kamis, 28 januari 2021 a
4 133 kamis, 28 januari 2021 a
4 134 kamis, 28 januari 2021 d
4 135 kamis, 28 januari 2021 c
4 136 kamis, 28 januari 2021 d
4 137 jumat, 29 januari 2021 d
5 138 senin, 1 februari 2021 a
5 139 senin, 1 februari 2021 a

a
5 140 senin, 1 februari 2021
5 141 senin, 1 februari 2021 a

a
5 142 senin, 1 februari 2021
5 143 senin, 1 februari 2021 a
5 144 senin, 1 februari 2021 a
5 145 senin, 1 februari 2021 a
5 146 senin, 1 februari 2021 a

d
5 147 senin, 1 februari 2021
5 148 senin, 1 februari 2021 d
5 149 selasa, 2 februari 2021 a
5 150 selasa, 2 februari 2021 a
5 151 selasa, 2 februari 2021 a
5 152 selasa, 2 februari 2021 a
5 153 selasa, 2 februari 2021 a
5 154 selasa, 2 februari 2021 a
5 155 selasa, 2 februari 2021 a
5 156 selasa, 2 februari 2021 a
5 157 selasa, 2 februari 2021 d
5 158 selasa, 2 februari 2021 d
5 159 rabu, 3 februari 2021 a
5 160 rabu, 3 februari 2021 a
5 161 rabu, 3 februari 2021 a
5 162 rabu, 3 februari 2021 a
5 163 rabu, 3 februari 2021 a
5 164 rabu, 3 februari 2021 a
5 165 rabu, 3 februari 2021 a
5 166 rabu, 3 februari 2021 a
5 167 rabu, 3 februari 2021 a
5 168 rabu, 3 februari 2021 a
5 169 rabu, 3 februari 2021 c
5 170 rabu, 3 februari 2021 d
5 171 rabu, 3 februari 2021 d
5 172 kamis, 4 februari 2021 a
5 173 kamis, 4 februari 2021 a
5 174 kamis, 4 februari 2021 a
5 175 kamis, 4 februari 2021 a
5 176 kamis, 4 februari 2021 a
5 177 kamis, 4 februari 2021 a
5 178 kamis, 4 februari 2021 a
5 179 kamis, 4 februari 2021 d
5 180 kamis, 4 februari 2021 d
5 181 kamis, 4 februari 2021 a
5 182 kamis, 4 februari 2021 a
5 183 jumat, 5 februari 2021 f
5 184 jumat, 5 februari 2021 c
5 185 jumat, 5 februari 2021 d
5 186 jumat, 5 februari 2021 d
5 187 jumat, 5 februari 2021 d
6 188 senin, 8 februari 2021 a
6 189 senin, 8 februari 2021 a
6 190 senin, 8 februari 2021 a
6 191 senin, 8 februari 2021 a
6 192 senin, 8 februari 2021 a
6 193 senin, 8 februari 2021 a
6 194 senin, 8 februari 2021 a
6 195 senin, 8 februari 2021 d
6 196 senin, 8 februari 2021 d
6 197 selasa, 9 februari 2021 a
6 198 selasa, 9 februari 2021 a
6 199 selasa, 9 februari 2021 a
6 200 selasa, 9 februari 2021 a
6 201 selasa, 9 februari 2021 a
6 202 selasa, 9 februari 2021 a
6 203 selasa, 9 februari 2021 d
6 204 selasa, 9 februari 2021 d
6 205 rabu, 10 februari 2021 a
6 206 rabu, 10 februari 2021 a
6 207 rabu, 10 februari 2021 a
6 208 rabu, 10 februari 2021 a
6 209 rabu, 10 februari 2021 a
6 210 rabu, 10 februari 2021 a
6 211 rabu, 10 februari 2021 a
6 212 rabu, 10 februari 2021 a
6 213 rabu, 10 februari 2021 c
6 214 rabu, 10 februari 2021 c
6 215 rabu, 10 februari 2021 d
6 216 kamis, 11 februari 2021 a
6 217 kamis, 11 februari 2021 a
6 218 kamis, 11 februari 2021 a
6 219 kamis, 11 februari 2021 a
6 220 kamis, 11 februari 2021 a
6 221 kamis, 11 februari 2021 a
6 222 kamis, 11 februari 2021 a
6 223 kamis, 11 februari 2021 d
6 224 jumat, 12 februari 2021 d
7 225 senin, 15 februari 2021 a
7 226 senin, 15 februari 2021 a
7 227 senin, 15 februari 2021 a
7 228 senin, 15 februari 2021 a
7 229 senin, 15 februari 2021 a
7 230 senin, 15 februari 2021 a
7 231 senin, 15 februari 2021 a
7 232 senin, 15 februari 2021 d
7 233 senin, 15 februari 2021 d
7 234 selasa, 16 februari 2021 a
7 235 selasa, 16 februari 2021 a
7 236 selasa, 16 februari 2021 a
7 237 selasa, 16 februari 2021 a
7 238 selasa, 16 februari 2021 a
7 239 selasa, 16 februari 2021 a
7 240 selasa, 16 februari 2021 c
7 241 selasa, 16 februari 2021 d
7 242 selasa, 16 februari 2021 d
7 243 rabu, 17 februari 2021 a
7 244 rabu, 17 februari 2021 a
7 245 rabu, 17 februari 2021 a
7 246 rabu, 17 februari 2021 a
7 247 rabu, 17 februari 2021 d
7 248 rabu, 17 februari 2021 d
7 249 kamis, 18 februari 2021 a
7 250 kamis, 18 februari 2021 a
7 251 kamis, 18 februari 2021 a
7 252 kamis, 18 februari 2021 e
7 253 kamis, 18 februari 2021 d
7 254 jumat, 19 februari 2021 b
7 255 jumat, 19 februari 2021 b
7 256 jumat, 19 februari 2021 f
7 257 jumat, 19 februari 2021 e
7 258 jumat, 19 februari 2021 c
7 259 jumat, 19 februari 2021 c
7 260 jumat, 19 februari 2021 c
7 261 jumat, 19 februari 2021 c
7 262 jumat, 19 februari 2021 d
8 263 senin, 22 februari 2021 a
8 264 senin, 22 februari 2021 a
8 265 senin, 22 februari 2021 a
8 266 senin, 22 februari 2021 b
8 267 senin, 22 februari 2021 b
8 268 senin, 22 februari 2021 b
8 269 senin, 22 februari 2021 b
8 270 senin, 22 februari 2021 b
8 271 senin, 22 februari 2021 b
8 272 senin, 22 februari 2021 b
8 273 senin, 22 februari 2021 b
8 274 senin, 22 februari 2021 b
8 275 senin, 22 februari 2021 b
8 276 senin, 22 februari 2021 b
8 277 senin, 22 februari 2021 b
8 278 senin, 22 februari 2021 b
8 279 senin, 22 februari 2021 b
8 280 senin, 22 februari 2021 b
8 281 senin, 22 februari 2021 b
8 282 senin, 22 februari 2021 e
8 283 senin, 22 februari 2021 d
8 284 selasa, 23 februari 2021 a
8 285 selasa, 23 februari 2021 a
8 286 selasa, 23 februari 2021 a
8 287 selasa, 23 februari 2021 a
8 288 selasa, 23 februari 2021 b
8 289 selasa, 23 februari 2021 b
8 290 selasa, 23 februari 2021 b
8 291 selasa, 23 februari 2021 b
8 292 selasa, 23 februari 2021 b
8 293 selasa, 23 februari 2021 b
8 294 selasa, 23 februari 2021 b
8 295 selasa, 23 februari 2021 b
8 296 selasa, 23 februari 2021 b
8 297 selasa, 23 februari 2021 b
8 298 selasa, 23 februari 2021 e
8 299 selasa, 23 februari 2021 d
8 300 rabu, 24 februari 2021 a
8 301 rabu, 24 februari 2021 a
8 302 rabu, 24 februari 2021 a
8 303 rabu, 24 februari 2021 a
8 304 rabu, 24 februari 2021 b
8 305 rabu, 24 februari 2021 b
8 306 rabu, 24 februari 2021 e
8 307 rabu, 24 februari 2021 d
8 308 kamis, 25 februari 2021 d
8 309 kamis, 25 februari 2021 d
8 310 kamis, 25 februari 2021 d
8 311 jumat, 26 februari 2021 d
8 312 sabtu, 27 februari 2021 a
9 313 senin, 1 maret 2021 a
9 314 senin, 1 maret 2021 a
9 315 senin, 1 maret 2021 a
9 316 senin, 1 maret 2021 a
9 317 senin, 1 maret 2021 b
9 318 senin, 1 maret 2021 b
9 319 senin, 1 maret 2021 b
9 320 senin, 1 maret 2021 b
9 321 senin, 1 maret 2021 b
9 322 senin, 1 maret 2021 b
9 323 senin, 1 maret 2021 b
9 324 senin, 1 maret 2021 b
9 325 senin, 1 maret 2021 d
9 326 selasa, 2 maret 2021 b
9 327 selasa, 2 maret 2021 b
9 328 selasa, 2 maret 2021 b
9 329 selasa, 2 maret 2021 b
9 330 selasa, 2 maret 2021 b
9 331 selasa, 2 maret 2021 b
9 332 selasa, 2 maret 2021 b
9 333 selasa, 2 maret 2021 b
9 334 selasa, 2 maret 2021 b
9 335 selasa, 2 maret 2021 b
9 336 selasa, 2 maret 2021 b
9 337 selasa, 2 maret 2021 b
9 338 selasa, 2 maret 2021 b
9 339 selasa, 2 maret 2021 b
9 340 selasa, 2 maret 2021 b
9 341 selasa, 2 maret 2021 a
9 342 selasa, 2 maret 2021 a
9 343 selasa, 2 maret 2021 a
9 344 selasa, 2 maret 2021 d
9 345 selasa, 2 maret 2021 d
9 346 03 maret 2021 a
9 347 03 maret 2021 a
9 348 03 maret 2021 a
9 349 rabu, 3 maret 2021 b
9 350 rabu, 3 maret 2021 b
9 351 rabu, 3 maret 2021 b
9 352 rabu, 3 maret 2021 b
9 353 rabu, 3 maret 2021 b
9 354 rabu, 3 maret 2021 b
9 355 rabu, 3 maret 2021 b
9 356 rabu, 3 maret 2021 b
9 357 rabu, 3 maret 2021 b
9 358 rabu, 3 maret 2021 b
9 359 rabu, 3 maret 2021 b
9 360 rabu, 3 maret 2021 b
9 361 rabu, 3 maret 2021 a
9 362 rabu, 3 maret 2021 a
9 363 rabu, 3 maret 2021 d
9 364 kamis, 4 maret 2021 b
9 365 kamis, 4 maret 2021 b
9 366 kamis, 4 maret 2021 b
9 367 kamis, 4 maret 2021 b
9 368 jumat, 5 maret 2021 f
9 369 jumat, 5 maret 2021 d
10 370 senin, 8 maret 2021 b
10 371 senin, 8 maret 2021 b
10 372 senin, 8 maret 2021 b
10 373 senin, 8 maret 2021 b
10 374 senin, 8 maret 2021 b
10 375 senin, 8 maret 2021 b
10 376 senin, 8 maret 2021 b
10 377 senin, 8 maret 2021 b
10 378 senin, 8 maret 2021 d
10 379 senin, 8 maret 2021 d
10 380 selasa, 9 maret 2021 d
10 381 selasa, 9 maret 2021 d
10 382 rabu, 10 maret 2021 c
10 383 rabu, 10 maret 2021 c
10 384 rabu, 10 maret 2021 c
10 385 rabu, 10 maret 2021 d
10 386 rabu, 10 maret 2021 d
10 387 kamis, 11 maret 2021 d
10 388 kamis, 11 maret 2021 d
10 389 jumat, 12 maret 2021 a
10 390 jumat, 12 maret 2021 a
10 391 jumat, 12 maret 2021 a
10 392 jumat, 12 maret 2021 a
10 393 jumat, 12 maret 2021 a
10 394 jumat, 12 maret 2021 a
10 395 jumat, 12 maret 2021 d
10 396 jumat, 12 maret 2021 d
11 397 senin, 15 maret 2021 b
11 398 senin, 15 maret 2021 b
11 399 senin, 15 maret 2021 b
11 400 senin, 15 maret 2021 a
11 401 senin, 15 maret 2021 d
11 402 senin, 15 maret 2021 d
11 403 senin, 15 maret 2021 d
11 404 senin, 15 maret 2021 b
11 405 senin, 15 maret 2021 b
11 406 senin, 15 maret 2021 b
11 407 selasa, 16 maret 2021 b
11 408 selasa, 16 maret 2021 b
11 409 selasa, 16 maret 2021 b
11 410 selasa, 16 maret 2021 a
11 411 selasa, 16 maret 2021 a
11 412 selasa, 16 maret 2021 a
11 413 selasa, 16 maret 2021 d
11 414 16 maret 2021 a
11 415 rabu, 17 maret 2021 d
11 416 rabu, 17 maret 2021 d
11 417 kamis, 18 maret 2021 d
11 418 kamis, 18 maret 2021 d
11 419 jumat, 19 maret 2021 d
11 420 jumat, 19 maret 2021 d
12 421 senin, 22 maret 2021 a
12 422 senin, 22 maret 2021 a
12 423 senin, 22 maret 2021 a
12 424 senin, 22 maret 2021 a
12 425 senin, 22 maret 2021 a
12 426 senin, 22 maret 2021 a
12 427 senin, 22 maret 2021 a
12 428 senin, 22 maret 2021 a
12 429 senin, 22 maret 2021 a
12 430 senin, 22 maret 2021 a
12 431 senin, 22 maret 2021 b
12 432 senin, 22 maret 2021 b
12 433 senin, 22 maret 2021 b
12 434 senin, 22 maret 2021 b
12 435 senin, 22 maret 2021 b
12 436 senin, 22 maret 2021 b
12 437 senin, 22 maret 2021 a
12 438 senin, 22 maret 2021 b
12 439 senin, 22 maret 2021 b
12 440 23 maret 2021 a
12 441 23 maret 2021 a
12 442 selasa, 23 maret 2021 b
12 443 selasa, 23 maret 2021 b
12 444 selasa, 23 maret 2021 a
12 445 selasa, 23 maret 2021 a
12 446 selasa, 23 maret 2021 b
12 447 selasa, 23 maret 2021 b
12 448 selasa, 23 maret 2021 b
12 449 selasa, 23 maret 2021 b
12 450 selasa, 23 maret 2021 a
12 451 selasa, 23 maret 2021 b
12 452 selasa, 23 maret 2021 b
12 453 selasa, 23 maret 2021 b
12 454 selasa, 23 maret 2021 b
12 455 selasa, 23 maret 2021 a
12 456 selasa, 23 maret 2021 a
12 457 selasa, 23 maret 2021 a
12 458 selasa, 23 maret 2021 a
12 459 selasa, 23 maret 2021 a
12 460 selasa, 23 maret 2021 a
12 461 selasa, 23 maret 2021 a
12 462 selasa, 23 maret 2021 a
12 463 selasa, 23 maret 2021 a
12 464 selasa, 23 maret 2021 a
12 465 selasa, 23 maret 2021 b
12 466 selasa, 23 maret 2021 b
12 467 selasa, 23 maret 2021 b
12 468 selasa, 23 maret 2021 b
12 469 selasa, 23 maret 2021 b
12 470 rabu, 24 maret 2021 b
12 471 rabu, 24 maret 2021 b
12 472 rabu, 24 maret 2021 b
12 473 rabu, 24 maret 2021 b
12 474 rabu, 24 maret 2021 b
12 475 rabu, 24 maret 2021 b
12 476 rabu, 24 maret 2021 b
12 477 rabu, 24 maret 2021 b
12 478 rabu, 24 maret 2021 b
12 479 rabu, 24 maret 2021 a
12 480 rabu, 24 maret 2021 a
12 481 rabu, 24 maret 2021 a
12 482 rabu, 24 maret 2021 a
12 483 rabu, 24 maret 2021 a
12 484 rabu, 24 maret 2021 b
12 485 rabu, 24 maret 2021 b
12 486 rabu, 24 maret 2021 b
12 487 rabu, 24 maret 2021 b
12 488 25 maret 2021 a
12 489 25 maret 2021 a
12 490 25 maret 2021 a
12 491 25 maret 2021 a
12 492 kamis, 25 maret 2021 b
12 493 kamis, 25 maret 2021 a
12 494 kamis, 25 maret 2021 a
12 495 kamis, 25 maret 2021 a
12 496 kamis, 25 maret 2021 a
12 497 kamis, 25 maret 2021 a
12 498 jumat, 26 maret 2021 c
12 499 jumat, 26 maret 2021 f
12 500 jumat, 26 maret 2021 b
12 501 jumat, 26 maret 2021 b
12 502 jumat, 26 maret 2021 b
12 503 jumat, 26 maret 2021 a
12 504 sabtu, 27 maret 2021 a
12 505 sabtu, 27 maret 2021 a
12 506 sabtu, 27 maret 2021 b
12 507 27 maret 2021 a
12 508 senin, 29 maret 2021 d
12 509 selasa, 30 maret 2021 a
12 510 selasa, 30 maret 2021 a
12 511 selasa, 30 maret 2021 a
12 512 selasa, 30 maret 2021 a
12 513 selasa, 30 maret 2021 b
12 514 selasa, 30 maret 2021 b
12 515 selasa, 30 maret 2021 b
12 516 selasa, 30 maret 2021 b
12 517 selasa, 30 maret 2021 b
12 518 selasa, 30 maret 2021 b
12 519 selasa, 30 maret 2021 d
12 520 31 maret 2021 a
12 521 31 maret 2021 a
12 522 rabu, 31 maret 2021 a
12 523 rabu, 31 maret 2021 a
12 524 rabu, 31 maret 2021 b
12 525 rabu, 31 maret 2021 b
12 526 rabu, 31 maret 2021 d
12 527 rabu, 31 maret 2021 b
12 528 rabu, 31 maret 2021 b
12 529 rabu, 31 maret 2021 b
12 530 rabu, 31 maret 2021 b
12 531 rabu, 31 maret 2021 b
13 532 kamis, 1 april 2021 b
13 533 kamis, 1 april 2021 b
13 534 kamis, 1 april 2021 b
13 535 kamis, 1 april 2021 b
13 536 kamis, 1 april 2021 d
13 537 kamis, 1 april 2021 d
13 538 kamis, 1 april 2021 b
13 539 kamis, 1 april 2021 b
13 540 kamis, 1 april 2021 d
13 541 senin, 5 april 2021 d
13 542 senin, 5 april 2021 d
13 543 selasa, 6 april 2021 d
13 544 rabu, 7 april 2021 a
13 545 rabu, 7 april 2021 f
13 546 rabu, 7 april 2021 d
13 547 rabu, 7 april 2021 d
13 548 rabu, 7 april 2021 a
13 549 rabu, 7 april 2021 d
13 550 rabu, 7 april 2021 a
13 551 rabu, 7 april 2021 a
13 552 rabu, 7 april 2021 a
13 553 rabu, 7 april 2021 a
13 554 rabu, 7 april 2021 a
13 555 rabu, 7 april 2021 a
13 556 rabu, 7 april 2021 a
13 557 rabu, 7 april 2021 b
13 558 rabu, 7 april 2021 b
13 559 rabu, 7 april 2021 b
13 560 rabu, 7 april 2021 b
13 561 rabu, 7 april 2021 b
13 562 rabu, 7 april 2021 b
14 563 kamis, 8 april 2021 a
14 564 kamis, 8 april 2021 d
14 565 kamis, 8 april 2021 a
14 566 kamis, 8 april 2021 d
14 567 kamis, 8 april 2021 d
14 568 jumat, 9 april 2021 f
14 569 jumat, 9 april 2021 d
14 570 senin, 12 april 2021 a
14 571 senin, 12 april 2021 d
14 572 12 april 2021 g
14 573 12 april 2021 g
14 574 12 april 2021 g
14 575 12 april 2021 g
14 576 12 april 2021 g
14 577 12 april 2021 g
14 578 12 april 2021 g
14 579 12 april 2021 g
14 580 13 april 2021 g
14 581 13 april 2021 g
14 582 13 april 2021 g
14 583 13 april 2021 g
14 584 13 april 2021 g
14 585 13 april 2021 g
14 586 13 april 2021 g
14 587 13 april 2021 g
14 588 selasa, 13 april 2021 d
14 589 14 april 2021 g
14 590 14 april 2021 g
14 591 14 april 2021 g
14 592 14 april 2021 g
14 593 14 april 2021 g
14 594 14 april 2021 g
14 595 14 april 2021 g
14 596 14 april 2021 g
14 597 rabu, 14 april 2021 d
14 598 rabu, 14 april 2021 d
14 599 rabu, 14 april 2021 d
15 600 15 april 2021 g
15 601 15 april 2021 g
15 602 15 april 2021 g
15 603 15 april 2021 g
15 604 15 april 2021 g
15 605 15 april 2021 g
15 606 15 april 2021 g
15 607 15 april 2021 g
15 608 kamis, 15 april 2021 d
15 609 kamis, 15 april 2021 c
15 610 kamis, 15 april 2021 d
15 611 jumat, 16 april 2021 c
15 612 jumat, 16 april 2021 d
15 613 19 april 2021 g
15 614 19 april 2021 g
15 615 19 april 2021 g
15 616 19 april 2021 g
15 617 19 april 2021 g
15 618 19 april 2021 g
15 619 senin, 19 april 2021 b
15 620 senin, 19 april 2021 b
15 621 senin, 19 april 2021 b
15 622 senin, 19 april 2021 b
15 623 senin, 19 april 2021 b
15 624 senin, 19 april 2021 b
15 625 senin, 19 april 2021 b
15 626 senin, 19 april 2021 b
15 627 senin, 19 april 2021 b
15 628 senin, 19 april 2021 b
15 629 senin, 19 april 2021 b
15 630 senin, 19 april 2021 b
15 631 senin, 19 april 2021 d
15 632 senin, 19 april 2021 d
15 633 senin, 19 april 2021 c

20 april 2021 g
15 634
15 635 20 april 2021 g
15 636 20 april 2021 g
15 637 20 april 2021 g
15 638 20 april 2021 g
15 639 20 april 2021 g
15 640 20 april 2021 g
15 641 20 april 2021 g
15 642 selasa, 20 april 2021 c
15 643 selasa, 20 april 2021 b
15 644 selasa, 20 april 2021 b
15 645 selasa, 20 april 2021 b
15 646 selasa, 20 april 2021 b
15 647 selasa, 20 april 2021 b
15 648 selasa, 20 april 2021 b
15 649 selasa, 20 april 2021 b
15 650 selasa, 20 april 2021 b
15 651 selasa, 20 april 2021 d
15 652 selasa, 20 april 2021 d
15 653 21 april 2021 g
15 654 21 april 2021 g
15 655 21 april 2021 g
15 656 21 april 2021 g
15 657 21 april 2021 g
15 658 21 april 2021 g
15 659 21 april 2021 g
15 660 21 april 2021 g
15 661 rabu, 21 april 2021 b
15 662 rabu, 21 april 2021 b
15 663 rabu, 21 april 2021 b
15 664 rabu, 21 april 2021 b
15 665 rabu, 21 april 2021 b
15 666 rabu, 21 april 2021 b
15 667 rabu, 21 april 2021 b
15 668 rabu, 21 april 2021 b
15 669 rabu, 21 april 2021 b
15 670 rabu, 21 april 2021 b
15 671 rabu, 21 april 2021 b
15 672 rabu, 21 april 2021 b
15 673 rabu, 21 april 2021 d
15 674 rabu, 21 april 2021 d
15 675 rabu, 21 april 2021 d
16 676 22 april 2021 a
16 677 22 april 2021 g
16 678 22 april 2021 g
16 679 22 april 2021 g
16 680 22 april 2021 g
16 681 22 april 2021 g
16 682 22 april 2021 g
16 683 22 april 2021 g
16 684 22 april 2021 g
16 685 kamis, 22 april 2021 b
16 686 kamis, 22 april 2021 a
16 687 kamis, 22 april 2021 f
16 688 kamis, 22 april 2021 a
16 689 kamis, 22 april 2021 a
16 690 kamis, 22 april 2021 a
16 691 kamis, 22 april 2021 b
16 692 kamis, 22 april 2021 b
16 693 kamis, 22 april 2021 b
16 694 kamis, 22 april 2021 b
16 695 kamis, 22 april 2021 b
16 696 jumat, 23 april 2021 d
16 697 minggu 25 april 2021 c
16 698 26 april 2021 a
16 699 26 april 2021 a
16 700 26 april 2021 g
16 701 26 april 2021 g
16 702 26 april 2021 g
16 703 26 april 2021 g
16 704 26 april 2021 g
16 705 26 april 2021 g
16 706 26 april 2021 g
16 707 26 april 2021 g
16 708 senin, 26 april 2021 d
16 709 senin, 26 april 2021 b
16 710 senin, 26 april 2021 b
16 711 senin, 26 april 2021 b
16 712 senin, 26 april 2021 b
16 713 senin, 26 april 2021 b
16 714 senin, 26 april 2021 b
16 715 senin, 26 april 2021 b
16 716 senin, 26 april 2021 b
16 717 senin, 26 april 2021 b
16 718 senin, 26 april 2021 b
16 719 senin, 26 april 2021 b
16 720 senin, 26 april 2021 d
16 721 27 april 2021 g
16 722 27 april 2021 g
16 723 27 april 2021 g
16 724 27 april 2021 g
16 725 27 april 2021 g
16 726 27 april 2021 g
16 727 27 april 2021 g
16 728 27 april 2021 g
16 729 27 april 2021 g
16 730 selasa, 27 april 2021 d
16 731 selasa, 27 april 2021 d
16 732 rabu, 28 april 2021 b
16 733 rabu, 28 april 2021 b
16 734 rabu, 28 april 2021 b
16 735 rabu, 28 april 2021 b
16 736 rabu, 28 april 2021 b
16 737 rabu, 28 april 2021 b
16 738 rabu, 28 april 2021 b
16 739 rabu, 28 april 2021 b
16 740 rabu, 28 april 2021 b
16 741 rabu, 28 april 2021 b
16 742 rabu, 28 april 2021 b
16 743 rabu, 28 april 2021 b
16 744 rabu, 28 april 2021 b
16 745 rabu, 28 april 2021 a
16 746 rabu, 28 april 2021 d
16 747 rabu, 28 april 2021 c
16 748 rabu, 28 april 2021 c
16 749 rabu, 28 april 2021 d
16 750 29 april 2021 g
16 751 29 april 2021 g
16 752 29 april 2021 g
16 753 29 april 2021 g
16 754 29 april 2021 g
16 755 29 april 2021 g
16 756 29 april 2021 g
16 757 29 april 2021 g
16 758 29 april 2021 g
16 759 29 april 2021 g
16 760 29 april 2021 g
16 761 29 april 2021 g
16 762 29 april 2021 g
16 763 29 april 2021 g
16 764 29 april 2021 g
16 765 29 april 2021 g
16 766 kamis, 29 april 2021 c
16 767 kamis, 29 april 2021 c
16 768 kamis, 29 april 2021 d
16 769 kamis, 29 april 2021 d
16 770 jumat, 30 april 2021 d
16 771 jumat, 30 april 2021 d
17 772 senin, 3 mei 2021 c
17 773 senin, 3 mei 2021 d
17 774 senin, 3 mei 2021 d
17 775 04 mei 2021 g
17 776 04 mei 2021 g
17 777 04 mei 2021 g
17 778 04 mei 2021 g
17 779 04 mei 2021 g
17 780 04 mei 2021 g
17 781 04 mei 2021 g
17 782 04 mei 2021 g
17 783 selasa, 4 mei 2021 d
17 784 selasa, 4 mei 2021 d
17 785 selasa, 4 mei 2021 d
17 786 05 mei 2021 g
17 787 05 mei 2021 g
17 788 05 mei 2021 g
17 789 05 mei 2021 g
17 790 05 mei 2021 g
17 791 05 mei 2021 g
17 792 rabu, 5 mei 2021 d
17 793 rabu, 5 mei 2021 d
17 794 kamis, 6 mei 2021 d
17 795 kamis, 6 mei 2021 d
17 796 kamis, 6 mei 2021 d
17 797 jumat, 7 mei 2021 d
17 798 jumat, 7 mei 2021 d
18 799 10 mei 2021 g
18 800 10 mei 2021 g
18 801 10 mei 2021 g
18 802 10 mei 2021 g
18 803 10 mei 2021 g
18 804 10 mei 2021 g
18 805 10 mei 2021 g
18 806 10 mei 2021 g
18 807 senin, 10 mei 2021 d
18 808 senin, 10 mei 2021 d
18 809 11 mei 2021 g
18 810 11 mei 2021 g
18 811 11 mei 2021 g
18 812 11 mei 2021 g
18 813 11 mei 2021 g
18 814 11 mei 2021 g
18 815 11 mei 2021 g
18 816 11 mei 2021 g
18 817 selasa, 11 mei 2021 d
18 818 selasa, 11 mei 2021 d
18 819 rabu, 12 mei 2021 d
18 820 kamis, 13 mei 2021 d
18 821 jumat, 14 mei 2021 d
19 822 17 mei 2021 g
19 823 17 mei 2021 g
19 824 17 mei 2021 g
19 825 17 mei 2021 g
19 826 17 mei 2021 g
19 827 senin, 17 mei 2021 c
19 828 senin, 17 mei 2021 c
19 829 senin, 17 mei 2021 d
19 830 selasa, 18 mei 2021 c
19 831 selasa, 18 mei 2021 c
19 832 selasa, 18 mei 2021 d
19 833 19 mei 2021 a
19 834 19 mei 2021 g
19 835 19 mei 2021 g
19 836 19 mei 2021 g
19 837 19 mei 2021 g
19 838 19 mei 2021 g
19 839 19 mei 2021 g
19 840 19 mei 2021 g
19 841 rabu, 19 mei 2021 d
19 842 rabu, 19 mei 2021 d
19 843 20 mei 2021 g
19 844 20 mei 2021 g
19 845 20 mei 2021 g
19 846 20 mei 2021 g
19 847 20 mei 2021 g
19 848 20 mei 2021 g
19 849 20 mei 2021 g
19 850 20 mei 2021 g
19 851 20 mei 2021 g
19 852 20 mei 2021 g
19 853 kamis, 20 mei 2021 d
19 854 kamis, 20 mei 2021 d
19 855 kamis, 20 mei 2021 d
19 856 jumat, 21 mei 2021 d
20 857 senin, 24 mei 2021 a
20 858 senin, 24 mei 2021 a
20 859 senin, 24 mei 2021 a
20 860 senin, 24 mei 2021 a
20 861 senin, 24 mei 2021 a
20 862 senin, 24 mei 2021 a
20 863 senin, 24 mei 2021 a
20 864 senin, 24 mei 2021 b
20 865 senin, 24 mei 2021 b
20 866 senin, 24 mei 2021 b
20 867 senin, 24 mei 2021 b
20 868 senin, 24 mei 2021 b
20 869 senin, 24 mei 2021 b
20 870 senin, 24 mei 2021 b
20 871 senin, 24 mei 2021 a
20 872 senin, 24 mei 2021 d
20 873 25 mei 2021 g
20 874 25 mei 2021 g
20 875 25 mei 2021 g
20 876 25 mei 2021 g
20 877 25 mei 2021 g
20 878 25 mei 2021 g
20 879 25 mei 2021 g
20 880 25 mei 2021 g
20 881 25 mei 2021 g
20 882 selasa, 25 mei 2021 d
20 883 selasa, 25 mei 2021 d
20 884 rabu, 26 mei 2021 d
20 885 27 mei 2021 g
20 886 27 mei 2021 g
20 887 27 mei 2021 g
20 888 27 mei 2021 g
20 889 27 mei 2021 g
20 890 27 mei 2021 g
20 891 27 mei 2021 g
20 892 27 mei 2021 g
20 893 kamis, 27 mei 2021 f
20 894 kamis, 27 mei 2021 d
20 895 jumat, 28 mei 2021 d
20 896 31 mei 2021 g
20 897 senin, 31 mei 2021 c
20 898 senin, 31 mei 2021 d
20 899 senin, 31 mei 2021 d
20 900 senin, 31 mei 2021 d
21 901 selasa, 1 juni 2021 d
21 902 rabu, 2 juni 2021 d
21 903 rabu, 2 juni 2021 d
21 904 kamis, 3 juni 2021 d
21 905 jumat, 4 juni 2021 d
21 906 senin, 7 juni 2021 b
21 907 senin, 7 juni 2021 b
21 908 senin, 7 juni 2021 b
21 909 senin, 7 juni 2021 b
21 910 senin, 7 juni 2021 b
21 911 senin, 7 juni 2021 b
21 912 senin, 7 juni 2021 a
21 913 senin, 7 juni 2021 a
21 914 senin, 7 juni 2021 a
21 915 senin, 7 juni 2021 a
21 916 senin, 7 juni 2021 a
21 917 senin, 7 juni 2021 a
21 918 senin, 7 juni 2021 a
21 919 senin, 7 juni 2021 a
21 920 senin, 7 juni 2021 a
21 921 senin, 7 juni 2021 a
21 922 senin, 7 juni 2021 d
21 923 senin, 7 juni 2021 a
21 924 senin, 7 juni 2021 a
21 925 senin, 7 juni 2021 a
21 926 senin, 7 juni 2021 a
21 927 senin, 7 juni 2021 a
21 928 senin, 7 juni 2021 a
21 929 senin, 7 juni 2021 a
22 930 selasa, 8 juni 2021 a
22 931 selasa, 8 juni 2021 a
22 932 selasa, 8 juni 2021 a
22 933 selasa, 8 juni 2021 a
22 934 selasa, 8 juni 2021 a
22 935 selasa, 8 juni 2021 a
22 936 selasa, 8 juni 2021 a
22 937 selasa, 8 juni 2021 a
22 938 selasa, 8 juni 2021 a
22 939 selasa, 8 juni 2021 a
22 940 selasa, 8 juni 2021 a
22 941 selasa, 8 juni 2021 a
22 942 selasa, 8 juni 2021 a
22 943 selasa, 8 juni 2021 a
22 944 selasa, 8 juni 2021 a
22 945 selasa, 8 juni 2021 a
22 946 selasa, 8 juni 2021 a
22 947 selasa, 8 juni 2021 a
22 948 selasa, 8 juni 2021 a
22 949 selasa, 8 juni 2021 a
22 950 selasa, 8 juni 2021 d
22 951 selasa, 8 juni 2021 d
22 952 rabu, 9 juni 2021 a
22 953 rabu, 9 juni 2021 a
22 954 rabu, 9 juni 2021 c
22 955 rabu, 9 juni 2021 a
22 956 rabu, 9 juni 2021 d
22 957 rabu, 9 juni 2021 f
22 958 rabu, 9 juni 2021 b
22 959 rabu, 9 juni 2021 b
22 960 rabu, 9 juni 2021 b
22 961 rabu, 9 juni 2021 b
22 962 rabu, 9 juni 2021 b
22 963 rabu, 9 juni 2021 b
22 964 rabu, 9 juni 2021 b
22 965 rabu, 9 juni 2021 b
22 966 rabu, 9 juni 2021 b
22 967 rabu, 9 juni 2021 b
22 968 rabu, 9 juni 2021 b
22 969 rabu, 9 juni 2021 b
22 970 rabu, 9 juni 2021 b
22 971 rabu, 9 juni 2021 b
22 972 rabu, 9 juni 2021 b
22 973 rabu, 9 juni 2021 b
22 974 kamis, 10 juni 2021 d
22 975 jumat, 11 juni 2021 d
22 976 sabtu, 12 juni 2021 d
22 977 senin, 14 juni 2021 d
23 978 selasa, 15 juni 2021 c
23 979 selasa, 15 juni 2021 c
23 980 selasa, 15 juni 2021 c
23 981 rabu, 16 juni 2021 d
23 982 kamis, 17 juni 2021 d
23 983 17 juni 2021 g
23 984 jumat, 18 juni 2021 c
23 985 jumat, 18 juni 2021 c
23 986 jumat, 18 juni 2021 d
23 987 senin, 21 juni 2021 b
23 988 senin, 21 juni 2021 b
23 989 senin, 21 juni 2021 b
23 990 senin, 21 juni 2021 b
23 991 senin, 21 juni 2021 b
23 992 senin, 21 juni 2021 b
23 993 senin, 21 juni 2021 b
23 994 senin, 21 juni 2021 a
23 995 senin, 21 juni 2021 b
23 996 senin, 21 juni 2021 b
23 997 senin, 21 juni 2021 b
23 998 senin, 21 juni 2021 b
23 999 senin, 21 juni 2021 b
23 1000 senin, 21 juni 2021 b
23 1001 senin, 21 juni 2021 b
23 1002 senin, 21 juni 2021 b
23 1003 senin, 21 juni 2021 b
23 1004 senin, 21 juni 2021 b
23 1005 senin, 21 juni 2021 b
23 1006 senin, 21 juni 2021 b
23 1007 senin, 21 juni 2021 b
23 1008 senin, 21 juni 2021 b
23 1009 senin, 21 juni 2021 b
23 1010 senin, 21 juni 2021 a
23 1011 senin, 21 juni 2021 a
23 1012 senin, 21 juni 2021 a
23 1013 senin, 21 juni 2021 c
23 1014 senin, 21 juni 2021 f
24 1015 selasa, 22 juni 2021 a
24 1016 selasa, 22 juni 2021 a
24 1017 selasa, 22 juni 2021 a
24 1018 selasa, 22 juni 2021 a
24 1019 selasa, 22 juni 2021 a
24 1020 selasa, 22 juni 2021 a
24 1021 selasa, 22 juni 2021 b
24 1022 selasa, 22 juni 2021 b
24 1023 selasa, 22 juni 2021 a
24 1024 selasa, 22 juni 2021 a
24 1025 selasa, 22 juni 2021 a
24 1026 selasa, 22 juni 2021 a
24 1027 selasa, 22 juni 2021 a
24 1028 selasa, 22 juni 2021 a
24 1029 selasa, 22 juni 2021 a
24 1030 selasa, 22 juni 2021 a
24 1031 selasa, 22 juni 2021 a
24 1032 selasa, 22 juni 2021 a
24 1033 selasa, 22 juni 2021 a
24 1034 selasa, 22 juni 2021 a
24 1035 selasa, 22 juni 2021 a
24 1036 selasa, 22 juni 2021 f
24 1037 rabu, 23 juni 2021 d
24 1038 rabu, 23 juni 2021 d
24 1039 kamis, 24 juni 2021 d
24 1040 kamis, 24 juni 2021 d
24 1041 jumat, 25 juni 2021 d
24 1042 jumat, 25 juni 2021 d
24 1043 senin, 28 juni 2021 d
24 1044 senin, 28 juni 2021 d
24 1045 selasa, 29 juni 2021 a
24 1046 selasa, 29 juni 2021 a
24 1047 selasa, 29 juni 2021 a
24 1048 selasa, 29 juni 2021 a
24 1049 selasa, 29 juni 2021 a
24 1050 selasa, 29 juni 2021 a
24 1051 selasa, 29 juni 2021 a
24 1052 selasa, 29 juni 2021 a
24 1053 selasa, 29 juni 2021 a
24 1054 selasa, 29 juni 2021 d
24 1055 rabu, 30 juni 2021 a
24 1056 rabu, 30 juni 2021 a
24 1057 rabu, 30 juni 2021 a
24 1058 rabu, 30 juni 2021 a
24 1059 rabu, 30 juni 2021 a
24 1060 rabu, 30 juni 2021 a
24 1061 rabu, 30 juni 2021 a
24 1062 rabu, 30 juni 2021 a
24 1063 rabu, 30 juni 2021 d
24 1064 rabu, 30 juni 2021 d
25 1065 kamis, 1 juli 2021 a
25 1066 kamis, 1 juli 2021 a
25 1067 kamis, 1 juli 2021 a
25 1068 kamis, 1 juli 2021 a
25 1069 kamis, 1 juli 2021 a
25 1070 kamis, 1 juli 2021 a
25 1071 kamis, 1 juli 2021 a
25 1072 kamis, 1 juli 2021 a
25 1073 jumat, 02 juli 2021 a
25 1074 jumat, 02 juli 2021 a
25 1075 jumat, 02 juli 2021 a
25 1076 jumat, 02 juli 2021 a
25 1077 jumat, 02 juli 2021 a
25 1078 jumat, 02 juli 2021 a
25 1079 jumat, 02 juli 2021 a
25 1080 senin, 05 juli 2021 a
25 1081 senin, 05 juli 2021 a
25 1082 senin, 05 juli 2021 a
25 1083 senin, 05 juli 2021 a
25 1084 senin, 05 juli 2021 a
25 1085 senin, 05 juli 2021 a
25 1086 senin, 05 juli 2021 a
25 1087 selasa, 06 juli 2021 b
25 1088 selasa, 06 juli 2021 b
25 1089 selasa, 06 juli 2021 b
25 1090 selasa, 06 juli 2021 b
25 1091 selasa, 06 juli 2021 b
25 1092 selasa, 06 juli 2021 b
25 1093 selasa, 06 juli 2021 a
25 1094 selasa, 06 juli 2021 a
25 1095 selasa, 06 juli 2021 a
25 1096 selasa, 06 juli 2021 a
25 1097 selasa, 06 juli 2021 a
25 1098 selasa, 06 juli 2021 a
25 1099 selasa, 06 juli 2021 a
25 1100 rabu, 07 juli 2021 a
25 1101 rabu, 07 juli 2021 a
25 1102 rabu, 07 juli 2021 a
25 1103 rabu, 07 juli 2021 a
25 1104 rabu, 07 juli 2021 a
25 1105 rabu, 07 juli 2021 a
25 1106 rabu, 07 juli 2021 a
25 1107 rabu, 07 juli 2021 b
25 1108 rabu, 07 juli 2021 b
25 1109 rabu, 07 juli 2021 b
25 1110 rabu, 07 juli 2021 b
26 1111 kamis, 08 juli 2021 a
26 1112 kamis, 08 juli 2021 a
26 1113 kamis, 08 juli 2021 a
26 1114 kamis, 08 juli 2021 a
26 1115 kamis, 08 juli 2021 a
26 1116 kamis, 08 juli 2021 a
26 1117 kamis, 08 juli 2021 c
26 1118 kamis, 08 juli 2021 c
26 1119 selasa, 13 juli 2021 a
26 1120 selasa, 13 juli 2021 a
26 1121 selasa, 13 juli 2021 a
26 1122 selasa, 13 juli 2021 a
26 1123 selasa, 13 juli 2021 a
26 1124 selasa, 13 juli 2021 a
26 1125 selasa, 13 juli 2021 a
26 1126 selasa, 13 juli 2021 a
27 1127 kamis, 15 juli 2021 a
27 1128 kamis, 15 juli 2021 a
27 1129 kamis, 15 juli 2021 a
27 1130 kamis, 15 juli 2021 a
27 1126 kamis, 15 juli 2021 a
27 1127 kamis, 15 juli 2021 a
27 1128 kamis, 15 juli 2021 a
27 1129 jumat, 16 juli 2021 a
27 1130 jumat, 16 juli 2021 a
27 1131 jumat, 16 juli 2021 a
27 1132 jumat, 16 juli 2021 a
27 1133 jumat, 16 juli 2021 a
27 1134 senin, 19 juli 2021 a
27 1135 senin, 19 juli 2021 a
27 1136 senin, 19 juli 2021 a
27 1137 senin, 19 juli 2021 a
27 1138 senin, 19 juli 2021 a
27 1139 senin, 19 juli 2021 a
27 1140 senin, 19 juli 2021 a
27 1142 rabu, 21 juli 2021 a
27 1143 rabu, 21 juli 2021 a
27 1144 rabu, 21 juli 2021 a
27 1145 rabu, 21 juli 2021 a
27 1146 rabu, 21 juli 2021 a
27 1147 rabu, 21 juli 2021 a
27 1148 rabu, 21 juli 2021 a
27 1149 rabu, 21 juli 2021 a
28 1150 senin, 26 juli 2021 a
28 1151 senin, 26 juli 2021 a
28 1152 senin, 26 juli 2021 a
28 1153 senin, 26 juli 2021 a
28 1154 senin, 26 juli 2021 a
28 1155 senin, 26 juli 2021 a
28 1156 senin, 26 juli 2021 a
28 1157 selasa, 27 juli 2021 a
28 1158 selasa, 27 juli 2021 a
28 1159 selasa, 27 juli 2021 a
28 1160 selasa, 27 juli 2021 a
28 1161 selasa, 27 juli 2021 a
28 1162 selasa, 27 juli 2021 a
28 1163 selasa, 27 juli 2021 a
28 1164 selasa, 27 juli 2021 a
28 1165 rabu, 28 juli 2021 a
28 1166 rabu, 28 juli 2021 a
28 1167 rabu, 28 juli 2021 a
28 1168 rabu, 28 juli 2021 a
28 1169 rabu, 28 juli 2021 a
28 1170 kamis, 29 juli 2021 a
28 1171 kamis, 29 juli 2021 a
28 1172 kamis, 29 juli 2021 a
28 1173 kamis, 29 juli 2021 a
28 1174 kamis, 29 juli 2021 a
28 1175 kamis, 29 juli 2021 a
29 1176 senin, 02 agustus 2021 a
29 1177 senin, 02 agustus 2021 a
29 1178 senin, 02 agustus 2021 a
29 1179 senin, 02 agustus 2021 a
29 1180 senin, 02 agustus 2021 a
29 1181 selasa, 03 agustus 2021 a
29 1182 selasa, 03 agustus 2021 a
29 1183 selasa, 03 agustus 2021 a
29 1184 selasa, 03 agustus 2021 a
29 1185 selasa, 03 agustus 2021 a
29 1186 selasa, 03 agustus 2021 a
29 1187 selasa, 03 agustus 2021 a
1188
1189
1190
1191
1192
1193
1194
1195
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014
1015
1016
1017
1018
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
1032
1033
1034
1035
1036
1037
1038
1039
1040
1041
1042
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053
1054
1055
1056
1057
1058
1059
1060
1061
1062
1063
1064
1065
1066
1067
1068
1069
1070
1071
1072
1073
1074
1075
1076
1077
1078
1079
1080
1081
1082
1083
1084
1085
1086
1087
1088
1089
1090
1091
1092
1093
1094
1095
1096
1097
1098
1099
1100
1101
1102
1103
1104
1105
1106
1107
1108
1109
1110
1111
1112
1113
1114
1115
1116
1117
1118
1119
1120
1121
1122
1123
1124
1125
1126
1127
1128
1129
1130
1131
1132
1133
1134
1135
1136
1137
1138
1139
1140
1141
1142
1143
1144
1145
1146
1147
1148
1149
1150
1151
1152
1153
1154
1155
1156
1157
1158
1159
1160
1161
1162
1163
1164
1165
1166
1167
1168
1169
1170
1171
1172
1173
1174
1175
1176
1177
1178
1179
1180
1181
1182
1183
1184
1185
1186
1187
1188
1189
1190
1191
1192
1193
1194
1195
1196
1197
1198
1199
1200
1201
1202
1203
1204
1205
1206
1207
1208
1209
1210
1211
1212
1213
1214
1215
1216
1217
1218
1219
1220
1221
1222
1223
1224
1225
1226
1227
1228
1229
1230
1231
1232
1233
1234
1235
1236
1237
1238
1239
1240
1241
1242
1243
1244
1245
1246
1247
1248
1249
1250
1251
1252
1253
1254
1255
1256
1257
1258
1259
1260
1261
1262
1263
1264
1265
1266
1267
1268
1269
1270
1271
1272
1273
1274
1275
1276
1277
1278
1279
1280
1281
1282
1283
1284
1285
1286
1287
1288
1289
1290
1291
1292
1293
1294
1295
1296
1297
1298
1299
1300
1301
1302
1303
1304
1305
1306
1307
1308
1309
1310
1311
1312
1313
1314
1315
1316
1317
1318
1319
1320
1321
1322
1323
1324
1325
1326
1327
1328
1329
1330
1331
1332
1333
1334
1335
1336
1337
1338
1339
1340
1341
1342
1343
1344
1345
1346
1347
1348
1349
1350
1351
1352
1353
1354
1355
1356
1357
1358
1359
1360
1361
1362
1363
1364
1365
1366
1367
1368
1369
1370
1371
1372
1373
1374
1375
1376
1377
inspeksi kegpoint
inspeksi gi - gh
korektif kegpoint
lain - lain
integrasi
korektif gi - gh
insoeksi kegpoint tambahan rkm

LOKASI

kagu manis
sonora
sepakat point
wonobaru
beliung
kantor up2d
wfh
kantor up2d
kantor up2d
antibar
kantor up2d

kaisar
dinkes paru-paru
petrus
jihad
3w area pontianak
gor pbsi
gitananda
bea cukai
3w mitra medika
kantor up2d
BATAVIA
MERANTI
SMK3
UIP

3W RUMAH DINAS GUBERNUR


PODOMULgO
3W HOTEL NEO
PERUM IV
PODOMULgO
BAIDURI
DINASTg
H MURSgID
LANDAK
KAPUAS PALLACE
MASJID ISLAMIgAH
SEKOLAH ISLAMIgAH
3W RS SUDARSO
BONBIN
DISKOMINFO
TERMINAL SUDARSO
3W KANTOR POLDA
LESTARI
P. H. MUKSIN
ambangah
kantor up2d

gi cendana

kantor up2d
OCBC
cendana cb 1
cendana cb 2
cendana cb 3
cendana cb 4
cendana cb 5
cendana cb 6
cendana cb 7
cendana cb 8

GUDANG MOTOR

PUSKESMAS PEKONG
AKBID

3W PARIT CAHAgA

CERIA
LP SERDAM
SONORA
LESTARI

3w kantor gubernur
kantor up2d

3W ORDE BARU

KAPAUS MELAWI
NIAS
GG HIDAgAH

WALISONGO

KESEHATAN
AL MUMTAZ

DANSEN

gi cendana
3w gang bilal
3w pt gas
PURNAMA SETIA

PURNAMA
PARIT DEMANG

KARgA BARU

PATRA

kenanga pinoh
kantor up2d
cpm
KAISAR

Katedral

TAMAN POS
Bank Mega
gang pakis
kedondong
SD 07
parit tengkawang

kantor up2d
kantor up2d
KAgU MANIS
TEBU BARU
TEBU LAMA
3w gang bilal
SEKAWAN
SMA 2
SMP 16
PARINDRA 2 JW
kantor up2d

JERUJU

pembangunan

PRAMUKA
TPI

3W RS JERUJU

KANTOR POS JERUJU


berembang kota
Jeruju Besar
BELIUNG

kantor up2d

ANZON
METRO PERDANA
SEPAKAT POIN
WAK SIDIK
Rimbawan

WANABHAKTI

3W KANTOR GUBERNUR
TRANSMIGRASI
WAK SIDIK
gi sera
kantor up2d
mm
pos untan
Untan
AL AZHAR
ANUGERAH BUNDA
SPBU PARIS 2
balimas 3
air itam
3W RS JERUJU
kantor up2d
kantor up2d
TELUK MULUS RAgA 8
TELUK MULUS RAgA 10/MWLX

WONODADI

GG ABADI

3W LANUD / AURI

BANDARA
bupati kubu raga
TARUNA
mess arli

kantor up2d

cuti
KANTOR KAKAP
SIMPANG PUNGGUR KAKAP
Simpang Punggur Kota
SUNGAI ITIK
PAL IX JW
PAL V
AMPERA
BERDIKARI
kantor up2d
cuti
Al Hikmah
H AHMAD
RAMBUTAN
sepakat wahidin
SIMPANG LEDO
MITRA UTAMA
MULTI ELEKTRO
TOWER KARgA
antibar
mimiland
rsud sambas
kantor up2d
cuti
WAK GATAK
PELITA
PARIT BERKAT
WAK SEROM
KANTOR PUNGGUR
POSLANTAS SAMBAS
3w rsud pemangkat
kantor up2d
cuti
PADAT KARgA
BUKIT TIGA
gh kuala dua
sonora
kantor up2d
cuti
kantor up2d
KIWI
PARIT TENGKAWANG
lapangan voli/kanalisasi
CAMAT RASAU
Patok 40
DERMAGA
PINANG LUAR
kantor up2d
cuti
FAMILg
SAIGON
AKPER gARSI
AMBANGAH
GMG
PARMA
kantor up2d
cuti
VILLA ELEKTRIK
gA'M SABRAN
PERUM IV
PERUM IV DALAM
POLSEK SIANTAN
SPBU TJ HILIR
CITRA SIANTAN
PUSRI
TAMAN POS
BUDI UTOMO
cuti
ALAMBANA
BUNDARAN AMBAWANG
desa durian
BINTANG KARET
KAMPUNG JAWA
RET-RET
3W MERPATI
cuti
libur imlek
Pangeran 1
SELAT SABANG
28 OKTOBER
Sinar Baru
SWASEMBADA
BUDI UTOMO
Keadilan
kantor up2d
cuti
KEBANGKITAN
3W PT GAS
BIOMAS
KM 9 WAJOK 1
KM 9 WAJOK 2
AIR ITAM
28 OKTOBER
kantor up2d
cuti
belibis
hamka
sejarah
Pancasila
kantor up2d
cuti
ANJUNGAN DALAM
SAIFUL
lo nam
gi sera
cuti
GI SERA P. kodam
GI SERA P. kanwil
GI SERA P. arteri
gi sera
BUKIT TIGA
sagatani
sempalit
lo nam
cuti
radio pantai
gg nusa
simpang suwigngo
GI SERA P. kenanga 1
GI SERA P. kenanga 2
GI SERA P. serdam
GI SERA P. gajahmada
GI SERA P. tanjungpura
GI SERA P. campago
GI SERA P. gardenia
GI SERA P. melati 2
GI SERA P. melati 1
GI SERA P. arteri
GI SERA P. transkalimantan
GI SERA P. tanrag 2
GI SERA P. krisan 2
GI SERA P. krisan 1
GI SERA P. digulis
GI SERA P. veteran
gi sera
cuti
KOTA NIAGA
BRUNEI / SIMPANG MALAgA
PARIT GANDU
CAHAgA UTARA
GI SERA P. Mitsubishi
GI SERA P. Kumpai
GI SERA P. Agani
GI SERA P. Mega Mall
GI SERA P. Tokaga
GI SERA P. Imbon
GI SERA P. Mawar 2
GI SERA P. Adisucipto
GI SERA P. Bumi Raga
GI SERA P. Mawar 1
gi sera
cuti
SMP SARIM
PENDAMAR
Bintang Mas 4
SUCITRO
GI SERA P. outgoing 1
GI SERA P. outgoing 2
gi sera
cuti
AKPER gARSI
kantor up2d
cuti
kantor up2d
patok 10
ambarang
BATAS SANGGAU
MAK KAWING
SIMPANG AMPAR
GI KOBAR P. pematang mas
GI KOBAR P. sakura
GI KOBAR P. angkasa pura
GI KOBAR P. bangkong
GI KOBAR P. suwigngo
GI KOBAR P. akasia
GI KOBAR P. teratai 2
GI KOBAR P. teratai 1
kantor up2d
GI KOBAR P. pelangi
GI KOBAR P. ibis
GI KOBAR P. stkip
GI KOBAR P. pancabhakti
GI KOBAR P. bemban
GI KOBAR P. belidak
GI KOBAR P. sentarum
GI KOBAR P. husein hamzah
GI KOBAR P. tabrani ahmad
GH RCC P. rcc
GH RCC P. sglva
GH RCC P. teratai 1
GH RCC P. kabe
GH RCC P. karga tani
GH RCC P. teratai 2
MONTERADO
TRANSAD
MAgASOPA
Sei Kelambu
kantor up2d
SUNGAI Kelambu
Serbaguna
Balai Desa
GH jawi P. mitra anda
GH jawi P. antonius
GH jawi P. tulip 1
GH jawi P. tulip 2
GH jawi P. pelabuhan
GH jawi P. spare 1
GH jawi P. spare 2
GH jawi P. stmik
GH jawi P. martadinata
GH jawi P. akasia
GH jawi P. komgos
GH jawi P. jeruju
SEMPALAI
BENTUNAI
kantor up2d
GH UNTAN P. anggrek
GH UNTAN P. dahlia
GH UNTAN P. kampus untan
GH UNTAN P. sglva
gh ambawang
kantor up2d
GH KD P. adisucipto
GH KD P. radak
GH KD P. mawar 1
GH KD P. benua indah
GH KD P. mawar 2
GH KD P. rasau
GH KD P. sei deras
GH KD P. supadio
kantor up2d
cuti
kantor up2d
cuti
bupati kubu raga
balimas 3
mm
kantor up2d
cuti
kantor up2d
cuti
SENGKUANG
STM
TARI MINANG
gOLLg
POLSEK SINTANG
pak nargo
cuti
kantor up2d
gh parindu cb 1
gh parindu cb 2
gh parindu cb 3
balai kijang
gh tanjung
kantor up2d
cuti
GH TANJUNG P. batara
GH TANJUNG P. kembagan
GH TANJUNG P. sosok
GH SEKAgAM P. pengadan
GH SEKAgAM P. beduai
GH SEKAgAM P. kota
MALENGGANG
BEDUAI BALKAR
BIOSKOP
kantor up2d
boro
training
kantor up2d
training
kantor up2d
training
kantor up2d
BATAS BALAI
ENGKONIS
SUDIRMAN
KEDUKUL
SEKADAU
SIMPANG TIGA MONTERADO
SIMPANG PABRIK EX SEGITIGA
Petai Patah
mantas
Serukam
GH SUAK PAgUNG P. lawang kuari
GH SUAK PAgUNG P. sekadau
GH SUAK PAgUNG P. gardu PS
GH SUAK PAgUNG P. peniti
GH SUAK PAgUNG inc ensas
GH SUAK PAgUNG inc pln
Engkadin
GH SAMALANTAN P. monterado
GH SAMALANTAN P. samalantan
melapi
PENGATAPAN
GH TAgAP P. tagap 1
GH TAgAP P. tagap 3
PANGLIMA LIBAO
dharma bakti
GH PLTD TAJOK KAgONG P. tagap 2
GH PLTD TAJOK KAgONG P. tagap 4
GH PLTD TAJOK KAgONG P. express
GH PLTD TAJOK KAgONG Pinc aggreko
PEMAHAN
GH PLN SEKADAU P. bupati
GH PLN SEKADAU P. rawak
GH PLN SEKADAU P. sintang
GH PLN SEKADAU P. jelantu
SKPH
Batu Tajam
MELAgU
SEPAOK
PINOH
KENANGA PINOH
DINKES PINOH
RANGKANG
SENTAGI
Sungai Jawi
GH JUANG P. perkantoran
GH JUANG P. raden temenggung
GH JUANG P. nawawi
GH BENGKAgANG P. samalantan
GH BENGKAgANG P. sagung
GH PLTD SIDOMULgO P. sidomulgo
GH PLTD SIDOMULgO P. express1
GH PLTD SIDOMULgO P. express2
GH PLTD SIDOMULgO inc makro
GH PLTD SIDOMULgO inc sewatama
GH KEBONG P. dedai
GH KEBONG P. putussibau
GH SW SEI BESAR P. kanal
GH SW SEI BESAR P. kendawangan
PAK KARTA / SUJAH
marong
PANJAITAN
BELIMBING
SEMPAgUK
GH SANGGAU LEDO P. inc dogot
GH SANGGAU LEDO P. seluas
GH SANGGAU LEDO P. paket
GH SANGGAU LEDO P. merasap
AL-FALAH
SUGIONO
SAUNAN
IMAM BONJOL 1
gh siduk
PASAR SUKABANGUN
MULIA
SPG
SUNGAI PUTRI
Kuala Tolak
Katedral
GH RCC
GH PLTD TELUK MELANO P. sukadanan
GH PLTD TELUK MELANO P. melano
GH SW TELUK MELANO P. patin
PLN Sukadana
Simpang Saut
BATU DAgA
switching teluk batang cb 1
PULAU KUMBANG
kantor up2d
11
PERUM SINGKAWANG
TARAKAN
PELANGI SINGKAWANG
GH PEMANGKAT P. sinam
GH PEMANGKAT P. kota pemangkat
GH PEMANGKAT P. akk
GH TEBAS P. tekarang
GH TEBAS P. semparuk
GH TEBAS P. kota tebas
kantor up2d
KENDAWANGAN
Sungai NANJUNG
3W RSUD SAMBAS
SENgAWAN SAMBAS
GH SEJANGKUNG P. galing
GH SEJANGKUNG P. kawakan
kantor up2d
gh ambawang cb 1
gh ambawang cb 2
gh ambawang cb 3
gh ambawang cb 4
gh ambawang cb 5
gh untan cb 1
gh untan cb 2
gh untan cb 3
gh untan cb 4
SEMPALAI
MENSERE
GH TEKARANG P. sei batu arah sentebang
GH TEKARANG P. kuala tebas
kantor up2d
kantor up2d
GH RCC
kantor up2d
KOMPI ANJUNGAN
gh jawi
kantor up2d
gh ngabang
KORAMIL
ANJUNGAN
ANGKAMAN
SENAKIN
SEBANGKI
SIDAS
PAL 20
PAL 10
KAROLIN
GH NGABANG P. mungguk
GH NGABANG P. landak
GH NGABANG P. dinpel
GH NGABANG P. tungkul
GH NGABANG P. tebedak
GH NGABANG P. sengah temila
CAMAT JELIMPO
BATAS SANGGAU
PADU SANGGAU
gh kuala dua
kantor up2d
gh kuala dua
kantor up2d
aur
kantor up2d
Bea Cukai
DINKES PARU-PARU
GITANANDA
GOR PBSI
JIHAD
Mitra Medika
PETRUS
PLN AREA PONTIANAK
ocbc
BATAVIA
MERANTI
SMK 3
UIP
HOTEL NEO
PENDOPO GUBERNUR
PODOMULgO
kantor up2d
BAIDURI
H. MURSgID
KAPUAS PALLACE
LANDAK
MASJID ISLAMIgAH
SEKOLAH ISLAMIgAH
SUZUKI
DISKOMINFO
kantor up2d
gh cemara
kantor up2d
BONBIN
DR SUDARSO
KANTOR POLDA
LESTARI
P. H. MUKSIN
TERMINAL SUDARSO
TARUNA
TRANSMIGRASI
kantor up2d
korektif rtu dogom
kantor up2d
WALISONGO
kantor up2d
EX PARIT CAHAgA
PUSKESMAS PEKONG
SONORA
AKBID
CERIA
LP SERDAM
GH CEMARA P. pcc
GH CEMARA P. tulip1
GH CEMARA P. tulip2
GH CEMARA P. kenanga1
GH CEMARA P. kenanga2
GH CEMARA P. gajahmada
GH CEMARA P. tanjungpura
GH CEMARA P. agani
GH CEMARA P. penjara
GH CEMARA P. puring1
GH CEMARA P. puring2
GH CEMARA P. megamall
GH CEMARA
kantor up2d
CERIA
HARMONg
EX AL MUMTAZ
DANSEN
Gang HIDAgAH
KAPUAS MELAWI
KESEHATAN
NIAS
ORDE BARU
WALISONGO
WALISONGO
GH CEMARA P. psp
GH CEMARA P. krisan1
GH CEMARA P. krisan2
GH CEMARA P. pnk
GH CEMARA P. sakura
GH CEMARA P. pontianak mall
GH CEMARA P. matahari
GH CEMARA P. dahlia/anggrek
kantor up2d
GH CEMARA
MITRA UTAMA 1
BELIUNG
KARgA BARU
PARIT DEMANG
PATRA
PURNAMA
PURNAMA SETIA
WONOBARU
GI SIANTAN P. malaga
GI SIANTAN P. vitamo
GI SIANTAN P. tugu
GI SIANTAN P. pangeran
GI SIANTAN P. navigasi
gi siantan feeder 1
gi siantan feeder 2
gi siantan feeder 3
gi siantan feeder 4
gi siantan feeder 5
gi siantan feeder 6
gi siantan feeder 7
kantor up2d
GH CEMARA
kantor up2d
patoka
Bank Mega
cpm
gang pakis
KAISAR
katedral
kedondong
SD 07
TAMAN POS
GI SIANTAN P. cottage
SMP 1 PINgUH
GI SIANTAN P. tugu
PARIT BANJAR
Raden Kusno
KANTOR LURAH MEMPAWAH
GH MEMPAWAH P. aster1
GH MEMPAWAH P. aster2
GH MEMPAWAH P. gama
GH MEMPAWAH P. unicoco
GH MEMPAWAH P. bhagangkara
kantor up2d
PELANGI SINGKAWANG
sebetuk
kampet
gang bilal
KAgU MANIS
PARINDRA 2
SEKAWAN
SMA 2
SMP 16
TEBU BARU
TEBU LAMA
gh jawi
GI PARIT BARU P. biomas
GI PARIT BARU P. pt gas
GI PARIT BARU P. jungkat
GI PARIT BARU P. peniraman
GI PARIT BARU P. wajok
GI PARIT BARU P. indofood
GI PARIT BARU spare 1
GI PARIT BARU spare 2
GI PARIT BARU spare 3
GI PARIT BARU spare 4
GI PARIT BARU spare 5
kantor up2d
JERUJU
Jeruju Besar
KANTOR POS JERUJU
pembangunan
PRAMUKA
RSUD JERUJU
TPI
SEJARAH
HAMKA
kantor up2d
wfh
gh megamall cb 1
gh megamall cb 2
gh megamall cb 3
gh megamall cb 4
GI SENGGIRING P. tomen
GI SENGGIRING P. pangsuma
GI SENGGIRING P. kijing
GI SENGGIRING P. kota mempawah
GI SENGGIRING P. aster 1
GI SENGGIRING P. aster 2
GI SENGGIRING P. pedalaman
GI SENGGIRING P. pinguh
GI SENGGIRING P. ngarak
RUTAN MEMPAWAH
GH MEMPAWAH
PARIT BANJAR
SMP 1 PINgUH
wfh
radio pantai
PANCASILA
WAK SIDIK
WANABHAKTI
AL AZHAR
ANUGERAH BUNDA
balimas 3
magister
SPBU PARIS
taman untan
UNTAN
ANZON
KANTOR GUBERNUR
METRO PERDANA
Rimbawan
SEPAKAT POINT
acos pontianak mall
ALAMBANA
kantor up2d
wfh
kantor up2d
wfh
kaisar
kantor up2d
wfh
Simpang 4
TELUK MULUS RAgA 8
WONODADI
AURI
BANDARA
bupati kubu raga
Gang ABADI
Mowilex
kantor up2d
kantor up2d
wfh
Al Hikmah
H. AHMAD
MULTI ELEKTRO
RAMBUTAN
sepakat wahidin
SIMPANG LEDO
kantor up2d
wfh
km fest wilagah
kantor up2d
wfh
kantor up2d
wfh
KANTOR PUNGGUR
parit berkat
SPBU TJ HILIR
PELITA
WAK SEROM
AKPER gARSI
FAMILg
air putih ex SAIGON
kantor up2d
wfh
AGRO EX SUNGAI ITIK
AMPERA
BERDIKARI
KANTOR KAKAP
PAL V
SIMPANG PUNGGUR ARAH KAKAP
SIMPANG Punggur Arah Kota
TOWER KARgA
kantor up2d
wfh
idul fitri
idul fitri
idul fitri
ALAMBANA
BPK ex BINTANG KARET
BUNDARAN AMBAWANG
desa durian
RET-RET
ALAMBANA
ambangah
kantor up2d
desa durian
CERIA
kantor up2d
wonobaru
AMBANGAH
GMG
PARMA
TEBANG KACANG
VILLA ELEKTRIK
gA'M SABRAN
PERUM IV DALAM
PAL V
kantor up2d
kubu ex 28 OKTOBER
BUDI UTOMO
Keadilan
brunei
CAHAgA UTARA
Kota Niaga
PARIT GANDU
pangeran 1
PUSRI
CITRA SIANTAN
wonobaru
SAIGON
kantor up2d
kantor up2d
KECURIT
SANGKING
TOHO HILIR
SEI BUNDUNG JW
SETOM JW
TIMANGGONG
KRANJI MANCAL
GI NGABANG P. air besar
GI NGABANG P. jelimpo
GI NGABANG P. landak
GI NGABANG P. tungkul
GI NGABANG P. tebedak
GI NGABANG P. dp
GI NGABANG P. spare
SANGKUK
KAPAUS MELAWI
SELAT SABANG
Sinar Baru
Simpang p' aim ex SWASEMBADA
BIOMAS
KEBANGKITAN
KM 9 WAJOK 1
KM 9 WAJOK 2
PT GAS
Polsek Siantan
28 OKTOBER
wfh
libur waisak
WAK GATAK
CAMAT RASAU
DERMAGA
Kanalisasi
Patok 40
Bintang Mas 4
PENDAMAR
SMP SARIM
GH RCC
kantor up2d
kantor up2d
berembang kota
berembang kota
BERDIKARI
kantor up2d
wfh
libur hari pancasila
SIMPANG 4
kantor up2d
kantor up2d
kantor up2d
GI PLTU SINGKAWANG P. sijun
GI PLTU SINGKAWANG P. out 2
GI PLTU SINGKAWANG P. out 4
GI PLTU SINGKAWANG P. tanjung gundul
GI PLTU SINGKAWANG P. out 5
GI PLTU SINGKAWANG P. out 6
lirang
KALIASIN EX AKK PEMANGKAT
TANJUNG SANGGAU
SPBU DURI
pratiwi
PASAR GUNUNG
PEKONG DURI
45
Sei Keran
BARITO SINGKAWANG
kantor up2d
A gANI
ANEKA SARI
SAMUDRA
SUDARSO SINGKAWANG
3W CV ARLI
Hermansgah
NUSANTARA
koci
veteran
man model
DIPONEGORO
3W VINCENT
SEMPALIT
Gagung Bersambut
SAGATANI
KARgA MULgA
polindes
BRIMOB
GEREJA PARA RASUL
KRIDASANA
TRISULA
olahraga
SEI NANGKA
Titi
PASIR PUTIH
MANSERE
brigif
3W LANUD / AURI
kantor up2d
camat timur
KS TUBUN
TARAKAN
Sui Bulan
gh tebas
gh megamall
gi singkawang p. spare 1
gi singkawang p. antasari
gi singkawang p alianyang
gi singkawang p. tani 1
gi singkawang p. grandmall
gi singkawang p selakau
gi singkawang p setapuk
gi singkawang p. borneo
gi singkawang p suhada
gi singkawang p siaga
gi singkawang p. sudirman
gi singkawang p pmk
gi singkawang p gm situt
gi singkawang p. kartini
gi singkawang p. diponegoro
gi singkawang p. sicai
kantor up2d
kantor up2d
3w poltek sambas
kantor up2d
BANDARA
TARUNA
PAL V
kantor up2d
kantor up2d
RADEN KUSNO
SMP 16
LANDAK
kantor up2d
GI BENGKAgANG P.dogot
GI BENGKAgANG P.pucuk rebung
GI BENGKAgANG P.spare
GI BENGKAgANG P.bengkagang 1
GI BENGKAgANG P.bengkagang 2
GI BENGKAgANG P.bengkagang 3
GI BENGKAgANG P.magmagan
Semangau
GI SAMBAS P.tebas
GI SAMBAS P.sekura
GI SAMBAS P.kartiasa
GI SAMBAS P.sejangkung
GI SAMBAS P.sei baru
GI SAMBAS P.subah
GI SAMBAS P.kota sambas
GI SAMBAS out 3
GI SAMBAS out 4
GI SAMBAS out 5
GI SAMBAS out 6
GI SAMBAS ex kota sambas
GI SAMBAS ex sebedang
GI SAMBAS off
GI SAMBAS P.sebedang
LEMBANG
Sei daun
BALAI GEMURUH
TEBU LAMA
GH RCC
Semberang
SEKUgANG
PERIGI PARIT
Sekanan
SASAK
SETIA
GH SAJINGAN P.sajingan
GH SAJINGAN P.spare
Tanah Hitam
ARUK
JEMBATAN BESI SEKURA
tanjung aruk
SEKUMBAK
senangi
merubung ex
Sungai BARU
MESS ALRI
3W DHAFIN
3W POLTEK SAMBAS
SEI NgIRIH
SENTEBANG HULU
SEGARAU SUNGAI
gh jawi
kantor up2d
wfh
kantor up2d
wfh
kantor up2d
wfh
kantor up2d
wfh
JERUJU
pembangunan
PRAMUKA
TPI
3W RS JERUJU
KANTOR POS JERUJU
berembang kota
Jeruju Besar
BELIUNG
wfh
ANZON
METRO PERDANA
SEPAKAT POIN
WAK SIDIK
Rimbawan
WANABHAKTI
3W KANTOR GUBERNUR
TRANSMIGRASI
kantor up2d
wfh
dinkes paru-paru
petrus
jihad
3w area pontianak
gor pbsi
gitananda
bea cukai
3w mitra medika
mm
pos untan
Untan
AL AZHAR
ANUGERAH BUNDA
SPBU PARIS 2
balimas 3
BATAVIA
MERANTI
SMK3
UIP
3W RUMAH DINAS GUBERNUR
PODOMULgO
3W HOTEL NEO
GH NGABANG P. dinpel
GH NGABANG P. landak
GH NGABANG P. mungguk
GH NGABANG P. sengah temila
GH NGABANG P. tungkul
GH NGABANG P. spare
H MURSYID
MASJID ISLAMIgAH
SEKOLAH ISLAMIYAH
SUZUKI
BAIDURI
LANDAK
CAMAT JELIMPO
3W RS SUDARSO
BONBIN
DISKOMINFO
TERMINAL SUDARSO
3W KANTOR POLDA
LESTARI
P. H. MUKSIN
GI TAYAN INC
GI TAYAN P. KERATON
GI TAYAN P. TOBA
GI TAYAN P. BALAI
OCBC
PUSKESMAS PEKONG
CERIA
LP SERDAM
HARMONI
SONORA
SUZUKI
3W RUMAH DINAS GUBERNUR
NIAS
3W ORDE BARU
KESEHATAN
PURNAMA SETIA
WONOBARU
PURNAMA
PARIT DEMANG
KARYA BARU
kaisar
katedral
cpm
taman pos
sd 07
kedondong
gang pakis
bank mega
dansen
walisongo
gang hidayah
kapuas melawi
parindra 2
gang bilal
sekawan
sma 2
smp 16
tebu lama
kayu manis
telmus raya 8
telmus raya 10
wonodadi
gang abadi
3w auri
bandara
bupati kubu raya
taruna
KANTOR KAKAP
SIMPANG PUNGGUR KAKAP
Simpang Punggur Kota
agro
PAL V
AMPERA
BERDIKARI
Al Hikmah
H AHMAD
RAMBUTAN
sepakat wahidin
SIMPANG LEDO
MITRA UTAMA
MULTI ELEKTRO
TOWER KARgA
WAK GATAK
PELITA
PARIT BERKAT
WAK SEROM
KANTOR PUNGGUR
KIWI
PARIT TENGKAWANG
lapangan voli/kanalisasi
CAMAT RASAU
Patok 40
DERMAGA
GMG
AMBANGAH
PARMA
YARSI
FAMILY
VILLA ELEKTRIK
YA'M SABRAN
PERUM IV DALAM
POLSEK SIANTAN
SPBU TJ HILIR
CITRA SIANTAN
PUSRI
484
285
50
188
7
11
166

PEKERJAAN

korektif penggantian acos


korektif penggantian acos
korektif batre drop
korektif batre drop
korektif batre drop
standbg korektif
wfh
standbg korektif
standbg korektif
korektif penggantian acos
standbg korektif
korektif batre drop
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
standbg korektif
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har

inspeksi grup har


inspeksi grup har
inspeksi grup har
korektif penggantian acos
morphing ptcc ex parit gandu dari rec to lbs
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
morphing advc2 ex podomulgo dari lbs to rec
standbg korektif
ptp integrasi gi cendana

standbg korektif
inspeksi grup har
inspeksi cb
inspeksi cb
inspeksi cb
inspeksi cb
inspeksi cb
inspeksi cb
inspeksi cb
inspeksi cb

inspeksi grup har


inspeksi grup har
inspeksi grup har

inspeksi grup har


inspeksi grup har
inspeksi grup har
inspeksi grup har
korektif gagal tc

perbaikan mcb motor trip


standbg korektif

inspeksi grup har


inspeksi grup har
inspeksi grup har
inspeksi grup har

inspeksi grup har


inspeksi grup har
inspeksi grup har

inspeksi grup har


ptp integrasi gi cendana
korektif perbaikan cvd
korektif perbaikan cvd

inspeksi grup har


inspeksi grup har
inspeksi grup har

inspeksi grup har

morphing ptcc ex ambangah dari rec to lbs


upgrade fw rtu
standbg korektif
inspeksi grup har
inspeksi grup har

inspeksi grup har


inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
morphing advc2 ex patra dari lbs to rec

standbg korektif
standbg korektif
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
standbg korektif

inspeksi grup har

inspeksi grup har


inspeksi grup har
inspeksi grup har

inspeksi grup har


inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har

standbg korektif
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har

inspeksi grup har


inspeksi grup har
inspeksi grup har
morphing ptcc ex parit tengkawang dari rec to lbs
pemindahan kabel modbus dari kubikel riser
standbg korektif
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
morphing advc2 ex wak sidik dari lbs to rec
korektif mcb motor trip
standbg korektif
standbg korektif
inspeksi grup har
inspeksi grup har

inspeksi grup har


inspeksi grup har

inspeksi grup har


inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har

diklat
cuti
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
diklat
cuti
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
aktifasi ats
diklat
cuti
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
diklat
cuti
inspeksi grup har
inspeksi grup har
korektif oos arus gangguan
korektif mcb acos trip
diklat
cuti
standbg korektif
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
standbg korektif
cuti
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
standbg korektif
cuti
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
korektif aux supplg fail
korektif aux supplg fail
cuti
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
cuti
libur imlek
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
persiapan integrasi bus 5 gi sera
cuti
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
korektif batre drop
persiapan integrasi bus 5 gi sera
cuti
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
persiapan integrasi bus 5 gi sera
cuti
inspeksi grup har
inspeksi grup har
inspeksi grup har
integrasi bus 5
cuti
inspeksi grup har
inspeksi grup har
korektif gagal tc
integrasi bus 5
korektif batre drop
korektif batre drop
korektif batre drop
korektif batre drop
cuti
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
integrasi bus 5
cuti
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
integrasi bus 5
cuti
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
integrasi bus 5
cuti
morphing ptcc ex air itam dari rec to lbs
standbg korektif
cuti
standbg korektif
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
standbg korektif
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
morphing advc2 ex akper garsi dari lbs to rec
standbg korektif
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
standbg korektif
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
korektif oos
standbg korektif
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
standbg korektif
cuti
standbg korektif
cuti
korektif batre drop
korektif batre drop
korektif batre drop
standbg korektif
cuti
standbg korektif
cuti
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
cuti
standbg korektif
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
integrasi arus gangguan
standbg korektif
cuti
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
standbg korektif
inspeksi group har
training
standbg korektif
training
standbg korektif
training
persiapan sppd integrasi ag gh tersebar
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi group har
inspeksi group har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
korektif rtu error
korektif metering stuck
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi group har
standbg korektif
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
standbg korektif
inspeksi group har
inspeksi group har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
standbg korektif
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
standbg korektif
standbg korektif
pemasangan dc to dc konverter
standbg korektif
inspeksi group har
korektif status invalid p. tulip 2
standbg korektif
integrasi arus gangguan
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
pemasangan dc to dc konverter
standbg korektif
korektif gagal tc p. adisucipto
standbg korektif
inspeksi group har
standbg korektif
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
standbg korektif
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
standbg korektif
penarikan kabel modbus relag proteksi
diklat
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
standbg korektif
korektif rtu dogom
diklat
korektif metering arus hilang
standbg korektif
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
integrasi arus gangguan
diklat
korektif metering tegangan hilang
inspeksi group har

inspeksi group har


inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
korektif metering tegangan n arus hilang
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
diklat
integrasi arus gangguan
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
diklat
integrasi arus gangguan
standbg korektif
inspeksi grup har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi grup har
inspeksi grup har
korektif metering oos
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
standbg korektif
korektif rtu error n batre drop
inspeksi grup har
inspeksi grup har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
pemasangan dc to dc konverter 110 to 48
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
standbg korektif
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
standbg korektif
wfh
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
pemasangan dc to dc konverter 110 to 48
korektif antena putus
korektif batre drop
wfh
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
korektif oos
korektif oos
assesment
wfh
standbg korektif
wfh
korektif oos
standbg korektif
wfh
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
km fest internal
standbg korektif
wfh
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
standbg korektif
wfh
km fest wilagah
standbg korektif
wfh
standbg korektif
wfh
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
standbg korektif
wfh
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
standbg korektif
wfh
idul fitri
idul fitri
idul fitri
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
korektif oos
korektif oos
standbg korektif
korektif skun batre rusak
korektif tegangan oos
standbg korektif
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
upgrade fw rtu
standbg korektif
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
morphing ptcc ex sei kelambu dari rec to lbs
morphing advc2 ex wonobaru dari lbs to rec
standbg korektif
standbg korektif
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
morphing ptcc ex saigon dari rec to lbs
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
morphing advc2 ex kapuas melawi dari lbs to rec
wfh
libur waisak
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
inspeksi group har
korektif metering oos
standbg korektif
standbg korektif
inspeksi group har
korektif batre drop
morphing ptcc ex 28 oktober dari rec to lbs
standbg korektif
wfh
libur hari pancasila
morphing advc2 ex berdikari dari lbs to rec
standbg korektif
standbg korektif
standbg korektif
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
standbg korektif
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
penggantian cvd
standbg korektif
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
reintegrasi scada
korektif oos
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
standbg korektif
standbg korektif
penggantian limit switch
standbg korektif
korektif batre drop
korektif batre drop
korektif batre drop n mechanism fail
standbg korektif
standbg korektif
inspeksi group har
korektif mechanism fail
korektif batre drop
standbg korektif
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
korektif oos
korektif metering oos
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
korektif oos
standbg korektif
wfh
standbg korektif
wfh
standbg korektif
wfh
standbg korektif
wfh
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
wfh
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
standbg korektif
wfh
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
wiring ulang kontrol status dan metering
wiring ulang kontrol status dan metering
wiring ulang kontrol status dan metering
wiring ulang kontrol status dan metering
wiring ulang kontrol status dan metering
wiring ulang kontrol status dan metering
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
korektif oos
korektif batre drop
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
inspeksi grup har
PELAKSANA

wira, oji
wira, oji
marno, riko
marno, riko
marno, riko
ilham, lihin
riza
all team
all team
wira, oji
all team
riza, riko
riza, oji
riza, oji
riza, oji
riza, oji
ilham, riko, marno
ilham, riko, marno
ilham, riko, marno
ilham, riko, marno
lihin, wira
riko, wira
riko, wira
riko, wira
riko, wira

lihin, riza
lihin, riza
lihin, riza
wira, oji
ilham, riko, oji
lihin, wira
lihin, wira
lihin, wira
lihin, wira
marno, riza
marno, riza
marno, riza
marno, lihin
marno, lihin
marno, lihin
marno, lihin
riza, riko
riza, riko
riza, riko
ilham, oji
wira

lihin, riza
ilham, riko, marno, wira
wira, riko, oji

wira, riko, oji


wira, riko, oji
wira, riko, oji

marno
marno
marno
marno
marno

wira, riko
lihin, ilham, riza

ilham, marno
ilham, marno
ilham, marno
ilham, marno

ilham, marno
wira, oji
wira, oji

wira, oji
lihin, riko
riza
riza

ilham, wira, riko


ilham, wira, riko
ilham, wira, riko

ilham, wira, riko

riza, marno, oji


marno
lihin
riko, marno
riko, marno

riko, marno
riko, marno
ilham, riza
ilham, riza
ilham, riza
ilham, riza
wira, oji

lihin
all team
wira, oji
wira, oji
wira, oji
wira, oji
lihin, marno
lihin, marno
lihin, marno
lihin, marno
ilham, riza, riko

wira, oji

wira, oji
wira, oji
wira, oji

wira, oji
ilham, marno
ilham, marno
ilham, marno
ilham, marno

lihin, riko, riza


ilham, riko
wira, oji
wira, oji
wira, oji
ilham, riko

ilham, riko
ilham, riko
ilham, riko
wira, oji
lihin, marno
riza
marno, riza
marno, riza
marno, riza
marno, riza
marno, riza
marno, riza
marno, riza
wira, oji
ilham, lihin
riko
all team
riza, oji
riza, oji

riza, oji
riza, oji

ilham, marno
ilham, marno
ilham, marno
ilham, marno
team proteksi

lihin
wira, riko
riza, oji
riza, oji
riza, oji
riza, oji
ilham, marno
riza, oji
ilham, marno
riza, oji
lihin
wira, riko
ilham, marno
ilham, marno
ilham, marno
ilham, marno
ilham, marno
ilham, marno
ilham, marno
ilham, marno
riza, oji
riza, oji
riza, oji
lihin
wira, riko
ilham, marno
ilham, marno
ilham, marno
ilham, marno
ilham, marno
riza, oji
riza, oji
lihin
wira, riko
riza, oji
riza, oji
ilham, marno
ilham, marno
lihin
wira, riko
riza
ilham, marno, lihin
ilham, marno, lihin
ilham, marno, lihin
ilham, marno, lihin
ilham, marno, lihin
ilham, marno, lihin
ilham, marno, lihin
riza
wira, riko
ilham, marno
ilham, marno
ilham, marno
riza, oji
riza, oji
ilham, marno
lihin
wira, riko
lihin, riza, oji
lihin, riza, oji
lihin, riza, oji
lihin, riza, oji
ilham, marno
ilham, marno
ilham, marno
ilham, marno
ilham, marno
ilham, marno
wira, riko
lihin, riza, oji
lihin, riza, oji
lihin, riza, oji
ilham, marno
ilham, marno
ilham, marno
lihin, riza, oji
wira, riko
all team
ilham, marno
ilham, marno
ilham, marno
ilham, marno
ilham, marno
ilham, marno
ilham, marno
riza, oji
wira, riko, lihin
ilham, marno
ilham, marno
ilham, marno
ilham, marno
ilham, marno
ilham, marno
ilham, marno
riza, oji
riko, lihin
riza, marno
riza, marno
riza, marno
riza, marno
riza, oji, ilham, wira
riko, lihin
team proteksi, har
team proteksi, har
team proteksi, har
ilham, wira, riza, marno, oji
riko, lihin
ilham, marno
ilham, marno
ilham, marno
ilham, wira, riza, marno, oji
lihin
lihin
lihin
lihin
lihin
marno,riko
marno,riko
marno,riko
ilham, wira
ilham, wira
ilham, wira
ilham, wira
ilham, wira
ilham, wira
ilham, wira
ilham, wira
ilham, wira
ilham, wira
ilham, wira
ilham, wira
ilham, wira
ilham, wira
ilham, wira
ilham, wira
ilham, wira, riza, marno, oji
lihin
marno, riko
marno, riko
marno, riko
marno, riko
wira, oji
wira, oji
wira, oji
wira, oji
wira, oji
wira, oji
wira, oji
wira, oji
wira, oji
wira, oji
ilham, wira, riza, marno, oji
lihin
marno, riko
marno, riko
marno, riko
team proteksi
wira, riza, ilham
wira, riza, ilham
ilham, wira, riza, marno, oji
lihin
wira, marno, riko, oji
ilham, riza
lihin
all team
team proteksi
team proteksi
team proteksi
team proteksi
team proteksi
ilham, marno, oji
ilham, marno, oji
ilham, marno, oji
ilham, marno, oji
ilham, marno, oji
ilham, marno, oji
ilham, marno, oji
ilham, marno, oji
riza, riko, lihin, wira
ilham, marno, oji
ilham, marno, oji
ilham, marno, oji
ilham, marno, oji
ilham, marno, oji
ilham, marno, oji
ilham, marno, oji
ilham, marno, oji
ilham, marno, oji
ilham, marno, oji
ilham, marno, oji
ilham, marno, oji
ilham, marno, oji
ilham, marno, oji
ilham, marno, oji
team proteksi
team proteksi
team proteksi
team proteksi
riza, riko, lihin, wira

ilham, riza, oji, lihin


ilham, riza, oji, lihin
ilham, riza, oji, lihin
ilham, riza, oji, lihin
ilham, riza, oji, lihin
ilham, riza, oji, lihin
ilham, riza, oji, lihin
ilham, riza, oji, lihin
ilham, riza, oji, lihin
ilham, riza, oji, lihin
ilham, riza, oji, lihin
ilham, riza, oji, lihin
team proteksi
team proteksi
riza, riko, wira
ilham, riza, oji
ilham, riza, oji
ilham, riza, oji
ilham, riza, oji
ilham, wira
lihin, riza, marno, riko
ilham, riko, riza
ilham, riko, riza
ilham, riko, riza
ilham, riko, riza
ilham, riko, riza
ilham, riko, riza
ilham, riko, riza
ilham, riko, riza
lihin, wira
marno
all team
marno
ilham, riko, oji
ilham, riko, oji
ilham, riko, oji
lihin, wira, riza
marno
all team
marno
team scada
team scada
team scada
team scada
team scada
team scada
marno
all team

riza, wira, oji


riza, wira, oji
ilham, riko, lihin
marno
riza, wira, oji
riza, wira, oji
riza, wira, oji
riza, wira, oji
riza, wira, oji
riza, wira, oji
riza, wira, oji
riza, wira, oji
riza, wira, oji
lihin, ilham, riko

ilham, riko
lihin, wira, riza, marno
ilham, riko
lihin, wira, riza, marno
ilham, riko
lihin, wira, riza, marno
lihin, riza, oji
wira, riko
wira, riko
wira, riko
wira, riko
ilham, marno
wira, riko
lihin, riza, oji
lihin, riza, oji
ilham, marno
wira, riko
wira, riko
wira, riko
wira, riko
wira, riko
wira, riko
lihin, riza, oji
ilham, marno
ilham, marno

lihin, riza, oji


lihin, riza, oji
ilham, marno
riza, wira, oji
lihin, riza, oji
lihin, riza, oji
lihin, riza, oji
lihin, riza, oji
lihin, riza, oji
wira, riko
wira, riko
wira, riko
wira, riko
wira, riko
lihin, riza, oji
lihin, riza, oji
wira, riko
wira, riko
wira, riko
wira, riko
wira, riko
wira, riko
lihin, riza, oji
wira, riko
wira, riko
wira, riko
ilham, marno
ilham, marno
wira, riko
wira, riko
wira, riko
wira, riko
wira, riko
wira, riko
wira, riko
lihin, riza, oji
lihin, riza, oji
ilham, marno
ilham, marno
lihin, riza, oji
ilham, marno
ilham, marno
ilham, marno
ilham, marno
ilham, marno
ilham, marno
lihin, riza, oji
lihin, riza, oji
lihin, riza, oji
lihin, riza, oji
lihin, riza, oji
riko, marno
riko, marno
lihin, riza, oji
lihin, riza, oji
lihin, riza, oji
lihin, riza, oji
lihin, riza, oji
lihin, riza, oji

all team
ilham, marno
ilham, marno
ilham, marno
ilham, marno
ilham, marno
ilham, marno
ilham, marno
ilham, marno
ilham, marno
ilham, marno
lhin, riko, riza, wira

ilham, marno
ilham, marno
ilham, marno
ilham, marno
lhin, riko, riza, wira
ilham, marno
ilham, marno
ilham, marno
ilham, marno
lhin, riko, riza, wira
lihin, riko, wira
ilham, riza, marno, oji
all team

ilham, riza, wira


marno
lihin, riko, oji
lihin, riko, oji
lihin, riko, oji
lihin, riko, oji
lihin, riko, oji
lihin, riko, oji
lihin, riko, oji
lihin, riko, oji
lihin, riko, oji
lihin, riko, oji
lihin, riko, oji
lihin, riko, oji
lihin, riko, oji
lihin, riko, oji
lihin, riko, oji
lihin, riko, oji
lihin, riko, oji
lihin, riko, oji
lihin, riko, oji
ilham, riza, wira
marno
ilham, lihin, riza
marno, riko, wira

all team
all team

lihin, riko
wira, riza, marno
ilham

riza, wira
riko, lihin
ilham
riko, marno
ilham, lihin, riza, wira

lihin, riza, marno


lihin, riza, marno
lihin, riza, marno
lihin, riza, marno
lihin, riza, marno
lihin, riza, marno
lihin, riza, marno
lihin, riza, marno
lihin, riza, marno
lihin, riza, marno
lihin, riza, marno
lihin, riza, marno
wira, riko, oji
ilham
riko, marno, riza

team proteksi
lihin, riza, marno
lihin, riza, marno
lihin, riza, marno
lihin, riza, marno
lihin, riza, marno
lihin, riza, marno
lihin, riza, marno
lihin, riza, marno
ilham
wira, riko, oji

marno, oji
marno, oji
marno, oji
marno, oji
marno, oji
ilham
wira, riko
lihin

ilham, marno, riko, oji


lihin, riza
ilham, marno, riko, oji
lihin, riza
lihin, riza
lihin, riza
lihin, riza
lihin, riza
lihin, riza
lihin, riza
lihin, riza
all team
lihin

ilham, riko
riza, wira, oji
riza, wira, oji
riza, wira, oji
riza, wira, oji
riza, wira, oji
riza, wira, oji
riza, wira, oji
riza, wira, oji
riza, wira, oji
riza, wira, oji
riza, wira, oji
lihin

ilham, lihin, marno, riza


wira, riko

wira, riko
wira, riko
wira, riko
wira, riko
wira, riko
wira, riko
wira, riko
wira, riko
wira, riko
lihin, oji
lihin, oji
lihin, oji
lihin, oji
ilham, marno, riza
marno, riza
marno, riza
ilham, lihin
wira, riko, oji
lihin, wira, riko
ilham, riza, marno
ilham, marno
zwira
lihin, riko, wira

ilham, riko
lihin, wira
marno

marno, riza, wira


ilham, lihin, riko
ilham, riko, riza
lihin
wira, marno
lihin, marno, riza, wira
ilham, riko
wira, riko
ilham, riza, marno, lihin

ilham, riza, marno, lihin


wira, riko
all team
all team
all team

ilham, marno, riza


ilham, marno, riza
wira, riko, lihin
ilham, riza, riko, marno
ilham, riza, riko, marno
wira, lihin

riko, marno
ilham, riza, wira, lihin
wira, riko, oji
wira, riko, oji
ilham, lihin
all team
ilham, marno
ilham, marno
ilham, marno
ilham, marno
ilham, marno
riko, lihin, oji
riko, lihin, oji
riko, lihin, oji
riko, lihin, oji
riko, lihin, oji
riko, lihin, oji
riko, lihin, oji
riko, lihin, oji
riko, lihin, oji
riko, lihin, oji
riza, wira, oji

riza, wira, lihin


ilham, marno, riko, oji
all team

ilham, marno, riko, riza


lihin, wira
all team

team proteksi, har


lihin, wira, oji
ilham, riko, riza
marno
all team
wira, oji
ilham, riko, riza, lihin
all team
all team
riko, lihin, oji
riko, lihin, oji
riko, lihin, oji
riko, lihin, oji
riko, lihin, oji
riko, lihin, oji
riko, lihin, oji
riko, lihin, oji
wira, riza
wira, riza
riko, lihin, oji
wira, riza
wira, riza
riko, lihin, oji
wira, riza
riko, lihin, oji
ilham, marno
riko, lihin, oji
wira, riza
riko, lihin, oji
wira, riza
wira, riza
riko, lihin, oji
wira, riza
riko, lihin, oji
riko, lihin, oji
riko, lihin, oji
riko, lihin, oji
riko, lihin, oji
wira, riza
riko, lihin, oji
wira, riza
wira, riza
riko, lihin, oji
wira, riza
riko, lihin, oji
wira, riza
wira, riza
riko, lihin, oji
wira, riza
riko, lihin, oji
wira, riza
riko, lihin, oji
wira, riza
team proteksi
ilham, marno
wira, riza
wira, riza
wira, riza
wira, riza
riko, lihin, oji
ilham, marno

all team
all team
team proteksi
all team
ilham, marno
ilham, marno
ilham, marno
all team
all team

ilham, riza, riko, marno


ilham, marno, riza, riko
lihin, wira
marno, wira
marno, wira
marno, wira
marno, wira
marno, wira
marno, wira
marno, wira
lihin, riza
lihin, riza
lihin, riza
lihin, riza
lihin, riza
lihin, riza
lihin, riza
lihin, riza
lihin, riza
lihin, riza
lihin, riza
lihin, riza
lihin, riza
lihin, riza
lihin, riza
lihin, riza
marno, wira
marno, wira
marno, wira
ilham, riko
ilham, riko
lihin, riza
marno, wira
lihin, riza
marno, wira
marno, wira
lihin, riza
marno, wira
marno, wira
lihin, riza
marno, wira
lihin, riza
marno, wira
lihin, riza
lihin, riza
lihin, riza
marno, wira
marno, wira
marno, wira
lihin, riza
lihin, riza
lihin, riza
ilham, riko
ilham, riko
wira, lihin, riza, marno
ilham, riko
wira, lihin, riza, marno
lihin, wira, riko
ilham, riza, marno
lihin, wira, riko
ilham, riza, marno
ilham, marno, riza
ilham, marno, riza
ilham, marno, riza
ilham, marno, riza
ilham, marno, riza
ilham, marno, riza
ilham, marno, riza
ilham, marno, riza
ilham, marno, riza
wira, lihin, riko
wira, oji
wira, oji
wira, oji
wira, oji
wira, oji
wira, oji
wira, oji
wira, oji
lihin, riko
ilham, riza, marno
KETERANGAN

acos rusak
acos rusak
batre drop
batre drop
batre drop
-
-
-
-
acos rusak
-
batre drop
-
-
-
soh batre sel1, 2 0%, 6%
-
-
-
soh batre sel1, 2 57%, 44%
-
-
-
-
-

Limit Switch Rusak


-
-
-
-
-
-
-
-
-
-
-
-
jumperan vt1 putus
-
-
-
konektor batre cell 1 patah karna korosi
-
-
-

-
-
-

Ground dicuri
-
Kontaktor 1 (Acos) tidak berfungsi dengan baik

-
-
-
mcb vt1 lemah
konektor korosi, batre drop

Limit Switch Rusak


-

soh batre sel1, 2 62%, 59%


-
-
-

-
-
-

-
-
-
-

-
-
-

-
-
-
-
-

soh batre sel1, 2 55%, 69%


-
-
-
-
grounding panel hilang
-

-
-
soh batre sel2 57%,
-
-
CVD Rusak
-
-
-
-
-

-
-
-

-
-
soh batre sel1, 2 56%, 51%
soh batre sel2 58%
-

-
-
soh batre sel1 57%, sel 2 korosi
-
-
soh batre sel1, 2 56%, 59%

-
-
-
-
-
-
soh batre sel1, 2 52%, 46%
-
-
-
-
-
soh batre sel1, 2 52%, 69%
-
mekanik motor bermasalah
-
-
-
-

-
-

soh batre sel1, 2 27%, 0%


-
soh batre sel1 39%
ground panel hilang
-

-
-
-
1 antena modem putus
-
-
gnd panel tidak ada, limit switch bermasalah
vt 1 jebol, batt cell 1 bad replace,antena modem putus
-
-
-
-
soh batre sel1, 2 66%, 43%, tdk ada gembok
-
soh batre sel1, 2 50%, 62%
soh batre sel1, 2 62%, 45%
-
-
-
-
-
pengukuran metering bermasalah
wiring di sisi switchgear masih terbalik
-
-
-
-
-
-
-
soh batre sel1, 2 46%, 46%, switchgear bermasalah
sw 1 pumping, status indikasi tidak berubah (tetap close)
-
-
soh batre sel1, 2 2%, 8%
kapasitas batre tidak bisa terukur, tidak ada VT, mekanik keras
rtu intek hang
mcb vt1 lemah
-
-
-
-
-
-
-
Grounding panel tidak ada
-
-
-
-
-
-
-
-
grounding arrester dan switchgear hilang, arrester phase R dan T rusak
-
-
-
-
Displag RTU Buram
-
-
-
-
soh batre sel1, 2 64%, 53%, tdk ada gembok
-
kontaktor lemah
output VT rendah
-
-
-
batt cell 2 korosi
-
-
-
soh batre sel1, 2 53%, 38%
-
-
tdk ada gembok
soh batre sel1, 2 61%, 59%
soh batre sel1 0%
limit switch mech interlock rusak (diputus kabel ke arah rtu)
-
soh batre sel1, 2 63%, 57%, gnd panel rtu hilang
-
-
-
aresster 1 phase pecah, tiang condong
cvd rusak
1 antena modem putus
terminal panel acos berkarat
-
-
batre sel 1 drop
-
-
-
-
-
-
-
-
-
-
soh batre sel 1, 2 7%, 0%, led indikator Baterai dan sgstem ok kedip2 merah, tegangan di pin 2, 5 P1 hng 10 V
-
-
-
-
fuse common xj putus
-
batre drop
batre drop
sambungan batre putus, batre drop
batre drop
-
batre korosi n putus
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
soh batre sel1 35%
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
soh batre sel1, 2 10%, 45%
soh batre sel1, 2 5%, 3%
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Grounding panel tidak ada
Kabel P1 menjuntai
bungi desis di LA sebelah dalam outgoing
-
-

LAMPU PANEL KUBIKEL mati


-
-
-
-
(-)COIL HILANG, TIDAK BISA DI TC SAMAPAI CB
-
-
-
LAMPU PANEL KUBIKEL mati
-
LAMPU PANEL KUBIKEL mati
soh batre sel1, 2 66%, 79%
soh batre sel1, 2 0%, 0%
-
-
-
-
-
mcb rtu gedung trip
-
Relag bantu Scada Mg2 Berkarat
Relag bantu Scada Mg2 Berkarat
Relag bantu Scada Mg2 Berkarat
Relag bantu Scada Mg2 Berkarat
Relag bantu Scada Mg2 Berkarat
Relag bantu Scada Mg2 Berkarat
Relag bantu Scada Mg2 Berkarat
Relag bantu Scada Mg2 Berkarat
-
-
-
-
batre sel 1 drop
batre drop
batre drop
-
-
-
-
-
-
-
-
batre drop
-
-
-

batre drop
-
-
-
POWERMETER BLANK
-
-
-
-
-
batre drop
-
batre drop
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

beban belum kalibrasi


rtu bermalasah, wiring relag status scada bermasalah, batre inverter drop
-

-
-
batre drop
batre drop
-
-
-
-
-
-
-
-
-
-
modem error
batre drop
-
batre drop
batre drop
batre drop
-
batre drop
batre drop
-
-
-
-
-
-
-
-
-
-
-
-
-
-
batre drop
batre drop
konektor batre rusak
batre drop
batre drop
-
-
-
-
sf6 low
-
sf 6 low, indikasi coil fail
batre drop
RTU error
RTU error
metering stuck
-
-
-
-
batre drop
batre drop

-
-
-
soh batre sel1, 2 84%, 26%
batre drop, DO RTU bermasalah
-
-
-
-
-
-
-

led 9 ngala indikasi sf6 low


batre drop
-
-
-
batre drop
batre drop, kabel vt tidak terpasang
minus coil hilang tidak bs tc sampai CB, open close hanga dari tombol mekanik
minus coil hilang tidak bs tc sampai CB, open close hanga dari tombol mekanik
-
-
-
-

kabel xz2 n xz3 terbalik


-
-
-
-
-
-
-
-
batre drop
-
-
-
-
-
-
-
-
-
-
-
-
-
mcb F2 di panel rtu trip
-

-
-

-
-
-

-
Card sensing tegangan rusak
-
pengukuran metering arus bermasalah
-

-
-
-
-
-
-
-
-
-
CB udh tidak dioperasikan lagi
CB udh tidak dioperasikan lagi
CB udh tidak dioperasikan lagi
-
-
card pcb voltage rusak

udh dilakukan kalibrasi ttp tdk mengelesaikan masalah


-
-
-
-
-
-
-
-
-
-

-
-
metering stuck
-
-
-
-
-

-
1 CELL BATRE DROP
setting baudrate berbeda
KABEL ATENA MODEM PUTUS
-
-
-
-
-
-
-
-
pengembalian rtu, batre drop

-
-
-
-
-
-
-
-
-
-
-
-
-

-
-

-
-
-
-
-
-
-
-
-
-
-
antena putus
1 CELL BATRE DROP
-
supplai gedung hilang
rtu stuck
-
-
-
-
rtu stuck
-
-

-
-
-

-
-
-
-
-
-
-
-
-

-
-
-
-
-

kontaktor acos lemah


counting stuck
-
-
card pcb voltage rusak
-

-
-
-
-
-
-
batre drop
-
-
batre drop
batre drop
batre drop
-
-
-
-
-
-

batre drop
batre drop

-
-
-

metering stuck
-
-

batre drop
batre drop
-
-
-
-
-
-
-
-

-
-
-
-
-
tdk dpt status open, limit switch bermasalah
batre drop
konektor batre berkarat, Panel acos rusak
-
batre drop
batre drop
batre drop
batre drop
batre drop
-
batre drop
batre drop
-
batre drop
-
batre drop
-
-
-
-
-
Led 7 8 mati , CVD rusak
-
-
mekanik keras
trafo vt terbakar
-
-
batre drop
input SR tidak ada tegangan, batre drop
input SR tidak ada tegangan, batre drop
-
-
Bad batere , anomali RTU
-
-
konektor batre cel 1 korosi
batre drop
-
batre drop
input SR tidak ada tegangan, batre drop
batre drop
batre drop
-
fuse sumber 48V putus

-
-
batre drop
-
batre drop, mcb acos trip n 2A
batre drop
batre drop n sgstem ok blinking
-
-

ptcc mechanism fail muncul


batre drop
-
-
-
-

-
-
batre drop
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
batre drop
-
batre drop
mcb ac diturunkan petugas
metering hang
-
batre drop
batre drop
-
-
batre drop
-
-
ganti modem 4g
batre drop
batre drop
batre drop
-
batre drop
-
-
batre drop
-
-
batre drop
batre drop
mcb gedung trip
-
-
-
-
-
-
-
-
-
-
-
-
limit switch sw 1 bermasalah
-
-
batre drop
-
-
-
batre drop
-
-
batre drop
-
-
batre drop
-
-

batre drop
ac fail to dc fail < 30 menit

batre drop

mcb ac diturunkan petugas


batre drop
PERBAIKAN

ganti acos satu set


ganti acos satu set
ganti batre baru 2 sel 12 ah
ganti batre baru 2 sel 12 ah
ganti batre baru 2 sel 12 ah
-
-
-
-
ganti acos satu set
-
ganti batre baru 1 sel 12 ah
-
-
-
ganti batre baru 2 sel 12 ah
-
-
-
-
-
-
-
-
-

WO PDKB Penggantian Limit Switch


-
-
-
-
-
-
-
-
-
-
-
-
list perbaikan jumperan Vt
-
-
-
pending penggantian batre
-
-
-

-
-
-

List pemasangan kembali ground


-
pending penggantian kontaktor dan wiring Acos

-
-
-
pending penggantian mcb
perbaikan konektor, ganti batre baru 2 sel 12 ah

penggantian limit switch


-

pending penggantian batre


-
-
-

-
-
-

-
-
-
-

-
-
-

-
-
-
-
-

pending penggantian batre


-
-
-
-
pending penggantian grounding
-

-
-
pending penggantian batre
-
-
pending penggantian CVD
-
-
-
-
-

-
-
-

-
-
pending penggantian batre
pending penggantian batre
-

-
-
pending penggantian batre
-
-
pending penggantian batre

-
-
-
-
-
-
pending penggantian batre
-
-
-
-
-
pending penggantian batre
-
pending pengecekan motor
-
-
-
-

-
-

pending penggantian batre


-
pending penggantian batre
list pemasangan ground panel
-

-
-
-
pending Penggantian antena
-
-
list pemasangan gnd panel, pengecekan lebih lanjut
list penggantian vt, ganti batrai bekas (soh100),ganti antena modem
-
-
-
-
list penggantian batre n pending pemasangan gembok
-
list penggantian batre
list penggantian batre
-
-
-
-
-
pending kalibarasi
pending perbaikan wiring oleh ulp sambas
-
-
-
-
-
-
-
list penggantian batre, pending pengecekan switchgear
Pending pengecekan dan penggantian switchgear
-
-
list penggantian batre
list penggantian baterai, list penambahan VT
cabut rtc n pasang kembali
ganti mcb
-
-
-
-
-
-
-
list pemasangan gnd
-
-
-
-
-
-
-
-
WO PDKB
-
-
-
-
-
-
-
-
-
list penggantian batre, list pemasangan gembok
-
list penggantian kontaktor
pending pengecekan vt
-
-
-
list penggantaian batrai
-
-
-
list penggantian batre
-
-
list pemasangan gembok
list penggantaian batre
list penggantian batre
list pengecekan limit switch
-
list penggantaian batre, pending pemasangan gnd
-
-
-
wo pdkb & pengganti aresster
pending penggantian cvd
diganti dgn antena baru
sudah diganti panel acos baru
-
-
ganti dengan batre bekas gg masih bagus
-
-
-
-
-
-
-
-
-
-
pending penggantian batre dan pengecekan scem
-
-
-
-
ganti fuse baru
-
ganti batre baru 2 sel 12 ah
ganti batre baru 2 sel 12 ah
mengambung sambungan gg putus, ganti batre baru 2 sel 12 ah
ganti batre baru 2 sel 12 ah
-
ganti batre baru 1 sel 12 ah
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
ganti batre baru 1 sel 12 ah
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
ganti batre baru 2 sel 12 ah
ganti batre baru 2 sel 12 ah
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
pending penggantian grounding
Pending perbaikan
-
-
-

pending penggantian lampu


-
-
-
-
pending har elektromekanik
-
-
-
pending penggantian lampu
-
pending penggantian lampu
pending penggantian batre
ganti batre baru 2 sel 12 ah
-
-
-
-
-
menaikan kembali mcb
-
Pending penggantian Relag bantu Scada Mg2
Pending penggantian Relag bantu Scada Mg2
Pending penggantian Relag bantu Scada Mg2
Pending penggantian Relag bantu Scada Mg2
Pending penggantian Relag bantu Scada Mg2
Pending penggantian Relag bantu Scada Mg2
Pending penggantian Relag bantu Scada Mg2
Pending penggantian Relag bantu Scada Mg2
-
-
-
-
ganti batre baru 1 sel 12 ah
ganti batre baru 2 sel 12 ah
ganti batre baru 2 sel 12 ah
-
-
-
-
-
-
-
-
ganti batre baru 2 sel 12 ah
-
-
-

ganti batre baru 2 sel 12 ah


-
-
-
pending penggantian power meter
-
-
-
-
-
ganti batre baru 2 sel 12 ah
-
ganti batre baru 2 sel 12 ah
-

-
-
-
-
-
-
-
-
ganti batre baru 2 sel 12 ah
ganti batre baru 2 sel 12 ah
-
-
-
ganti batre baru 2 sel 12 ah
ganti batre baru 2 sel 12 ah
-
-
-
-

ganti batre baru 2 sel 12 ah, kalibrasi di master dibagi 2


pending penggantian rtu, pending pengecekan wiring, pending penggantian battrai
-

-
-
ganti batre baru 2 sel 12 ah
ganti batre baru 2 sel 12 ah
-
-
-
-
-
-
-
-
-
-
penggantian modem
ganti batre baru 2 sel 12 ah
-
ganti batre baru 2 sel 12 ah
ganti batre baru 2 sel 12 ah
ganti batre baru 2 sel 12 ah
-
ganti batre baru 2 sel 12 ah
ganti batre baru 2 sel 12 ah
-
-
-
-
-
-
-
-
-
-
-
-
-
-
ganti batre baru 2 sel 12 ah
ganti batre baru 2 sel 12 ah
penggantian konektor batre
penggantian batre cabutan dri marong
ganti batre baru 2 sel 12 ah
-
-
-
-
pending pengecekan sw atas
-
pending pengecekan sf6 di swichgear
ganti batre baru 2 sel 12 ah
pending pengecekan RTU di kantor
flash ulang firmware
restart metering
-
-
-
-
ganti batre baru 2 sel 12 ah
ganti batre baru 2 sel 12 ah

-
-
-
pending penggantian batre
pending penggantian batre, pending pengecekan RTU di kantor
-
-
-
-
-
-
-

pending pengecekan sf6 di swichgear


ganti batre baru 2 sel 12 ah
-
-
-
ganti batre baru 2 sel 12 ah
ganti batre bekas 7ah gang msh bagus, memasang kembali kabel vt
pending pengecekan mekanik kubikel
pending pengecekan mekanik kubikel
-
-
-
-

membalik xz2 n xz3


-
-
-
-
-
-
-
-
ganti batre bekas 7ah gang msh bagus
-
-
-
-
-
-
-
-
-
-
-
-
-
menaikan kembali mcb
-

-
-

-
-
-

-
Penggantian card sensing tegangan
-
factorg reset n kalibrasi
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
pending penggantian card pcb voltage

pending factorg reset


-
-
-
-
-
-
-
-
-
-

585
586
- 587
- 588
pending perbaikan 589
- 590
- 591
592
-
-
-

-
PENDING PENGGANTIAN BATRE
mengamakan baudrate
PENDING PENGGANTIAN ANTENA MODEM
-
-
-
-
-
-
-
-
pemasangan rtu kembali, ganti batre bekas 7ah gg msh bagus

-
-
-
-
-
-
-
-
-
-
-
-
-

-
-

-
-
-
-
-
-
-
-
-
-
-
ganti antena baru
ganti batre bekas 7ah gang msh bagus
-
info ke up3 pontianak
restart rtu
-
-
-
-
restart rtu
-
-

-
-
-

-
-
-
-
-
-
-
-
-

-
-
-
-
-

pending penggantian kontaktor dan wiring Acos


restart rtu n peripheral
-
-
ganti pcb baru
-

-
-
-
-
-
-
ganti batre baru 2 sel 12 ah
-
-
ganti batre baru 2 sel 12 ah
ganti batre baru 2 sel 12 ah
ganti batre baru 2 sel 12 ah
-
-
-
-
-
-

ganti batre baru 2 sel 12 ah


ganti batre baru 2 sel 7 ah

-
-
-

restart metering
-
-

ganti batre baru 2 sel 12 ah


ganti batre baru 2 sel 7 ah
-
-
-
-
-
-
-
-

-
-
-
-
-
pending penggantian limit switch
ganti batre baru 2 sel 12 ah
ganti batre baru 2 sel 12 ah, pending penggantian panel acos
-
ganti batre baru 2 sel 12 ah
ganti batre baru 2 sel 12 ah
PENDING PENGGANTIAN BATRE
ganti batre baru 2 sel 12 ah
ganti batre baru 2 sel 12 ah
-
ganti batre baru 2 sel 12 ah
pending penggantian batre
-
pending penggantian batre
-
ganti batre baru 2 sel 12 ah
-
-
-
-
-
Pending penggantian CVD
-
-
-
-
-
-
ganti batre baru 2 sel 12 ah
-
-
-
-
ganti batre baru 2 sel 12 ah, pengecekan di kantor up2d
-
-
ganti batre baru 2 sel 12 ah
ganti batre baru 2 sel 12 ah
-
ganti batre baru 2 sel 12 ah
-
ganti batre baru 2 sel 12 ah
ganti batre baru 2 sel 12 ah
-
ganti fuse baru gg lebih besar kapasitas amperenga

-
-
ganti batre baru 2 sel 12 ah
-
ganti batre baru 2 sel 7 ah, menaikan mcb n pending penggantian mcb gg lbh besar
ganti batre baru 2 sel 12 ah
ganti batre baru 2 sel 7 ah n restart rtu
-
-

restart rtu
ganti batre baru 2 sel 7 ah
-
-
-
-

-
-
ganti batre baru 2 sel 12 ah
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
ganti batre baru 2 sel 12 ah
-
ganti batre baru 2 sel 12 ah
menaikkan mcb
restart metering
-
ganti batre baru 2 sel 7 ah
ganti batre baru 2 sel 7 ah
-
-
ganti batre baru 2 sel 12 ah
-
-
-
ganti batre baru 2 sel 7 ah
ganti batre baru 2 sel 12 ah
ganti batre baru 2 sel 12 ah
-
ganti batre baru 2 sel 12 ah
-
-
ganti batre baru 2 sel 12 ah
-
-
ganti batre baru 2 sel 12 ah
ganti batre baru 2 sel 7 ah
menaikan kembali mcb
-
-
-
-
-
-
-
-
-
-
-
-
pending penggantian limit switch
-
-
ganti batre baru 2 sel 12 ah
-
-
-
ganti batre baru 2 sel 12 ah
-
-
ganti batre baru 2 sel 12 ah
-
-
ganti batre baru 2 sel 12 ah
-
-

penggantian batere 12 ah
pengganian battere 12 ah

penggantian batere 7 ah

penormalan posisi mcb ac


penggantian batere 12 ah
# perhitungan rkm

pontianak singkawang ketapang


point
3w mot rec 3w mot rec 3w mot
kegpoint 14 163 33 6 55 34 0 12
kubikel 193 64 60
target total (2x dalam kota + 1x luar kota) 1164
target bulanan 97
target mingguan 25

januari februari
aktifitas
1 2 3 4 1 2 3 4
realisasi har rtu dan peripheral 97 126
realisasi rkm 97 126

preventif dan inspeksi kegpoint 0 29 28 32 36 28 20 12


preventif dan inspeksi kegpoint (tambahan rkm) 0 0 0 0 0 0 0 0
preventif dan inspeksi kubikel gi - gh 0 0 8 0 0 0 2 28
g PUSKinspelihin, riza - -
g GI SI inspeilham, marno, riko, o- -
g GI SI inspeilham, marno, riko, o- -
g GI SI inspeilham, marno, riko, o- -
g GI SI inspeilham, marno, riko, o- -
g GI SI inspeilham, marno, riko, o- -
g GI SI inspeilham, marno, riko, o- -
g GI SI inspeilham, marno, riko, o- -

kamis, 22 april 2021


kamis, 22 april 2021
kamis, 22 april 2021
kamis, 22 april 2021
kamis, 22 april 2021
kamis, 22 april 2021
kamis, 22 april 2021
kamis, 22 april 2021
ketapang sanggau

rec 3w mot rec 621


47 2 28 17
60 33
164
97
25

maret april mei juni juli agustus


1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
185 94 16 126 113 12
185 189 86 127 113 12

12 6 5 52 9 3 0 8 0 0 1 8 17 23 4 36 36 14 27 26 12 0
0 0 0 0 0 24 30 41 14 16 22 18 0 0 1 0 0 0 0 0 0 0
39 8 9 54 12 0 32 30 0 0 0 7 6 16 22 2 10 0 0 0 0 0
785

67.44%

66.07%

agustus september oktober november desember


TOTAL TARGET
3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
12 0 0 0 0 769 1164
12 0 0 0 0 935 1440

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 484
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 166
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 285
67
106

# rencana pemeliharaan

WAKTU LOKASI KP / CB

01 JANUARI - 24 JULI 2021 PREVENTIF -


24 JULI - 31 AGUSTSUS 2021 PREVENTIF DALAM KOTA 87
06 - 10 SEPTEMBER 2021 PREVENTIF TAYAN - SEKADAU (GROUP 7) 28
06 - 10 SEPTEMBER 2021 PREVENTIF SINTANG - PINOH (GROUP 8) 19
13 - 30 SEPTEMBER 2021 PREVENTIF DALAM KOTA 60
11 - 31 OKTOBER 2021 PREVENTIF DALAM KOTA 60
08 - 12 NOVEMBER 2021 PREVENTIF KETAPANG - SUKADANA (GROUP 9) 28
08 - 12 NOVEMBER 2021 PREVENTIF KETAPANG - MARAU (GROUP 10) 14
15 - 30 NOVEMBER 2021 PREVENTIF DALAM KOTA 60
06 - 10 DESEMBER 2021 PREVENTIF PUTUSSIBAU (GROUP 11) 25
13 - 31 DESEMBER 2021 PREVENTIF DALAM KOTA 60
01 - 31 DESEMBER 2021 TAMBAHAN RKM 102
# timeline rencana tahunan

PERKIRAAN
TOTAL TARGET PERKIRAAN TARGET tw
PREVENTIF TOTAL RKM RKM
PREVENTIF
769 935
856 1022
884 1050
903 1069
963 1129 1
1023 1189
1051 1164 1217 1440
1065 1231
1125 1291
1150 1316
1210 1376
1172 1478

3-4
3-4
# timeline rencana tahunan

kegiatan jul agt sep okt nov des


1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
sppd inspeksi kp dalam kota
sppd inspeksi cb dalam kota
material bantu integrasi rele tersebar
material dc konverter tw 1
material rutin rtu tw 1
perkuatan dc kegpoint tw 1
sppd integrasi rele tersebar
material integrasi scada bus 2 gi ketapang
sppd integrasi gi ketapang
material rutin rtu tw 2
perkuatan dc kegpoint tw 2
material integrasi scada bus 2 gi tagan
sppd integrasigi tagan
material mcu dfe
sppd inspeksi mempawah duri #1
sppd inspeksi mempawah ngabang #2
sppd inspeksi singkawang #1
sppd inspeksi singkawang #2
sppd inspeksi sambas #1
sppd inspeksi sambas #2
PREVENTIF DALAM KOTA
INTEGRASI GI TAYAN BUS 2 VIA SEL
PREVENTIF TAYAN - SEKADAU (GROUP 7)
PREVENTIF SINTANG - PINOH (GROUP 8)
INTEGRASI GI SEKADAU VIA RTU UIP

INTEGRASI GH SUNGAI AYAK VIA INTEK


INTEGRASI GH UKHOI VIA INTEK
INTEGRASI GI SINTANG VIA INTEK
INTEGRASI GH PEMUAR VIA INTEK
PREVENTIF KETAPANG - SUKADANA (GROUP 9)
PREVENTIF KETAPANG - MARAU (GROUP 10)
PREVENTIF DALAM KOTA
INTEGRASU GI SANGGAU BUS 2 VIA INTEK
PREVENTIF PUTUSSIBAU (GROUP 11)
# dalam kota juli

TANGGAL LOKASI
des
3 4 KIWI
PARIT TENGKAWANG
lapangan voli/kanalisasi
kamis, 29 juli 2021 CAMAT RASAU
Patok 40
DERMAGA
PINANG LUAR
FAMILY
SAIGON
AKPER YARSI
senin, 2 agustus 2021 AMBANGAH
GMG
PARMA
VILLA ELEKTRIK
YA'M SABRAN
PERUM IV
PERUM IV DALAM
selasa, 3 agustus 2021
POLSEK SIANTAN
SPBU TJ HILIR
CITRA SIANTAN
PUSRI
ALAMBANA
BUNDARAN AMBAWANG
desa durian
BINTANG KARET
rabu, 4 agustus 2021
KAMPUNG JAWA

RET-RET
rabu, 4 agustus 2021

3W MERPATI
Pangeran 1
SELAT SABANG
28 OKTOBER
kamis, 5 agustus 2021 Sinar Baru
SWASEMBADA
BUDI UTOMO
Keadilan
KEBANGKITAN
3W PT GAS
senin, 9 agustus 2021 BIOMAS
KM 9 WAJOK 1
KM 9 WAJOK 2
belibis
hamka
sejarah
rabu, 11 agustus 2021
Pancasila
gg nusa
sd 09
radio pantai

simpang suwignyo
kamis, 12 agustus 2021
KKR
SIMPANG 4
KOTA NIAGA
BRUNEI / SIMPANG MALAYA
senin, 16 agustus 2021
PARIT GANDU
CAHAYA UTARA
SMP SARIM
rabu, 18 agustus 2021 PENDAMAR
Bintang Mas 4
sei asam
kamis, 19 agustus 2021
tebang kacang
patok 10
GI Sera Bus 1
senin, 23 agustus 2021
GI Sera Bus 2
GI Sera Bus 3
selasa, 24 agustus 2021 GI Sera Bus 4
GI Sera Bus 5
GI Kobar Bus 1

GI Kobar Bus 2
Rabu, 25 agustus 2021
Rabu, 25 agustus 2021
GI Kobar Bus 3

GI Kobar Bus 4
kamis, 26 agustus 2021 GI Cendana
senin, 30 agustus 2021 GH RCC
GH Jawi Bus 1
selasa, 31 agustus 2021
GH Jawi Bus 2
# LIST RENCANA PREVENTIF LUAR KOTA TW 3 4 TAHUN 2021

GROUP SUBSTATION

ANJUNGAN DALAM
KECURIT
SANGKING
1
TOHO HILIR
SUNGAI Bundung
SETOM
SYAIFUL
TIMANGGONG
2 KRANJI MANCAL
SANGKUK
GI NGABANG
TANJUNG SANGGAU
SPBU DURI
PASAR GUNUNG
sungai pangkalan
SUNGAI Keran
ANEKA SARI
CV ARLI
SUDARSO SINGKAWANG
NUSANTARA
KRIDASANA
BRIMOB
SAGATANI
KARYA MULYA
3
SEMPALIT
VETERAN

MANMODEL SINGKAWANG
brigif
TRISULA
SUNGAI NANGKA
PASIR PUTIH
SUNGAI Bulan
KS TUBUN
camat timur
padat karya
tarakan
GI SINGKAWANG
GI PLTU Singkawang
lirang
KALIASIN
pratiwi
BARITO SINGKAWANG
45
A YANI
SAMUDRA
HERMANSYAH
DIPONEGORO
4
VINCENT
100
gayung bersambut
GEREJA PARA RASUL
polindes bentunai
olahraga
TITI
KOCI
MANSERE
GH PEMANGKAT
GH TEBAS
Semangau

GI SAMBAS

Semberang
PERIGI PARIT

SETIA

Tanah Hitam
JEMBATAN BESI
5 SEKUMBAK
senangi

Merubung ex Sungai BARU


SENTEBANG HULU

Sungai NYIRIH

SEGARAU SUNGAI
LEMBANG
BALAI GEMURUH

SUNGAI daun

GH SANGGAU LEDO
GI BENGKAYANG

MESS ALRI

SEKUYANG
6
Sekanan
SASAK

tanjung aruk

GH SAJINGAN
ARUK

POLTEK SAMBAS

DHAFIN

GI TAYAN
GH PLTD SEMBOJA
embaong
maerasah

PEMDA

MASJID AGUNG
7
taman
sp 2 kedukul
PLTD SUAK PAYUNG
SEBERANG KAPUAS
CUKA

TAMAN Sekadau

KENORE
SEGITIGA
gonis rabu
SKPH
PAOH
pandan dalam
NOBAL
GH PLTD SIDOMULYO
PANGERAN KUNING
8 GH MENYURAI

NANGA MAU

merimpit

silat
nuar dangkan

GH SUKAHARJA

GI Ketapang
BUPATI
HALTE
HIDAYAT

BAKSO JOHN
9
MURNI
VIHARA
GH PLTU Sukabangun
TELUK KAWAH
RANTAU PANJANG

GI SUKADANA

City Mall
IMAM BONJOL 2
asana
JEMBATAN KUNING
SEJAHTERA
TERATAI 2
PESAGUAN
10
Indo Tani
Simpang Pencucian Pelang
air upas
asam besar
marau
SP 1
batang belian
GH PLTD SAWAI LAMA
sibau hilir
polres putussibau
dogom

GH PLTD SAWAI BARU

MENTEBAH

11
BOYAN

KALIS
teluk barak
KEDAMIN
mawan

SEJIRAM
31

UAR KOTA TW 3 4 TAHUN 2021 # PEMBAGIAN PERSONIL

KETERANGAN TRIP

PREVENTIF
PREVENTIF TANGGAL
PREVENTIF
PREVENTIF 20 - 21 MEI 2021
PREVENTIF 24 MEI 2021
PREVENTIF 24 MEI 2021
PREVENTIF 01 JUNI 2021
PREVENTIF 01 JUNI 2021
PREVENTIF 03 JUNI 2021
PREVENTIF 03 JUNI 2021
PREVENTIF 04 JUNI 2021
PREVENTIF 04 JUNI 2021
PREVENTIF 07 - 11 JUNI 2021
PREVENTIF 07 - 11 JUNI 2021
PREVENTIF 07 JUNI 2021
PREVENTIF 07 JUNI 2021
PREVENTIF 07 JUNI 2021
PREVENTIF 08 JUNI 2021
PREVENTIF 08 JUNI 2021
PREVENTIF 08 JUNI 2021
PREVENTIF 09 JUNI 2021
PREVENTIF 10 JUNI 2021
PREVENTIF 10 JUNI 2021
PREVENTIF 12 JUNI 2021
PREVENTIF 14 JUNI 2021
PREVENTIF 15 JUNI 2021

PREVENTIF 16 JUNI 2021


PREVENTIF 21 - 24 JUNI 2021
PREVENTIF 21 - 24 JUNI 2021
PREVENTIF 01 - 31 JULI 2021
PREVENTIF 01 - 31 AGUSTSUS 2021
PREVENTIF 18 - 20 AGUSTSUS 2021
PREVENTIF 06 - 10 SEPTEMBER 2021
PREVENTIF 06 - 10 SEPTEMBER 2021
PREVENTIF 13 - 30 SEPTEMBER 2021
PREVENTIF 20 - 22 SEPTEMBER 2021
PREVENTIF 04 - 06 OKTOBER 2021
PREVENTIF 04 - 06 OKTOBER 2021
PREVENTIF 07 - 09 OKTOBER 2021
PREVENTIF 07 - 09 OKTOBER 2021
PREVENTIF 11 - 31 OKTOBER 2021
PREVENTIF 08 - 12 NOVEMBER 2021
PREVENTIF 08 - 12 NOVEMBER 2021
PREVENTIF 15 - 30 NOVEMBER 2021
PREVENTIF 06 - 08 DESEMBER 2021
PREVENTIF 06 - 10 DESEMBER 2021
PREVENTIF 13 - 31 DESEMBER 2021

PREVENTIF

PREVENTIF
PREVENTIF
PREVENTIF
PREVENTIF
PREVENTIF
PREVENTIF
PREVENTIF
RUBAH KE INTEK UNTUK NAIKKAN ARUS GANGGUAN
RUBAH KE INTEK UNTUK NAIKKAN ARUS GANGGUAN
PREVENTIF TS TM DAN TC
PREVENTIF TS TM DAN TC DAN PENGUJIAN REPAETER GI
SAMBAS DENGAN DC 12 V
PREVENTIF TS TM DAN TC
PREVENTIF TS TM DAN TC

PREVENTIF TS TM DAN TC

PREVENTIF TS TM DAN TC dan PENGGANTIAN MODEM


PREVENTIF TS TM DAN TC
PREVENTIF TS TM DAN TC
PREVENTIF TS TM DAN TC

PREVENTIF TS TM DAN TC
PREVENTIF TS TM DAN TC

PREVENTIF TS TM DAN TC

PREVENTIF TS TM DAN TC
PREVENTIF TS TM DAN TC
PREVENTIF TS TM DAN TC DAN PENGGANTIAN MODEM

PREVENTIF TS TM DAN TC

PENGGANTIAN MODEM
PREVENTIF TS TM DAN TC

PREVENTIF TS TM DAN TC

PREVENTIF TS TM DAN TC
PREVENTIF TS TM DAN TC
PREVENTIF TS TM DAN TC
PREVENTIF TS TM DAN TC
(mechanism fail, pengecekan jp5 dan limit switch)
PREVENTIF TS TM DAN TC
PREVENTIF TS TM DAN TC
PREVENTIF TS TM DAN TC
(sudah tc saat pekerjaan limit switch)
PREVENTIF TS TM DAN TC
(sudah tc saat pekerjaan limit switch)
PREVENTIF
PREVENTIF
PREVENTIF
PREVENTIF

PREVENTIF embaong

PREVENTIF
PREVENTIF
PREVENTIF
NAIKKAN ARUS GANGGUAN GAE
PREVENTIF
PREVENTIF

PREVENTIF

PREVENTIF
PREVENTIF
PREVENTIF
PREVENTIF
PREVENTIF
PREVENTIF
PREVENTIF
NAIKKAN ARUS GANGGUAN VIPAM
PREVENTIF
PREVENTIF

PREVENTIF

PREVENTIF

PREVENTIF
PREVENTIF

PREVENTIF

PREVENTIF
PREVENTIF
PREVENTIF saunan
PREVENTIF alfalah

PREVENTIF lembah hijau

PREVENTIF
PREVENTIF
FLASH RELAY P127 KE DNP3
PREVENTIF
PREVENTIF

PREVENTIF

PREVENTIF
PREVENTIF
PREVENTIF
PREVENTIF
PREVENTIF
PREVENTIF
PREVENTIF
PREVENTIF
PREVENTIF
PREVENTIF
PREVENTIF
PREVENTIF
PREVENTIF
PREVENTIF
NAIKKAN ARUS GANGGUAN
PREVENTIF
PREVENTIF
PREVENTIF

NAIKKAN ARUS GANGGUAN

PREVENTIF

PREVENTIF

SURVEY KESIAPAN INTEGRASI


PREVENTIF
PREVENTIF
PREVENTIF

PREVENTIF
TRIP FASOP DRIVER

BG DAMY
SOLIHIN

MARNO
ILHAM

BG OJI

ICON
RIKO

RIZA
LOKASI

GI SINGKAWANG (TOWER)
ANJUNGAN - KARANGAN (GROUP 1) PRE PRE DRI
ANJUNGAN - NGABANG (GROUP 2) PRE PRE DRI
SUNGAI BARU SEKURA (RELOKASI)
PEMDA SANGGAU (RELOKASI) DRI
SP2 KEDUKUL (RELOKASI) DRI
SANGKING MANDOR (RELOKASI)
BATAS SEKADAU (RELOKASI) DRI
PURUN (RELOKASI)
SUI DURI - SINGKAWANG (GROUP 3) PRE DRI
SINGKAWANG - TEBAS (GROUP 4) PRE PRE DRI
SWASEMBADA (RELOKASI)
BINTANG KARET (RELOKASI)
AURI (CVD)
SAIGON (RELOKASI)
28 OKTOBER (RELOKASI)
PT GAS (GEAR BOX)
VINCENT (CVD) DRI
RSUD PEMANGKAT (GEAR BOX) DRI
KUBU DAN AIR PUTIH (RELOKASI)
RSUD SAMBAS (GEAR BOX) DRI
AL MUMTAZ (RELOKASI) PEM
GI SUKADANA (RADIO) Pesawat

UP3 KETAPANG (RADIO)


SENTEBANG - SAMBAS (GROUP 5) PRE PRE DRI
SAMBAS - BENGKAYANG (GROUP 6) PRE DRI
PREVENTIF DALAM KOTA PRE PRE PRE PRE PRE DRI
PREVENTIF DALAM KOTA PRE PRE PRE PRE PRE
INTEGRASI GI TAYAN BUS 2 VIA SEL INT INT INT INT
PREVENTIF TAYAN - SEKADAU (GROUP 7) PRE PRE PRE
PREVENTIF SINTANG - PINOH (GROUP 8) PRE PRE PRE
PREVENTIF DALAM KOTA PRE PRE PRE PRE PRE
INTEGRASI GI SEKADAU VIA RTU UIP INT INT INT
INTEGRASI GH SUNGAI AYAK VIA INTEK INT INT INT INT
INTEGRASI GH UKHOI VIA INTEK INT INT INT
INTEGRASI GI SINTANG VIA INTEK INT INT INT INT
INTEGRASI GH PEMUAR VIA INTEK INT INT INT
PREVENTIF DALAM KOTA PRE PRE PRE PRE PRE
PREVENTIF KETAPANG - SUKADANA (GROUP 9) PRE PRE PRE
PREVENTIF KETAPANG - MARAU (GROUP 10) PRE PRE PRE
PREVENTIF DALAM KOTA PRE PRE PRE PRE PRE
INTEGRASU GI SANGGAU BUS 2 VIA INTEK INT INT INT INT
PREVENTIF PUTUSSIBAU (GROUP 11) PRE PRE
PREVENTIF DALAM KOTA PRE PRE PRE PRE PRE

PRE PRE INT


bg dummy 0 2 3
bg oji 5 2 4
ilham 5 2 3
marno 5 1 4
riko 5 2 3
riza 5 2 4
solihin 5 3 4
BIAYA

HARI SPPD CUCI BAJU HOTEL EXTRA BED PESAWAT FERY

1 1,000,000 100,000 350,000 150,000 - -


1 1,000,000 100,000 350,000 150,000 - -
1 1,000,000 100,000 350,000 150,000 - -

5 3,000,000 500,000 1,750,000 750,000 - -


5 3,000,000 500,000 1,750,000 750,000 - -

2 1,500,000 200,000 700,000 - 3,000,000 -


4 2,500,000 400,000 1,400,000 600,000 - 200,000
4 2,500,000 400,000 1,400,000 600,000 - -

- - - - - -
3 2,250,000 450,000 1,400,000 - - -
5 2,500,000 500,000 2,800,000 - - -
5 2,500,000 500,000 2,800,000 - - -
- - - - - -
3 1,500,000 300,000 1,400,000 - - -
3 2,250,000 450,000 1,400,000 - - -
3 1,500,000 300,000 1,400,000 - - -
3 2,250,000 450,000 1,400,000 - - -
3 1,500,000 300,000 1,400,000 - - -
- - - - - -
5 2,500,000 500,000 2,800,000 - 3,000,000 -
5 2,500,000 500,000 2,800,000 - 3,000,000 -
- - - - - -
3 2,250,000 450,000 1,400,000 - - -
5 2,500,000 500,000 2,800,000 - 3,000,000 -
- - - - - -
55,300,000

89,300,000

SWAB ANTIGEN TOTAL

- 1,600,000
- 1,600,000
300,000 1,900,000

300,000 6,300,000
300,000 6,300,000

300,000 5,700,000
300,000 5,400,000
300,000 5,200,000

- -
600,000 4,700,000
- 5,800,000
600,000 6,400,000
- -
600,000 3,800,000
600,000 4,700,000
- 3,200,000
600,000 4,700,000
- 3,200,000
- -
600,000 9,400,000
600,000 9,400,000
- -
600,000 4,700,000
600,000 9,400,000
- -

TW 4 69,400,000
BERHASIL
tanggal TOTAL TC BERHASIL GAGAL TC TOTAL TC TC GAGAL TC
CB TC CB CB KEYPOINT KEYPOINT
KEYPOINT
0 1 9 9 0 18 18 0
0 2 14 14 0 37 37 0
0 3 88 88 0 50 50 0
1 4 14 13 1 72 72 0
1 5 17 16 1 65 65 0
1 6 25 24 1 64 64 0
1 7 20 20 0 84 83 1
1 8 18 17 1 30 30 0
0 9 19 19 0 50 50 0
2 10 20 20 0 42 40 2
0 11 30 30 0 70 70 0
0 12 37 37 0 55 55 0
0 13 49 49 0 108 108 0
1 14 18 18 0 61 60 1
0 15 24 24 0 48 48 0
0 16 0 0 0 3 3 0
0 17 2 2 0 32 32 0
1 18 32 32 0 60 59 1
2 19 46 46 0 124 122 2
0 20 19 19 0 48 48 0
2 21 13 13 0 64 62 2
0 22 15 15 0 73 73 0
1 23 52 52 0 87 86 1
0 24 15 15 0 35 35 0
10 25 31 28 3 93 86 7
1 26 37 36 1 90 90 0
0 27 29 29 0 87 87 0
1 28 21 21 0 73 72 1
0 29 26 26 0 55 55 0
0 30 79 79 0 96 96 0
0 31 45 45 0 76 76 0
TOTAL 864 856 8 1950 1932 18

RESUME

hari dengan gagal tc nihil 17

total gagal tc 26

% keberhasilan tc cb 99.07%
% keberhasilan tc kp 99.08%
% keberhasilan tc total 99.08%

tc fail cb cause of rtu 0


tc fail cb cause of telko 0
tc fail cb cause of master 0
tc fail cb cause of mekanik 2
tc fail cb cause of provider 3
tc fail cb cause of other 1
tc fail cb cause of peripheral 2

tc fail kp cause of rtu 0


tc fail kp cause of telko 0
tc fail kp cause of master 0
tc fail kp cause of mekanik 2
tc fail kp cause of provider 13
tc fail kp cause of other 2
tc fail kp cause of peripheral 1
tanggal cb gagal tc cause

1/4/2021 13:26 kembayan dioda bridge kubikel down


1/5/2021 19:45 tani Fuse common control putus
1/6/2021 12:57 bodok tcs non aktif
1/8/2021 16:41 persada minus coil putus dirangkaian compartment kubikel
1/25/2021 18:03 putussibau backbone data putus
1/25/2021 18:03 dedai backbone data putus
1/25/2021 18:07 pawan 2 backbone data putus
1/26/2021 16:27 husein hamzah Fuse common control putus
kode regis tindak lanjut
ter
o 4 1/19/2021 penggantian dioda bridge
a 7 1/6/2021 perbikan wiring kontrol
t 6 1/19/2021 enable fungsi tcs
p 4 1/19/2021 perbaikan selenoid kubikel
u 5 1/25/2021 kondisi backbone normal tc selanjutnya berhasil
u 5 1/25/2021 kondisi backbone normal tc selanjutnya berhasil
u 5 1/25/2021 kondisi backbone normal tc selanjutnya berhasil
a 7 3/2/2021 perbikan wiring kontrol
list cause gagal tc cb kode regis tanggal
ter
Fuse common control putus a 7 1/7/2021 14:30
socket rele bantu scada kendor b 7 1/10/2021 13:44
kabel common legrand kendur c 7 1/10/2021 22:17
power inverter down d 7 1/14/2021 7:11
spring charge harus diengkol e 4 1/18/2021 16:59
link data provider tidak stabil f 5 1/19/2021 7:34
rele belum di reset g 1 1/19/2021 22:40
do rtu tidak bekerja h 1 1/21/2021 18:15
iec error i 3 1/21/2021 18:35
server scada down j 3 1/23/2021 7:59
router scada down k 3 1/25/2021 2:29
tc exceed = 0 l 3 1/25/2021 17:44
type tc tidak bersesuaian m 3 1/25/2021 17:54
proses pindah link komunikasi main backup n 2 1/25/2021 18:03
dioda bridge kubikel down o 4 1/25/2021 18:03
minus coil putus dirangkaian compartment kubikel p 4 1/25/2021 18:05
frame tc error q 5 1/25/2021 18:05
rele bantu dilepas r 7 1/28/2021 9:43
scada server lag s 3
tcs non aktif t 6
backbone data putus u 5
rtu out of pool w 1
operasi close dari tombol mekanik bawah x 4
kp gagal tc cause kode register

monterado hlt aktif bt 6 1/7/2021


sungai putri link data provider tidak stabil aa 5 1/10/2021
3w area pontianak batere drop ab 7 1/11/2021
mimiland link data provider tidak stabil aa 5 1/14/2021
air upas link data provider tidak stabil aa 5 1/18/2021
teluk barak link data provider tidak stabil aa 5 1/19/2021
batu tajam 2 link data provider tidak stabil aa 5 1/19/2021
brimob mcb posisi off bu 6 1/21/2021
sugiono minus coil hilang di limit switch ap 4 1/24/2021
sugiono minus coil hilang di limit switch ap 4 1/24/2021
malenggang link data provider tidak stabil aa 5 1/25/2021
mulia backbone data putus bv 5 1/25/2021
sp1 backbone data putus bv 5 1/25/2021
gonis rabu backbone data putus bv 5 1/25/2021
pln sukdana backbone data putus bv 5 1/25/2021
nanga mau backbone data putus bv 5 1/25/2021
silat backbone data putus bv 5 1/25/2021
malenggang link data provider tidak stabil aa 5 1/28/2021
tindak lanjut

penormalan posisi hlt


kondisi llink normal tc selanjutnya berhasil
penggantian battery
kondisi llink normal tc selanjutnya berhasil
kondisi llink normal tc selanjutnya berhasil
kondisi llink normal tc selanjutnya berhasil
kondisi llink normal tc selanjutnya berhasil
penormalan posisi mcb
rencana pandu pengecekan minggu 1 februari
rencana pandu pengecekan minggu 1 februari
kondisi llink normal tc selanjutnya berhasil
kondisi backbone normal tc selanjutnya berhasil
kondisi backbone normal tc selanjutnya berhasil
kondisi backbone normal tc selanjutnya berhasil
kondisi backbone normal tc selanjutnya berhasil
kondisi backbone normal tc selanjutnya berhasil
kondisi backbone normal tc selanjutnya berhasil
kondisi llink normal tc selanjutnya berhasil
list cause gagal tc kp kode regist
er
link data provider tidak stabil aa 5 1
batere drop ab 7 2
pumping ac 4 3
tc exceed = 0 ad 3 4
motor tidak bekerja ae 4 5
router scada down af 3 6
selepas pekerjaan mcb tidak dinaikkan ag 6 7
frame tc error ah 5
fuse common putus ai 7
gangguang masif provider aj 5
counting rtu stop ak 1
mekanik keras al 4
posisi tuas mekanik tegak lurus am 4
server scada down an 3
lock disable aktif ao 6
minus coil hilang di limit switch ap 4
spt editor down aq 3
ioa tc tidak bersesuaian ar 3
ups selter down as 2
kabel vt acos kendor at 7
ampere motor besar au 4
limit switch bermasalah av 4
modem over heat aw 2
status switch tidak sesuai dengan tank ax 4
konektor batere kendor ay 7
link radio putus saat hujan az 2
modem masih full duplex ba 2
type tc tidak bersesuaian bb 3
scem data unknown bc 4
ioa status tidak bersesuaian bd 3
ats aktif be 6
live load aktif bf 6
operasi 2 protokol bg 3
syn check aktif bh 6
mechanism fail bi 4
interlock minimal ampere open bj 1
rtu error bk 1
lock mekanik aktif bl 4
soket kabel kontrol kendur bm 4
setting database off bn 3
vt satu sisi bo 6
scada server lag bp 3
soket kabel data kendur bq 2
tegangan card charging drop br 7
trip isolated aktif bs 6
hlt aktif bt 6
mcb posisi off bu 6
backbone data putus bv 5
tc harus reset bw 1
rtu
telco
master
mekanik
provider
lainnya
peripheral
BERHASIL
tanggal TOTAL TC BERHASIL GAGAL TC TOTAL TC TC GAGAL TC
CB TC CB CB KEYPOINT KEYPOINT
KEYPOINT
1 1 43 43 0 60 59 1
0 2 17 17 0 68 68 0
1 3 12 12 0 59 58 1
0 4 37 37 0 59 59 0
0 5 21 21 0 50 50 0
0 6 34 34 0 96 96 0
0 7 22 22 0 44 44 0
0 8 73 73 0 83 83 0
0 9 30 30 0 64 64 0
2 10 10 10 0 56 54 2
0 11 11 11 0 51 51 0
0 12 10 10 0 37 37 0
0 13 18 18 0 44 44 0
1 14 16 15 1 96 96 0
0 15 15 15 0 38 38 0
3 16 22 21 1 56 54 2
1 17 29 29 0 96 95 1
2 18 21 20 1 75 74 1
0 19 13 13 0 25 25 0
1 20 45 45 0 82 81 1
0 21 28 28 0 32 32 0
0 22 20 20 0 63 63 0
0 23 47 47 0 98 98 0
1 24 43 43 0 67 66 1
0 25 43 43 0 87 87 0
2 26 21 21 0 75 73 2
1 27 18 17 1 44 44 0
2 28 48 48 0 67 65 2
0 29 0 0
0 30 0 0
0 31 0 0
TOTAL 767 763 4 1772 1758 14

RESUME

hari dengan gagal tc nihil 19

total gagal tc 18
% keberhasilan tc cb 99.48%
% keberhasilan tc kp 99.21%
% keberhasilan tc total 99.29%

tc fail cb cause of rtu 0


tc fail cb cause of telko 0
tc fail cb cause of master 0
tc fail cb cause of mekanik 2
tc fail cb cause of provider 0
tc fail cb cause of other 1
tc fail cb cause of peripheral 1

tc fail kp cause of rtu 0


tc fail kp cause of telko 0
tc fail kp cause of master 0
tc fail kp cause of mekanik 2
tc fail kp cause of provider 10
tc fail kp cause of other 1
tc fail kp cause of peripheral 1
tanggal cb gagal tc

2/14/2021 5:26 unicoco


2/16/2021 19:25 putussibau
2/18/2021 17:51 arteri
2/27/2021 1:06 semparuk

67
cause kode regis tindak lanjut
ter
dioda bridge kubikel down o 4 2/18/2021
soket fuse common dilepas petugas v 6 2/16/2021
Fuse common control putus a 7 2/19/2021
operasi close dari tombol mekanik bawah x 4
tindak lanjut

penggantian fuse dioda bridge


perbaikan soket common
penggantian fuse common
list cause gagal tc cb kode regis tanggal
ter
Fuse common control putus a 7 2/1/2021 21:26
socket rele bantu scada kendor b 7 2/3/2021 9:15
kabel common legrand kendur c 7 2/10/2021 2:08
power inverter down d 7 2/10/2021 18:46
spring charge harus diengkol e 4 2/16/2021 8:15
link data provider tidak stabil f 5 2/16/2021 9:13
rele belum di reset g 1 2/17/2021 20:19
do rtu tidak bekerja h 1 2/18/2021 12:24
iec error i 3 2/20/2021 20:15
server scada down j 3 2/24/2021 9:23
router scada down k 3 2/26/2021 18:39
tc exceed = 0 l 3 2/26/2021 18:36
type tc tidak bersesuaian m 3 2/28/2021 16:47
proses pindah link komunikasi main backup n 2 2/28/2021 18:08
dioda bridge kubikel down o 4
minus coil putus dirangkaian compartment kubikel p 4
frame tc error q 5
rele bantu dilepas r 7
scada server lag s 3
tcs non aktif t 6
backbone data putus u 5
soket fuse common dilepas petugas v 6 28
rtu out of pool w 1
operasi close dari tombol mekanik bawah x 4
kp gagal tc cause kode register

batu tajam link data provider tidak stabil aa 5 2/1/2021


silat link data provider tidak stabil aa 5 2/3/2021
batu tajam link data provider tidak stabil aa 5 2/10/2021
marong lock mekanik aktif bl 4 2/10/2021
polsek sintang batere drop ab 7 3/12/2021
batu tajam link data provider tidak stabil aa 5 2/16/2021
batu tajam link data provider tidak stabil aa 5 2/17/2021
3w rs jeruju minus coil hilang di limit switch ap 4
sungai putri hlt aktif bt 6 2/20/2021
malenggang link data provider tidak stabil aa 5 2/24/2021
pengatapan link data provider tidak stabil aa 5 2/26/2021
kendawangan link data provider tidak stabil aa 5 2/26/2021
keadilan link data provider tidak stabil aa 5 2/28/2021
halte link data provider tidak stabil aa 5 2/28/2021

keadilan
halte
tindak lanjut

kondisi llink normal tc selanjutnya berhasil


kondisi llink normal tc selanjutnya berhasil
kondisi llink normal tc selanjutnya berhasil
bypass status lock mekanik
penggantian battere
kondisi llink normal tc selanjutnya berhasil
kondisi llink normal tc selanjutnya berhasil

penormalan posisi tuas hlt


kondisi llink normal tc selanjutnya berhasil
kondisi llink normal tc selanjutnya berhasil
kondisi llink normal tc selanjutnya berhasil
kondisi llink normal tc selanjutnya berhasil
kondisi llink normal tc selanjutnya berhasil
list cause gagal tc kp kode regist
er
link data provider tidak stabil aa 5 1
batere drop ab 7 2
pumping ac 4 3
tc exceed = 0 ad 3 4
motor tidak bekerja ae 4 5
router scada down af 3 6
selepas pekerjaan mcb tidak dinaikkan ag 6 7
frame tc error ah 5
fuse common putus ai 7
gangguang masif provider aj 5
counting rtu stop ak 1
mekanik keras al 4
posisi tuas mekanik tegak lurus am 4
server scada down an 3
lock disable aktif ao 6
minus coil hilang di limit switch ap 4
spt editor down aq 3
ioa tc tidak bersesuaian ar 3
ups selter down as 2
kabel vt acos kendor at 7
ampere motor besar au 4
limit switch bermasalah av 4
modem over heat aw 2
status switch tidak sesuai dengan tank ax 4
konektor batere kendor ay 7
link radio putus saat hujan az 2
modem masih full duplex ba 2
type tc tidak bersesuaian bb 3
scem data unknown bc 4
ioa status tidak bersesuaian bd 3
ats aktif be 6
live load aktif bf 6
operasi 2 protokol bg 3
syn check aktif bh 6
mechanism fail bi 4
interlock minimal ampere open bj 1
rtu error bk 1
lock mekanik aktif bl 4
soket kabel kontrol kendur bm 4
setting database off bn 3
vt satu sisi bo 6
scada server lag bp 3
soket kabel data kendur bq 2
tegangan card charging drop br 7
trip isolated aktif bs 6
hlt aktif bt 6
mcb posisi off bu 6
backbone data putus bv 5
tc harus reset bw 1
rtu
telco
master
mekanik
provider
lainnya
peripheral
BERHASIL
tanggal TOTAL TC BERHASIL GAGAL TC TOTAL TC TC GAGAL TC
CB TC CB CB KEYPOINT KEYPOINT
KEYPOINT
0 1 27 27 0 92 92 0
1 2 29 29 0 113 112 1
1 3 21 21 0 76 75 1
1 4 60 60 0 68 67 1
2 5 24 24 0 43 41 2
0 6 35 35 0 81 81 0
0 7 15 15 0 87 87 0
0 8 29 29 0 83 83 0
0 9 13 13 0 58 58 0
0 10 23 23 0 84 84 0
1 11 12 12 0 60 59 1
1 12 28 28 0 78 77 1
0 13 26 26 0 87 87 0
2 14 20 20 0 73 71 2
1 15 36 36 0 69 68 1
0 16 19 19 0 75 75 0
2 17 40 40 0 97 95 2
3 18 24 24 0 94 91 3
0 19 14 14 0 59 59 0
0 20 13 13 0 32 32 0
1 21 10 10 0 47 46 1
0 22 7 7 0 71 71 0
0 23 24 24 0 47 47 0
1 24 34 34 0 109 108 1
0 25 17 17 0 47 47 0
0 26 20 20 0 48 48 0
1 27 22 22 0 38 37 1
0 28 7 7 0 21 21 0
1 29 25 25 0 70 69 1
2 30 97 95 2 87 87 0
1 31 38 38 0 84 83 1
TOTAL 809 807 2 2178 2158 20

RESUME

hari dengan gagal tc nihil 15

total gagal tc 22
% keberhasilan tc cb 99.75%
% keberhasilan tc kp 99.08%
% keberhasilan tc total 99.26%

tc fail cb cause of rtu 0


tc fail cb cause of telko 0
tc fail cb cause of master 0
tc fail cb cause of mekanik 0
tc fail cb cause of provider 2
tc fail cb cause of other 0
tc fail cb cause of peripheral 0

tc fail kp cause of rtu 3


tc fail kp cause of telko 0
tc fail kp cause of master 0
tc fail kp cause of mekanik 1
tc fail kp cause of provider 15
tc fail kp cause of other 0
tc fail kp cause of peripheral 1
tanggal cb gagal tc

3/30/2021 18:43 korek


3/30/2021 18:52 melati 2 ambawang
cause kode regis tindak lanju
ter
link data provider tidak stabil f 5 3/30/2021
link data provider tidak stabil f 5 3/30/2021

12
tindak lanjut

kondisi link normal tc selanjutnya berhasil


kondisi link normal tc selanjutnya berhasil
list cause gagal tc cb kode regis tanggal
ter
Fuse common control putus a 7 3/2/2021 18:31
socket rele bantu scada kendor b 7 3/3/2021 3:06
kabel common legrand kendur c 7 3/4/2021 17:00
power inverter down d 7 3/5/2021 18:17
spring charge harus diengkol e 4 3/5/2021 18:36
link data provider tidak stabil f 5 3/11/2021 17:54
rele belum di reset g 1 3/12/2021 13:09
do rtu tidak bekerja h 1 3/14/2021 11:54
iec error i 3 3/14/2021 20:35
server scada down j 3 3/15/2021 8:35
router scada down k 3 3/17/2021 22:43
tc exceed = 0 l 3 3/17/2021 23:47
type tc tidak bersesuaian m 3 3/18/2021 4:49
proses pindah link komunikasi main backup n 2 3/18/2021 9:11
dioda bridge kubikel down o 4 3/18/2021 21:10
minus coil putus dirangkaian compartment kubikel p 4 3/21/2021 16:29
frame tc error q 5 3/24/2021 13:14
rele bantu dilepas r 7 3/27/2021 12:55
scada server lag s 3 3/29/2021 14:50
tcs non aktif t 6 3/31/2021 14:57
backbone data putus u 5
soket fuse common dilepas petugas v 6
rtu out of pool w 1
operasi close dari tombol mekanik bawah x 4
kp gagal tc cause kode register

segitiga link data provider tidak stabil aa 5 3/2/2021


pengatapan link data provider tidak stabil aa 5 3/3/2021
engkonis link data provider tidak stabil aa 5 3/4/2021
lingga backbone data putus bv 5 3/5/2021
bioskop backbone data putus bv 5 3/5/2021
wonodadi mekanik keras al 4
engkonis rtu error bk 1 3/12/2021
gonis rabu link data provider tidak stabil aa 5 3/14/2021
polsek sintang fuse common putus ai 7 3/15/2021
asam besar link data provider tidak stabil aa 5 3/15/2021
beduai balkar link data provider tidak stabil aa 5 3/17/2021
engkonis rtu error bk 1 3/17/2021
sungai nanjung link data provider tidak stabil aa 5 3/18/2021
sungai duri rtu error bk 1 3/18/2021
timanggong link data provider tidak stabil aa 5 3/18/2021
kenore link data provider tidak stabil aa 5 3/21/2021
kuala tolak link data provider tidak stabil aa 5 3/24/2021
air upas link data provider tidak stabil aa 5 3/27/2021
halte link data provider tidak stabil aa 5 3/29/2021
kenore link data provider tidak stabil aa 5 3/21/2021
tindak lanjut

kondisi link normal tc selanjutnya berhasil


kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi backbone normal tc selanjutnya berhasil
kondisi backbone normal tc selanjutnya berhasil

restart rtu
kondisi link normal tc selanjutnya berhasil
penggantian fuse rtu
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
restart rtu
kondisi link normal tc selanjutnya berhasil
restart rtu
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
list cause gagal tc kp kode regist
er
link data provider tidak stabil aa 5 1
batere drop ab 7 2
pumping ac 4 3
tc exceed = 0 ad 3 4
motor tidak bekerja ae 4 5
router scada down af 3 6
selepas pekerjaan mcb tidak dinaikkan ag 6 7
frame tc error ah 5
fuse common putus ai 7
gangguang masif provider aj 5
counting rtu stop ak 1
mekanik keras al 4
posisi tuas mekanik tegak lurus am 4
server scada down an 3
lock disable aktif ao 6
minus coil hilang di limit switch ap 4
spt editor down aq 3
ioa tc tidak bersesuaian ar 3
ups selter down as 2
kabel vt acos kendor at 7
ampere motor besar au 4
limit switch bermasalah av 4
modem over heat aw 2
status switch tidak sesuai dengan tank ax 4
konektor batere kendor ay 7
link radio putus saat hujan az 2
modem masih full duplex ba 2
type tc tidak bersesuaian bb 3
scem data unknown bc 4
ioa status tidak bersesuaian bd 3
ats aktif be 6
live load aktif bf 6
operasi 2 protokol bg 3
syn check aktif bh 6
mechanism fail bi 4
interlock minimal ampere open bj 1
rtu error bk 1
lock mekanik aktif bl 4
soket kabel kontrol kendur bm 4
setting database off bn 3
vt satu sisi bo 6
scada server lag bp 3
soket kabel data kendur bq 2
tegangan card charging drop br 7
trip isolated aktif bs 6
hlt aktif bt 6
mcb posisi off bu 6
backbone data putus bv 5
tc harus reset bw 1
rtu
telco
master
mekanik
provider
lainnya
peripheral
BERHASIL
tanggal TOTAL TC BERHASIL GAGAL TC TOTAL TC TC GAGAL TC
CB TC CB CB KEYPOINT KEYPOINT
KEYPOINT
2 1 74 74 0 153 151 2
0 2 7 7 0 47 47 0
3 3 43 43 0 105 102 3
0 4 26 26 0 46 46 0
0 5 38 38 0 87 87 0
0 6 53 53 0 93 93 0
0 7 14 14 0 93 93 0
1 8 60 59 1 113 113 0
0 9 36 36 0 38 38 0
0 10 44 44 0 99 99 0
4 11 18 17 1 107 104 3
0 12 14 14 0 50 50 0
0 13 26 26 0 53 53 0
0 14 38 38 0 96 96 0
1 15 29 29 0 53 52 1
1 16 29 29 0 68 67 1
1 17 35 35 0 84 83 1
0 18 31 31 0 111 111 0
2 19 61 60 1 63 62 1
0 20 18 18 0 61 61 0
3 21 27 26 1 68 66 2
0 22 27 27 0 59 59 0
0 23 10 10 0 40 40 0
0 24 11 11 0 54 54 0
0 25 14 14 0 32 32 0
0 26 25 25 0 46 46 0
1 27 27 27 0 87 86 1
0 28 7 7 0 56 56 0
0 29 4 4 0 51 51 0
1 30 15 15 0 74 73 1
0 31 0 0
TOTAL 861 857 4 2187 2171 16

RESUME

hari dengan gagal tc nihil 20

total gagal tc 20
% keberhasilan tc cb 99.54%
% keberhasilan tc kp 99.27%
% keberhasilan tc total 99.34%

tc fail cb cause of rtu 1


tc fail cb cause of telko 0
tc fail cb cause of master 0
tc fail cb cause of mekanik 0
tc fail cb cause of provider 2
tc fail cb cause of other 0
tc fail cb cause of peripheral 1

tc fail kp cause of rtu 2


tc fail kp cause of telko 0
tc fail kp cause of master 0
tc fail kp cause of mekanik 1
tc fail kp cause of provider 13
tc fail kp cause of other 0
tc fail kp cause of peripheral 0
tanggal cb gagal tc

4/8/2021 19:06 adi sucipto kd


4/11/2021 17:36 dedai
4/19/2021 11:51 rengas
4/21/2021 13:26 binjai
cause kode regis tindak lanju
ter
Fuse common control putus a 7 4/9/2021
link data provider tidak stabil f 5 4/11/2021
rtu out of pool w 1 4/20/2021
backbone data putus u 5 4/21/2021
tindak lanjut

penormalan mcb fuse do


kondisi link normal tc selanjutnya berhasil
pengencangan soket
kondisi backbone normal tc selanjutnya berhasil
list cause gagal tc cb kode regis tanggal
ter
Fuse common control putus a 7 4/1/2021 18:27
socket rele bantu scada kendor b 7 4/1/2021 23:03
kabel common legrand kendur c 7 4/3/2021 9:07
power inverter down d 7 4/3/2021 14:12
spring charge harus diengkol e 4 4/3/2021 16:47
link data provider tidak stabil f 5 4/11/2021 17:33
rele belum di reset g 1 4/11/2021 19:21
do rtu tidak bekerja h 1 4/11/2021 20:17
iec error i 3 4/15/2021 7:43
server scada down j 3 4/16/2021 17:25
router scada down k 3 4/17/2021 10:20
tc exceed = 0 l 3 4/19/2021 18:11
type tc tidak bersesuaian m 3 4/21/2021 16:09
proses pindah link komunikasi main backup n 2 4/21/2021 16:52
dioda bridge kubikel down o 4 4/27/2021 16:06
minus coil putus dirangkaian compartment kubikel p 4 4/30/2021 7:36
frame tc error q 5
rele bantu dilepas r 7
scada server lag s 3
tcs non aktif t 6
backbone data putus u 5
soket fuse common dilepas petugas v 6
rtu out of pool w 1
operasi close dari tombol mekanik bawah x 4
kp gagal tc cause kode register

beduai balkar link data provider tidak stabil aa 5 4/1/2021


kuala tolak tc harus reset bw 1 4/1/2021
mulia tc harus reset bw 1 4/3/2021
kendawangan link data provider tidak stabil aa 5 4/3/2021
sepaok link data provider tidak stabil aa 5 4/3/2021
gonis rabu link data provider tidak stabil aa 5 4/11/2021
melayu link data provider tidak stabil aa 5 4/11/2021
sidas link data provider tidak stabil aa 5 4/11/2021
melayu link data provider tidak stabil aa 5 4/15/2021
pekong duri link data provider tidak stabil aa 5 4/16/2021
kenore link data provider tidak stabil aa 5 4/17/2021
silat link data provider tidak stabil aa 5 4/19/2021
silat backbone data putus bv 5 4/21/2021
yolly backbone data putus bv 5 4/21/2021
marong mechanism fail bi 4
batu tajam link data provider tidak stabil aa 5 4/30/2021
tindak lanjut

kondisi link normal tc selanjutnya berhasil


operasi reset sebelum tc untuk tc selanjutnya
operasi reset sebelum tc untuk tc selanjutnya
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi backbone normal tc selanjutnya berhasil
kondisi backbone normal tc selanjutnya berhasil

kondisi link normal tc selanjutnya berhasil


list cause gagal tc kp kode regist
er
link data provider tidak stabil aa 5 1
batere drop ab 7 2
pumping ac 4 3
tc exceed = 0 ad 3 4
motor tidak bekerja ae 4 5
router scada down af 3 6
selepas pekerjaan mcb tidak dinaikkan ag 6 7
frame tc error ah 5
fuse common putus ai 7
gangguang masif provider aj 5
counting rtu stop ak 1
mekanik keras al 4
posisi tuas mekanik tegak lurus am 4
server scada down an 3
lock disable aktif ao 6
minus coil hilang di limit switch ap 4
spt editor down aq 3
ioa tc tidak bersesuaian ar 3
ups selter down as 2
kabel vt acos kendor at 7
ampere motor besar au 4
limit switch bermasalah av 4
modem over heat aw 2
status switch tidak sesuai dengan tank ax 4
konektor batere kendor ay 7
link radio putus saat hujan az 2
modem masih full duplex ba 2
type tc tidak bersesuaian bb 3
scem data unknown bc 4
ioa status tidak bersesuaian bd 3
ats aktif be 6
live load aktif bf 6
operasi 2 protokol bg 3
syn check aktif bh 6
mechanism fail bi 4
interlock minimal ampere open bj 1
rtu error bk 1
lock mekanik aktif bl 4
soket kabel kontrol kendur bm 4
setting database off bn 3
vt satu sisi bo 6
scada server lag bp 3
soket kabel data kendur bq 2
tegangan card charging drop br 7
trip isolated aktif bs 6
hlt aktif bt 6
mcb posisi off bu 6
backbone data putus bv 5
tc harus reset bw 1
rtu
telco
master
mekanik
provider
lainnya
peripheral
BERHASIL
tanggal TOTAL TC BERHASIL GAGAL TC TOTAL TC TC GAGAL TC
CB TC CB CB KEYPOINT KEYPOINT
KEYPOINT
0 1 14 14 0 31 31 0
1 2 18 17 1 81 81 0
0 3 26 26 0 67 67 0
1 4 25 25 0 119 118 1
1 5 37 37 0 100 99 1
2 6 16 16 0 72 70 2
0 7 3 3 0 24 24 0
0 8 8 8 0 41 41 0
0 9 6 6 0 32 32 0
0 10 16 16 0 61 61 0
0 11 22 22 0 78 78 0
0 12 22 22 0 77 77 0
1 13 18 18 0 37 36 1
0 14 11 11 0 27 27 0
2 15 18 16 2 53 53 0
0 16 10 10 0 45 45 0
0 17 20 20 0 37 37 0
1 18 27 27 0 78 77 1
0 19 19 19 0 57 57 0
1 20 19 19 0 48 47 1
1 21 15 15 0 38 37 1
0 22 35 35 0 79 79 0
2 23 34 34 0 82 80 2
1 24 41 41 0 112 111 1
0 25 20 20 0 66 66 0
0 26 17 17 0 81 81 0
0 27 49 49 0 93 93 0
2 28 35 35 0 110 108 2
0 29 14 14 0 61 61 0
0 30 8 8 0 41 41 0
0 31 17 17 0 63 63 0
TOTAL 640 637 3 1991 1978 13

RESUME

hari dengan gagal tc nihil 19

total gagal tc 16
% keberhasilan tc cb 99.53%
% keberhasilan tc kp 99.35%
% keberhasilan tc total 99.39%

tc fail cb cause of rtu 0


tc fail cb cause of telko 0
tc fail cb cause of master 0
tc fail cb cause of mekanik 0
tc fail cb cause of provider 3
tc fail cb cause of other 0
tc fail cb cause of peripheral 0

tc fail kp cause of rtu 0


tc fail kp cause of telko 0
tc fail kp cause of master 0
tc fail kp cause of mekanik 1
tc fail kp cause of provider 12
tc fail kp cause of other 0
tc fail kp cause of peripheral 0
tanggal cb gagal tc

5/2/2021 19:08 putussibau


5/15/2021 13:45 dedai
5/15/2021 13:40 putussibau

33
cause kode regis tindak lanju
ter
link data provider tidak stabil f 5 5/2/2021
link data provider tidak stabil f 5 5/15/2021
link data provider tidak stabil f 5 5/15/2021
tindak lanjut

kondisi link normal tc selanjutnya berhasil


kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
list cause gagal tc cb kode regis tanggal
ter
Fuse common control putus a 7 5/4/2021 13:25
socket rele bantu scada kendor b 7 5/5/2021 15:15
kabel common legrand kendur c 7 5/6/2021 11:50
power inverter down d 7 5/6/2021 21:23
spring charge harus diengkol e 4 5/13/2021 0:51
link data provider tidak stabil f 5 5/18/2021 17:00
rele belum di reset g 1 5/20/2021 22:20
do rtu tidak bekerja h 1 5/21/2021 12:44
iec error i 3 1/23/2021 10:04
server scada down j 3 1/23/2021 23:21
router scada down k 3 1/24/2021 11:55
tc exceed = 0 l 3 5/28/2021 21:31
type tc tidak bersesuaian m 3 5/28/2021 22:39
proses pindah link komunikasi main backup n 2
dioda bridge kubikel down o 4
minus coil putus dirangkaian compartment kubikel p 4
frame tc error q 5
rele bantu dilepas r 7
scada server lag s 3
tcs non aktif t 6
backbone data putus u 5
soket fuse common dilepas petugas v 6
rtu out of pool w 1
operasi close dari tombol mekanik bawah x 4
kp gagal tc cause kode register

ambangah link data provider tidak stabil aa 5 5/4/2021


pak karta link data provider tidak stabil aa 5 5/5/2021
marong lock mekanik aktif bl 4 5/6/2021
simpang 3 monterado link data provider tidak stabil aa 5 5/6/2021
silat link data provider tidak stabil aa 5 5/13/2021
sungai nangka link data provider tidak stabil aa 5 5/18/2021
silat link data provider tidak stabil aa 5 5/20/2021
silat link data provider tidak stabil aa 5 5/21/2021
segitiga link data provider tidak stabil aa 5 5/23/2021
paoh link data provider tidak stabil aa 5 5/23/2021
paoh link data provider tidak stabil aa 5 5/24/2021
silat link data provider tidak stabil aa 5 5/28/2021
pemahan link data provider tidak stabil aa 5 5/28/2021
tindak lanjut

kondisi link normal tc selanjutnya berhasil


kondisi link normal tc selanjutnya berhasil
penormalan posisi tuas lock mekanik
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
list cause gagal tc kp kode regist
er
link data provider tidak stabil aa 5 1
batere drop ab 7 2
pumping ac 4 3
tc exceed = 0 ad 3 4
motor tidak bekerja ae 4 5
router scada down af 3 6
selepas pekerjaan mcb tidak dinaikkan ag 6 7
frame tc error ah 5
fuse common putus ai 7
gangguang masif provider aj 5
counting rtu stop ak 1
mekanik keras al 4
posisi tuas mekanik tegak lurus am 4
server scada down an 3
lock disable aktif ao 6
minus coil hilang di limit switch ap 4
spt editor down aq 3
ioa tc tidak bersesuaian ar 3
ups selter down as 2
kabel vt acos kendor at 7
ampere motor besar au 4
limit switch bermasalah av 4
modem over heat aw 2
status switch tidak sesuai dengan tank ax 4
konektor batere kendor ay 7
link radio putus saat hujan az 2
modem masih full duplex ba 2
type tc tidak bersesuaian bb 3
scem data unknown bc 4
ioa status tidak bersesuaian bd 3
ats aktif be 6
live load aktif bf 6
operasi 2 protokol bg 3
syn check aktif bh 6
mechanism fail bi 4
interlock minimal ampere open bj 1
rtu error bk 1
lock mekanik aktif bl 4
soket kabel kontrol kendur bm 4
setting database off bn 3
vt satu sisi bo 6
scada server lag bp 3
soket kabel data kendur bq 2
tegangan card charging drop br 7
trip isolated aktif bs 6
hlt aktif bt 6
mcb posisi off bu 6
backbone data putus bv 5
tc harus reset bw 1
rtu
telco
master
mekanik
provider
lainnya
peripheral
BERHASIL
tanggal TOTAL TC BERHASIL GAGAL TC TOTAL TC TC GAGAL TC
CB TC CB CB KEYPOINT KEYPOINT
KEYPOINT
0 1 6 6 0 48 48 0
0 2 32 32 0 88 88 0
0 3 34 34 0 68 68 0
1 4 11 11 0 92 91 1
0 5 15 15 0 78 78 0
2 6 25 25 0 73 71 2
1 7 43 43 0 125 124 1
1 8 31 31 0 91 90 1
1 9 67 67 0 112 111 1
0 10 44 44 0 96 96 0
2 11 22 21 1 81 80 1
0 12 54 54 0 94 94 0
1 13 24 24 0 82 81 1
0 14 31 31 0 86 86 0
0 15 22 22 0 65 65 0
2 16 31 31 0 89 87 2
0 17 12 12 0 67 67 0
0 18 22 22 0 64 64 0
2 19 39 37 2 82 82 0
0 20 9 9 0 29 29 0
1 21 24 24 0 40 39 1
0 22 33 33 0 80 80 0
0 23 19 19 0 97 97 0
0 24 15 15 0 61 61 0
0 25 8 8 0 24 24 0
1 26 13 13 0 74 73 1
1 27 7 7 0 56 55 1
0 28 22 22 0 63 63 0
1 29 11 11 0 64 63 1
1 30 7 7 0 61 60 1
0 31 0 0
TOTAL 733 730 3 2230 2215 15

RESUME

hari dengan gagal tc nihil 17

total gagal tc 18
% keberhasilan tc cb 99.59%
% keberhasilan tc kp 99.33%
% keberhasilan tc total 99.39%

tc fail cb cause of rtu 0


tc fail cb cause of telko 0
tc fail cb cause of master 2
tc fail cb cause of mekanik 0
tc fail cb cause of provider 1
tc fail cb cause of other 0
tc fail cb cause of peripheral 0

tc fail kp cause of rtu 1


tc fail kp cause of telko 0
tc fail kp cause of master 0
tc fail kp cause of mekanik 1
tc fail kp cause of provider 11
tc fail kp cause of other 0
tc fail kp cause of peripheral 2
tanggal cb gagal tc

6/11/2021 20:15 putussibau


6/19/2021 12:20 pawan 8
6/19/2021 12:27 pawan 10
cause kode regis tindak lanju
ter
link data provider tidak stabil f 5 6/11/2021
server scada down j 3 6/19/2021
server scada down j 3 6/19/2021
tindak lanjut

kondisi link normal tc selanjutnya berhasil


restart server vspe
restart server vspe
list cause gagal tc cb kode regis tanggal
ter
Fuse common control putus a 7 6/4/2021 15:58
socket rele bantu scada kendor b 7 6/6/2021 6:07
kabel common legrand kendur c 7 6/6/2021 11:12
power inverter down d 7 6/7/2021 16:31
spring charge harus diengkol e 4 6/8/2021 18:10
link data provider tidak stabil f 5 6/9/2021 15:25
rele belum di reset g 1 6/11/2021 19:28
do rtu tidak bekerja h 1 6/13/2021 22:36
iec error i 3 6/16/2021 18:19
server scada down j 3 6/16/2021 23:27
router scada down k 3 6/21/2021 22:31
tc exceed = 0 l 3 6/26/2021 14:16
type tc tidak bersesuaian m 3 6/27/2021 21:36
proses pindah link komunikasi main backup n 2 6/29/2021 17:49
dioda bridge kubikel down o 4 6/30/2021 9:40
minus coil putus dirangkaian compartment kubikel p 4
frame tc error q 5
rele bantu dilepas r 7
scada server lag s 3
tcs non aktif t 6
backbone data putus u 5
soket fuse common dilepas petugas v 6
rtu out of pool w 1
operasi close dari tombol mekanik bawah x 4
kp gagal tc cause kode register

kenore link data provider tidak stabil aa 5 6/4/2021


kenore link data provider tidak stabil aa 5 6/6/2021
jembatan kuning tc harus reset bw 1 6/6/2021
gonis rabu link data provider tidak stabil aa 5 6/7/2021
kuala tolak link data provider tidak stabil aa 5 6/8/2021
beliung link data provider tidak stabil aa 5 6/9/2021
mowilex mechanism fail bi 4 6/11/2021
kalis batere drop ab 7
sasak link data provider tidak stabil aa 5 6/16/2021
parit tengkawang link data provider tidak stabil aa 5 6/16/2021
boro link data provider tidak stabil aa 5 6/21/2021
cuka link data provider tidak stabil aa 5 6/26/2021
kampet link data provider tidak stabil aa 5 6/27/2021
pesaguan link data provider tidak stabil aa 5 6/29/2021
yolly tegangan card charging drop br 7 6/30/2021
tindak lanjut

kondisi link normal tc selanjutnya berhasil


kondisi link normal tc selanjutnya berhasil
tc reset dari scada
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
penormalan posisi tuas mekanik

kondisi link normal tc selanjutnya berhasil


kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
penggantian card psu rtu
list cause gagal tc kp kode regist
er
link data provider tidak stabil aa 5 1
batere drop ab 7 2
pumping ac 4 3
tc exceed = 0 ad 3 4
motor tidak bekerja ae 4 5
router scada down af 3 6
selepas pekerjaan mcb tidak dinaikkan ag 6 7
frame tc error ah 5
fuse common putus ai 7
gangguang masif provider aj 5
counting rtu stop ak 1
mekanik keras al 4
posisi tuas mekanik tegak lurus am 4
server scada down an 3
lock disable aktif ao 6
minus coil hilang di limit switch ap 4
spt editor down aq 3
ioa tc tidak bersesuaian ar 3
ups selter down as 2
kabel vt acos kendor at 7
ampere motor besar au 4
limit switch bermasalah av 4
modem over heat aw 2
status switch tidak sesuai dengan tank ax 4
konektor batere kendor ay 7
link radio putus saat hujan az 2
modem masih full duplex ba 2
type tc tidak bersesuaian bb 3
scem data unknown bc 4
ioa status tidak bersesuaian bd 3
ats aktif be 6
live load aktif bf 6
operasi 2 protokol bg 3
syn check aktif bh 6
mechanism fail bi 4
interlock minimal ampere open bj 1
rtu error bk 1
lock mekanik aktif bl 4
soket kabel kontrol kendur bm 4
setting database off bn 3
vt satu sisi bo 6
scada server lag bp 3
soket kabel data kendur bq 2
tegangan card charging drop br 7
trip isolated aktif bs 6
hlt aktif bt 6
mcb posisi off bu 6
backbone data putus bv 5
tc harus reset bw 1
rtu
telco
master
mekanik
provider
lainnya
peripheral
BERHASIL
tanggal TOTAL TC BERHASIL GAGAL TC TOTAL TC TC GAGAL TC
CB TC CB CB KEYPOINT KEYPOINT
KEYPOINT
2 1 35 35 0 111 109 2
0 2 25 25 0 100 100 0
0 3 14 14 0 72 72 0
0 4 7 7 0 32 32 0
1 5 4 4 0 55 54 1
0 6 24 24 0 67 67 0
0 7 14 14 0 120 120 0
2 8 21 20 1 94 93 1
1 9 18 18 0 88 87 1
0 10 43 43 0 131 131 0
0 11 13 13 0 63 63 0
1 12 12 12 0 63 62 1
0 13 12 12 0 63 63 0
2 14 87 87 0 184 182 2
1 15 44 44 0 101 100 1
0 16 30 30 0 81 81 0
0 17 18 18 0 76 76 0
1 18 29 29 0 57 56 1
0 19 34 34 0 81 81 0
1 20 9 9 0 53 52 1
1 21 7 7 0 49 48 1
1 22 56 56 0 89 88 1
1 23 18 18 0 73 72 1
1 24 26 26 0 86 85 1
0 25 12 12 0 35 35 0
0 26 25 25 0 83 83 0
0 27 24 24 0 103 103 0
2 28 11 11 0 74 72 2
0 29 14 14 0 41 41 0
1 30 21 21 0 39 38 1
0 31 13 13 0 37 37 0
TOTAL 720 719 1 2401 2383 18

RESUME

hari dengan gagal tc nihil 16

total gagal tc 19
% keberhasilan tc cb 99.86%
% keberhasilan tc kp 99.25%
% keberhasilan tc total 99.39%

tc fail cb cause of rtu 0


tc fail cb cause of telko 0
tc fail cb cause of master 0
tc fail cb cause of mekanik 1
tc fail cb cause of provider 0
tc fail cb cause of other 0
tc fail cb cause of peripheral 0

tc fail kp cause of rtu 1


tc fail kp cause of telko 0
tc fail kp cause of master 2
tc fail kp cause of mekanik 2
tc fail kp cause of provider 11
tc fail kp cause of other 0
tc fail kp cause of peripheral 2
tanggal cb gagal tc

7/8/2021 15:01 pemuar


cause kode regis tindak lanju
ter
minus coil putus dirangkaian compartment kubikel p 4
tindak lanjut
list cause gagal tc cb kode regis tanggal
ter
Fuse common control putus a 7 7/1/2021 15:53
socket rele bantu scada kendor b 7 7/1/2021 19:09
kabel common legrand kendur c 7 7/5/2021 23:03
power inverter down d 7 7/8/2021 13:58
spring charge harus diengkol e 4 7/9/2021 12:55
link data provider tidak stabil f 5 7/12/2021 12:07
rele belum di reset g 1 7/14/2021 4:36
do rtu tidak bekerja h 1 7/14/2021 5:19
iec error i 3 7/15/2021 11:22
server scada down j 3 7/18/2021 22:08
router scada down k 3 7/20/2021 22:59
tc exceed = 0 l 3 7/21/2021 0:22
type tc tidak bersesuaian m 3 7/22/2021 20:56
proses pindah link komunikasi main backup n 2 7/23/2021 20:40
dioda bridge kubikel down o 4 7/24/2021 14:42
minus coil putus dirangkaian compartment kubikel p 4 28/07/2021 xx:xx:xx
frame tc error q 5 28/07/2021 xx:xx:xx
rele bantu dilepas r 7 30/07/2021 xx:xx:xx
scada server lag s 3
tcs non aktif t 6
backbone data putus u 5
soket fuse common dilepas petugas v 6
rtu out of pool w 1
operasi close dari tombol mekanik bawah x 4
kp gagal tc cause kode register

sepaok link data provider tidak stabil aa 5 7/1/2021


silat link data provider tidak stabil aa 5 7/1/2021
pemahan link data provider tidak stabil aa 5 7/5/2021
simpang 3 monterado link data provider tidak stabil aa 5 7/8/2021
sebangki link data provider tidak stabil aa 5 7/9/2021
silat link data provider tidak stabil aa 5 7/12/2021
sungai nangka link data provider tidak stabil aa 5 7/14/2021
sungai keran link data provider tidak stabil aa 5 7/14/2021
tanah putih fuse common putus ai 7 7/16/2021
polsek siantan rtu error bk 1 7/18/2021
simpang tae scada server lag bp 3 7/22/2021
asam besar scada server lag bp 3 7/22/2021
camat jelimpo link data provider tidak stabil aa 5 7/22/2021
wanabhakti posisi tuas mekanik tegak lurus am 4 7/22/2021
silat link data provider tidak stabil aa 5 7/24/2021
3w rsud pemangkat limit switch bermasalah av 4
sekadau link data provider tidak stabil aa 5 7/28/2021
kalis batere drop ab 7 7/31/2021
tindak lanjut

kondisi link normal tc selanjutnya berhasil


kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
kondisi link normal tc selanjutnya berhasil
klaim garansi penggantian card control
reset rtu
restart vspe
restart vspe
kondisi link normal tc selanjutnya berhasil
penormalan posisi tuas mekanik
kondisi link normal tc selanjutnya berhasil

kondisi link normal tc selanjutnya berhasil


penggantian batere
list cause gagal tc kp kode regist
er
link data provider tidak stabil aa 5 1
batere drop ab 7 2
pumping ac 4 3
tc exceed = 0 ad 3 4
motor tidak bekerja ae 4 5
router scada down af 3 6
selepas pekerjaan mcb tidak dinaikkan ag 6 7
frame tc error ah 5
fuse common putus ai 7
gangguang masif provider aj 5
counting rtu stop ak 1
mekanik keras al 4
posisi tuas mekanik tegak lurus am 4
server scada down an 3
lock disable aktif ao 6
minus coil hilang di limit switch ap 4
spt editor down aq 3
ioa tc tidak bersesuaian ar 3
ups selter down as 2
kabel vt acos kendor at 7
ampere motor besar au 4
limit switch bermasalah av 4
modem over heat aw 2
status switch tidak sesuai dengan tank ax 4
konektor batere kendor ay 7
link radio putus saat hujan az 2
modem masih full duplex ba 2
type tc tidak bersesuaian bb 3
scem data unknown bc 4
ioa status tidak bersesuaian bd 3
ats aktif be 6
live load aktif bf 6
operasi 2 protokol bg 3
syn check aktif bh 6
mechanism fail bi 4
interlock minimal ampere open bj 1
rtu error bk 1
lock mekanik aktif bl 4
soket kabel kontrol kendur bm 4
setting database off bn 3
vt satu sisi bo 6
scada server lag bp 3
soket kabel data kendur bq 2
tegangan card charging drop br 7
trip isolated aktif bs 6
hlt aktif bt 6
mcb posisi off bu 6
backbone data putus bv 5
tc harus reset bw 1
rtu
telco
master
mekanik
provider
lainnya
peripheral

You might also like